Equipment and Solutions LNG / NG STARVAP TM REGASIFICATION APPLICATIONS

Similar documents
Equipment and Solutions LNG TRANSPORTATION, CARGO HANDLING AND FUELLING APPLICATIONS

ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL

Green FSRU for the future

Design study of ship LNG storage and engine feeding system. Gerasimos Theotokatos NAOME, University of Strathclyde

BOIL-OFF GAS MANAGEMENT LNG TERMINAL TECHNOLOGIES

Development of Efficient, Environmentally Friendly and Flexible Shipboard Regasification Vessel

LCNG-LNG refuelling stations LNG AS A FUEL FOR VEHICLES.

SMALL-SCALE LNG BUNKERING

COMPLETING THE LNG VALUE CHAIN

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

SMALL LNG SOLUTIONS FOR INDONESIA

04 November LNG Ready Capabilities

Floating storage and regasification barges

LIQUEFACTION STORAGE DISTRIBUTION BUNKERING SMALL-SCALE LNG SOLUTIONS

Small Scale LNG From Concept to Reality. Chris Johnson, General Manager, LNG New Markets, Shell

Petronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations

A new re-liquefaction system of MRS-F (Methane Refrigeration System Full re-liquefaction) for LNG Carriers

SAMSUNG Energy Plant: All-in-One Solution for Floating Power Plants with Gas-fired Combined Cycle Gas Turbines

Rosemount Custody Transfer System. Accuracy driven profit

LNG Import Facility Infrastructure Options

TrelleBorg MArINe SYSTeMS Corporate Overview

STANDARD PLANTS FULLY-PACKAGED MODULAR SOLUTIONS

The World First Ever Very Large Ethane Carrier (VLEC)

We will incorporate life cycle strategic partnering to achieve operational efficiency and economically effective programs. Low-Carbon, Low-Cost Energy

Inland Technologies Inc

MLNG DUA DEBOTTLENECKING PROJECT

AN INTEGRATED VIRTUAL PIPELINE SYSTEM Proven Clean Energy Compression technology harmonized to deliver optimal return on investment.

Introduction of Gas Turbine- Powered, LPG Fueled Ship. Byeongyeol Baek Advanced Lead Engineer GE s Marine Solutions March 6 to 7, 2018

NOVEL SCHEME FOR SMALL SCALE LNG PRODUCTION in POLAND. W.H. Isalski

INCREASING THE CAPACITY OF NGL RECOVERY TRAINS. Stéphane MESPOULHES XVI CONVENCIÓN INTERNACIONAL DE GAS Caracas de Mayo de 2004

Hydrogen Recovery by Pressure Swing Adsorption

Natural Gas. and the Liquefaction Process

Evolution of an LNG Terminal: Senboku Terminal of Osaka Gas

DET NORSKE VERITAS TM

Uniflo Fog Reduction Module

Modular air separation plants. Proven technology offering cost and schedule gains.

LIQUEFIED NATURAL GAS- SUPPLY PLANTS

LNG LIQUEFIED NATURAL GAS TECHNOLOGIES

Investor Presentation

LNG BUNKERING. Advancements & Challenges. HHP Summit Jay Gottlieb Houston, TX USA. President Sept 2012 Argent Marine Companies

Ortloff NGL/LPG Recovery, CO2 Separation and Sulfur Recovery Technologies

3456 en / c. 1 to 20 MW Land and offshore applications

ezng Solutions LLC for Maritime Fuel and Transport Nested Liquefied Natural Gas Tank Concept

LNG Small Scale Bunkering & Transport Solutions. Go LNG Study trip to Bergen 18th of May 2017 Managing Director Knut Førland, Liquiline LNG

Eliminate the risks involved in executing complex analytical systems projects.

