Innovations for the Global LNG Industry Bringing Continents of Energy Together Marine Technology Society March 22, 2007

Similar documents
On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

The Adoption of FSRU For Cost-effective LNG Import Solution

Excelerate Energy: Efficient And Cost-Effective Solutions for the Global Gas Market

FSRUs: Accommodating Emerging Markets Gas and Power Needs

LNG Import Facility Infrastructure Options

Woodfibre LNG Limited Response to SIGTTO LNG Ports and Risk Reduction Options

Ship to Ship Transfer (POAC/Superintendent) for Liquefied Natural Gas and Liquefied Petroleum Gas (LNG or LPG) (3 days) (OCIMF)

OLT Offshore LNG Toscana Alessandro Fino CEO

PART 3 TERMINAL INFORMATION

THE TRANSFER OF LNG IN OFFSHORE CONDITIONS. SAME SONG NEW SOUND

Development of Efficient, Environmentally Friendly and Flexible Shipboard Regasification Vessel

B.C. TOWBOAT INDUSTRY CONFERENCE

LNG Facts A Primer. Presentation before US Department of Energy, Office of Fossil Energy, LNG Forums. March 10, Kristi A. R.

Liquefied Natural Gas: What Is LNG? And What Is Proposed for California?

Ship to Ship Transfer POAC/ Superintendent Crude Oil, Chemicals and Petroleum Products (Bulk Liquids) 3 days

LNG Supply Options. Report for Comisión de Regulación de Energía y Gas, CREG. David Ledesma. 19 th April South- Court for CREGVF 1

ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL

Air Products Supports Large U.S. Energy Producer Restart LNG Terminal

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

Need For The Project

Why LNG? LNG is mainly produced for transportation purposes. More economical to transport gas as LNG compared to pipelines over long distances

LNG PUMPS FOR FLOATING STORAGE AND REGAS UNIT

FALCONARA OIL TERMINALS INFORMATIONS = API REFINERY = S.P.M. abt 8 miles

6th Annual LNG Transport Handling & Storage 2016 Forum. FSRU as The Pivotal Point for Effective LNG Distribution

Gorgon Project Update: Selected Images

CHAPTER 3: GENERAL DESCRIPTION OF THE PROPOSED COEGA INTEGRATED POWER PROJECT

SUEZ LNG NA: A Leading Player in the U.S. LNG Market. Clay Harris, CEO of SUEZ LNG NA LLC May 30,2007

Who is WesPac Midstream?

LNG market developments. 12 th of February 2015 Jonathan Raes development EXMAR LNG Infrastructure

DECLARATION OF INSPECTION

SAFETY BENEFITS 18. Tide-independence 18 Rapid ballasting 19 Integrated hydraulic Ro-Ro ramps 20 Safety features, the future and engineering 22

LNG SAFETY AND SECURITY

SAMSUNG Energy Plant: All-in-One Solution for Floating Power Plants with Gas-fired Combined Cycle Gas Turbines

ENERGY. Responding to the Upstream Boom

Enabling safe and reliable offshore LNG transfer operations By Vincent Lagarrigue, Marketing & Project Manager within Trelleborg Industrial Solutions

LNG Operations: safety issues and procedures. Styliadis, Theodore Koliousis, Ioannis Deparment of Maritime Studies University of Piraeus

ZEEBRUGGE LNG TERMINAL: FROM REGAS TERMINAL TO VERITABLE LNG HUB IN NORTH-WESTERN EUROPE

CITGO PETROLEUM CORPORATION CORPUS CHRISTI MARINE FACILITY REGULATIONS FOR VESSELS

The Technical & Practical challenges of FLNG

An Integrated Framework for the Analysis of New Technology Selection for an Application to the LNG Industry

Braemar Technical Services

Green FSRU for the future

FIELD PERSONNEL 24 HOUR SUPPORT SPECIALIZED DREDGING, EXCAVATION & RECOVERY

Gas Access To Europe

Ministry of Energy and Water Government of Lebanon

AES CORPORATION. LNG Review. Aaron Samson Director, LNG Projects

TrelleBorg MArINe SYSTeMS Corporate Overview

DESIGNING AND IMPLEMENTING INFORMATION MANAGEMENT SYSTEMS FOR LNG RECEIVING TERMINALS

GRAIN LNG Challenges & benefits for the deployment of LNG in ports. October 2017 BPA Conference, Poole, UK

