ADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE

Similar documents
Frequently Asked Questions Updated July 17, 2015

Revised 8-4. Board of Directors Water Planning and Stewardship Committee. September 11, 2007 Board Meeting. Subject. Description

Los Angeles 3 rd Regional

INFRASTRUCTURE. OPERATIONS. FINANCE AND COST ALLOCATION

SUPERSEDED. BDCP Conservation Measure 1: Water Facilities and Operation. BDCP Bay Delta Conservation Plan

SRCD s Review of Impacts the Proposed Bay Delta Conservation Plan (BDCP) and Companion EIR/EIS on the Suisun Marsh

2.1 Overview. Chapter 2 Project Objectives and Purpose and Need

Kern Water Bank. Kern Water Bank Authority

Economic Analysis of Stage I of the California WaterFix

Pipelines to Nowhere? Structural Responses to Climate Change and Population

Chapter 8 National Economic Development and Locally Preferred Alternative

Frequently Asked Questions*

Water Banking Projects Update for Municipal Water District of Orange County

Integrated Resources Planning Committee Item 7a December 12, 2016

The Los Angeles Desalination Project

Colorado River Challenges Impacts to Southern Arizona

DRINKING WATER QUALITY MANAGEMENT PLAN DRAFT FINAL. June 2005

Engineer s Report. Santa Clara Valley Water District California Aqueduct Reverse Flow Project Project No

Brackish Desalination Water Supply Planning for Resiliency and Growth

CALFED Ecosystem Restoration Program (ERP)

Amortized annual capital cost ($) + Annual Operating Cost ($) = Unit Cost ($/acre-foot) Annual beneficially used water production in acre-feet (AF)

Central Valley Project (CVP) Operations: In Brief

OFFICE OF PUBLIC ACCOUNTABILITY

Water Operations 101. Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09

Questions and Answers about the Water Supply and Water Quality bond act for the November, 2018 ballot. Updated November 17, 2017

ARCHITECTURAL & ENGINEERING CONTRACTS TASK ORDER

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

City of San Diego Pure Water Project October 2014

Myths and Facts about a Drought Year in the San Joaquin Valley

Local, State and Federal Funding Opportunities

California Drought, Water, Parks, Climate, Coastal Protection, and Outdoor Access for All Act of 2018 (Proposition 68) Item 5.7

Executive Directive #5 Issue Date: October 14, 2014 Subject: Emergency Drought Response Creating a Water Wise City Introduction Los Angeles and

Key Facts: Metropolitan Responses to Statements from the San Diego County Water Authority

Supplying Southern California with Dependable Supplies of Water

Committee on Water. Desalination as a Water Source

Farmington Dam Repurpose Project

Local Resource Management in Southern California

U.S. Water Budget. Figure Source:Data from The Nation s Water Resources , Vol. 1, U.S. Water Resources Council.

A7. Economic Analysis Water Supply Cost and Benefits

PRESENTATION TITLE. Orange County Water and Beyond!

Recycled Water Feasibility Study

WATER RELIABILIT Y TO SAN DIEGO S ECONOMY

4.0 ENVIRONMENTAL IMPACT ANALYSIS K. UTILITIES AND SERVICE SYSTEMS 1. WATER SUPPLY

Chapter 6 Water Resources

ENVIRONMENTAL IMPACT ANALYSIS WATER RESOURCES: WATER SUPPLY 1. ENVIRONMENTAL CONDITIONS. a. Physical Setting. (1) Water Supply

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

San Diego, A Cadillac Desert; Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager

Environmental Geography

Association of California Water Agencies. NO TIME TO WASTE A Blueprint for California Water BLUEPRINT

Friant Dam and Millerton Reservoir

FEMA s Mitigation Support for Resiliency: Innovative Drought and Flood Mitigation Projects

Climate Change Adaptation for Local Water Management in the San Francisco Bay Area WILLIAM STEVEN SICKE. B.S. (University of California, Davis) 2000

Are Juvenile Chinook Salmon Entrained at Unscreened Diversions in Direct Proportion to the Volume of Water Diverted?

