Client: City of Pontiac Project Name: Regional WWTP Feasibility Location: Pontiac, MI Project Number: Issue Date: October 23, 2006

Similar documents
ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

Air Lift Pumps (Grit Pump) ST-027

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

ENVIRONMENTAL VISITATION CENTER ALEGRIA WWTP

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

Ellis Creek Water Recycling Facility, City of Petaluma

FAIRMONT WASTEWATER TREATMENT PLANT

TABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment

CHAPTER 10 PRELIMINARY TREATMENT

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

City of Staples, Minnesota

APPENDIX E: EXISTING FACILITIES DESCRIPTIONS AND DESIGN CRITERIA

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION

Chapter 2: Description of Treatment Facilities

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

Wastewater Treatment Processes

Liquid Stream Fundamentals: Grit Removal

Need-to-Know Criteria Wastewater Treatment Operator Class III

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv

Need-to-Know Criteria Wastewater Treatment Operator Class II

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017

Sanitary and Environmental Engineering I (4 th Year Civil)

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

Outline. Introduction Case Studies. Anoxic Zone Mixing Channel Mixing. Theory and Criteria. Mixing Theory Design Criteria.

Polishing Ponds. Biosolids Storage. Ammonia Removal. Digesters. Thickeners. Pretreatment. Final Clarifiers. Primary Clarifiers.

OPERATIONS OVERVIEW TABLE 1-1 ANTICIPATED FLOW RATES. Design Flows (mgd)

Lowering The Total Cost Of Operation

Grit Collection & Classification Case Studies

Walker Process Equipment

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E.

Need-to-Know Criteria Wastewater Treatment Operator Class IV

Water and Wastewater Treatment Energy Savings Guide

POTW s As An Emergency Option For Dairy Manure Disposal

Tampa Bay Water (TBW) is a regional

Activated Sludge Process Control:

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

I am writing in response to your request for a Revenue Legal Opinion addressing the Sales Tax on the Wastewater Treatment equipment.

COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL

Appendix D JWPCP Background and NDN

Advanced Wastewater Treatment Plant Plant Profile

CEDAR CREEK Wastewater Treatment Facility

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT

Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY

EVALUATION OF A WASTEWATER TREATMENT FACILITY USING A ROTATING LOW-ENERGY NON-BLOWER AERATOR

Aeration University Advanced Concepts in Energy Efficiency

WWETCO FlexFilter and Bio-FlexFilter

WWTF Capacity Assessment Project

Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant


Tour of Regional Water Reclamation Facility

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati

ISAM INTEGRATED SURGE ANOXIC MIX

LAKESIDE Water Purification Since Bulletin #1218 Revised June Spiravac Clarifier. Peripheral Feed Center Takeoff Suction Sludge Removal

BILFINGER WATER TECHNOLOGIES SOLUTIONS FOR INLET WORKS / HEADWORKS OUR BRANDS FOR RELIABLE TECHNOLOGIES: PASSAVANT JOHNSON SCREENS NOGGERATH GEIGER

OPERATION AND MANAGEMENT OF WASTEWATER TREATMENT PLANTS

Primary Clarifier Odor Control Replacing Nitrates with D.O. Kevin Jacobs, P.E. ECO Oxygen Technologies

Figure 6.3 STORAGE BASIN AREA OF INFLUENCE INTEGRATED WASTEWATER MASTER PLAN CITY OF SAN MATEO. sm0914f ai

A NEW METHOD FOR EVALUATING PRIMARY CLARIFIERS Alex Ekster and Cristina Pena San Jose/Santa Clara Water Pollution Control Plant City of San Jose

Water Treatment Math

AQUAROBIC MINI-PLANT TM

Alexandria Sewage Lagoon Treatment Facility Municipal Class C Environmental Assessment Public Information Centre #2 Welcome!

Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project

Wastewater Treatment - Energy Saving Opportunity

IMPROVED BIO-TOWER TECHNOLOGY MUNICIPAL SEWAGE TREATMENT

GRIT HAPPENS: KNOW HOW TO DEAL WITH IT

Watertown Wastewater Facility Plan. August 11, 2015

November 28, Dear Mr. Bechtold:

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Definition separation of unstable and destabilized suspended solids from a suspension by the force of gravity

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant

CITY OF ALBANY BIOSOLIDS MANAGEMENT PROGRAM DEQ/EPA ANNUAL REPORT 2009

Eco-Efficient Solids Separation

Hillsdale Wastewater Treatment Plant

Conceptual Design for a Future Wastewater Treatment Plant

9-1. Wet-weather high-speed wastewater filtration system

- 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants. by Glenn Thesing

Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest

Lagoons Operation and Management in New Brunswick

Startup of Virginia's Newest Organics Co-Digestion Facility. Dennis Clough, Energy Systems Group George Bevington, Gerhardt, LLC

Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc.