The Impact of Recent Hurricanes on U.S. Gas Markets for the Upcoming Winter

LNG Houston, February 6-7 th, The case for developing a Floating LNG Receiving Terminal on the US East Coast

Summary of PTTGC Oil Spill Incident and Execution

1) 2) 3) 4) 5) The oil and gas cycle. Life cycle of oil and gas (time) Potential requirement on ground

Toronto, ON September 27, Natural Gas Update. Presentation to: Northeast Power Coordinating Council (NPCC) General Meeting

Natural Gas Market Update

SMALL-SCALE LNG BUNKERING

MARKET DRIVERS AND FLOATING LNG REGAS PROJECTS. John D White, Partner, Baker Botts L.L.P.

Petronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations

REVIEW OF ISO-NE OPERATIONAL FUEL SECURITY ANALYSIS

Regasification N. Atlantic

INNOVATIVE MARINE TERMINAL CONFIGURATIONS

ELIGIBILITY CRITERIA FOR QUALIFICATION OF EPC CONTRACTORS FOR LNG TERMINAL AT GANGAVARAM, VISAKHAPATNAM, ANDHRA PRADESH (INDIA)

V International Seminar on Port Engineering, Concepción, Chile. Site Selection & Design of Marine Terminals

Algonquin Gas Quality Technical Conference August 21, 2007 Weaver s Cove Energy

Floating LNG: Origins and Future Impact on the LNG Industry

Distribution Restriction Statement Approved for public release; distribution is unlimited.

RE: Federal Docket #USCG Comments on Liberty LNG s Port Ambrose Deepwater Port License Application Draft Environmental Impact Statement.

Comparative Analysis of Incumbent and Emerging Liquefied Natural Gas Regasification Technologies

ASX/MEDIA RELEASE 23 APRIL 2015 MAGNOLIA LNG PROJECT TOLLING AGREEMENT UPDATE WITH MERIDIAN LNG

SHAPING THE NATURAL GAS MARKET OF CYPRUS

HOUSTON OFFICE 2401 Fountain View, Suite 510 Houston, Texas Tel:

LNG as a Marine Fuel. Cliff Gladstein President Gladstein, Neandross & Associates

COMPLETING THE LNG VALUE CHAIN

DOWNSTREAM PETROLEUM 2017 DOWNSTREAM PETROLEUM

Immediate & Future LNG Opportunities in the Midstream; Reviewing Innovative

LNG as a marine fuel in BC. West Coast Marine LNG Workshop 26 th June 2012

LIQUEFIED NATURAL GAS- SUPPLY PLANTS

OUR CONVERSATION TODAY

Strainstall Middle East L.L.C. INTRODUCTION Strainstall M.E. L.L.C. Corporate Profile OIL & GAS/ENERGY

Marginal Field Production Vessel The Solution For Marginal Fields & Early Production!

Paul F. Richardson-Short-Sea Shipping Session. Marine Board Spring Meeting-May Short-Sea Shipping.

Avoiding the Disconnect

Update on Energy, Projects, & Infrastructure Investments Jarl Pedersen Chief Commercial Officer

LNG Terminal Equipment. Juan Manuel Martín Ordax

Energy Reliability, Extreme Events & Sustainability A L I S O N S I L V E R S T E I M A C. C O M

FLOATING LNG OVERVIEW

PO Box 103 Fremont Center, NY RE: Res

In this reprint from World Pipelines April 2015, Land & Marine. highlights its recent and current projects and announces the

Pre-Winter Briefing Northeast Gas Association

About Cortland in Australia

3 rd LNG SUPPLY, STORAGE AND TRANSPORTATION PHILLIPINES FORUM 2016 SMX AURA, MANILA

Floating storage and regasification barges

REQUEST FOR INFORMATION (RFI) ON COMMERCIAL SOLUTIONS FOR REFUELLING OF NAVAL SHIPS AT SEA DURING EU MARITIME OPERATIONS

About Cortland in Australia

ALASKA STAND ALONE GAS PIPELINE /ASAP

Processing LNG Offshore: Maximizing Reliability, Performance & Safety. By Inga Bettina Waldmann at KANFA Aragon FLNG World Congress 28 th June 2016

