1 Situation Normal During a UV Disinfection Retrofit Research has proven ultraviolet (UV) disinfection to be a viable alternative to the chemical disinfection of water and wastewater. New treatment facilities incorporate UV technology in their designs, but what about existing chlorine disinfection facilities? Can a wastewater treatment plant be retrofit for UV disinfection while staying on line and on spec for treatment standards?

2 By Brian M. Balchunas, P.E., and Lawrence H. Hentz, P.E., D.E.E. WASTEWATER TREATMENT The answer is yes at the Patuxent Water Reclamation Facility in Anne Arundel County, Md. A carefully considered construction sequence will keep the facility in operation during its retrofit from chlorine to UV disinfection.construction started in June 2002 and is expected to be complete by summer Moving Towards UV The Patuxent Water Reclamation Facility was designed to treat 6 million gallons per day (mgd) domestic wastewater for discharge to the Little Patuxent River. PBS&J, an environmental science and engineering consulting firm,evaluated plant processes and, in Phase One of the plant upgrade project, proposed minor modifications to increase plant capacity to 7.5 mgd. The construction cost for these changes was approximately $1 million. Next, Anne Arundel County, located south of Baltimore, conducted a study to evaluate the planned expansion of the plant to 9 mgd. Because PBS&J had helped the County rerate the plant to 7.5 mgd, the County was able to delay the overall expansion. A study comparing disinfection alternatives to treat the future 9 mgd capacity was included in Phase Two of the plant upgrade. PBS&J found that chlorine and UV disinfection had comparable present worth costs. While the initial construction cost for a UV disinfection system was higher than the chlorine system, operation and maintenance costs for the UV system were significantly lower over a 20-year period.a new UV disinfection system outscored chlorine disinfection in non-economic factors such as ease of operation, safety, constructibility and maintenance. Ultimately, the UV disinfection system was selected.the key deciding factor was the opportunity to remove most of the stored chlorine from the site.this decision greatly improved site safety and eliminated the need for a Risk Management Plan (RMP) along with mandated training and evacuation planning. The UV disinfection system was designed for 9 mgd average flow with space for additional UV modules for future expansion. Ultraviolet disinfection was chosen over sodium hypochlorite disinfection to eliminate a reliance on chemicals and to reduce operational costs. Other Options Most of Maryland s wastewater treatment facilities are evaluating alternative disinfection technologies. Many choose sodium hypochlorite disinfection to eliminate onsite chlorine gas storage. UV was selected over sodium hypochlorite at the Patuxent plant to eliminate a reliance on chemicals. The only chemical used in UV disinfection is a dilute acid for cleaning tubes. Sodium hypochlorite does not carry the same risk as chlorine gas, but it still can be a dangerous chemical to have on site. Operational costs of a sodium hypochlorite disinfection system also are higher than costs for a UV system. Choosing the Right System A number of UV disinfection products from reliable vendors are available in today s market. Several manufacturers were reviewed, and two were short-listed for the Patuxent project. Both of the short-listed manufacturers offered low pressure/high output lamps. Just a few years ago, the equipment selection would have been limited to either medium pressure/high intensity lamps that could not be installed in an open channel or low pressure/low output lamps. The low-pressure lamps can be installed in open channels, and lamp costs are 25 to 50 percent lower than medium pressure lamp systems. Low pressure/high output lamp systems use about half the lamps that low pressure/low intensity systems require. One system provided a horizontal lamp configuration that is parallel to wastewater flow. The other system utilized a vertical lamp configuration perpendicular to wastewater flow. Operators from the Patuxent plant observed both systems installed. Each system performs well, but the low pressure/high output vertical lamp configuration was selected for ease of maintenance. All electrical connections are located above the water surface and operators can simply open a hatch and replace a lamp in minutes. The UV disinfection system will be installed in two channels to allow for isolation and redundancy. Four modules, each containing a total of 40 lamps WEM NOVEMBER

