Cranbrook Drain/Counter Drain Flood Risk Management Strategy

Similar documents
This document was endorsed by Cambridgeshire County Council (CCC) in its capacity as Lead Local Flood Authority on 14 July 2016.

Cambridgeshire and Peterborough Minerals and Waste Development Plan. Core Strategy Development Plan Document

Cambridgeshire & Peterborough Minerals and Waste Core Strategy Schedule of Council s Proposed Changes APPENDIX B MINOR CHANGES

Natural Flood Management. Measures & Multiple Benefits. Steve Rose (JBA)

Guidance on the role of flood and coastal defence in nature conservation in England

High Speed Rail (London- West Midlands)

Waste Minimisation, Re-use, and Resource Recovery

Where next for flood risk management policy?

English Nature Research Reports. Number 598. Integrated washland management for flood defence and biodiversity

CLIMATE CHANGE MITIGATION AND ADAPTATION IMPLEMENTATION PLAN for the Draft South East Plan

South West Water Strategic Environmental Assessment of Water Resources Plan Summary Document

These potential changes and their implications are outlined in Annex 1.

Policy Statement Floods and Coastal Defence: Approved by LDC Interim Cabinet March 2001

Agriculture and Climate Change

Towards Better Environmental Options for Flood risk management

Babergh & Mid Suffolk Joint Local Plan: Sustainability Appraisal. August 2017

Environmental Report Draft Dee Flood Risk Management Plan

Thames Regional Flood and Coastal Committee (RFCC) Flood risk management and environmental benefits in the Thames River Basin, 2015 to 2021

Northumbrian Water Limited 9 March 2011

Otonabee Region WATERSHED

Job Description. The Wildlife Trust for Bedfordshire, Cambridgeshire, and Northamptonshire, Priory Country Park, Barkers Lane, Bedford MK41 9DJ

Chapter 6 Objective: Protect and Enhance the Environment

Environment Agency Flood and Coastal Risk Management (FCRM) maintenance review. IUK Client working group peer review

The Cam and Ely Ouse Management Catchment Figure 1 - River Ouse looking towards Ely Cathedral, Cambridgeshire

Arun DC Draft Local Plan , July Policy SP8: Strategic Housing, Parish and Town Council Allocations Page 109

1 General questions on zone and catchment management plans

Response from the Association of Drainage Authorities

YORKSHIRE WATER SERVICES. Humbercare Sewerage Network Analysis

The Tasmanian Government s response to climate change The Draft Climate Change Strategy for Tasmania

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Standards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities

Rising Sun. Scaffold Hill. Flood Risk Assessment

Cascade Consulting APPENDICES

Sustainable Development Ensure all new developments contribute to the overall sustainability of Cullompton as a town and a community

The Nore Suir River Trust Strategy Report Phase 1 Why Do The Nore and Suir Rivers Need a River Trust?

Blueprint for Water Response to the draft Flood and Water Management Bill

The role of Green Infrastructure. Background: Defra and the Environment Agency 13/06/2016. Contents. Offer to LEPs and City Deals. New Defra strategy

SECTION 3: Water, Wetlands and Waterways

PROGRAMME: A CONSERVING AND RESTORING

UK Climate Change Risk Assessment 2017: Summary of ASC-commissioned research projects

Recreation Management Framework

Response to the Infrastructure UK peer review of flood and coastal risk management. November 2015

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Water Crisis! What Water Crisis?

Consumer Issues Workshop

Draft Local Flood Risk Management Strategy

Improving the condition of Solway Tweed s water environment Tweed area management plan

Land Management and Flooding. Where are we now?

SUMMARY OF OUR WATER RESOURCES MANAGEMENT PLAN

Credit Valley Conservation (CVC) Board of Directors. Chief Administrative Officer (CAO) Watershed Knowledge. Watershed Management

Midlands Highway Alliance - Climate Change Adaptation Guidance and Good Practice

A CTION PLAN FOR LEEDS

Surface water is the rainwater that runs off roofs, roads and paved areas into the public sewerage system.

CCCW p5 -AnnexB

ASSESSING THE FINANCIAL RESOURCES NEEDED TO IMPLEMENT THE STRATEGIC PLAN FOR BIODIVERSITY AND ACHIEVE THE AICHI BIODIVERSITY TARGETS

ADA Showcase: Working for Water Level Management 1

Desalination plant operating regime September 2010

Environmental Sustainability Strategy

RURAL LIVING AREAS Rural Living Areas Rural Lifestyle and Rural Residential 8.1 Issues, Objectives and Policies

Appendix General Environmental Risk Analysis

Site Improvement Plan. Fens Pools SAC. Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future

Cork County Development Plan Volume Three: SEA Statement and Natura Impact Report

PERMEABLE PAVEMENTS FREQUENTLY ASKED QUESTIONS

Berth 9 Quay Extension Environmental Statement Non-Technical Summary

Central Farms Estate. Developing a Farm Estate Strategy. Appendix A. Central Bedfordshire Council

LIVERPOOL MUTUAL HOMES GROUP 2015/ /20 CORPORATE PLAN

How can we work together to protect our environment?

