Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting

Similar documents
Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv

Process Treatment Selection and. Jeff Macomber, P.E. One Water Conference August 28, 2014

Western Carolina University

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Matt Leach, P.E. CH2M. Mark Eppich, P.E. City of Columbus Division of Water. S. Dean Ramsey, P.E. CH2M

St. John the Baptist Parish

Separations Overview TDRL Seminar

Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant

Treatment Facility Condition Assessment

Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY

TOLEDO COLLINS PARK WTP 40 MGD PLANT ADDITION DESIGN CONSIDERATIONS AND CHALLENGES

Innovative Approach to Expanding the Olentangy WTP

PIONEERING PELLET SOFTENING TREATMENT IN PENNSYLVANIA

TABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope

Water Treatment Plant Startup Issues and Considerations

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado

Optimizing the Ballasted Sedimentation Process at the Anacortes Water Treatment Plant Jeff Marrs Plant Manager Greg Pierson - HDR

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

Jungzhina Water Treatment Plant Thimpu, Bhutan

Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc.

Seasonal Source Water Quality and Treatment Challenges Town of Newburgh s Chadwick Lake Filtration Plant

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

Lowering The Total Cost Of Operation

MAKING THE SWITCH FROM LIME TO MEMBRANE SOFTENING: WHEN IS IT THE RIGHT TIME? Introduction

Ferric Sulfate Success Story - OWASA s Switch to Ferric Sulfate Leads to a Reduction in Disinfection Byproducts

Situation Normal. facilities? Can a wastewater treatment plant be retrofit for UV disinfection

Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities

A/E Design Deliverable Checklist

System & Equipment Checkout Procedure Client Name Plant Location

CHAPTER 10 PRELIMINARY TREATMENT

SYSTEMATIC APPROACH TO WATER TREATMENT PLANT PROCESS OPTIMIZATION

Monthly Progress Report. June 2017

Suggested Practices for Fluoride Design

Side by Side Piloting of Process Alternatives Yields Direct Performance Comparison

20-YEAR INFRASTRUCTURE REPLACEMENT PLAN

Drinking Water Production Using Moving Bed Filtration

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

Riverbend Water Resources District Phase 3 Report on Water Treatment Plant and Raw Water Intake Site Selection

A/E Design Deliverable Checklist

Project 1 Treatment Cost. Project 1 Treatment Cost. Project 1 Treatment Cost. Project 1 Treatment Cost. Project 1 Treatment Cost

Advanced Grit Removal Technology

Improved Membrane Design Addresses Integrity Issues for the City of Yuba City Water Treatment Plant

WRF Webcast Biofilter Conversion Guidance Manual

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment

OPERATOR CERTIFICATION EXAMINATION REGISTRATION PA Certification to Operate Water or Wastewater Systems PRINT CLEARLY

Terry Leeds, Director KC Water. February 21, 2017

INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series

COMPARATIVE COSTS. Denver, Colorado. Kelly DiNatale Ci of Westminster Westminster, Colorado. Dorian Brown C i of Broomfield Broomfield, Colorado

Fencing, locks on access manholes, and other necessary precautions shall be provided to prevent trespassing, vandalism, and sabotage.

ATTACHMENT 4: Design Calculations and Construction Details

Tampa Bay Water (TBW) is a regional

Liquid Stream Fundamentals: Grit Removal

DELTA WASTEWATER TREATMENT PLANT UPGRADES

High Performance. Uniform Distribution

Water and Wastewater Impact Fee Analysis Capital Improvement Plan City of Lockhart February 2017

CITY OF VALLEJO FINISHED WATER PUMP STATION ELECTRIFICATION PROJECT PRELIMINARY DESIGN REPORT. FINAL December 2015

Carbon Canyon Water Recycling Facility Title 22 Engineering Report

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

Water Resources Director: Chris Graybeal

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

SAWEA Workshop 2010 Innovative Water and Wastewater Networks Presented by Greg Welch, AECOM

ATTACHMENT A TO THE AGREEMENT FOR ENGINEERING SERVICES. Project: Chloramine Replacement Alternative Evaluation

CENTRIFUGE DECANTER AND HOW IT WORKS

APPENDIX E: EXISTING FACILITIES DESCRIPTIONS AND DESIGN CRITERIA

2018 Proposed Budget PRESENTED TO UTILITIES COMMISSION OCTOBER 2 ND 2017

The Montreal Water Supply*

Air Lift Pumps (Grit Pump) ST-027

Best Practices for Chemical Facility Design in Water Treatment. Sara N. Gibson, P.E.