PREPARE60 OVERVIEW 1

Water Supply Board Briefing. Water Operations Department March 22, 2016

BAY DELTA CONSERVATION PLAN/ CALIFORNIA WATERFIX

Cadiz Inc. Corporate Presentation November 2017

Special Committee on Bay-Delta Item 3b, September 24, 2013

Decentralized Scalping Plants

400,000. MILLION GALLONS of water per day. The Desalination Plant and Process Locations. Welcome and Overview. people in San Diego County

California Water: Looking to the Future. Statistical Appendix

Chapter 6. Comparison of Case Studies and Cross-cutting Issues

SLIDES: Status of Southern Nevada Water Authority (SNWA): Third Intake into Lake Mead and Groundwater Project

Green California Schools Summit Metropolitan Water District of Southern California

Folsom Dam Water Control Manual Update

A joint effort of the Orange County Water District and Orange County Sanitation District

Notice of Preparation of an Environmental Impact Report and Scoping Meeting

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

February 7, Purpose. Background. the BDCP. needs the project. Discussion. Facilities 1. plants) 1, October 1, 2013,

Report. Water Resources Management Water Transfer and Exchange Transactions. Summary. Attachments. Detailed Report

MWD Water Sales and State Water Project Water Conditions to 2015

SOUTHERN NEVADA WATER BRIEFING Prepared for the Legislative Commission's Subcommittee to Study Water

Madera Irrigation District Water Supply Enhancement Project

WATER FOR LOS ANGELES

Integrated Regional Water Management

Timeline of the Stockton East Water District:

Water Management Representatives

WATER STORIES WEST BASIN, CA

Imperial Valley Economic Development Renewable Energy Conference

EXECUTIVE SUMMARY STORMWATER CAPTURE MASTER PLAN

System Plan Components Inventory

Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future

San Diego Basin Study IRWM RAC Meeting

8.4 West Central Brazos Water Distribution System

Executive Summary. ES.1 Project Background

DRAFT BAY DELTA CONSERVATION PLAN STATEWIDE ECONOMIC IMPACT REPORT

CRS Report for Congress Received through the CRS Web

APPENDIX A NOTICE OF PREPARATION/ NOTICE OF INTENT. Proposed Lower Yuba River Accord June 2007 Draft EIR/EIS

SPECIAL BOARD OF DIRECTORS MEETING. 1:00 p.m.

The Quest for Long-Term Water Resource Planning

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

Managed Groundwater Recharge to Support Sustainable Water Management. A Sacramento Valley Perspective November 8, 2017

NOTICE OF PREPARATION. Notice of Preparation of an Environmental Impact Report for the Kern Water Bank Conservation and Storage Project

A10. Cost and Benefits Summary

Chapter 13. Implementation Plan

State of the Estuary Report 2015

OPERATIONS IN THE MONO BASIN*

Lake County Success. support through synergistic local partnerships that not only mitigate, but also produce

State of the Valley Report

Response to Comments of Don and Tricia Nevis (Letter I25) See the master response to Public Outreach Process.

Transcription:

ADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE Presented by Gary Takara City Council September 18, 2017 Agenda Item 12

Recommendations Find that adopting a resolution in support of the California WaterFix and the California Eco Restore is exempt from the California Environmental Quality Act per Guidelines Section 15061 (b)(3); and Adopt a Resolution in support of the California WaterFix and California Eco Restore 2

Sacramento -San Joaquin Delta Sacramento & San Joaquin Rivers form the Sacramento- San Joaquin Delta ( Delta ) > Wetland consisting of marshes, levees, islands, and waterways > Home to more than 500 plants & wildlife including the endangered delta smelt > 1,150 square miles in area > 1,100 miles of levees & 700 miles of waterways > 4.9 million acre-feet ( MAF ) per year in water supplies to 25 million people & 3 million acres of agricultural land. 3

Delta Major Hub of Water Exports South Delta diversion at the Clifton Court Forebay > Two large pumping plants > Harvey Banks for the SWP > Bill Jones for the CVP 1

Delta Major Hub of Water Exports South Delta diversion at the Clifton Court Forebay > Two large pumping plants > Harvey Banks for the SWP > Bill Jones for the CVP Central Valley Project ( CVP ) > U.S. Bureau of Reclamation ( USBR ) > Constructed in the 1940s > 2.2 MAF/year for central California agricultural & farm land State Water Project ( SWP ) > California Department of Water Resources ( DWR ) > Constructed in the 1960s > 2.7 MAF/year for central & southern California municipal and institutional > Conveyed via California Aqueduct 2

Delta Issues Reverse Flows Pumps redirect river flows > Entrain and trap fish (endangered Delta Smelt) > Introduce higher salinity 5

