New and renewable energy application and its future in Thailand

Similar documents
SPP Hybrid Firm and VSPP Semi-Firm Feed-in Tariff (FiT) policy

Thailand s Alternative Energy Development Plan

Renewable Energy Plan in Thailand Karnnalin Theerarattananoon

แผนพ ฒนาพล งงานทดแทนและพล งงานทางเล อก พ.ศ Alternative Energy Development Plan: AEDP2015

Yaowateera Achawangkul, Ph.D.

Thailand s Solar Energy Policy and New Alternative Energy Development Plan ( )

Economic Potential of Biomass Utilization Case of Thailand

Best Practices and Experiences on Thailand s Energy Policy for Sustainable Development

Fuel Ethanol in Thailand: What s Next?

Renewable Energy Projects in Thailand

BIOGAS FROM POULTRY FARMS A DRIVE TOWARDS THAILAND RENEWABLE ENERGY TARGET

Thailand Solar Energy Overview

Thailand s Past Success and Future outlook of its Solar Energy Policy. Mr. Phongkarn Piamsuttitam 15 th June 2015

Renewables Readiness Assessment Thailand (Progress Report)

Overview on Waste and Biowaste Generation and Their Management Status in Southeast Asian Countries

Biomass and Energy A Perspective from Municipal Solid Waste (MSW)

Energy Efficiency and Renewable Energy Financing Measures: Thailand

SOLAR ENERGY DEVELOPMENT IN THAILAND

Biogas Technology from Research to Regional Technology Transfer

Approach of using Corn Residue as Alternative Energy Source for Power Production: A Case Study of the Northern Plain Area of Thailand

Introduction. Klean Industries is committed to providing commercially viable, environmentally sound waste recycling technologies and systems.

Dr. Twarath Sutabutr Deputy Director-General

Thailand Power Development Plan ( ) TANONGSAK WONGLA

Biomass as an Energy Resource for Michigan: Opportunities, Challenges and Policies. William A. Knudson Working Paper January 2011

OPERATION ANALYSIS OF LARGE SCALE SOLAR POWER GENERATION IN THAILAND

BIOMASS RENEWABLE ENERGY RESOURCE ASSESSMENTS IN INDONESIA

Palm oil residue waste potential and waste utilization in Thailand

THE ASSESSMENT OF RENEWABLE ENERGY SCENARIOS FOR NAN, RAYONG, AND PHUKET

AORC Technical meeting 2014

Solar PV in ASEAN Challenges and Opportunities. Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia

By: Dr. Dadan Kusdiana Director for Bioenergy

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region

Case study of commercial grass silage digestion for power production & Digestion of solid agro-wastes

Introduction to wood fuel and the RHI. Heartwoods West Midlands Wood Fuel Project

Technology, Equipment and Policy : Status Quo and Future for Biomass Heat, Power and Ethanol Industrial Development in China.

RENEWABLE ENERGY RESOURCES

Cogeneration policies in ASEAN

ENERGY EFFICIENCY PROGRAMS IN MALAYSIA

State Agency on Energy Efficiency and Energy Saving of Ukraine. State policy on renewable energy in Ukraine

France renewable energy policies

BIOGAS DEVELOPMENT IN EASTERN EUROPE: CURRENT STATE AND PERSPECTIVES

Waste Business Monitor The only source of "real time" trend data analysing global waste plant developments

Latvia Energy efficiency report

RES - Status Quo, Potential and Prospects Vasileios Tsolakidis, CRES

Energy. in Thailand : Facts & Figures Q1 / 2013

Biomass and the RPS. Anthony Eggert Commissioner. California Energy Commission

European Commission. EU Bioenergy market development in the past. EU25, , biomass & waste only. Other wood & wood waste

Public Perspective toward Waste-to-energy Applications in Thailand: An Opportunity on Biogas Production from Organic Waste