3 arranged in five rows, will be placed in series in each channel. The 320 lamps will provide a UV dosage of over 30,000 µwsecs/cm 2 at a peak flow rate of 20 mgd (hydraulic peak flow at average daily flow of 20 mgd).this dosage has been shown to be adequate in studies and actual installations to meet a 200 MPN/100 ml fecal coliform discharge limit with a filtered effluent (e.g., UV transmissivity greater than 65 percent).the system will be able to treat 75 percent of the maximum rated flow with one module in each channel out of service. A bypass system or fifth UV module per channel could be added to accommodate future peak flows above 20 mgd. Plant Modifications The UV disinfection itself comprises just less than half the $1.65 million total Phase Two project cost.cost savings were realized by reusing existing contact tanks and channels rather than constructing a new facility. Once both contact tanks have been fitted with UV systems,additional accessory items will be installed,including a scum system,covers over the contact tanks and a bridge crane for removing UV modules. The water depth in the existing contact tank is 10,and the water depth with the new UV system will be approximately 5.Therefore, the floor of the first pass of the existing chlorine tank will be raised to accommodate the UV system. A 10 sluice gate provided at the end of the raised portion will allow for complete drainage of the UV channel with channel flow sloped towards the sluice gate. Existing sumps in chlorine contact tanks will be used for complete drainage of the system. Influent channels will be modified to gradually reduce the channel width to approximately 2. This will allow for uniform laminar flow at the UV modules and minimum head loss. Grating will be placed over open channels for access. New walls will direct effluent to a cascade aeration system. The second and third passes of the chlorine contact tank will be abandoned and covered with a sealed concrete system to drain rainwater away from the basins. Covering the abandoned portions of the tanks integrates the unused areas with the new system making the completed project look less like a retrofit. The project also includes installation of an effluent flowmeter (required for permit purposes) and an uninterruptible power source to serve the influent pump station and the UV disinfection system. Phasing is Key A local contractor experienced in wastewater treatment facilities is constructing the facility. The contractor and the consulting engineer will work together to keep treatment plant staff informed of progress and scheduled modifications to operations. Construction will take place in two chlorine contact tanks currently in operation. The following planned construction sequence is designed to maintain disinfection of the effluent at all times. One contact tank will be taken out of service and cleaned. The first pass of the chlorine contact tank will be isolated by constructing a new wall at the beginning of the second pass. The existing influent box to the contact tank will be modified to allow flow to bypass the first pass and enter the second pass directly. The second and third pass of the contact tank will provide chlorine contact time in a parallel configuration. This will allow for construction of the UV system in the first pass without interrupting chlorine disinfection. The same construction sequence will be used on the second contact tank. During the modification of the second tank, only two of the six passes of the 26 WEM NOVEMBER

4 original contact tank will be in service. However, at existing plant flow rates,this still will provide greater than 15 minutes of contact time at maximum plant flow rate in accordance with Ten States Standards. In addition, testing was conducted on the existing system to confirm that this amount of contact time would result in the necessary fecal coliform kill.to minimize time that the system is operating with only two passes; the Contractor is limited to 30 days to complete the modifications to each contact tank. Once the modifications of the second tank are completed, the Contractor will complete construction of the UV system in the first pass of both contact tanks. When the UV system construction is complete and the system has been tested, the first contact tank will be taken out of service again so final modifications can be made.once these modifications are complete, one UV channel will be placed into operation. Once the UV system in one channel is proven effective, the second contact tank will be taken out of service and the second UV channel will be placed into operation. When both systems are operational, additional accessory items will be installed, including a scum system, covers over the contact tanks and a bridge crane for removing UV modules. Managing the Hydraulics The UV disinfection system will have more head loss than the existing chlorine system. Modifications noted above in the construction sequence accommodate this change.the existing weir on the chlorine contact tank influent will be submerged. At a maximum 20 mgd flow, the influent distribution structure will have a total freeboard of 13. The water surface elevation in the UV channel must remain nearly constant in all flow conditions to keep the lamps submerged. Effluent launders will maintain submergence of UV bulbs within a two-inch range between maximum and minimum flows.two steps in the channel will maintain submergence of the last module to accommodate head loss at higher flows in the UV modules. Operations and Maintenance A new microprocessor controller will operate the UV system. Wastewater operators will be able to change set points through a main computer control system. Controls tied to the effluent flowmeter will operate lamps to maximize lamp life. The system will be powered from existing power supplies. A new 80kW diesel-driven emergency generator also will be provided. Lamps will have an in-situ air scour cleaning system that includes a blower WEM NOVEMBER

5 Switching to ultraviolet technology allowed for the removal of most of the stored chlorine from the site,greatly improving site safety and eliminating the need for a Risk Management Plan. with sound enclosure.two dip tanks will be used to periodically clean modules with a mild acid solution of citric acid, Lime Away or muriatic acid purchased in solid form and added to the dip tank. The dip tank will connect to an air blower system for agitation and mixing during cleaning. A one-half-ton overhead bridge constructed of corrosion-resistant aluminum will remove modules for service and cleaning. Modules do not need to be removed to change lamps. Chlorine still will be required for filter cleaning and filamentous control. Sodium hypochlorite will be used instead of chlorine gas for these needs so that chlorine gas can be eliminated completely from the site. The easiest option for any treatment plant is to continue using its existing chlorine disinfection facilities. But many facilities in the State of Maryland are taking a hard look at the use of chlorine gas. With new security concerns, these facilities are evaluating UV disinfection to avoid the risk associated with chlorine gas storage on site. About the Authors: Brian M. Balchunas, P.E., is a project manager with PBS&J, a full-service nationwide consulting firm with expertise in environmental science and engineering. Balchunas is a chemical engineer and is recognized as a disinfection expert. He can be reached at or BMBalchunas@pbsj.com. Lawrence H. Hentz, P.E., D.E.E., is a division manager for PBS&J. Hentz serves as the principal technical professional for PBS&J s Water/Wastewater Services. He can be reached at or LHHentz@pbsj.com. The Future of Disinfection The only risk with UV disinfection is exposure to UV light. Precautions including eye shields are built in place, and there is no risk to the public. For more information on this subject, circle 865 on the reader service card. LearnMore! For more information related to this article, go to 28 WEM NOVEMBER

75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT

75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT 75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT Basis of Design Memorandum Design Memo No.: DM-7 (REVISED) Date: February 2005 Project/Task: 124487.001.420 Subject: Prepared by: Reviewed by: Hydraulic