Delta Issues Levee Vulnerability > Large seismic event and subsidence may breach levees > Re-direct flows and impact downstream users > Introduce chemicals & increased turbidity > Costly repairs Supply Reliability > Global warming & rising sea levels 6

Water Delivery With and Without California WaterFix 6.00 5.00 Average Conveyance (1) SWP & CVP Contractors Metropolitan Water District 4.70 5.00 (4) Volume (MAF) 4.00 3.00 2.00 1.00 1.20 3.70 (3) 0.84 360 TAF Reduction (30%) 1.21 0.00 Existing Conditions Future without CA WaterFix Future with CA WaterFix (2) (2) (1) All deliveries assumed with 2025 climate change impacts. (2) Future scenarios analyzed under a range of outflow requirements & operating criteria. (3) Future without CA WaterFix ranged from 3.5 to 3.9 MAF. (4) Future with CA WaterFix ranged from 4.7 to 5.3 MAF.

California WaterFix 3 intakes and 34 miles north of Clifton Court Forebay > Each rated at 3,000 CFS Main Tunnels > Two tunnels, 40-foot diameter and 30-miles in length > Up to 150 feet below ground surface Schedule > Construction 13 years > Operational by mid-2030s 8

California WaterFix Benefits Dual conveyance > Provides operational flexibility > Allows for operations in a dynamic fishery environment > Diversion of excess flood flows for dry-year storage & emergencies Reduce risks for climate change > North intakes are at a higher elevation Improved flow patterns in the Delta > Reduced diversion in the south Delta which lessens reverse flows > Reduce risk of fish entrainment Reduce seismic and subsidence risks > Tunnels are reinforced & below grade Improved water quality > Lower total dissolved solids, salinity & bromide 9

California Eco Restore Restore and protect +30,000 acres of Delta habitat by 2020 > Restore floodplains, tidal habitat, and aquatic and riparian habitat Work in progress: > Restored 1,900 acres of habitat > 3,900 acres are under construction & 23,200 acres under permitting > Restored 1.2 miles of aquatic waterways & planning and permitting 5.5 miles Planning & implementation cost $300 million > Funded primarily by CVP and SWP contractors 10

California WaterFix Cost Capital cost at $16.7 billion (2017 dollars) > Contingency of 36% or $3.7 billion > $401 million in capital mitigation Operation, maintenance, and mitigation cost > $64.4 million in 2033 (2017 dollars) > Facilities operational by 2033 SWP contractors cost share at 55% > Negotiating with CVP contractors on cost share Metropolitan Water District ( MWD ) is the largest SWP contractor with 45.8% rights > 5 of 29 SWP contractors will not benefit from California WaterFix > MWD s cost share 47.1%

California WaterFix Cost Costs are in 2017 Dollars Interest Rate Scenario (Term 40 Years) Description 4% 6% 8% Total Capital & Mitigation Costs $16.7 Billion $16.7 Billion $16.7 Billion Total SWP Annual Financing and O&M Cost at 55% in 2033 $438 Million $567 Million $709 Million MWD Annual Cost Share at 47% in 2033 $207 Million $268 Million $334 Million MWD Annual Volumetric Sales (Million Acre-Feet) 1.7 1.7 1.7 MWD Unit Costs ($/Acre-Foot) $122 $157 $196 WaterUsage for an Average Pasadena Single Family Household (Billing Units) 13

MWD Cost Share Based on 6% Scenario ($ Million) ~ 5% Increase for an Average Household Bill $400 MWD Cost Share $350 Monthly Cost for Average SF Household (MWD Sales of 1.7 MAF) $3.24 $3.28 $3.32 $3.36 $3.40 $3.44 $3.48 $3.52 Monthly Cost for Average SF Household (MWD Sales of 1.36 MAF) $300 $250 $200 $150 $100 $0.50 $50 $0.40 $0.21 $0.26 $0 Cost for MWD & City s Average Single Family Household $38 $20 $2.59 $2.62 $2.65 $2.69 $2.72 $2.75 $2.78 $2.81 $2.71 $2.23 $2.17 $1.75 $1.78 $1.40 $1.26 $246 $249 $252 $255 $258 $261 $264 $267 $1.01 $0.83 $206 $0.66 $169 $133 $96 $63 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Fiscal Year (July 1 to June 30) -- MWD s cost share of the California WaterFix does not include other water related increases. -- Monthly costs for an average single family household are based on a 60% imported MWD water. $4.00 $3.50 $3.00 $2.50 $2.00 $1.50 $1.00 $0.50 $0.00 Monthly Cost for Average SF Household