Economics, Design, and Operation of Sewage-Treatment Plants W. E. Ross

Domestic Waste Water (Sewage): Collection, Treatment & Disposal

Coupling Trickling Filter or RBC s with Activated Sludge

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY

Startup and Performance of the World s first Large Scale Primary Dissolved Air Floatation Clarifier ABSTRACT KEYWORDS INTRODUCTION

INFORMATION TO CONSULTANTS for. (C3) RFP E CBJ Biosolids Belt Dryer System. 155 South Seward Street Juneau, Alaska 99801

Separations Overview TDRL Seminar

Aqua MSBR MODIFIED SEQUENCING BATCH REACTOR

Module 22 : Sludge Management

REHABILITATION AND OPTIMIZATION OF ANAEROBIC DIGESTION MIXING SYSTEMS

Wastewater Treatment Works... The Basics

Screening, Definition: The unit involved is called a screen.

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT

Transcription:

Client: City of Pontiac Project Name: Regional WWTP Feasibility Location: Pontiac, MI Project Number: 13649553 Issue Date: October 23, 2006 Subject: WWTP Condition Assessment Auburn Plant 1. Grit Removal: Description of Unit: Aerated grit chamber No. of Units: Two Dimensions: 30 x 20 x 15 SWD each Grit Volume: Normal: Removal: <1.5 cy/mo Clamshell bucket Comments: 2-120 cfm positive displacement blowers provide aeration Blowers are located in Screen Bldg. Generally in good condition, but will require periodic diffuser replacement (every 5-7 years) and regular blower maintenance. Aerated Grit Chamber Grit Blowers 34555 West 12 Mile Road Farmington Hills, MI 48331-5627 T: 248.553.9449 F: 248.553.9571 www.urscorp.com

Page 2 2. Screening: Mechanical Bar Screens: No. of Units: Two Name/ID: Dorr Oliver Bar Screen Width (in.): 72-in. Bar Spacing (in. O.C.): 3/4-in. Within Building?: Yes Heated?: Yes Description of Operation/Control: Timer and headloss Units are nearing the end of useful life, but are currently functional. Consider replacing with units with ¼-in. openings for more efficient removal. Mechanical Bar Screens Manually-Cleaned Bar Rack: No. of Units: Two Width (in.): 90-in. Bar Spacing (in.) 1-in. Within Building?: Yes Heated?: Yes Description of Operation: Manually raked currently functional. Unit is nearing the end of useful life, but is Screenings Volume: Normal: Disposal Method: 5 cy/wk. Rolling carts

Page 3 3. Primary Clarifiers: Number: Four Name/ID: #1 & #2 (old), #3 & #4 (new) Surface Dimensions: 80-ft. dia. Water Depth (shallowest) (ft.): 10 (new), 8.5 (old) Water Depth (deepest) (ft.): 13.17 (new), (?) (old) Weir Location: Peripheral Weir Length (ft.): 251 Total Surface Area (sf): 5,026.4 Flow (Design) (mgd): 16.9/4 = 4.225 Flow (Operating) (mgd): 6.02/4 = 1.5 Weir Overflow Rate (Design) (gpd/ft): 16,800 Weir Overflow Rate (Operating) (gpd/ft.): 5,996 Surface Settling Rate (Design) (gpd/ft 2 ): 840.5 Surface Settling Rate (Operating) (gpd/ft 2 ): 299.4 Collector Mechanism: Sludge Collection and Treatment: Scum Treatment and Disposal: 2-Dorr Oliver, 2 Westech HP: 1/2 Sludge and scum pumped to anaerobic digester Pumped to anaerobic digester 2 new (1972) primary clarifiers and two old primary clarifiers are old, but serviceable. No problems reported. Drives will need periodic maintenance and replacement. Primary Clarifiers Primary Clarifier

