1 17 Santa Clara Valley Water District California Aqueduct Reverse Flow Project Project No Engineer s Report February 2015 Water Utility Capital Division
2 This page intentionally left blank.
3
4 This page intentionally left blank.
5 1. PROJECT DESCRIPTION On September 23, 2014, the Santa Clara Valley Water District (SCVWD) adopted the Engineer s Report for the SCVWD California Aqueduct Reverse Flow Project. The Engineer s Report described the installation of temporary reverse flow pumping systems at up to four check structures; one each at Check Structure 22, Check Structure 20, Check Structure 18, and Check Structure 15 along the California Aqueduct, in Kings and Fresno Counties, to facilitate reverse flow of 18,000 acre-feet (AF) of SCVWD s previously banked water from Semitropic Water Storage District (Semitropic). Since adoption of the Engineer s Report, the project has undergone additional modifications which include a proposed increase in water delivery from 18,000 AF to 50,000 AF and the installation of additional infrastructure, including two 48 inch bypass pipelines, a small vacuum pump and a siphon at the Dos Amigos Pumping Plant in Merced County. The proposed modified SCVWD California Aqueduct Reverse Flow Project (Project) is located at check structures 15, 18, 20, 22, and the Dos Amigos Pumping Plant along the California Aqueduct in the central San Joaquin Valley (see Figure 1 for project location). The proposed Project sites (each of the check structures and the Dos Amigos Pumping Plant) are located on properties owned by the California Department of Water Resources (DWR) and/or United States Bureau of Reclamation (Reclamation). The purpose of the proposed Project is to convey water previously banked by the SCVWD to address impacts of the severe drought. The conveyance will occur by utilizing temporary pumps to be installed at the four check structures to essentially reverse the flow of the California Aqueduct (Aqueduct) from north of check structure 25 to O Neill Forebay. SCVWD has previously banked Central Valley Project (CVP) water and State Water Project (SWP) water with Semitropic. This is accomplished via a banking agreement that provides for at least 31,500 AF of banked water to be pumped into the Aqueduct in any year (later referred to as pump-in capacity). In addition, SCVWD may gain access to another 18,500 AF from Semitropic in 2015 or 2016 that would similarly be conveyed, resulting in total flow capacity of 50,000 AF over a four-month period. Under normal operations, previously banked water is pumped into the Aqueduct for SWP use south of Semitropic, and in exchange, SCVWD is delivered an equal amount of SWP water supply through the South Bay Aqueduct or San Felipe Division (hereinafter referred to as normal operations). However, in critically dry years such as 2014 and 2015, limited supplies in the SWP may result in insufficient capacity within the SWP for exchanges under normal operations, in which case SCVWD would not receive sufficient supplies from Semitropic to meet its needs. SCVWD proposes to install a temporary reverse flow pumping system within DWR and/or Reclamation right-of-way to enable delivery of a portion of SCVWD s banking withdrawals. Temporary pumps would be installed at up to four existing check structures (Check Structures 22, 20, 18, and 15) along the Aqueduct 1 and a vacuum pump, siphon and two bypass pipelines would be installed at Dos Amigos Pumping Plant (Merced County). Of the 50,000 AF that would be pumped into the Aqueduct from Semitropic on behalf of SCVWD pursuant to the SCVWD/Semitropic banking agreement, all of it could be conveyed northerly for the purposes of the proposed Project and: (1) made available to Reclamation as CVP supply and/or DWR as SWP supply, and in return, SCVWD would receive a similar amount of exchange water, as described below; and/or (2) made available to Reclamation as CVP 1 Check structure 22 is on State of California right-of-way; check structures 20, 18, and 15 are on federal right-of-way managed by Reclamation. 1
6 supply and/or DWR as SWP supply for direct delivery to O Neill Forebay. All water that is conveyed northerly, and not required to be bypassed at the Dos Amigos Pumping Plant, would be distributed through existing conveyance facilities pursuant to normal operational delivery procedures. CVP exchange CVP water would be pumped through metered discharge piping around the sides of the existing control gates at up to four check structures (22, 20, 18, and/or 15), and/or siphoned from Pool 14 to 13 to bypass the Dos Amigos Pumping Plant to meet scheduled CVP demands out of San Luis Reservoir 2. Reclamation would deliver an equal amount less potential conveyance losses, if any, of CVP supply to SCVWD in San Luis Reservoir or O Neill Forebay, depending upon conditions at the time of exchange (see Figure 2); SWP exchange SWP water would be pumped through metered discharge piping around the sides of the existing control gate at one check structure (22) and delivered to SWP contractors between check structures 25 and 20 to meet scheduled demands. DWR would deliver an equal amount less potential conveyance losses, if any, of SWP supply to SCVWD via the South Bay Aqueduct and/or in San Luis Reservoir or O Neill Forebay, depending upon conditions at the time of exchange (see Figure 2). Direct delivery CVP water and/or SWP water would be pumped through metered discharge piping around the sides of the existing control gates at four check structures (22, 20, 18, and 15), and siphoned from Pool 14 to Pool 13 to bypass the Dos Amigos Pumping Plant, allowing for direct delivery to O Neill Forebay (see Figure 2). In general, the Project would include rental of pumps, high-density polyethylene (HDPE) or steel pipes, diesel-driven power units, pump watch and security, and operation and maintenance. Potential types of pumps to be used include axial flow, submersible pumps or skid-mounted, horizontal pumps of various sizes, with the capability to pump at the various flow rates required to meet SCVWD demands at the time. 2. ZONE BENEFITS The proposed Project work would benefit customers of both Zones W-2 (North County) and W-5 (South County). 3. PROJECT RIGHT-OF-WAY As work on the proposed Project would occur within DWR and Reclamation right-of-way, SCVWD is entering into agreements with both DWR and Reclamation to allow for the installation, operation, maintenance, and de-mobilization of the temporary pump stations and siphon to occur. 2 The District may not need to install and operate the temporary pumps at all four check structures to complete this exchange.