OIL & GAS DOWNSTREAM ASSET OPTIMISATION AND COMPLIANCE FOR PROCESS INDUSTRIES, STORAGE AND DISTRIBUTION

K-Sim Engine Diesel Electric Dual Fuel Cruise Ferry. Evy Kristine Sæter Product Advisor Engine Room Simulator

Gas - the energy source of the future. Small scale LNG - the regional solution for gas distribution. Oslo 31 May 2013

Marine Vapor Recovery with a Twist

Optimising. the LNG process. The rapidly expanding global LNG industry continues. Projects

Modern Small-Scale LNG Plant Solutions

GREEN SHIPPING SUMMIT 2015 LNG CHAIN: OPPORTUNITIES & LIMITS

Precooling strategies for efficient natural gas liquefaction

Electrical & Automation Services

ATLAS COPCO CONSTRUCTION TECHNIQUE

We deliver gas infrastructure

LNG Facts A Primer. Presentation before US Department of Energy, Office of Fossil Energy, LNG Forums. March 10, Kristi A. R.

NATURAL GAS. photo credit: Tourism BC

LNG Operations: safety issues and procedures. Styliadis, Theodore Koliousis, Ioannis Deparment of Maritime Studies University of Piraeus

Introduction to the Safe Design of LNG, CNG and Hydrogen Refueling Stations

Cryobox-Bio. Biomethane upgrading and liquefaction nano station. & Virtual Pipeline

Marine Transportation of LNG. Intertanko Conference March 29, 2004 Bob Curt Ship Acquisition Manager, QatargasII Development

VANZETTI MULTIPURPOSE LNG REFUELING STATIONS Results of the first operational year: benchmark for a successful network development.

LNG Houston, February 6-7 th, The case for developing a Floating LNG Receiving Terminal on the US East Coast

ENERGY SOLUTIONS FOR THE OIL AND GAS INDUSTRY POWERING THE FUTURE

NEW RECYCLE PROCESS SCHEME FOR HIGH ETHANE RECOVERY NEW PROCESS SCHEME FOR HIGH NGL RECOVERY INTRODUCTION. Abstract PROCESS FUNDAMENTALS

BASED ON EXPERIENCE TGE GAS ENGINEERING EPC EXECUTION OF BOREALIS ETHANE TANK PROJECT

Creating Optimal LNG Storage Solutions. 40 in detail

Mobile Nitrogen Vaporizer Skid

LNG as a marine fuel in BC. West Coast Marine LNG Workshop 26 th June 2012

Liquefied Natural Gas (LNG) for Commercial Applications. David Jaskolski Senior Account Manager Pivotal LNG September 2014

Capturing growth through global systems integration

SMALL SCALE LNG FOR SHIPPING. Go LNG Conference Vilnius, 26th of April 2016 Managing Director Knut Førland, Liquiline LNG

Improving Natural Gas Liquefaction Plant Performance with Process Analyzers

Brazed aluminium heat exchangers (BAHXs), also referred to

Perfect with Pressure

Clean LNG fuel for Black Sea-Danube-Rhine corridor

CO2 Transport via Pipeline and Ship

Refinery and Petrochemical Services. Your First Choice for Industrial Services and Environmental Management

Autogas Series. Regenerative Turbine Coro-Flo Pumps. For LPG High Differential Pressure Applications

FULL-CYCLE GLOBAL ENERGY SOLUTIONS

LNG Technology Session & Panel General Electric Company - All rights reserved

Ballast water management system

Floating LNG: Origins and Future Impact on the LNG Industry

NITROGEN MARINE SYSTEMS

Floating LNG. Solutions. Floating LNG solutions Catalogue TRELLEBORG FLUID HANDLING SOLUTIONS

CUSTOMER SERVICES YOUR PARTNERSHIP WITH THE WORLD LEADER IN INDUSTRIAL GASES

Atlas Copco Solutions. Gas Sector

The case of Poseidon Med, LNG Bunkering Challenges at Port

Gas Processing. Speed. Simplicity. Efficiency Modular Gas Processing Plants

Gas Processing. Speed. Simplicity. Efficiency Modular Gas Processing Plants

LNG PUMPS FOR FLOATING STORAGE AND REGAS UNIT

BASED ON EXPERIENCE TGE GAS ENGINEERING EVOLUTION OF SAFETY DESIGN FOR CRYOGENIC TANKS REVAMP VS. NEW BUILT

OUR EXPERIENCE: BALLAST WATER MANAGEMENT SYSTEM (BWMS) RETROFIT

small to mid-scale LNG solutions LNG-TO-POWER

LNG market update. Surge in LNG supply creates opportunities to open new markets

LNG conversions for marine installations

NORWAY: A Look at Recent LNG Marine Fuel Developments. Dr. Michael Parsons with support from Randolph Helland and Carol Wolosz