Page 4 4. Aeration Basins: Number: Four, 1N/1S, 2N/2S, 3 & 4 Surface Dimensions: New (1972) 54 x 238 (each for 3 & 4) Old - 36.5 x 209 (each for 1N, 1S, 2N & 2S) Water Depth (ft.): New 14.25, Old 12 Total Volume (cf): 738,876 Flow (Design) (mgd): 16.9 Flow (Operating) (mgd): 6.02 Wastewater Detention Time: (Design) (hrs.): 7.8 Wastewater Detention Time (Operating) (hrs.): 22 BOD 5 Loading (Design) (lb/1000 cf): 8.05 BOD 5 Loading (Operating) (lb/1000 cf): 5.3 Covered? Comments: Old no, New have elevated deck Old basins have diffused aeration system (coarse bubble). New basins have surface aerators (5 per basin) Need concrete repairs. Consider economics of using fine bubble diffused aeration with D.O. control. May need to increase wall height/freeboard for tanks 1 & 2 due to splashing. Aeration Basin #1N Aeration Basin #3 Aeration Basins 1 & 2

Page 5 5. Oxygen Supply: Surface Mechanical Aerators: No. of Units: 10 (5 per Basin) Mfgr.: Eimco HP: 40/17 (2-speed) Old, but serviceable (no reported problems). Consider economics of using diffused aeration system with D.O. control. Diffused Aeration: Blowers: No. of Blowers: 3 elec., 1 gas Mfgr.: Roots Positive displacement HP: 50, 100, 125 Rated Capacity (cfm): 1,300, 2,600, 3,500 and 2,600 (gas) Good condition. Gas-driven blower used continuously. Blowers used for basins 1 and 2 only. 125 HP blower is 2 yrs. Old, 100 HP blower is 5 yrs. Old. Diffusers: Coarse bubble Manufacturer: Unknown \ Diffusers poor. Aerators in good condition, but provide lower oxygen transfer than diffused aeration or newer mechanical aeration technologies. Surface Aerators Aeration Blowers

Page 6 6. Secondary Clarifiers: Number: Two old, Two new Name/ID: 1 & 2 (old), 3 & 4 (new) Surface Dimensions: 90-ft. dia. Water Depth (shallowest) (ft.): 8 (1&2), 13 (3 & 4) Water Depth (deepest) (ft.): 8.5 (1 & 2), 14 (3 & 4) Weir/Launder Location: peripheral double weir Weir Length (ft.): 540 /tank, 2,160 total Total Surface Area (sf): 6,361.5/tank, 25,446 total Total Volume (cf): 85,880/tank, 343,521 total Flow (Design) (mgd): 16.9 Flow (Operating) (mgd): 6.02 Weir Overflow Rate (Design) (gpd/ft): 7,824 Weir Overflow Rate (Operating) (mgd/ft.): 2,787 Surface Settling Rate (Design) (gpd/ft 2 ): 664 Surface Settling Rate (Operating) (gpd/ft 2 ): 236.5 Hydraulic Detention Time (Design)(hrs.): 3.65 Hydraulic Detention Time (Operating)(hrs.) 10.2 Collector Mechanism: 2 Dorr Oliver, 2 Walker Process HP: 1/2 Sludge Collection and Removal: Suction tubes attached to sweep. Sludge returned to aeration tanks or wasted to anaerobic digesters. Wall effect carryover noted. Consider installing Stamford baffles in Clarifiers 3 & 4. Clarifiers 1 & 2 are 8 deep and do not meet current 10-States standards. These should be replaced with deeper clarifiers. Replace mechanisms in remaining clarifiers. Final Clarifier Launder/Weir Final Clarifier

Page 7 7. Tertiary Filtration Number: Four Surface Dimensions: 16 x 48 Rapid Sand Hydraulic Loading Rate (Design) (gpm/ft 2 ): 5.76 Hydraulic Loading Rate (Operating) (gpm/ft 2 ): 2.22 Backwash Tank: Washwater Standpipe: 85 dia. x 11 ft. SWD 46 dia. x 48 SWD Appears to be in good operating condition. No reported problems Tertiary Filters