Alternative Resource Unit Costs $14,000 $12,000 Cost per Acre-Foot $10,000 $8,000 $6,000 $4,000 $7,200 $3,300 $2,000 $0 Centralized Project (Spreading Grounds) $1,100 On-site Direct Use (Cisterns & Rain Barrels) $1,800 On-Site Infiltration (Rain Gardens) Sub-Regional Direct Use (Park Storage & Irrigation) $900 Sub-Regional Infiltration (Neighborhood Recharge) $1,300 Commercial Green Street Stormwater Capture Alternatives

Alternative Resource Unit Costs $4,500 $4,000 Cost per Acre-Foot $3,500 $3,000 $2,500 $2,000 $2,100 $2,400 $1,500 $1,500 $1,000 Recycled Water (Irrigation) Recycled Water (Recharge) Seawater Desalination Recycled Water & Desalination Alternatives

2011 WIRP Alternative Local Resources Cost per Acre-Foot $7,000 $6,000 $5,000 $4,000 $3,000 $2,000 $1,000 $2,228 410 $5,950 807 $6,532 Cost per AF $3,630 32 106 Volume $4,190 577 900 800 700 600 500 400 300 200 100 Volume (AF/Year) $0 Satellite MBR On-Site Non- Potable Reuse (Irrigation) Graywater Reuse (Irrigation) Residential Rain Barrel (Irrigation) Residential Rain Gardens (Recharge) Residential & Commercial Infiltration Strip & Bioswale (Recharge) 0 Alternative Local Resources (Based on 2010 Cost)

Large Scale Alternative Resources $3,000 Cost per AF Capacity 360 400 Cost per Acre-Foot $2,500 $2,000 $1,500 $1,000 $500 $2,410 56 $960 100 $1,925 56 $1,660 165 $1,800 34 $745 300 200 100 Capacity (1,000 AF/Year) $0 San Diego Claude "Bud" Lewis Orange County Water District * Cost does not account for groundwater pumping. Poseidon Huntington Beach (Proposed) MWD Regional Recycled Water (Proposed)* San Diego Pure Water (Proposed) MWD's Share of California WaterFix (Proposed)** 0 **Cal WaterFix @ 6% Interest Scenario ($268M 360 TAF)

Cost to Replace Full Delta Supply (MWD s Share of 1,200 TAF) $50 $42.4 Capital Cost ($ Billion) $40 $30 $20 $10 $21.4 $9.2 $21.4 $19.6 $4.3 $0 San Diego Claude "Bud" Lewis Orange County Water District* *Cost includes upgrade from 100 MGD to 130 MGD capacity. Poseidon Huntington Beach (Proposed) MWD Regional San Diego Pure Recycled Water Water (Proposed) (Proposed) MWD's Share of California WaterFix (Proposed)

Risks of Not Moving Forward with California WaterFix Increasing regulatory constraints > Impacts to water operations result in reduced diversions > In ability to capture storm flows for drought and emergency supplies > Threatened fish species requiring higher outflows and decline in water supply Threats from earthquakes and subsidence > Levee failures and flooding > Introduce higher turbidity and chemicals > Costly repairs Climate change > Rising sea levels and introducing higher salinity into water supplies 19

Risks of California WaterFix Political Risks > Strong opposition challenging the project Taking of additional water True cost of project & rate impacts Alternatives (conservation, recycled water, desalination, storm water capture) > Potential litigation costs and project delays Construction Overruns > Very large and complex project Rate Impacts > MWD s cost allocation is volumetric based > PWP will always be dependent on MWD imported water 20

Local & Regional Water Supply Pasadena s water supply > Local groundwater & spreading credits 40% > Imports from MWD 60% MWD s imported water supply > SWP water provides 60% Preserving investments made in the SWP > City is 1.2% of MWD s sales > MWD has 45.8% of rights to the SWP water Water Integrated Resources Portfolio > Local resources (groundwater, conservation, recycled water, stormwater) Southern California s water supply > SWP water 30% 21

California WaterFix -Conclusion The threat to the water supply and reliability is greater if no action is taken. California WaterFix supports the 2009 Delta Reform Act co-equal goals of improving the State s water reliability while protecting, enhancing, and restoring the Delta ecosystem. 22

QUESTIONS? 23