Biomass and Biogas Conference Overview of Biomass Technology in Germany

Renewable Energy Development in Cambodia. Institute of Technology of Cambodia

Lady and Gentlemen I am Bui Duc Dien and from Viet Nam, I am very happy to this forum here. Now, I will read summary report about bioenergy

Solid Waste to Energy

Overview of Municipal Solid Waste Management in Thailand. Pollution Control Department Ministry of Natural Resources and Environment, Thailand

Biogas Fuel Source for a Renewable Future. Jan Buijk (416)

Masterplan New Energy and Biomass utilisation Saarland

DISTRICT HEATING & HEAT NETWORKS PRESENTATION

Bioenergy Policy Implementation in Ghana

Renewables Update Argyll, Nov John Farquhar Senior Renewables Consultant

Exploring waste to energy opportunities. Thembakazi Mali Senior Manager: Clean Energy Solutions

Bioenergy in Ukraine: state of the art, prospects, barriers

(c) Tertiary Further treatment may be used to remove more organic matter and/or disinfect the water.

Assessment of Alternative Waste Management Technologies

Thai-German Renewable Energy Community Conference October 20-21, 2015

Export & import possibilities and fuel prices

Creating Energy from Waste How the RFS2 Helps Make it Happen

Ministry of Employment and the Economy Energy Department [Finland]

Biomass technologies

DEVELOPMENT OF BIOMASS ENERGY SYSTEMS IN ECUADOR

Renewable Energy - A technology overview and the new Feed in Tariffs. Jos Mister Energy Saving Trust

Energy Profile of Maldives

The American University in Cairo. Alternative Fuels From Solid Waste in Egypt

AGRI WASTE TO ENERGY: THE BIOGAS ROUTE. By Deepak Palvankar KIRLOSKAR INTEGRATED TECHNOLOGIES LTD. (KITL)

Lecture 1: Energy and Environment

Experience of DEDE s ESCO Fund in financing RE projects in Thailand

RENEWABLE ENERGY MARKET DEVELOPMENT IN LAO PDR- OPPORTUNITUES FOR INVESTMENT

Existing and New Bio Energy Policies Needed and Implementation Target

ECONOMIC COMPETITIVENESS

ECOWAS Regional Bioenergy Forum Bamako, Mali: March 2012

Development of biomass fuel in Austria as the dominant heating fuel. Dr. Horst Jauschnegg

Bioenergy markets and policies, 2018

GBEP Workshop. Zhao Lixin. Chinese Academy of Agricultural Engineering

Possibilities for Carbon Neutral Energy in Finland

Renewable energy in Europe. E-turn 21 workshop Cologne, 10 May 2006

Patrick Mathews, General Manager/CAO Salinas Valley Solid Waste Authority. CALIFORNIA BIOMASS COLLABORATIVE 7 TH ANNUAL FORUM May 10 11, 2010

What is the Real Story about Emerging Technologies? Materials Management as a Waste Management Strategy

Product and chain development for Oil Palm

IEEJ:August Uruguay Paula Cobas. Energy Policy Course Tokio, 2015

Project Development of the Renewable Energy Sector in the Russian Federation and in CIS Countries: Prospects for Interregional Cooperation

Efficient utilization of energy sources

NATIONAL POLICY FOR ENERGY EFFICIENCY AND RENEWABLE ENERGY SOURCES

Research priorities for large scale heating and industrial processes

STATUS OF CLEAN ENERGY DEVELOPMENT PROGRAMS IN GHANA

Waste to Energy. M V Ananthakrishna M K RAJU CONSULTANTS PRIVATE LIMITED NOVEMBER 07

RES in Latvia: policy and strategy

Plasma Gasification: The Next Generation of Waste-to-Energy (WTE) Solutions

Waste to Energy in Germany

Management of solid wastes in India - Status and initiatives

Waste management in the Netherlands. Herman Huisman RWS Environment

Transcription:

New and renewable energy application and its future in Thailand Miss Sutthasini Glawgitigul Scientist Department of Alternative Energy Development And Efficiency Ministry of Energy, Thailand Expert Group Meeting on Sustainable Application of 1 Waste-to-Energy in Asian Region in Busan, Republic

Content Waste-to-energy Situation Biomass-to-energy Situation Alternative Energy Development Plan Supporting Scheme for waste & biomass-toenergy 2

Content Waste-to-energy Situation 3

Situation of MSW management in Thailand Source: PCD 4

National Waste Management Master Plan (2016-2021) Source: PCD 5

WTE Technology in Thailand Landfill gas to energy Anaerobic Digestion Incineration Gasification Refuse derived fuel 6

WtE Projects Incineration (MSW) PJT, Phuket 14 MW C&G, Bangkok 9.8 MW Alliance Clean Power, Khonkaen 4.9 MW 7

WtE Projects Incineration (RDF) TPI, Saraburi 20 + 60 MW ETC, Saraburi 9.4 MW R-EEP, Samut Prakarn 9.9 MW 8

WtE Projects Landfill gas to Energy Kamphaeng Saen West and East, Nakhonpatom 2x8 MW Bantan, Chiang Mai 1 MW 9

WtE Projects Electricity from pyrolysis oil ACECO, Ayutthaya 3 MW 10

Refuse-Derived Fuel (RDF) Utilization Use of RDF in cement kiln in 2016 Type Amount (ton) Energy (ktoe) RDF 94,456 43.28 Used tire 31,735 25.15 Total 126,191 68.43 11

Barriers for solid waste management Limited allocated budget for solid waste management Lack of co-operation between local authorities Lack of skill personnel in waste management practice Opposition against waste disposal facilities from public/communities Lack of public awareness/participation 12

Content Biomass-to-energy Situation 13

Biomass Opportunities 1. Promoting higher potential biomass Rice straw Sugarcane leaves Cassava rhizome Oil palm leaves and bunch Corncob & stalk Wood chips & Pellets 2. Promoting plantation of fast growing crops for power generation 14

Napier grass Project Napier grass Encourage community enterprise for energy crop production Contract between community enterprise & biogas plant Secure income for farmers All stakeholders generate income from biogas utilization Energy security in Thailand Biogas Objective Power generation 3,000 MW CBG for transportation Replace LPG 15

Biomass Plan under AEDP 2015 Encourage biomass utilization Replace fossil fuel using in local industry and in community Increase the utilization of unutilized biomass Improve the energy efficiency in agro industry (e.g. sugar mill, palm oil mill) Promotion & Support Update and provide biomass potential map Develop biomass excellent center Financial support Develop the biomass collection and transportation system Conduct the correct understanding to people Reduce complicate permit procedures Solve the bottleneck problem of national grid Promote plantation of fast growing trees R&D Encourage biomass transformation : pellet Biomass to liquid technology New biomass technology (e.g. hydrothermal gasification, torrefaction) 16 16

Biomass Power Plant 17

Biomass Power Plant 18

Biomass Power Plant 19

Barriers for utilizing Solid Biomass to energy It is difficult to collect / transport / store. Unpredictable the quantities of biomass. Cost of biomass is not stable. Cost of transport is high. Protests by communities 20

Content Alternative Energy Development Plan 21

Alternative Energy Development Plan AEDP 2015 - Targets Overall Targets 30% Renewable Energy in total energy consumption By 2036 RE share 14.47% (Oct 2017) Electricity 19,684.4 MW Wind Hydro Waste Heat 25,088 ktoe Solar Biomass Biogas Fuel 11.3 MLPD Ethanol 14 MLPD B100 +0.53 MLPD Pyrolysis Oil +4,800 TPD of CBG Ethanol Biodiesel Compressed Biogas 22

Benefit of AEDP 2015 23

Target & Current capacity from Waste under AEDP 2015 Target Current Capacity (MW) MSW : electricity generation (MW) 500 188.47 Industrial Waste: electricity generation (MW) 50 37.43 MSW : heat generation (ktoe) 495 68 Data : DEDE, Nov 2017 24