Page 8 8. Disinfection (Sodium Hypochlorite): Contact Basins(s): Number: Two cells Surface Dimensions: 200 x 20 x 8.5 swd Channel Length to Width Ratio: 10:1 No. of Bends: 1-180 deg. Water Depth (ft.): 8.5 Total Volume (cf): 34,000 each cell, 68,000 total Detention Time (Design) (min.) 43 Detention Time (Operating) (min.) 121 Drain Capability: Pump or Drain Scum Removal Capability: No Comments: 1-10 HP floating aerator in each tank for D.O. control (seldom used). Plant water and scrubber water pumped from effluent end of tank. Changed from chlorine gas to sodium hypochlorite 7-8 years ago. Use sodium bisulfite for dechlorination. Generally in good condition, some concrete repairs needed. Chlorination/Dechlorination Pumps: Number: Two sodium hypochlorite and two sodium bisulfite Sodium Hypochlorite Capacity (gal./hr.): 0-22.5 Sodium Bisulfite Capacity (gal./hr.): 0-3.5 Type of Injection: Metering pumps (Pulsafeeder) Comments: Generally in good condition. Periodic maintenance required. New system installed 7-8 years ago. Good condition Aerator in CCT Chlorine Contact Tank

Page 9 9. Sludge Handling Facilities: Primary Sludge: Description of Pumping Operation: Method of Sludge Volume Measurement: Sampling Location: Sampling Procedure: 2,800 gals., approx. 8X/day Meter on total discharge Pump discharge Multiple grabs for composite Pumps nearing end of useful life (30-40 years old). Existing plunger pumps are not used. Co-thickened sludge is thin. Consider gravity thickener for primary sludge and separate thickening of WAS. Return Sludge: Description of Sludge Movement: Controllable Capacity Ranges: Method of Control: Method of RAS Volume Msmt: Comments: RAS flows by gravity to telescoping valves, then into pit, then to pumps. 2-2.2 MGD with 2 pumps Constant speed Flow meter on sludge withdrawal line Long travel to pump suction. Difficult to automate due to telescoping valves. Old, but serviceable. Pumps will need replacement in near future. Waste Sludge: Description of Waste Procedure: On a timed basis (usually 2 hrs.) Method of WAS Volume Measurement: Flow meter Sampling Location: Discharge line Sampling Procedure: Composite Old, but serviceable. Pumps will need replacement in near future.

Page 10 10. Pumping Equipment Flow Stream Pumped: Primary Sludge Wemco No. of Pumps: 4 HP: 15 Capacity: 75 gpm Head: 50 ft. Two plunger pumps (150 gpm) no longer used. Old, but serviceable. Pumps will need replacement in near future. Two pumps rebuilt in last 10 years. One pump is four years old. Primary Sludge Pumps Flow Stream Pumped: RAS Allis Chalmer Centrifugal No. of Pumps: 10 HP: 2.5 Capacity: 1000 gpm Head: Unknown Old, but serviceable. Pumps will need replacement in near future. Five of 10 pumps rebuilt in last six years. RAS Pumps

Page 11 Flow Stream Pumped: WAS Allis Chalmer Centrifugal No. of Pumps: 3 HP: Unknown Capacity: 220 gpm Head: 25 ft. Old, but serviceable. Pumps will need replacement in near future. Waste and Scum Pumps Flow Stream Pumped: Scum Allis Chalmer Centrifugal No. of Pumps: 2 HP: 3 Capacity: 200 gpm Head: 1 @ 15 ft., 1 @ 25 ft. Old, but serviceable. Pumps will need replacement in near future.

Page 12 Flow Stream Pumped: Secondary Effluent Screw No. of Pumps: 3 Mfgr: US Filter (Passavant) HP: 100 Capacity: 13,000 gpm Head: 20 ft. Old, but serviceable. All three motors rebuilt in last 10 years. Screw Pumps Flow Stream Pumped: Backwash Supply Allis Chalmer Centrifugal No. of Pumps: 1 HP: 100 Capacity: 11,000 gpm Head: 23 ft. Like new Backwash Pumps

Page 13 11. Sludge Treatment (Anaerobic): Digesters: No. of Digesters: 2 (Primary and Secondary) Diameter (ft): 70 Sidewall Depth(ft): Prim. @ 25 ft., Sec. @ 27 ft. Floating Cover? Secondary only Heating: Manufacturer: PFT Capacity (10^6 BTU/hr): 2 @ 750, 1 @ 125 Mixing: Manufacturer: Dorr Oliver Draft Tube No. of Units: 3 @ 7,500 gpm each HP: 7.5 Sampling Ports: 1 Mode of Operation: Raw sludge to digester. Continuous heat, mixing and recirculation. Comments: 2 150 gpm centrifugal recirculation pumps and 1 150 gpm plunger pump for digested sludge In good condition for the age of the equipment. Digesters Digester Boilers