More information

Non Contact UV System at the Yakima Regional WWTP

Non Contact UV System at the Yakima Regional WWTP Installation of a Flow Through- Non Contact UV System at the Yakima Regional WWTP Sean Goris, P.E. Engineering Manager September 15, 2009 Yakima Treatment Facility Background Secondary treatment facility

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l ATTACHMENT 1 GENERAL FACILITY INFORMATION 1. Facility Name: 2. Type of Facility: 3. Population Served: Present: Design: 4. Flow: Average Maximum Peak 5. Water Quality: Present Design Assumed Actual Source:

More information

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

WEFTEC.06. **Cobb County Water System, Marietta, Georgia CHEMICALLY ENHANCED PRIMARY TREATMENT FOR A LARGE WATER RECLAMATION FACILITY ON A CONSTRICTED SITE - CONSIDERATIONS FOR DESIGN, START-UP, AND OPERATION ABSTRACT Jeffrey A. Mills, P.E., BCEE,* Roderick

More information

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES A range of potential ammonia limits were identified for alternatives evaluation, as discussed in Section 2.2.5. This chapter

More information

TABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope

TABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope TABLE OF CONTENTS Page EXECUTIVE SUMMARY... ES-1 SECTION 1 INTRODUCTION 1.1 Background... 1-1 1.2 Purpose and Scope... 1-2 SECTION 2 HYDRAULIC AND PROCESS ASSESSMENT 2.1 Data Gathering and Analysis...

More information

INNOVATIVE TECHNOLOGY TO IMPLEMENT A REUSE WATER PROGRAM. Stefan Haecker*, John Healy** 9311 College Parkway, Suite 1 Fort Myers Florida 33919

INNOVATIVE TECHNOLOGY TO IMPLEMENT A REUSE WATER PROGRAM. Stefan Haecker*, John Healy** 9311 College Parkway, Suite 1 Fort Myers Florida 33919 INNOVATIVE TECHNOLOGY TO IMPLEMENT A REUSE WATER PROGRAM Stefan Haecker*, John Healy** 9311 College Parkway, Suite 1 Fort Myers Florida 33919 ABSTRACT *CDM, **Piton Environmental, LLC The city of Fort

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0

More information

Present Disinfection Practices and Solution for the Future Ashbridges Bay Treatment Plant

Present Disinfection Practices and Solution for the Future Ashbridges Bay Treatment Plant Present Disinfection Practices and Solution for the Future Ashbridges Bay Treatment Plant Presentation Outline Project Background Overview of ABTP Existing Infrastructure and Flow Management Primary Effluent

More information

NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE

NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE Keith C. Dayton Department of Utilities Stafford County, Virginia P. O. Box 339 Stafford,

More information

Facilities Plan. Technical Memorandum Nos. TM-CSO-11 and TM-WW-5 Disinfection Facilities

Facilities Plan. Technical Memorandum Nos. TM-CSO-11 and TM-WW-5 Disinfection Facilities City of St. Joseph, Missouri Technical Memorandum Nos. TM-CSO-11 and TM-WW-5 Disinfection Facilities By Work Order No. 09-001 B&V Project 163509 July 31, 2009 Technical Memorandum Nos. TM-CSO-11/TM-WW-5

More information

When confronted with increasing peaking. Managing the deluge

When confronted with increasing peaking. Managing the deluge Located on more than 121 ha (300 ac) of land, the Trinity River Authority (Dallas) Central Regional Wastewater water resource recovery facility is an advanced secondary treatment facility and a winner

More information

Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E.

Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E. Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E. Topics Covered Background Challenges and Priorities UV and Filters High Flows Evaluation Aeration Evaluation Aeration Basins

More information

Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013

Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013 Report Engineering Services Group Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013 Summary This report provides a summary of fiscal year accomplishments, capital expenditures

More information

Index Number District II Primary Clarifier #2 and #3 Rehabilitation Project Definition FINAL

Index Number District II Primary Clarifier #2 and #3 Rehabilitation Project Definition FINAL T E C H N I C A L M E M O R A N D U M DISTRICT II PRIMARY CLARIFIER #2 AND #3 REHABILITATION PROJECT DEFINITION Index Number 129-15 and #3 Rehabilitation Project Definition FINAL PREPARED FOR: JEA Capital

More information

From manual to automatic at Spring Creek

From manual to automatic at Spring Creek When upgrading its water resource recovery facility on Spring Creek, the Springfield (Ill.) Metro Sanitary District designed with operations in mind. By bringing together operators and designers, the district

More information

ODORS Troubleshooting. Tank Start-up [New Systems] Toxic Waste. Maintenance. Corrosion in the Tank. Inside. Outside

ODORS Troubleshooting. Tank Start-up [New Systems] Toxic Waste. Maintenance. Corrosion in the Tank. Inside. Outside ODORS Troubleshooting Inside Outside Special Problems: Applying the Scientific Process Tank Start-up [New Systems] Seals Filters Toxic Waste First time on septic- Education on use Understanding the need

More information

VC Series Wastewater. Vertical Open Channel Ultraviolet Disinfection

VC Series Wastewater. Vertical Open Channel Ultraviolet Disinfection VC Series Wastewater Vertical Open Channel Ultraviolet Disinfection VC Series dour Company Glasco has been manufacturing UV disinfection systems for over 50 years. Equipment is manufactured for a variety

More information

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins

More information

Module 5: Disinfection and Chlorination Answer Key

Module 5: Disinfection and Chlorination Answer Key Module 5: Disinfection and Chlorination Answer Key What processes in wastewater treatment serve to remove pathogens? See Table at top of page 1-3. Exercise for Unit 1 Disinfection and Chlorination Principles

More information

Lessons Learned from CM-at-Risk and Design Build Projects at Water and Wastewater Treatment Plants. Lawrence H. Hentz Jr., P.E.