Target & Current capacity From Biomass under AEDP 2015 Target Current Capacity (MW) Biomass (Electricity) 5,570 MW 3102.28 MW Biomass (heat) 22,100 ktoe 535 ktoe Data: DEDE, Nov. 2017 25

Content Supporting Scheme for waste & biomass-toenergy 26

Other Supporting Measures ESCO fund FiT Data Support Resource data maps BOI Exemption of import duty on equipment or machines income-corporate taxes resulting from selling RE or saving energy for periods up to 8 years 27

Feed-in Tariff (FiT) for VSPP in 2015 FiT (THB/kWh) FiT Premium (THB/kWh) Installed Capacity (MW) FiT F (1) FiT V,2560 FiT Supporting Period (years) Biobased Fuel (for the first 8 yrs) special Southern zones ( 2) (for project lifetime) Waste-to-Energy 1 MW 3.13 3.21 6.34 20 0.70 0.50 > 1-3 MW 2.61 3.21 5.82 20 0.70 0.50 > 3 MW 2.39 2.69 5.08 20 0.70 0.50 Landfill organic waste 5.60-5.60 10-0.50 Biomass 1 MW 3.13 2.21 5.34 20 0.50 0.50 > 1-3 MW 2.61 2.21 4.82 20 0.40 0.50 > 3 MW 2.39 1.85 4.24 20 0.30 0.50 Biogas from wastewater/manure 3.76-3.76 20 0.50 0.50 Biogas from energy crops 2.79 2.55 5.34 20 0.50 0.50 (1) FiT V is subjected to be adjusted by core inflation (2) Includes 3 Southern provinces (Yala, Pattani, Narathiwas) and 4 districts in Songkhla province 28

Electricity generation from industrial waste FiT for Industrial waste FiT (Baht/kWh) FiT Premium (Baht/kWh) Capacity (MW) Period FiT F FiT V,2560 FiT (1) For year 1-8 (year) For 3 provinces in the south (2) (Whole period) General technologies 3.39 2.69 6.08 20 0.70 0.50 Plasma technologies 3.39 2.69 6.08 20 1.70 0.50-7 projects have been accepted. - PPAs 37.43 MW. - SCOD: 31 December 2019 Note: (1) FiT rates will be used for projects that COD by 2017. After 2017, FiTv rates will continuously increase by core inflation. (2) Projects in Yala, Pattani Naratiwat and 4 districts in Songkla; Chana, Tepa, Sabayoi, and Natawee

New scheme For Renewable Energy 30

Power purchase programs SPP Waste to Energy SPP Hybrid Firm Program VSPP Semi Firm Program VSPP: Very Small Power Producer (less than 10 MW) SPP: Small Power Producer (10-50 MW)

Feed-in Tariff for Solid Waste Capacity (MW) FiT for SPP project FiT (Baht/kWh) Period (year) FiT F FiT V,2560 FiT > 10-50 MW 1.81 1.85 3.66 20 Projects have to be approved by cabinet or Ministry of Interior. Contract of waste disposal with the municipalities Non-firm contract No competitive bidding Locate on municipality land area SCOD within 2020 32

FiT for SPP Hybrid Firm All kinds of fuel types : Mix-sources (Hybrid) 1 type(s) Contracted capacity: <10 50 MW Firm all year (Peak 100% and Off-peak 65%) Installation of Energy Storage System is allowed. SCOD 2020-2021 competitive bidding Target: 300 MW 33

FiT Rate for VSPP semi-firm Type: biomass or biogas (sewage/waste) or biogas (energy crops) Only 1 type of energy source; Installation of Energy Storage System is allowed. Contracted capacity: < 10 MW Firm (Peak 100% and Off-peak 65%) for 6 months (Covering Mar-Jun) Other 6 months are Non-firm. FiT rates by each type of fuel with competitive bidding FiT Premium only for Firm-duration Target: 269 MW 34

35