Page 14 12. Dewatering: Type of Unit(s): Belt Filter Press No. of Units: 2 Manufacturer: Ashbrook Model: 2.2 meter Loading Rate (Design)(lb/hr): 1,500 lbs./hr. Cake Solids (Operating)(% solids): 17% Hours of Operation (Design)(hrs/wk): Continuous Hours of Operation (Operating)(hrs/wk): 1 unit - 24 hrs./day, 3 days/wk. Look nearly new Belt Filter Press Belt Filter Press 13. Incineration: No. of Units: 1 Manufacturer: Nichols Diameter: 22 No. of Hearths: 7 Loading Rate (Design)(lb/hr): 16,000 wet lbs./hr or ~2 dry ton.hr. Hours of Operation (Design)(hrs/wk): 24 hrs/day, 7 days/wk. Hours of Operation (Operating)(hrs/wk): 24 hrs/day, 3 days/wk. Serviceable

Page 15 East Boulevard Plant 1. Grit Removal: Description of Unit: Aerated grit chamber No. of Units: Two Dimensions: 30 x 20 x 13 SWD each Grit Volume: Normal: Removal: <5 cy/mo Clamshell bucket Comments: 2-120 cfm positive displacement blowers provide aeration Generally in good condition, but will require periodic diffuser replacement (every 5-7 years) and regular blower maintenance. Grit Chamber Grit Clamshell

Page 16 2. Screening: Mechanical Bar Screens: No. of Units: One Bar Screen Width: 66-in. Bar Spacing (in. O.C.): 3/4-in. Within Building?: Yes Heated?: Yes Description of Operation/Control: Timer and headloss Units are nearing the end of useful life and should be replaced, but are currently functional. Consider replacing with units with ¼-in. openings for more efficient removal. New rack installed in 2006. Mechanical Bar Screen Manually-Cleaned Bar Rack: No. of Units: One Width (in.): 66-in. Bar Spacing (in.) 3/4-in. Within Building?: Yes Heated?: Yes Description of Operation: Mechanically raked Unit is in good condition. Screenings Volume: Normal: Disposal Method: 2.5 cy/wk. Rolling carts

Page 17 3. Primary Clarifiers: Number: Two Surface Dimensions: 100-ft. dia. Water Depth (shallowest) (ft.): 10 (new), 8.5 (old) Water Depth (deepest) (ft.): 14 (new), (?) (old) Weir Location: Peripheral Weir Length (ft.): 314 ea. Total Surface Area (sf): 7,853 ea. Flow (Design) (mgd): 8.6/2 = 4.3 Flow (Operating) (mgd): 3.4/2 = 1.7 Weir Overflow Rate (Design) (gpd/ft): 13,700 Weir Overflow Rate (Operating) (gpd/ft.): 5,415 Surface Settling Rate (Design) (gpd/ft 2 ): 550 Surface Settling Rate (Operating) (gpd/ft 2 ): 216 Collector Mechanism HP: 1/2 Sludge Collection and Treatment: Scum Treatment and Disposal: Sludge and scum pumped to anaerobic digester Pumped to anaerobic digester New (1972) primary clarifier and old (1952) primary clarifier are old, but are beyond expected useful life. Older unit does not meet Ten States Stds. for required depth. Odor and corrosion problems were observed. Consider taking one unit out of service under current flow rate. Drives will need periodic maintenance and replacement. Primary Clarifier Primary Clarifiers

Page 18 4. Aeration Basins: Number: Four Surface Dimensions: 179 x 40 x 11 SWD Total Volume (cf): 315,040 Flow (Design) (mgd): 8.6 Flow (Operating) (mgd): 3.4 Wastewater Detention Time: (Design) (hrs.): 6.6 Wastewater Detention Time (Operating) (hrs.): 16.6 BOD 5 Loading (Design) (lb/1000 cf): 9.5 BOD 5 Loading (Operating) (lb/1000 cf): 10.6 Covered? No Comments: Two of the basins are currently operating as A/O process (anaerobic/oxic). Each A/O basin includes two anaerobic zones (mixers with no aeration, and intermediate baffles (curtains) Need concrete repairs and handrails. Consider economics of using fine bubble diffused aeration with D.O. control. Aeration Basins Anaerobic Zones