Lessons Learned from CM-at-Risk and Design Build Projects at Water and Wastewater Treatment Plants. Lawrence H. Hentz Jr., P.E. Lessons Learned from CM-at-Risk and Design Build Projects at Water and Wastewater Treatment Plants Lawrence H. Hentz Jr., P.E., BCEE Presentation Outline Background of Two >$110 M Projects Improvements

More information

AS-H Iso-Disc Cloth Media Filter

AS-H Iso-Disc Cloth Media Filter AS-H Iso-Disc Cloth Media Filter Tertiary filtration and final polishing of wastewaters in municipal and industrial applications Toby.Sedgwick@AlfaLaval.com Slide 2 Typical Performance Range Influent Average

More information

Southerly First Stage Final Settling Improvements (SFSS-1)

Southerly First Stage Final Settling Improvements (SFSS-1) Southerly First Stage Final Settling Improvements (SFSS-1) May 30, 2012 1 First Stage Final Settling Facilities 2 Project Objectives Evaluation and replacement of existing equipment Construct SFP OPT1

More information

Energy Use Impacts of Flow Conveyance Alternatives for Membrane Bioreactor (MBR) Facilities

Energy Use Impacts of Flow Conveyance Alternatives for Membrane Bioreactor (MBR) Facilities Energy Use Impacts of Flow Conveyance Alternatives for Membrane Bioreactor (MBR) Facilities Thor Young 1* and Kristi Perri 1 1 GHD Inc., Bowie, Maryland * Email: thor.young@ghd.com ABSTRACT Flow conveyance

More information

UV Wastewater. Vertical Open Channel Ultraviolet Disinfection

UV Wastewater. Vertical Open Channel Ultraviolet Disinfection UV Wastewater Vertical Open Channel Ultraviolet Disinfection GLOW VC Series dour Company Glasco Ultraviolet has been manufacturing UV water and wastewater disinfection systems for over 50 years. We manufacture

More information

The High-Capacity. Inclined Plate. Settler System

The High-Capacity. Inclined Plate. Settler System The High-Capacity Inclined Plate Settler System P a M R I P L A T E S E T T L E R S The Golden Water Treatment Plant, Colorado This facility in scenic Golden handles several million gallons more per day

More information

Water Resources Director: Chris Graybeal

Water Resources Director: Chris Graybeal Water Resources Director: Chris Graybeal Our Mission To promote and protect the environment, preserve natural resources, and ensure the health and safety of our customers. Granite Falls Wastewater Treatment

More information

ULTRAVIOLET DISINFECTION 2013 Municipal Markets.

ULTRAVIOLET DISINFECTION 2013 Municipal Markets. ULTRAVIOLET DISINFECTION 2013 Municipal Markets www.glascouv.com Glasco Timeline 1940 s NYC based industrial manufacturer - pharmaceutical and food grade stainless steel fabricator 1960 s - Added Industrial

More information

The City of Baltimore Back River Wastewater. No more backups Reducing SSOs with headworks improvements in Baltimore

The City of Baltimore Back River Wastewater. No more backups Reducing SSOs with headworks improvements in Baltimore No more backups Reducing SSOs with headworks improvements in Baltimore Brian Balchunas, Meredith Welle, Jason Kerns, Gurminder Singh, Misrak Shiferaw, Ben Asavakarin, Thomas Demlow, and Kara Hurtig The

More information

Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting

Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting October 12, 2017 Water Treatment Plant Phase 1 Upgrades 22 mgd WTP Expand capacity to 32 mgd Upgrades to most processes Only

More information

Refinement of Nitrogen Removal from Municipal Wastewater Treatment Plants

Refinement of Nitrogen Removal from Municipal Wastewater Treatment Plants Refinement of Nitrogen Removal from Municipal Wastewater Treatment Plants Prepared for Maryland Department of the Environment Presented by: Gannett Fleming, Inc. Stephen B. Gerlach, PE & Carrie DeSimone

More information

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION Analytical Environmental Services 2-1 Jamul Indian Village Wastewater Treatment Plant Analytical Environmental Services 2-2 Jamul

More information

Baltimore City Department of Public Works

Baltimore City Department of Public Works Baltimore City Department of Public Works Back River WWTP Process and Construction Overview Michael F. Gallagher, Chief Wastewater Facilities Division Wastewater Treatment Chesapeake Bay Restoration Water

More information

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP Timothy McCann AECOM Keith Bovard Rocky River WWTP WWTP Infrastructure Redundancy Redundancy As NASA Would Say: A Backup Plan for the Backup Plan Nuclear Power Plant Wastewater Treatment Plant Page 3 Infrastructure

