B. American Concrete Institute 1. ACI 302, 1R-89 Guide for Concrete Floor and Slab Construction

Similar documents
Custom Polishing Systems

CONCRETE POLISHING SPECIFICATION NEW OR EXISTING CONCRETE

SECTION CONCRETE DUSTPROOFING. A. Section includes: 1. Liquid hardeners to protect horizontal concrete surfaces.

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

SECTION MOISTURE RESISTANT/WATER-PROOF FLOORING ADHESIVE FOR CONCRETE SLABS

International Polished Concrete Institute November 2006 Toll Free (866) Website

DIVISION 3 HEAVY DUTY CONCRETE FLOOR TOPPING SECTION 03340

SECTION EPOXY FLOORING SYSTEMS

Section Polished Concrete Finishing. Vexcon

SECTION RESINOUS FLOORING or SECTION QUARTZ FLOORING

ARDEX GUIDE SPECIFICATION ARDEX K 521 Self-Leveling Concrete Topping with Aggregate Surface

SECTION EPOXY TERRAZZO

CONCRETE & STAINING TECHS SIMPLY WARRANTY

SECTION EPOXY TERRAZZO

ARDEX GUIDE SPECIFICATION

1.1 Related Work Specified in Other Sections (Delete if Not Applicable):

The American Society of Concrete Contractors Concrete Polishing Council SECTION BONDED ABRASIVE POLISHED CONCRETE FLOORS

Broadcast Parking Garage System

RESILIENT FLOORING: Select Step Wood

2018 Flooring Specification - Tile Set Method TECTURA DESIGNS CEMENT TERRAZZO TILES

SECTION CONCRETE. B. ACI 318 Building Code Requirements for Structural Concrete and Commentary

SECTION TERRAZZO FLOOR TILE

RESILIENT FLOORING: Hot and Heavy - Secoya

ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX Products

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS MATERIAL AND PROPERTY STANDARD FOR

Ash Brook Golf Course Scotch Plains, New Jersey

SECTION CAST-IN-PLACE CONCRETE

Frequently Asked Questions (FAQ s) about Concrete Driveways

KOSTER AMERICAN CORPORATION

Florock Seamless Flooring Systems

SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES

ELASTOFLEX ELASTOMERIC TEXTURED ACRYLIC WALL COATING SPECIFICATION

A. Section includes hydraulic-cement-based, polymer-modified, self-leveling underlayment for application below interior floor coverings.

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

Sample Specification Guideline for Installing a Polished Concrete System Using Rapid Set TRU PC SECTION POLISHED CONCRETE TOPPING

for Mortar-Set Concrete Tiling Installations

CSI SECTION MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials

Narrow Modular Pavers (NMP) for Mortar-Set Concrete Tiling Installations

ITEM 421 STRUCTURAL CONCRETE

Part 1 - GENERAL 1.01 DESCRIPTION. Section

A. ASTM C 150 Standard Specification for Portland Cement. B. ASTM C 595 Standard Specification for Blended Hydraulic Cements.

SECTION A. American Society for Testing and Materials (ASTM):

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

Florock Seamless Flooring Systems

ARDEX GUIDE SPECIFICATION ARDEX PC-T POLISHED CONCRETE TOPPING Part of the ULTRAFLOR ARDEX DIAMATIC Polished Concrete System

SECTION RESINOUS MATRIX TERRAZZO FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

MDC MicroTex Eggshell Micro-Textured Ceramic Coating for Walls

Overlays. HCC Deck Overlays. Key Decisions for Concrete Deck Overlays

Tolerances- Section

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE

SECTION CONCRETE PAVING SLABS SET IN MORTAR

RESILIENT PHOTOLUMINESCENT STAIR TREADS

Recommended Specifications For Portland Cement Pervious Pavement

By CTS Cement Manufacturing Corp.

Kolorines Glass Mosaic Tiles Project Specification

Floor Care Solutions. Cost Effective, High Performance and Easy to Use Concrete Treatments

Con-Spec Industries Ltd.

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)

Suggested Specification for Tri-Patch Versatile Concrete Patching Compound

System Specifications

DIVISION 3 - CONCRETE Section Concrete Rehabilitation

A. Section includes surface preparation and the application of high-performance coating systems on the following substrates:

Specifier Notes: Edit the following list as required by the project. List other sections with work directly related to the floor coating.