Providing LNG Supply and Bunkering Solutions. USCG Sector Delaware Bay LNG Bunkering Workshop Margaret Kaigh Doyle

Loading Master for Oil, LNG/Gas and Petrochemical Terminals

LNG AND THE FUTURE AAPA MARINE TERMINAL MANAGEMENT TRAINING PROGRAM ANTHONY CHIARELLO PRESIDENT & CEO TOTE

Transcription:

Innovations for the Global LNG Industry Bringing Continents of Energy Together Marine Technology Society March 22, 2007 Kathleen Eisbrenner President and Chief Executive Officer Excelerate Energy

Excelerate Energy Overview ~ First and only company in the world to develop, construct, and operate an offshore LNG receiving facility ~ First and only company in the world to develop, construct and operate a dockside LNG receiving facility ~ First and only company to complete commercial LNG ship to ship transfer operations Soon. ~ First and only company to develop, construct and operate an offshore LNG receiving terminal on the U.S. East Coast

The Traditional LNG Value Chain Natural Gas Production Liquefaction Plant LNG Shipping Regasification Terminal

The Excelerate LNG Value Chain Natural Gas Production Liquefaction Plant LNG Shipping Regasification Terminal

Energy Bridge Regasification Vessels Provide Natural Gas Delivery in Three Ways Energy Bridge was primarily designed to access markets unreachable by conventional means Energy Bridge Deepwater Port Excelerate GasPort Conventional Land-Based Terminal however, its economics are competitive with a conventional, land-based LNG terminal with added flexibility benefits

Energy Bridge Regasification Vessels Location of the Three Discharge Points Conventional LNG Manifold High Pressure Gas Manifold STL Buoy

Energy Bridge Deepwater Port STL Subsea Buoy System The Energy Bridge system is based on proven technology used for over a decade in the harsh North Sea marine environment Traction Winch Buoy Compartment High Pressure Pumps And Vaporizers Reinforced LNG Storage Tanks Oversized Boiler Energy Bridge Regasification Vessel When not in use, the buoy remains 80 to 100 feet below the surface

Energy Bridge Technology Makes GasPort Possible EBRVs come with a high pressure gas manifold as standard equipment High Pressure Gas Manifold Allows delivery of regasified LNG directly into a gas pipeline installed on the jetty

Excelerate Energy s Current Market Access Network ~ Gulf Gateway deepwater port ~ Commissioned March 2005 ~ 500 mmcf/d baseload ~ 690 mmcf/d peak ~ Northeast Gateway deepwater port ~ In-service December 2007 ~ 400 mmcf/d baseload ~ 800+ mmcf/d peak ~ Teesside GasPort ~ Commissioned February 2007 ~ 400 mmcf/d baseload ~ 600 mmcf/d peak

Long permitting process may hinder development of future LNG projects: Excelerate s Experience ~ The U.S. (Northeast Gateway) ~ Overlapping jurisdiction and responsibilities among Agencies ~ Evolving rules and policies for approving (offshore) projects ~ Results is a lengthy and complex process ~ The UK (Teesside GasPort) ~ Defined jurisdiction and responsibilities among Agencies ~ Established rules and policies for approving projects ~ All parties driven to see project going through very short process Impact to Permitting Timeline: US (Federal = 18 months; State = 4 months; Overall = 22 months) UK (Overall = 3 months) 0 22

Hurricane Rita s s Path Approximately 25 Miles From The Eye Gulf Gateway Source: NOAA

Hurricane Katrina Timeline For Gulf Gateway / EBRV Excellence 8/19 EBRV Excellence arrives at Gulf Gateway & starts the commissioning process 8/25 Hurricane Katrina makes landfall in Florida, expectation is it will trend north 8/26 Hurricane Katrina enters the Gulf of Mexico, strengthening to a Category 5 storm by 8/28 8/28 EBRV Excellence continues operations with 5 to 6 meter sea states and 50 knots winds 8/30 Discharge successfully completed with no interruptions due to weather Source: AccuWeather, Inc.