AIR JAMMER : CUTTING AMD COSTS AT WARWICK MINE ON A LIMITED BUDGET

Water and Wastewater Treatment Energy Savings Guide

November 28, Dear Mr. Bechtold:

DON T WASTE YOUR MONEY

Volume 1 Executive Summary

Startup and Performance of the World s first Large Scale Primary Dissolved Air Floatation Clarifier ABSTRACT KEYWORDS INTRODUCTION

Appendix VIII. Hazen and Sawyer Technical Memorandum: Option 4: Permanent Haw River Intake. and. Supporting Tables Showing Results of OWASA Analysis

CITY OF DAWSON CREEK WATER QUALITY ASSURANCE PLAN

9-1. Wet-weather high-speed wastewater filtration system

for a Better San Francisco Public Utilities Commission Pipe Users Group 2013 Seminar Form

Challenges in Municipal Water Treatment and the MIOX Solution

Notice of Preparation of an Environmental Impact Report and Scoping Meeting

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

The Southwest Florida Water Management

Calculate the Costs of Piping System Elements

Figure 6.3 STORAGE BASIN AREA OF INFLUENCE INTEGRATED WASTEWATER MASTER PLAN CITY OF SAN MATEO. sm0914f ai

Need-to-Know Criteria Wastewater Treatment Operator Class III

SERVICES DEPUTY CITY MANAGER I ADMINISTRATIVE SERVICES PUBLIC WORKS ClOY ENGINEER DIRECTOR DIRECTOR PROJECT & CONSTRUCTION ENGINEERING

Current Circumstance of Ballast Water Management System

Water Treatment Overview. Gabe Sasser December 2016

Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY

DW Module 21: Chemical Addition Answer Key- Revised Oct 2015

Transcription:

Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting October 12, 2017

Water Treatment Plant Phase 1 Upgrades 22 mgd WTP Expand capacity to 32 mgd Upgrades to most processes Only minor improvements to ozone, PI, and lagoon

Facility Expansion Site Layout

Raw Water Intake Intake screens will require repair or replacement to resolve recent failures Hazen conducting further investigations Construction may require temporary pumping systems and cofferdams around the screens

Raw Water Pump Station Upsize intake piping and pump discharge header to 42-inch Raw Water Pumps Impeller retrofit - No. 1, 3, and 4 Replace Motor - No. 4 Install vortex suppression Install parallel RW pipelines to PI and bypass to WTP ~2,000 ft of 30-inch ~1,600 ft of 48-inch (PI to Rapid Mix)

Modifications to Existing PI Raise outlet structure in Pre-Sedimentation Impoundment to expand supply range and provide the ability to draw from a range of water quality zones.

WTP Upgrades Enlarged Plan = Phase 1

Raw Water Contactor = Phase 1 56,000 Gallon Raw Water Contactor Provides sufficient sodium permanganate contact time Designed to accommodate future use as Pre-ozonation contactor

Coagulation and Sedimentation Existing Increase raw water venturi meter and flow control valve size Install finger weirs in the existing sedimentation basins New Train New vertical rapid mix facility (single stage) with parallel basins. 2 basins expandable to 3 in the future New 10-mgd SuperPulsator basin

Coagulation, Flocculation, and Clarification

SuperPulsator

SuperPulsator Sludge Hopper 36 Influent Riser Collection Flume Distribution Flume

Ozone Improvements Replace Gas Flowmeters (GOX meters) Add O 3 monitoring to off-gas to monitor transfer efficiency

Filter Upgrades & Backwash Supply Line 4 new single cell filters (544 sf) Install new BW supply header in filter gallery Backup Backwash Supply Install PRV on backwash line from high service pump header

New Filters

New Filters

New Clearwell Pump Station New facility at NW Corner of WTP site 3 new clearwell pumps drawing from a wet well 54-inch transmission suction piping from new filters to CWPS 36-inch discharge piping from CWPS to Ground Storage Tanks

FW Storage Improvements Modify existing tanks with curtain baffling Install 1 new 3-MG clearwell tank with Inset-C shotcrete baffling New 36-inch yard piping to HS Pump Station New 24-inch Clearwell drain piping

High Service Pump Station Upgrades Finished Water Pumps Impeller retrofit and motor upgrade No. 4 Install vortex suppression Implement suction piping improvements

Improvements to Chemical Bulk Storage Fl Hypo Hypo Hypo 45 38 32 32 Additional Pump for Permanganate Additional Containment for Fluoride

New Chemical Bulk Storage Building ALUM CAUSTIC ORTHO 45 32 32 32 38 / 45 38 32 32 32 32 DECHLOR Chem Unloading Elec Room Mech Room

New Chemical Bulk Storage Building

Improvements to Existing Chemical Feed Larger Capacity Pumps for Caustic Additional Pumps for Hypo

New Pre-Chemical Feed Facility Adjacent to SuperPulsators ALUM CAUSTIC POLYMER

Residuals Management Improvements Construction of parallel 16- inch pipeline to lagoon Improvements to redistribute solids into lagoon Addition of road to lagoon for dewatering equipment access

Architectural Upgrades Break Room: new finishes and casework Lab: Minor changes to layout, new finishes and casework Control Room: modify layout Expand women s restrooms on 1st and 2 nd floor Add Operations Supervisor Office and Storage in Filter Gallery

Electrical Upgrades New electrical power distribution - medium voltage primary loop to new facilities Pre-Chemical Facility Clearwell Pump Station Install 4 th electrical utility transformer Electrical modifications to provide redundancy in key areas

QUESTIONS