More information

Request for Proposals

Request for Proposals Request for Proposals Aeration Basin Improvement Predesign and Design Project Project Number WD1401 You are hereby invited to submit a proposal for consulting services necessary to provide the City of

More information

We Know Water. AnoxKaldnes. Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification

We Know Water. AnoxKaldnes. Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification APPENDIX C.2 IFAS We Know Water AnoxKaldnes Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification WATER TECHNOLOGIES AnoxKaldnes MBBR and Hybas

More information

SECTION 9.0 SEWPCC SECOND PRIORITY CONTROL ALTERNATIVES

SECTION 9.0 SEWPCC SECOND PRIORITY CONTROL ALTERNATIVES SECTION 9.0 SEWPCC SECOND PRIORITY CONTROL ALTERNATIVES 9.1 ALTERNATIVES CONSIDERED FOR SEWPCC 9.1.1 Preamble Table 9.1 below indicates the target ammonia concentrations for the Second Priority Levels

More information

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado JUST ADD WATER Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado Thomas M. Getting, P.E., DEE, Filtration Product Manager John Geibel, P.E., Chief Engineer Michael

More information

demand special treatment SAF range techflo TM SAF single stream techflo TM SAF multi stream

demand special treatment SAF range techflo TM SAF single stream techflo TM SAF multi stream SAF range the conder SAF range of package sewage treatment plants techflo TM SAF 60-600 - single stream techflo TM SAF 700-1800 - multi stream above or below ground installation granular or concrete backfill

More information

Cloth Media Filter Retrofit Increases Filtration Capacity in Existing Sand Filter Basins of WWTPs in USA

Cloth Media Filter Retrofit Increases Filtration Capacity in Existing Sand Filter Basins of WWTPs in USA Cloth Media Filter Retrofit Increases Filtration Capacity in Existing Sand Filter Basins of WWTPs in USA H. Lin, P.E., P. Baumann, P.E., T. Reid, P.E. Aqua-Aerobic Systems, Inc., 6306 N. Alpine Road, Loves

More information

Non-contact UV disinfection systems. Dry Simple Intelligent Energy Efficient

Non-contact UV disinfection systems. Dry Simple Intelligent Energy Efficient Non-contact UV disinfection systems Dry Simple Intelligent Energy Efficient PURIFYING THE WATERS OF THE WORLD TM Designed and manufactured in USA The right choice UV is the most cost effective and environmental

More information

CHAPTER 100 DISINFECTION

CHAPTER 100 DISINFECTION CHAPTER 100 DISINFECTION 101. GENERAL Disinfection of the effluent shall be provided as necessary to meet applicable standards. The design shall consider meeting both the bacterial standards and the disinfectant

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information

SEPTIC TANK CONSTRUCTION GUIDELINES

SEPTIC TANK CONSTRUCTION GUIDELINES SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic

More information

WHAT TO CONSIDER IN CHOOSING A SYSTEM

WHAT TO CONSIDER IN CHOOSING A SYSTEM WHAT TO CONSIDER IN CHOOSING A SYSTEM Reflections Comparison Price Include engineering Plan & Report for local council Include excavation and installation of: - Septic Tank - Treatment Plant - Irrigation

More information

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1 APPENDIX A PRELIMINARY TECHNICAL SPECIFICATIONS FOR BIOSOLIDS MANAGEMENT SERVICES JEA Buckman Residuals Management Facility 1. Background JEA is seeking biosolids management services from experienced biosolids

More information

Exploration of Utulei Clarigester #1 for Facility Upgrade

Exploration of Utulei Clarigester #1 for Facility Upgrade Pacific Design Build Corporation 1036 Mikole St. Honolulu, HI 96819 Phone #: (808) 841-6685 Fax#: (808) 843-1797 I. Objective: Exploration of Utulei Clarigester #1 for Facility Upgrade At the request of

More information

Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update

Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update The 7 th Biennial Meeting of the Lake Erie Millennium Network Status of Lake Erie Management Needs & Research Questions

More information

Can MBR Eliminate Additional Disinfection? A Case Study. Ufuk Erdal, PhD, PE, CH2M Jonathan Vorheis, PE, CH2M July 17, 2015

Can MBR Eliminate Additional Disinfection? A Case Study. Ufuk Erdal, PhD, PE, CH2M Jonathan Vorheis, PE, CH2M July 17, 2015 Can MBR Eliminate Additional Disinfection? A Case Study Ufuk Erdal, PhD, PE, CH2M Jonathan Vorheis, PE, CH2M July 17, 2015 2 Acknowledgement We sincerely thank to co-authors for their valuable contribution

More information

Unique Flow Measurement Challenges for Large UV Systems

Unique Flow Measurement Challenges for Large UV Systems Unique Flow Measurement Challenges for Large UV Systems Authors: Phil Sanders, Plant Operations Supervisor - Clark County Water Reclamation District Guy Miller, P.E., Engineering Manager Accusonic Technologies

More information

Control of Trihalomethanes (THM s) In Wastewater. Philip S. Bober, Operations Superintendent, Wayne Township

Control of Trihalomethanes (THM s) In Wastewater. Philip S. Bober, Operations Superintendent, Wayne Township Control of Trihalomethanes (THM s) In Wastewater By Philip S. Bober, Operations Superintendent, Wayne Township A viable solution exists for wastewater treatment plants using sodium hypochlorite to decrease

More information

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION TABLE OF CONTENTS 2. Description of Water and Wastewater Systems... 2 2.1 General... 2 2.2 Existing Facilities Reference and Record Documents... 2 2.3 Existing Infrastructure Location and Legal Description...