RENEW ELASTOMERIC ACRYLIC COATING (PAINT GRADE) MANUFACTURERS SPECIFICATION / SECTION

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

A. This Section includes resinous flooring systems with epoxy body coat(s).

***********************************************************************************

CAST IN PLACE TACTILE / DETECTABLE WARNING SURFACE TILES

ARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment

SECTION ARCHITECTURAL SPECIFICATIONS FOR INDOOR WOOD ATHLETIC FLOORING

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

PRODUCT SPECIFICATIONS

Copyright 2018, The Sherwin-Williams Company ISSUED MAY CARB FLUID APPLIED FLOORING FOR CONCRETE THE SHERWIN-WILLIAMS COMPANY

PART 1 - GENERAL. Section Cast-in-Place Concrete 1.3 REFERENCES

Easy to apply Nonflammable Low odor Castable Make excellent materials of construction

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

DECORATIVE EXTERIOR FINISHING

SECTION HYDRAULIC CEMENT UNDERLAYMENT

1.3 Work shall include all reinforcement and accessories necessary to complete installation.

MANUFACTURER S SPECIFICATIONS Section LIME CONCRETE. A. This section describes the requirements for floors and slabs on grade.

SECTION BRICK MASONRY ASSEMBLIES

SECTION COMMON WORK RESULTS FOR CONCRETE SSPECIALTY COATINGS

Chapter 2. Basic practices. Topics. 7 Basic practices. Notes. 2.5 Existing flooring and adhesive residue Job site conditions 8

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

BSS 50 Synthetic Track Surfacing System Specifications

SECTION POLYACRYLATE MODIFIED CEMENTITIOUS TERRAZZO FLOORING

CONNOR Control XT Page 1

ADA APPROVED SURFACE APPLIED DETECTABLE WARNING SYSTEM

SECTION CAST-IN-PLACE CONCRETE FOR UTILITIES

The following specification refers to the Stepstone, Inc. product known as: Steptreads

Narrow Modular Pavers (NMP) for Sand-Set Installations

Rust-Oleum Industrial Brands Specification

MANUFACTURER S (SHORT FORM) SPECIFICATION / SECTION

SUPER-KRETE SPECIFICATION S-1 EXISTING CONCRETE SURFACE PREPARATION SECTIONS ; /19; ;

***************************************************************************************************************

1. CONCRETE SUBFLOORS.SECTION a. Slab Depression: Equal to thickness of selected flooring (6, 8,10,12,13 or 14mm).

Defining polished concrete...

SECTION POLISHED CONCRETE FINISHING (WITH DYE)

Transcription:

SECTION 03360- CONCRETE FINISHES SPECIALIZED TERR-CON FLOORING SYSTEM PART 1-GENERAL 1.01 SUMMARY A. This section includes the following: 1. Standard placement of concrete and Terr-Con Aggregate 2. Grinding of Aggregate/Concrete and Sealing 3. Applying liquid hardener, and polishing concrete to specified finish level. 4. Applying Joint Filler B. Related Work: 1. Section 03300 Cast-in-Place Concrete 2. Section 03390 Concrete Hardening/Sealing 3. Section 07920 Joint filler 4.Section 09410 Portland Cement Terrazzo 1.02 REFERENCES A. American Society for Testing and Materials: 1. ASTM-C779, Standard Test Method for Abrasion Resistance of Horizontal Concrete Surfaces 2. ASTMC805, Impact Strength 3. ASTM G23-81,Ultraviolet Light and Water Spray 4. ASTM 1028,Co-Efficient of Friction 5. ASTM C150 type 1,11 Portland cement conformity, depending on soil conditions 6. ASTM C33 Aggregate conformity B. American Concrete Institute 1. ACI 302, 1R-89 Guide for Concrete Floor and Slab Construction C. Other Test: 1. Reflectivity January 2010