Page 19 5. Oxygen Supply: Diffused Aeration: Blowers: No. of Blowers: 3 elec., 1 gas Mfgr.: Roots Positive displacement HP: 60, 100, 125 Rated Capacity (cfm): 1,400, 2,100, 3,500 and 3,500 (gas) Units have exceeded useful life and should be replaced, but are currently serviceable. Gas-driven blower used continuously. Diffusers: Manufacturer: Water Depth: Coarse bubble Unknown 10.3 ft. New diffusers in #2 & #3 tanks in last five years.. Consider economics of changing to fine bubble diffused aeration system. Aeration Blowers Aeration Blower

Page 20 6. Secondary Clarifiers: Number: Four Surface Dimensions: Rectangular - 101 x 33 x 9.5 SWD Weir/Launder Location: End Total Surface Area (sf): 3,333/tank, 13,332 total Total Volume (cf): 31,663/tank, 126,654 total Flow (Design) (mgd): 8.6 Flow (Operating) (mgd): 3.4 Surface Settling Rate (Design) (gpd/ft 2 ): 645 Surface Settling Rate (Operating) (gpd/ft 2 ): 285 Hydraulic Detention Time (Design)(hrs.): 2.65 Hydraulic Detention Time (Operating)(hrs.) 6.69 Collector Mechanism: Sludge Collection and Removal: Chain and Flight HP: Unknown Sludge returned to aeration tanks or wasted to anaerobic digesters. Clarifiers do not meet current 10-States standards for required depth. These should be replaced with deeper clarifiers. Secondary Clarifier Secondary Clarifier Scum Removal

Page 21 7. Sludge Handling Facilities: Primary Sludge: Description of Pumping Operation: Method of Sludge Volume Measurement: Sampling Location: Sampling Procedure: Cycle timer Meter on total discharge Pump discharge Multiple grabs for composite Pumps are at end of useful life (30-40 years old) and should be replaced. Return Sludge: Description of Sludge Movement: Controllable Capacity Ranges: Method of Control: Method of RAS Volume Msmt: Comments: RAS flows by gravity to telescoping valves, then into pit, then to pumps. Unknown Constant speed Flow meter on sludge withdrawal line Difficult to automate due to telescoping valves. Pumps are at end of useful life (30-40 years old) and should be replaced. Waste Sludge: Description of Waste Procedure: On a timed basis (usually 2 hrs.) Method of WAS Volume Measurement: Flow meter Sampling Location: Discharge line Sampling Procedure: Composite Pumps are at end of useful life (30-40 years old) and should be replaced.

Page 22 8. Pumping Equipment Flow Stream Pumped: Primary Sludge Wemco No. of Pumps: 2 HP: 15 Capacity: 150 gpm Head: 50 ft. Flow Stream Pumped: Pumps are at end of useful life (30-40 years old) and should be replaced. S. Primary pump rebuilt in last 5 years. RAS Centrifugal No. of Pumps: 6 Capacity: 4 pumps @ 1000 gpm @ 60 (7.5 HP) 2 pumps @ 600 gpm @ 10 (5 HP) Pumps are at end of useful life (30-40 years old) and should be replaced. Three of six pumps rebuilt in last five years. RAS Pumps Flow Stream Pumped: WAS Centrifugal No. of Pumps: 2 HP: Unknown Capacity: 1 pump @ 150 gpm @ 22 1 pump @ 350 gpm @ 20 Pumps are at end of useful life (30-40 years old) and should be replaced. #1 pump rebuilt in last eight years.

Page 23 9. Sludge Treatment (Anaerobic): Digesters: No. of Digesters: 2 (Primary and Secondary) Diameter (ft): 75 Sidewall Depth(ft): 27 Floating Cover? No Heating: Manufacturer: PFT Capacity (10^6 BTU/hr): 2 @ 750 Mixing: Manufacturer: No. of Units: Mode of Operation: Pearth Multiple Lance gas recirculation 1 @ 150 gpm each Raw sludge to digester. Continuous heat, mixing and recirculation. Comments: 2 150 gpm centrifugal recirculation pumps and 1 150 gpm plunger pump for digested sludge In good condition for the age of the equipment. Digester Mixing System Digester Boilers Digester Cover Digester Cover

Page 24 10. Flow Equalization: Number of Tanks: Capacity: Dimensions: Operation: One 3.5 MG 235 dia. x 14 SWD Flow is routed through the new primary clarifier to the EQ tank. Pumps return the flow to the clarifer as flows recede. Appears to be in good condition. Ozone system for odor control has not been used. EQ Tank (In Background)