Transcription:

Equipment and Solutions LNG / NG STARVAP TM REGASIFICATION APPLICATIONS

THE CRYOSTAR GROUP CRYOSTAR is a cryogenic equipment manufacturer with more than 600 employees including 150 engineers. With its Headquarters located in France, the company operates five production sites and is present worldwide through seven business centers and sixteen business partners. Founded in 1966 the company has over 40 years experience with LNG and has become the world leader for boil-off gas compressors and on-board liquefaction units for LNG Carriers. The company has delivered thousands of cryogenic pumps for liquid hydrocarbon applications (including methane, ethylene, ethane, etc.) SAFETY AND STANDARDS Safety is an integral part of CRYOSTAR s management and manufacturing commitments. For each new development or project, the company performs a risk analysis using approved techniques such as HAZOP (Hazard and Operability) and FMEA (Failure Mode and Effects Analysis). CRYOSTAR s equipment and solutions comply with most stringent machine and safety regulations such as the Pressure Equipment Directive 97/23/CE (Module H and H1) and ATEX. CRYOSTAR engineers continuously innovate with patented solutions for various applications throughout the LNG supply chain such as small scale liquefaction, LNG transportation, LCNG/LNG vehicle refueling stations and LNG bunkering. CRYOSTAR United Kingdom CRYOSTAR Russia FACTORY AND ON-SITE ACCEPTANCE TESTS CRYOSTAR s Headquarters host the world s largest and most sophisticated liquid nitrogen test facility for cryogenic pumps as well as three test facilities dedicated to turbines. CRYOSTAR engineers subject each pump and turbine to a performance test prior to shipment, offering customers guaranteed performance. CRYOSTAR provides commissioning, start-up and support for onboard performance testing for LNG Carrier Regasification unit. CRYOSTAR USA West CRYOSTAR Houston CRYOSTAR France CRYOSTAR Automation CRYOSTAR USA East CRYOSTAR India CRYOSTAR China QUALITY AND ENVIRONMENT CRYOSTAR is ISO 9001-2008 certified. To structure its environmental approach, CRYOSTAR has used the ISO 14001 standard to set up all the organizational and operational processes necessary for an aspiring Environmentally Responsible company. In parallel, CRYO- STAR has applied this approach to Health and Safety through the OHSAS 18001 standard. ISO 9001-2008/ ISO 14001-2004 / OHSAS 18001-2007 quality assurance system. CRYOSTAR Singapore CRYOSTAR Brazil 2

LNG / NG STARVAP TM REGASIFICATION APPLICATIONS City Fleet LNG Station Landfill Digester CSM CBM LNG Bunkering Station Small Town Small Scale Liquefaction Small Scale Liquefaction Pressure Let Down Station Industry Satelite LNG Plant Truck Stop LNG refuelling station Peak Shaving Plant Gas Pipeline LCNG / LNG Station LNG Trailer LNG Feeder LNG Receiving Terminal Ferry LNG Bunkering Barge LNG Carrier LNG Floating Storage and Regasification Unit 3

OVERALL VIEW OF REGASIFICATION BUSINESS Floating LNG regasification is used to meet fast track project natural gas demand peaks or for smaller markets where costly infrastructure is a limitation. A FSRU (Floating Storage and Regasification Unit) is a flexible, cost effective method of supplying natural gas for fast track project peak requirements or as an intermediate solution until the shore-based plant is completed. FSRU s are typically purpose-built based on the design of a regular LNG Carrier, allowing it to still be used as a trading vessel, or by conversion of an existing vessel. Since the first FSRU in 2002, the market has developed from a niche into a more broadly used business model, with more and more players involved. CRYOSTAR has recognised this as a growth market, and in addition to the traditional Cargo Handling and Fuel Gas supply machinery and systems, has developed technology and processes to support this regasification market. 4