Recreation on YW Land and Waters. Policy Statement

Testing the effectiveness of climate change adaptation principles for biodiversity conservation

Agriculture and the Environment IX, Valuing Ecosystems: Policy, Economic and Management Interactions (2012)

Climate Change and Watershed Management

Scottish Forestry Grants Scheme review: Consultation questions.

Scottish Forestry Grants Scheme review: Consultation questions.

IMPLEMENTING WATER REFORM IN QUEENSLAND, AUSTRALIA CASE # 24

draft Environment Strategy

REQUEST FOR STATEMENT OF QUALIFICATIONS SOQ #

Strategic Priorities and Objectives Statement to Ofwat issued under section 2B of the Water Industry Act 1991

NATIONAL REPORT FOR UGANDA TO THE 7 TH MEETING OF THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON WETLANDS

Asset Management Group GROUP MANAGER ACTING MANAGER LAND MANAGEMENT TEAM LEADER NATURAL ASSETS MANAGEMENT SENIOR LAND SENIOR LAND LAND MANAGEMENT

2014/2015 Rivers and Drainage Asset Management Plan

Approval and Permitting Requirements Document for Renewable Energy Projects

STORMWATER HARVESTING, AN INNOVATIVE WAY OF MEETING THE CATCHMENT WIDE NEEDS OF THE BUILT AND SOCIAL ENVIRONMENTS

Pasquia Area Drainage and Pumping System

WHITE-CLAWED CRAYFISH SPECIES ACTION PLAN

THE MEDWAY LETTER. Ministry of Agriculture and Fisheries, 10 Whitehall Place SW1. 28 June Sir

River restoration and flood management fact or fiction: a British perspective

Biodiversity Net Gain Good practice principles for development

Works, services and infrastructure code

Climate Adaptation. Introduction

Code of Corporate Governance

06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards

River restoration theme plan

Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania

Information on LULUCF actions by Sweden. First progress report

Prairie Pothole Wetlands: Characteristics, Functions, and Values

APPENDIX A. Project Scoping

This standard will apply to English European Sites on land and water and to Marine Protected Areas (MPAs) within English territorial waters.

Transcription:

Cranbrook Drain/Counter Drain Flood Risk Management Strategy Flood Risk Management Principles and Specification Environment Agency Submission to Cambridgeshire County Council in Support of Proposals to create a Flood Storage Area at Block Fen July 2009 Cranbrook/Counter Drain FRM Strategy

Introduction In 2008 the Environment Agency s Flood Risk Management Strategy for the Cranbrook / Counter Drain was approved and adopted. One important component of the preferred strategy is to investigate and, if possible, develop flood storage over the medium term to replace Welches Dam pumping station. In so doing to provide a more sustainable long term flood risk management solution for the area that can bring wider social and environmental benefits. The Cranbrook Drain/Counter Drain is primarily a drainage and flood protection system. As structures within this system are approaching the end of their useful lives a strategic approach is required to safeguard the future of the system. The current standard of flood risk to the 10,550ha catchment is a 1 in 25 chance of flooding in any given year. This document presents the vision and key principles for flood storage at Block Fen. Shared vision Synergies between the Cranbrook / Counter Drain Flood Risk Management Strategy and the Cambridgeshire and Peterborough Minerals and Waste Development Plan were first identified during the development of the Environment Agency s Strategy. There is an opportunity to provide flood storage as one of a range of after-uses following minerals extraction in the Earith/Mepal area at Block Fen. This opportunity was recognised in the Earith / Mepal Area Action Plan and is an important component of the flood risk management strategy. The Environment Agency s vision is to be able to deliver their primary objective of providing sustainable flood risk management to the Cranbrook Drain catchment in the face of a changing climate whilst also contributing recreational, amenity and biodiversity gains and maximising efficient use of natural resources. PRIMARY ROLE: FLOOD RISK MANAGEMENT Existing and future risk in the area BAP HABITAT GAINS Without compromising primary role RECREATION AND AMENITY GAINS Without compromising primary role RESOURCE EFFICIENCY Energy, water, materials, effort 2

This flood storage scheme accords very well with Defra s Flood and Coastal Erosion Risk Management Strategy Making Space for Water and the Environment Agency s Corporate Strategy to create a better place for people and wildlife and its five themes: 1. Act to reduce climate change and its consequences 2. Protect and improve air, land and water quality 3. Put people and communities at the heart of what we do 4. Work with businesses and the public sector to use resources wisely 5. Be the best we can In 2009, the Environment Agency established a Project Steering Group to help them to progress the flood storage element of their approved strategy. This comprises Natural England, Cambridgeshire County Council, the Royal Society for the Protection of Birds (RSPB), minerals companies, the Sutton and Mepal Internal Drainage Board (IDB) and the Middle Level Commissioners. Engagement with these stakeholders has helped the Environment Agency to understand their various aspirations for the area, the challenges the project faces and the multiple benefits that it can deliver. This improved understanding has been used to inform the drafting of a number of key principles for the future design, operation and management of a flood storage area at Block Fen. 3