More information

membrane bioreactor performance compared to conventional wastewater treatment

membrane bioreactor performance compared to conventional wastewater treatment Water Technologies & Solutions technical paper membrane bioreactor performance compared to conventional wastewater treatment Authors: Thomas C. Schwartz and Brent R. Herring, Woodard and Curran Incorporated

More information

Irvine Ranch Water District Michelson Water Recycling Plant. Irvine, CA LOCATION: MBR MANUFACTURER: COMMENTS:

Irvine Ranch Water District Michelson Water Recycling Plant. Irvine, CA LOCATION: MBR MANUFACTURER: COMMENTS: FACILITY: Irvine Ranch Water District Michelson Water Recycling Plant LOCATION: Irvine, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: FILANC ENGINEERING: HDR Engineering MBR

More information

SETTLING REVIEW CHECKLIST

SETTLING REVIEW CHECKLIST SETTLING REVIEW CHECKLIST Water Quality Wastewater Technical Review and Guidance FACILITY NAME CONSULTING ENGINEER DATE Water/Wastewater/#5.73, May 2001 SITE INSPECTION (DATE & INSPECTOR) PLANNING OR DESIGN

More information

Volume 1 Executive Summary

Volume 1 Executive Summary 2013 Cheyenne Water and Wastewater Master Plans Final November 27, 2013 Prepared for: City of Cheyenne Board of Public Utilities 2416 Snyder Ave. Cheyenne, WY 82001 Prepared by: HDR Engineering AMEC Earth

More information

TECHNICAL BROCHURE WASTEWATER TREATMENT SYSTEMS

TECHNICAL BROCHURE WASTEWATER TREATMENT SYSTEMS WASTEWATER TREATMENT SYSTEMS by PUMPING & WATER TREATMENT The system most preferred by customers who clearly understand the economic value in purchasing an expertly designed and professionally built system

More information

Lagoons Operation and Management in New Brunswick

Lagoons Operation and Management in New Brunswick Lagoons Operation and Management in New Brunswick Lagoons Provide secondary treatment to domestic wastewater by the action of bacteria stabilizing the organic matter in the wastewater. Benefits of lagoons:

More information

Hybrid Sequencing Batch Reactors (SBR) Offer an Efficient Wastewater Treatment

Hybrid Sequencing Batch Reactors (SBR) Offer an Efficient Wastewater Treatment Hybrid Sequencing Batch Reactors (SBR) Offer an Efficient Wastewater Treatment CONTRIBUTING WRITERS Michael Lahlou, E.I.T. and James Matthews, P.E. Batch processes are not a new or innovative wastewater

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 PREPARED: January 2019 2018 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

Selection of UV Disinfection Systems for Achieving Class A Reuse Water at Small MBR plants

Selection of UV Disinfection Systems for Achieving Class A Reuse Water at Small MBR plants Selection of UV Disinfection Systems for Achieving Class A Reuse Water at Small MBR plants Li Lei, Douglas Berschauer, Elizabeth Hill, and Tom Moore 1 Outline Introduction (UV, WWTPs) Regulations on UV

More information

Gross Receipts Tax Exemption for Equipment Installed in a Wastewater Treatment Facility Opinion Number

Gross Receipts Tax Exemption for Equipment Installed in a Wastewater Treatment Facility Opinion Number STATE OF ARKANSAS REVENUE LEGAL COUNSEL Department of Finance Post Office Box 1272, Room 2380 Little Rock, Arkansas 72203-1272 and Administration Phone: (501) 682-7030 Fax: (501) 682-7599 http://www.arkansas.gov/dfa

More information

OMNIPURE. Rugged, dependable and purpose-built for the demanding offshore industrial sector.

OMNIPURE. Rugged, dependable and purpose-built for the demanding offshore industrial sector. OMNIPURE Rugged, dependable and purpose-built for the demanding offshore industrial sector. OMNIPURE is the only marine sewage system that oxidizes sewage in an electrochemical cell as well as generates

More information

International Joint Commission Water & Wastewater Treatment Best Management Practices Forum Monday, March 26, 2012 Wayne State University, Detroit MI

International Joint Commission Water & Wastewater Treatment Best Management Practices Forum Monday, March 26, 2012 Wayne State University, Detroit MI STARTUP AND OPERATION OF A BIOLOGICAL AERATED FILTER (BAF) FOR SIMULTANEOUS BOD REMOVAL AND NITRIFICATION AT THE LOU ROMANO WATER RECLAMATION PLANT WINDSOR ONTARIO CANADA International Joint Commission

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 PREPARED: January 2015 2014 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

Green City, Clean Waters

Green City, Clean Waters Green City, Clean Waters Facility Concept Plan F o r t h e Southwest Water Pollution Control Plant Consent Order & Agreement Deliverable IV - c City of Philadelphia Combined Sewer Overflow Long Term Control

More information

MWMC Eugene-Springfield WPCF Facility Plan Secondary Clarifier Enhancement Alternatives

MWMC Eugene-Springfield WPCF Facility Plan Secondary Clarifier Enhancement Alternatives TECHNICAL MEMORANDUM NO. 8 MWMC Eugene-Springfield WPCF Facility Plan Secondary Clarifier Enhancement Alternatives PREPARED FOR: COPIES FOR: PREPARED BY: SUBMITTED BY: DATE: Troy McAllister/MWMC Project

More information

Is membrane filtration worth it?