LNG / NG STARVAP TM REGASIFICATION APPLICATIONS STARVAP TM PROCESS DEVELOPMENT CRYOSTAR continuously develops new technologies for LNG applications. Regasification has been highlighted as one of the key future markets. In order to demonstrate the technology as well as development and studies of the process control, a scale 1/40 th capacity pilot plant was constructed in our facility to perform this work. Main Characteristics: PILOT PLANT «Flow: 8t/h «Pressure range: 30 to 70 bar «Vaporized Fluid: LN 2 «Heating Medium: Fresh Water «Heating type: Intermediate Propane Loop «Heating Power: 1 MW Experience gained from this Pilot Plant: «Demonstration of Regasification with propane loop «Controlled through a Remote I/O system similar to IAS Integration onboard a ship «Pressures, temperatures, levels, flows were monitored during the test «Trends were recorded for better process analysis & control improvment «Ramp Up/Down, Start/Stop functions were validated Performance target achieved 5

In cooperation with DNV (DET NORSKE VERI- TAS), CRYOSTAR has validated the Propane & Glycol Water Intermediate Loop technology through an A.I.P. (Approval In Principle). This program has resulted in a review of key aspects of the design and equipment, in order to ensure compliance with Class rules. In addition CRYOSTAR has produced a risk analysis in accordance with World Class Safety Requirement. STARVAP TM TECHNOLOGY VALIDATION 6

LNG / NG STARVAP TM REGASIFICATION APPLICATIONS OVERALL SOLUTION FOR LNG VESSEL «One Stop Shop» for a complete integrated solution, from the management of the BOG to the NG Send-Out Header. Flexibility of this concept is based on 250 MMSCFD per train, with additional trains according to requested capacity. The range of operation of each unit is from 20% to 100%. VAPORIZATION REGASIFICATION UNIT To GCU GENSET NG Send-Out Header Vaporization BOG COMPRESSOR Recondenser HP Pumps Train1 Vaporization BOG COMPRESSOR HP Pumps Train2 HP Vent Mast Vaporization HP PUMPS HP Pumps Train3 RECONDENSER MODULE Recondensing is possible during send out operations to handle BOG. Tank 1 Tank 2 Tank 3 Tank 4 VESSEL LNG STORAGE TANK 7

STARVAP TM LNG / C3 PROPANE INTERMEDIATE LOOP Propane as a heating medium, why? «Evaporative pressure between 1 bara and 10 bara for selected temperature range «Not toxic or forbidden by Montreal Protocol like Fluoro compounds. «Highly Flammable (F+) fluids excluded «Propane available on a large scale «Propane does not have any freezing issue «Tolerant of wide sea water temperature range NG OUT LNG IN LNG PUMPS VAPORIZER [PCHE] C3 DRUM SW IN PHE PHE STEAM HEATER [OPT.] SW OUT 8

LNG / NG STARVAP TM REGASIFICATION APPLICATIONS STARVAP TM LNG / GW GLYCOL INTERMEDIATE LOOP Glycol as a heating medium, why? «Non flammable product «Lower safety impact «Widely available Glycol «Flexible operation «Easy to install PCHE = Printed Circuit Heat Exchanger PHE = Plate Heat Exchanger S&T = Shell & Tube Heat Exchanger NG OUT LNG IN LNG PUMPS VAPORIZER [S&T] TRIM HEATER [PCHE] EXPANS. DRUM STEAM HEATER [OPT.] PHE SW IN SW OUT 9

MODULAR DESIGN Packages and Modules for Regasification & Liquefaction are delivered to our Clients. These packages are based on in-house know-how which makes CRYOSTAR a world leading company. In order to comply with the demanding constraints of the modern day market, we have dedicated our resources to develop a top notch modularization strategy, simplifying installation activities and decreasing construction cost and time for Client. Multi Skid Propane Plant 10