1.03 SUBMITTALS A. Comply with pertinent provisions of Section 01600-Product Requirements 1. Provide submittal information within 35 calendar days after the contractor has received owner s notice to proceed B. Product data: 1.. Submit special concrete finishes manufacturer s specifications, test date and other data required for each type of manufactured material and product indicated. 2. Submit special concrete describing products to be provided, giving Manufacturer s name product name and product line number for the specified material proposed to be provided under this section. 3. Submit special concrete finishes technical data sheet giving descriptive data.,curing time and application requirements. 4. Submit special finishes manufacturer s installation instructions. 5. Follow all special concrete finishes published manufacturer s installation instructions. 1.04 QUALITY ASSURANCE; A. Certified Terr-Con Representatives 1. No exceptions or substitutions allowed. Contact Terr-Con Decorative Concrete Floors, Inc. at TEL:585-509-0736 2. Certified applicators only. a. Use only factory approved and recommended machinery and supplies from Terr-Con Decorative Concrete Floors, Inc. B. Samples 1. Supply samples of completed finish to demonstrate color variation, surface finish, and standard workmanship. 2. Notify Architect or Owner Representative when samples are completed. 3. Obtain approval from Architect or Owner Representative in advance to starting construction. C. Protection of Concrete Surfaces During Construction 1. No satisfactory acidic or chemical cleaning procedure is available to remove stains from the concrete surface. Prevention is essential:

a. All hydraulic powered equipment must be diapered to avoid staining on the Concrete. b. No trade will park vehicles on the slab. If necessary to complete their scope of work, drop cloths need to be placed under vehicles at all times. c. No pipe cutting machines will be used on the slabs. d. Steel will not be placed on slabs to avoid rust staining. D. Pre-installation Conference 1. Conduct Section Project management and Coordination Pre-Construction Conference to include Architect, Owner s Representative, General Contractor, Certified Applicator, Product Representatives to establish guidelines and Expectations for finished work.(timetable, concrete finish, specs. etc) E. Concrete mixture shall be 3000 PSI or higher, non air entrained. 1. Any admixtures, plasticizers, slag, fly ash, or anything taking the place of Portland- based cement should be kept to a minimum 480 lbs cement 2. The cement should be Portland Cement, Type 1 or 11, conforming to ASTM C150 3. Wet cures are the best but, if this cannot be done, use a membrane cure only. Do not us a densifier /hardener type material due to grinding of the floor after 6 days. 4. All mix designs must be approved by Terr-Con Decorative Concrete Floors, Inc. Send all mix designs to Terr-Con Decorative Concrete Floors, Inc. 5. Engineer and Terr-Con Decorative Concrete Floors, Inc. shall determine saw cut griuds 1.05 DELIVERY,STORAGE AND HANDLING A. Deliver materials in original packages sealed with Terr-Con stamps. B. Store materials to comply with Terr-Con written instructions to prevent Deterioration from moisture or any other detrimental effects. C. Dispense special concrete finish material from factory numbered and sealed containers. Maintain record of container numbers. D. Color loads for integral color should never be smaller than 3 cubic yards. E. Use one source for cement, aggregates and pozzolans throughout the job. Monitor and control incoming material consistency. Do not use calcium chloridebased admixtures. Non-chloride admixtures may be used. F. Wash out all drums before loading. Keep slumps consistent. Minimize driveradded water

1.06 PROJECT CONDITIONS A. Environmental limitations: 1. Comply with Terr-Con written instructions for substrate temperature and moisture content, ambient temperature and humidity, ventilation, and other conditions affecting topping performance. 2. Final polish to take place 28 days with supervision of a certified Terr-Con Representative. B. Close areas to traffic during floor application and after application, for time period recommended in writing by manufacturer. 1.07 ALL TERR-CON APPLICATIONS A. Certified installers and Representatives must follow the guidelines of the Terr-Con technical information see 03360 from Terr-Con Decorative Concrete Floors, Inc. No substitutions will be allowed.

PART-2 PRODUCTS 2.01 MATERIALS AND MANUFACTURERS A.. Hardener and Sealer Agent 1. Retro-Plate 99, manufactured by Advanced Floor Products, Inc. P.O.Box 50533,Provo,Utah 84605,801-812-3420 a. Performance Criteria: i. Abrasion Resistance: ASTM C779-Up to 400% increase in abrasion resistance. ii. Impact Strength: ASTM C805-Up to 21% increase impact strength. iii. Ultra Violet Light and Water Spray: ASTM G23-81-No adverse effect to ultra violet and water spray. iv. Co-efficient of Friction: ASTM 1028-all levels of finish exceed OSHA and ADA recommendations. v. Reflectivity: Up to 30% increase in reflectivity. 2. No substitutions allowed C. Terr-Con Aggregate application to be purchased and supplied by certified Terr-Con Representative 585-509-0736 1.No Substitutions Allowed. D. Joint Filler 1. A 100% 2 part,1:1 ratio non-staining Polyurea shall be used for all joints. 2. Joint Filler application should be deferred as long as possible. A. minimum of a 90-day slab cure in ambient temperatures is advisable to allow for maximum slab shrinkage and joint widening. 3. Joints must be filled at 1 ½ for a standard 6 slab. a. Performance Criteria: i. Must reach a Shore A hardness of 75-80 (ASTM D2240) ii. Tensile Strength ASTM D 412-620psi iii. Can set rapidly & consistently in applications ranging from -40 F to 130F iv. Elongation-minimum of 460-500 % 2.02 ACCESSORIES a. Retro Plate Abrasive Disc/or equivalent provided by Advanced Floor Products Inc. P.O. Box 50533, Provo, UT 84605 (801) 812-3420 1. Use size of Abrasive Grit Disc as recommended by the manufacturer. 2. Use application equipment as recommended by the manufacturer. B. Water source.