Is membrane filtration worth it? Is membrane filtration worth it? A case study of 3 municipal MBR s in Michigan and their operational experiences. Joe Hebert - Ottawa County Public Utilities 1 Who are these MBR s? North Kent Sewer Authority,

More information

SESSION February 20, :00 AM

SESSION February 20, :00 AM AGENDA REGULAR STUDY SESSION February 20, 2019 9:00 AM DIRECTORS PRESENT: McBride Burke Morris Ryan Williams PUBLIC COMMENTS DISCUSSION ITEMS 1. Pre-Selection Purchase Agreement with Suez Treatment Solutions,

More information

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below:

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below: 6.1.3 Environmental Impacts A summary of the impacts of this treatment alternative are listed below: 1. The Matanuska River will receive treated effluent as it currently does. 2. Effluent quality would

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LONSDALE WASTEWATER TREATMENT FACILITY EXPANSION,

More information

City of Ames. Water Pollution Control. Long Range Facility Plan

City of Ames. Water Pollution Control. Long Range Facility Plan City of Ames Water Pollution Control Long Range Facility Plan Introduction Over 25 years ago, the City of Ames last completed a Wastewater Facility Plan. That Facility Plan prompted design and construction

More information

KUBOTA Submerged Membrane Unit for MBR Technologies

KUBOTA Submerged Membrane Unit for MBR Technologies KUBOTA Submerged Membrane Unit for MBR Technologies February 2017 Kubota Corporation Kubota was established in 1890. We are globally challenging problems on Water, Food and Environment. Combine Corporate

More information

Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities

Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities 147 Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities Todd Stong PE 1, Ron R. Jorgenson 2, and Jacob Sauer 3 1 Senior Engineer,

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

National Pollutant Discharge Elimination System (NPDES) Permit Program F A C T S H E E T

National Pollutant Discharge Elimination System (NPDES) Permit Program F A C T S H E E T National Pollutant Discharge Elimination System (NPDES) Permit Program F A C T S H E E T Regarding a Modification to an NPDES Permit To Discharge to Waters of the State of Ohio for the Elyria Wastewater

More information

City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012

City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012 City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and

More information

REFLECTION ISF INFORMATION RWTS.CO.NZ. Pure. Wastewater. Solutions.

REFLECTION ISF INFORMATION RWTS.CO.NZ. Pure. Wastewater. Solutions. REFLECTION ISF INFORMATION RWTS.CO.NZ Pure. Wastewater. Solutions. WITH MORE THAN 3000 WASTEWATER SYSTEMS TREATING IN EXCESS OF 2.5 MILLION LITRES OF WASTEWATER EVERY DAY THROUGHOUT THE REGION, OUR TRACK

More information

Emerging Issues in the Water/Wastewater Industry. Austin s Full-Scale Step-BNR Demonstration

Emerging Issues in the Water/Wastewater Industry. Austin s Full-Scale Step-BNR Demonstration Summer Seminar Emerging Issues in the Water/Wastewater Industry Austin s Full-Scale Step-BNR Demonstration Rajendra P. Bhattarai, P.E., DEE Austin Water Utility, City of Austin 625 East 10 th Street, Suite

More information

IS DESIGNER RECLAIMED WATER IN NORTH CAROLINA S FUTURE?

IS DESIGNER RECLAIMED WATER IN NORTH CAROLINA S FUTURE? IS DESIGNER RECLAIMED WATER IN NORTH CAROLINA S FUTURE? Alan E. Rimer PhD, P.E. DEE Vice President, Director of Water Reuse EnviroTechNovations LLC AlanRimer@Outlook.com Substituting for Edmund Kobylinski

More information

UV Disinfection for a Municipal Wastewater Lagoon Effluent No Prior Filtration Needed? Wayne Wong, M.A.Sc., P.Eng., PMP

UV Disinfection for a Municipal Wastewater Lagoon Effluent No Prior Filtration Needed? Wayne Wong, M.A.Sc., P.Eng., PMP UV Disinfection for a Municipal Wastewater Lagoon Effluent No Prior Filtration Needed? Wayne Wong, M.A.Sc., P.Eng., PMP Acknowledgements 2 Northern Rockies Regional Municipality Northern Rockies Engineering

More information

City of Leadwood Wastewater System Engineering Report

City of Leadwood Wastewater System Engineering Report City of Leadwood Wastewater System Engineering Report DRAFT H2O C Engneering www.h2oc.com 877-22-WATER Background The purpose of this report is to describe the City of Leadwood s wastewater system (System

More information

City of Fairfax, Virginia City Council Regular Meeting. Honorable Mayor and Members of Cfy ;ouncil Robert L. Sisson, City Manager /I.