Flood Storage Principles We have developed a set of guiding principles for a flood storage area at Block Fen. PRIMARY OBJECTIVE To Provide a Sustainable Flood Risk Management Solution for the Cranbrook Drain/Counter Drain Catchment. In meeting the primary objective the Environment Agency will look to: PRINCIPLE 1 PRINCIPLE 2 PRINCIPLE 3 PRINCIPLE 4 PRINCIPLE 5 PRINCIPLE 6 PRINCIPLE 7 PRINCIPLE 8 PRINCIPLE 9 Provide a sustainable flood risk management solution that is resilient to predicted changes in our climate (e.g. wetter winters with more intense rainfall events and warmer drier summers) Ensure that there are no significant effects of the scheme on the ability of the IDB to manage the surrounding drainage system. Minimise future operational and maintenance costs (e.g. pumping) through careful design. Provide a water resource for local irrigators. Minimise the disruption to other land users and uses within the flood storage area through careful design (e.g. focussing of high return period flood events into defined parts of the wider storage area). Provide appropriate compensation to landowners, where required, for disruption caused by infrequent high return flood events. Explore the potential for providing inert waste storage where it can be accommodated in the design and where it is in accordance with the Cambridgeshire and Peterborough Minerals and Waste Plan. Promote recreational after-uses where there will be no detriment to the primary objective of flood storage and other land users. Maximise benefits to biodiversity where they don t conflict with the primary objective (e.g. providing water to and avoiding flooding of the habitat restoration area; reducing the volume of water pumped into the Ouse Washes SPA and Ramsar site). PRINCIPLE 10 Actively engage with stakeholders as the proposals for the area develop. PRINCIPLE 11 Ensure proposals comply with the Objectives and principles outlined in the Agency s Strategic Environmental Assessment for the Welches Dam Flood Risk Management Strategy. 4

What we are proposing Following the extraction of minerals from the area the Environment Agency s vision is to utilise the restored land for storage of flood events. During periods of non-flooding the land would be available for various land uses which would be flood tolerant. During times of flood the land would be inundated to varying depths depending on the intensity of the flood event. The current proposals for land restoration following the minerals extraction is for low level restoration to agricultural use. However, it is understood that the Master Plan is suggesting that the existing restoration proposals be re-visited and that the land restoration proposals compliment the habitat creation areas, giving more holistic restoration for the entire area. The Environment Agency's proposals for flood storage do not preclude land restoration in line with the current proposals and it is likely that some or all of the following would be required to enable the use of this land for flood storage based on these proposals: Clay lining, or similar impermeable lining of the low level areas to prevent seepage, both into and out of the flood storage area. Pumping to evacuate flood waters to the receiving watercourses following flood events. Acceptance by future land owners of flooding of restored land (for less frequent events) to varying depths, although compensated through Agency flood easements. Potential bunds to contain flooding of restored land. The Environment Agency would seek to modify, where possible, the land restoration proposals to encourage a holistic and sustainable land and flood management system and to reduce the future costs and environmental impacts, and which would compliment land restoration proposals outside of the main flood storage area. The Environment Agency propose to undertake detailed investigations and Environmental Impact Assessments into the mechanisms of flood risk management in order to work closely with the minerals extraction companies to develop their restoration proposals in detail and in line with the primary objective of flood storage and the principles for flood storage outlined above. Detailed hydrological studies are planned which will determine the extent, if any, of bunding and clay lining required. The purpose of the detailed hydrological assessment is also to help determine the most appropriate land restoration option to be pursued. Characteristics of the flood storage area The following provides a list of specific items that will need to be satisfied in order to meet the primary objective to provide a long term sustainable flood risk management solution at Block Fen: 5

1. Sustain the current standard of flood protection of 1 in 25 year statistical return period event 2. Provide 10.8 million cubic metres of flood storage capacity, equivalent of two 1 in 25 year statistical return period flood events in succession; 3. Serve the same area as is currently served by Welches Dam pumping station. 4. A phased restoration of land to bring flood storage on-line as land is released over the 50 year minerals extraction programme. 5. Where practicable maximise the number and areas of lakes provided through restoration to maximise the available flood storage volume contained within the lakes, thereby reducing frequency of flooding on the remaining restored land. 6. Where possible provide continuity of the drainage of the area with the surrounding IDB system to reduce ongoing drainage and pumping costs associated with the restoration of the site. Future management of the flood storage area The Environment Agency will be responsible for the setting the operating rules for the flood storage area, including the levels at which water is stored and removed from the area. The Environment Agency will also be responsible for ensuring that the area is operated and maintained in accordance with the operating rules. It is envisaged that the day to day management, in line with the operating rules, could be undertaken either by Internal Drainage Boards (IDBs) or the Environment Agency s operations teams. The cost of running the area will be kept in line with the existing local precept arrangement for the operation and maintenance of Welches Dam pumping station, which is part funded by the IDBs and the Environment Agency. The Environment Agency does not seek to own the land. In line with other similar assets, the land is likely to be owned by other landowners who are compensated, through flooding easements, for the flooding of the land. In addition the Environment Agency will retain the right to inspect and repair assets on the land as required, also through the agreement of easements with landowners. 6