EXCELSIOR Docked at Teesside GasPort February 12, 2007 ~ Second operational LNG receiving facility in the United Kingdom ~ Site selection to in-service in 12 months ~ Low capital cost, high flexibility asset for LNG impact

Development Timeline Chronology of Teesside GasPort July 2005 December 2005 February 2006 June 2006 August 2006 February 2007 ~ Global price differentials for upcoming winters reveal a market opportunity ~ Excelerate teams with Gas Strategies to identify best sites in UK for GasPort ~ Teesport identified as an ideal location discussion on possible locations ensues ~ Agreement reached with PD Teesport to locate on a disused crude jetty the Excelerate Jetty is born ~ Design work commences-planning application filed ~ EPIC contract executed construction commences ~ Planning permissions received investment to date over 10 million ~ Detailed risk assessments performed with close regulatory coordination ~ First cargo arrival and discharge!

GasPort Offloading Arm Brings It All Ashore ~ High-pressure gas arm capable of accommodating full flows of up to 600 million cubic feet per day (17 mcmd) ~ Designed to accommodate a wide tidal range while Energy Bridge Regasification Vessels are moored at the jetty ~ Quick connect / quick disconnect coupling allows for rapid dry-break separation in an emergency

Latest Innovation

Teesside GasPort Above Ground Installation (AGI)

LNGC Excalibur At Anchor Scapa Flow Ship to Ship Transfer February 8-10, 2007

EBRV Excelsior Mooring Approach Ship to Ship Transfer February 8-10, 2007

EBRV Excelsior Hoses Rigged and Ready Ship to Ship Transfer February 8-10, 2007

Ship to Ship Transfer February 8-10, 2007 Coming Alongside

Mooring With Tugboat Assistance Ship to Ship Transfer February 8-10, 2007

Vessels Alongside On Fenders Excelsior Cooled Down Ship to Ship Transfer February 8-10, 2007

Ship to Ship Transfer February 8-10, 2007 Connecting Hoses

Full Rate Cargo Transfer (5,000 m 3 /hr) Ship to Ship Transfer February 8-10, 2007

Draining and Purging Hoses Ship to Ship Transfer February 8-10, 2007

Vessels Letting Go Mooring Lines Ship to Ship Transfer February 8-10, 2007

Ship to Ship Transfer February 8-10, 2007 Vessels Separated

STS Transfer Scapa Flow Time Log (Hours) ~ Rigging Fenders 1.0 ~ Approach Maneuver 1.9 ~ Mooring 1.9 ~ Pre-Transfer Safety Meeting 1.0 ~ Connecting Hoses 2.5 ~ Hose Purge & Cool Down 4.0 ~ Emergency Shut Down Test 0.7 ~ Cargo Transfer 25.8 ~ Hose Drain and Purge 2.0 ~ Disconnect Hoses 2.0 ~ Letting Go Mooring Lines 0.9 ~ Separate Vessels 0.3 ~ Recover Fenders 1.0 ~ TOTAL STS TRANSFER OPERATION 45.0

To date, Excelerate Energy traded 25 LNG cargoes since early 2005 Loading terminals Discharge terminals

Flexible Cargo History Loaded in Trinidad and Tobago Sts in Scapa Flow 5% discharged via dockside to commission Teesside GasPort 90% discharged as liquid at Cove Point 5% discharged via the buoy at Gulf Gateway

What s s Next

Northeast Gateway

Pakistan GasPort

Implications from the Excelerate Value Chain Excelerate s s Network and Technology Offer Significant Contributions ~ Low capital cost offers inexpensive insurance plan (aprox $50 MM) ) for markets/ suppliers ~ Dramatic reduction in capital concentration reduces risks and some costs ~ Time to In-Service reduced by 75% ~ Multi-point delivery approach mitigates risk, and creates combination of liquidity points and high value market access ~ StS technology breaks LNG logistics paradigm