City of Fairfax, Virginia City Council Regular Meeting. Honorable Mayor and Members of Cfy ;ouncil Robert L. Sisson, City Manager /I. City of Fairfax, Virginia City Council Regular Meeting Agenda Item #..,.,C:::o~Or!---!h~--- city Council Meeting q+----4-j/.-...:cx:l..-.>o?...~-/_,_j-=2=; r 1 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: Honorable

More information

UV DISINFECTION OF LOW TRANSMITTANCE PHARMACEUTICAL WASTEWATER

UV DISINFECTION OF LOW TRANSMITTANCE PHARMACEUTICAL WASTEWATER UV DISINFECTION OF LOW TRANSMITTANCE PHARMACEUTICAL WASTEWATER Jurek Patoczka, PhD, PE Hatch Mott MacDonald, 27 Bleeker Str., Millburn, NJ 74 jurek.patoczka@hatchmott.com ABSTRACT An UV disinfection system

More information

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100 MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033

More information

Notice of Preparation

Notice of Preparation Notice of Preparation To: From: County of Sacramento Department of Environmental Review and Assessment 827 7 th Street, Room 220 Sacramento, CA 95814 (916) 874-7914 Contact: Dennis E. Yeast Subject: Notice

More information

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment A Technical Memorandum Date: Project: Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation Subject: Task 3 Existing Grit Removal System Assessment This memorandum presents

More information

MEMORANDUM SUBJECT: CONSIDERATION OF SUBMISSION OF A LETTER OF SUPPORT FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT S REDUNDANCY PROJECT

MEMORANDUM SUBJECT: CONSIDERATION OF SUBMISSION OF A LETTER OF SUPPORT FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT S REDUNDANCY PROJECT MEMORANDUM TO: FROM: CITY COUNCIL GEOFF ENGLISH, PUBLIC WORKS DIRECTOR SUBJECT: CONSIDERATION OF SUBMISSION OF A LETTER OF SUPPORT FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT S REDUNDANCY

More information

GHG Inventory Report February 2018 KENT COUNTY REGIONAL RESOURCE RECOVERY FACILITY 2017 GREENHOUSE GAS (GHG) EMISSION INVENTORY

GHG Inventory Report February 2018 KENT COUNTY REGIONAL RESOURCE RECOVERY FACILITY 2017 GREENHOUSE GAS (GHG) EMISSION INVENTORY KENT COUNTY REGIONAL RESOURCE RECOVERY FACILITY 2017 GREENHOUSE GAS (GHG) EMISSION INVENTORY FEBRUARY 2018 1 INTRODUCTION Greenhouse gases (GHG) are believed to contribute to the global warming phenomenon

More information

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant April 7, 2014 Prepared by Jerry Blain, P.E., Project Associate Environmental Finance Center Funding for this Energy Assessment was provided

More information

The NEORSD Demonstration of a Cost-Effective Solution

The NEORSD Demonstration of a Cost-Effective Solution 2015 OWEA Technical Conference Advancing Wet Weather Treatment The NEORSD Demonstration of a Cost-Effective Solution June 24, 2015 Advancing Wet Weather Treatment The NEORSD Demonstration of a Cost-Effective

More information

WHEREAS, the Board has previously so adopted a wastewater supply system comprehensive plan, and

WHEREAS, the Board has previously so adopted a wastewater supply system comprehensive plan, and LAKEHAVEN WATER AND SEWER DISTRICT King County, Washington Resolution No. 2017-1283 A RESOLUTION of the Board of Commissioners of the Lakehaven Water and Sewer District, King County, Washington, adopting

More information

CAPITAL IMPROVEMENT PROGRAM WATER

CAPITAL IMPROVEMENT PROGRAM WATER CAPITAL IMPROVEMENT PROGRAM 246 247 FUNDS (711-715) Access Road Improvements c709840 Minor road repair and pipeline clearance work to gain access to water facilities and equipment. Project Cost Estimate

More information

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals City of Elk River Wastewater Treatment Facility Improvements Achieving Wastewater Treatment Goals By Tejpal Bala, P.E. Bolton & Menk, Inc. The City of Elk River received a new NPDES permit and the existing

More information

Water and Wastewater Treatment Energy Savings Guide

Water and Wastewater Treatment Energy Savings Guide Water and Wastewater Treatment Energy Savings Guide Oregon water and wastewater treatment plants face challenges of growing hydraulic demand, rising operating costs, increased regulatory requirements and

More information

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration ROLE OF OTHERS For the design focus of the project, key partners included:»» Mortenson Construction, Contractor»» Jacobs, Contract Plant Operator»» Portland Engineering and Controls, I&C The City of The

More information

Environmental Improvements Associated with Springfield WWTP EHRT. Using the Compressed Media Filter Technology

Environmental Improvements Associated with Springfield WWTP EHRT. Using the Compressed Media Filter Technology Environmental Improvements Associated with Springfield WWTP EHRT Tuesday, June 23 9:30 am Using the Compressed Media Filter Technology WWETCO WWETCO FlexFilter ENGINEERS CLUB OF ST. LOUIS Performance Testing

More information

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA A. EXISTING FACILITIES 1. Westtown-Chester Creek Plant Westtown Township acquired the Westtown-Chester Creek Treatment Plant (WCC Plant)

More information