LNG / NG STARVAP TM REGASIFICATION APPLICATIONS BENEFITS OF MODULAR DESIGN CRYOSTAR has selected worldwide partners able to manufacture modules close to Shipyard. Benefits of Modularization: «Pre-engineered process solutions and a modularized design approach to accomplish shortest delivery time with minimum on-site construction. «Applying toolbox approach to ease module customization while maintaining the benefits of standardization. The idea of StarVap TM is to standardize and optimize a regasification LNG / NG Off-Shore Unit based on a wide set of process variations. This Process Toolbox is designed to cover about 90% of real-life boundary conditions, with the following major benefits: «Safety as for world class LNG (QRA, HAZOP codes & standards) «Fast-track time schedule (reduction by up to 2 months) «Reduction of CAPEX «Highly efficient process, easy to operate (lowest OPEX) «Modularized units for process and main pipe racks Prefabricated Recondenser Module LOWER CAPEX «LOWER OPEX «EASY INSTALLATION 11

ONE SINGLE REGAS MODULE CRYOSTAR is able to develop a tailor-made solution for retrofit of LNG Carrier with One Single Module integrating the capacity of several train and recondenser. Our Clients turn to CRYOSTAR for modular construction solutions when building offshore facilities. These projects are often in challenging locations and require innovative execution approaches. In breaking new ground in modular construction, CRYOSTAR has developed sophisticated methods of identifying modules, developing module specification packages, auditing fabricators design, conducting inspections, planning and coordinating transportation of the modules at the project shipyard. Overall Dimension Max. 26 m x 16 m x 12 m 1 2 3 12 Trunk deck module

LNG / NG STARVAP TM REGASIFICATION APPLICATIONS DE-RATING & STEAM MAKE-UP HEATING Cryostar can produce specific curves like de-rating tools and steam heating system requirement in case of sea water condition evolution. DE RATING TOOLS ABOVE TEMPERATURE SPECIFICATION Send-out Temperature ( C) 8 STEAM HEATING SYSTEM REQUIREMENT Heater Capacity (%) 100 7 Design Point 80 6 BELOW TEMPERATURE SPECIFICATION 5 4 3 OPEN LOOP (Steam Heaters Off) COMBINED LOOP CLOSED LOOP (Sea Water heaters off) 60 40 20 70% 72% 74% 76% 78% 80% 82% 84% 86% 88% 90% 92% 94% 96% 98% 100% Train Capacity (%) Sea Water temperature ( C) 15 14 13 12 2 25 20 15 10 5 0 Sea Water Inlet temperature ( C) Steam Heaters SW Heaters 0 13

BOG RECONDENSER The BOG Recondenser is able to treat all or part of the vapour from the BOG compressors, with the recovered liquid added to the feed for the HP booster pumps. The Recondenser consists of a vertical vessel containing a number of packed screen elements. The BOG and part of the send-out liquid are introduced to the vessel, and through a direct contact reaction, perform the recondensing function. Control is simple and stable operation can be managed automatically. The Recondenser can be isolated from the system during maintenance, while the surplus BOG treated by the vessel s GCU without affecting the vessel s send-out capability. 14

LNG / NG STARVAP TM REGASIFICATION APPLICATIONS Caring for your equipment for 40 years Since the production of equipment began in 1967, CRYOSTAR has always emphasised the need to support the end-user for the life of the equipment. In the world of marine applications, the reliability and efficient operation of the equipment is mission critical. This is why CRYO- STAR allocates each vessel to a single point of contact for most efficient servicing, parts supply and technical back-up. Many end-users benefit from our maintenance agreements when it comes to dry-dock servicing. Dedicated spare part kits ensure that no critical parts are missing during this time-pressured period off-hire. Routine and major servicing can be handled by our large team of technical experts anywhere in the world. Unplanned maintenance interventions are always a challenge, with the vessel presenting a moving target. It requires skill, patience and immense co-operation to achieve seamless service under these circumstances. CRYOSTAR s service team is geographically distributed, affording quick reaction times wherever you may be, and the 24h service line means that you are guaranteed a response. Most equipment only needs servicing at 5 and 10 year intervals, so it is key that the organisation is well planned and our team is always ready to work with you to define a course of action. 15

BRAZIL CHINA FRANCE INDIA RUSSIA SINGAPORE UK USA For contact and address of CRYOSTAR locations worldwide, please go to www.cryostar.com/locations www.cryostar.com CRYOSTAR - all rights reserved