PART-3 EXECUTION 3.01 ACCEPTABLE INSTALLERS A. Submit certification letter stating that the Retro-Plate applicator was certified by Advanced Floor Products prior the project bid date. B. Application concrete slab and placement of the Terr-Con chips must be installed by Terr-Con Certified Applicator 3.02 WARRANTY a. Submit a 10-year product warranty no later than 45 days after completion of installation of Terr-Con Flooring System 3.03 EXAMINATION A. Site Verification of Conditions: 1. Examine areas and conditions under which Retro-Plate application shall be performed for conditions that will adversely affect execution, performance, or quality of the system application. 2. Correct conditions detrimental to timely and proper execution of Work,. 3. Do not proceed until unsatisfactory conditions have been corrected. 4. Commencement of installation constitutes acceptance of conditions and responsibility for satisfactory performance.. 3.04 PREPARATION A. Verify slab profile requirements in Division 3 Section Cast in Place Concrete. B. Prior to placing of concrete in conjunction with placement of Terr-Con Stone General Contractor is responsible for keeping concrete clean prior to, during and following all substrate Terr -Con applications. C. Protection: 1. Take precautionary treasures to prevent fire hazards and spontaneous combustion. Remove empty containers from Site. 2. Place cotton waste, cloths and hazardous materials in containers and remove from site daily. 3. Provide drop cloths, shields, and other protective equipment. 4. Protect elements surrounding work of this section from damage or disfiguration 5. As work proceeds, promptly remove spilled, splashed, or splattered materials from surfaces. D. Surface Preparation of Sealer:

1. General Requirements: a. Prior to application of Retro-Plate, surface shall be prepared to receive material in compliance with manufacturer s recommendations and specifications. b. Clean surfaces of residual deposits of grease, oil, dirt, and other foreign matter, immediately prior to application. 3.05 APPLICATION A. Apply in strict accordance with Terr-Con Specifications for application utilizing recommended equipment. B. Follow recommended Terr-Con Flooring Procedures C. Applications Must Be Installed by Terr-Con Certified Applicators. D. Application of Retro Plate 1. After 28 days, apply Retro-Plate in compliance with manufacturer s instructions and using application method best suited for obtaining the desired uniform sheen and finish. 2. Employ only application equipment that is clean, properly adjusted, and in good working order, and of type recommended by Advanced Floor Products. 3. Concrete must be in place a minimum of 28 days before application can begin. 4. Application is to take place at least ten days prior to racking and other in-store Accessory installation, thus providing a complete, uninhibited concrete slab for application. 5. Only certified applicators will be used; therefore, complete application procedures are not necessary within this specification. 6. Provide the finish level desired by the owner or architect. Level 1 (Satin), Level 2(semi-gloss) Level 3 (Gloss) E. Achieve water repellency, hardening, dust proofing, and abrasion resistance of the surfaces without changing the natural appearance of the concrete, except for the sheen. 3.06 FIELD QUALITY CONTROL A. Manufacturer s Field Service: 1. The Terr-Con & Retro Plate representative shall be available to provide on-site service, technical assistance, and guidance for application of Terr-Con and Retro- Plate as needed. 3.07 CLEANING A. At completion of day s work, remove from Site rubbish and accumulated materials. B. Leave storage area clean and in same condition indicated for equivalent spaces in Project. 3.08 PROTECTION a. Protect finished work in accordance with manufacturer s recommendations. END OF SPECIFICATION