7 4. MAPS AND FIGURES See attached Figures 1 through 4 at the end of this Engineer s Report. Figure 1 shows the location of each of the facilities. Figure 2 shows an overview of facilities and locations associated with the exchange of CVP and SWP water, including SCVWD, San Luis Reservoir, O Neill Forebay, the San Felipe Division, and the South Bay Aqueduct. Figure 3 shows a typical check structure and a conceptual layout of the project features, including intake pipes, nurse tanks, pumps, discharge pipes, fuel tanks, and a portable containment berm. Figure 4 shows a conceptual layout of the siphon at the Dos Amigos Pumping Plant. 5. PROJECT COSTS The estimated costs to plan, design, install, and operate the proposed Project are as follows: External Services Planning and design phase costs $435,100 Installation and operational costs $6,000,000 Subtotal $6,435,100 Internal District labor costs $300,000 Total Project cost (in 2015 dollars) $6,735,100 The proposed Project costs would be funded by the Water Utility Enterprise, with 88.2 percent of the costs allocated to Zone W-2 (North County) and 11.8 percent of the costs allocated to Zone W-5 (South County). The cost allocation is based on each zone s average Municipal and Industrial (M&I) water use versus total M&I water use. 6. PROJECT SCHEDULE Environmental review o CEQA Final IS/MND adopted: October 2014 Addendum to IS/MND completed: February 2015 o NEPA Supplemental environmental assessment completed by Reclamation staff: April 2015 Reserve equipment: April 2015 Mobilize/install project and operate or stand-by: September 2015 through March 2016 De-mobilize: April 2016 (note: with appropriate amendments, the project may be continued in 2016 if the drought continues)
8 7. LIST OF MAPS AND FIGURES Figure 1 Project Location and Vicinity Map Figure 2 Other Associated Facilities Figure 3 Check Structures Conceptual Site Plan Figure 4 Siphon Conceptual Site Plan (Remainder of page intentionally left blank)
9 Figure 1. Project Location and Vicinity Map
10 Figure 2. Other Associated Facilities
11 Figure 3. Check Structures Conceptual Site Plan
12 Figure 4. Siphon Conceptual Site Plan
California Water Commission. June 28, 2018
California Water Commission June 28, 2018 1 Los Vaqueros Reservoir Off-stream reservoir in Contra Costa County Operated in conjunction with four Delta intakes Capacity of 160 TAF Uses: Water quality Drought
More informationReport. Water Resources Management Water Transfer and Exchange Transactions. Summary. Attachments. Detailed Report
Report Water Resources Management Summary 2008-2010 Water Transfer and Exchange Transactions Following the 1986-1991 drought, Metropolitan intensified its strategic planning efforts towards diversification
More informationSemitropic Stored Water Recovery Unit Special Study Report
Semitropic Stored Water Recovery Unit Special Study Report U.S. Department of the Interior Bureau of Reclamation Mid-Pacific Region Sacramento, California November 2007 Mission Statements The mission of
More informationThe Los Vaqueros Reservoir Expansion Project
The Los Vaqueros Reservoir Expansion Project Marguerite Patil Special Assistant to the General Manager Contra Costa Water District SCVWD/CCWD Joint Meeting July 14, 2016 Today s Itinerary 11:00 11:50 Presentation
More informationLos Vaqueros Reservoir Expansion Investigation Update on Draft Feasibility Report and State Funding Application
Los Vaqueros Reservoir Expansion Investigation Update on Draft Feasibility Report and State Funding Application February 22, 2018 Los Vaqueros Reservoir Off-stream storage facility currently served by
More informationPurpose, Need and Objectives for the Los Vaqueros Reservoir Expansion Project
CHAPTER 1 Purpose, Need and Objectives for the Los Vaqueros Reservoir Expansion Project 1.1 Introduction The San Francisco Bay/Sacramento San Joaquin Delta estuary is the largest estuary on the West Coast
More informationMetropolitan Water District. July 25, 2013
Metropolitan Water District July 25, 2013 The Mission of the Metropolitan Water District is to provide its service area with adequate and reliable supplies of high-quality water to meet present and future
More informationInvestigation Highlights
Investigation Highlights May 2014 INVESTIGATION HIGHLIGHTS A Summary North-of-the-Delta Offstream Storage (NODOS) would provide a robust set of benefits, including water supply reliability for municipal
More informationMontecito Water District Desalination Facilities Status Update. Board of Directors Meeting March 17, 2015
Montecito Water District Desalination Facilities Status Update Board of Directors Meeting March 17, 2015 Desalination Studies Update 1) Desalination Feasibility Study 2) Desalination Technical Support
More informationADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE
ADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE Presented by Gary Takara City Council September 18, 2017 Agenda Item 12 Recommendations Find that
More informationReport Documenting the Reasonableness of the Conjunctive Use Benefit of Surface Water and Recycled Water to Groundwater Customers
Report Documenting the Reasonableness of the Conjunctive Use Benefit of Surface Water and Recycled Water to Groundwater Customers For the Santa Clara Valley Water District Final Report February 27, 2015
More informationLos Angeles 3 rd Regional
Los Angeles 3 rd Regional Investors Conference Los Angeles, California March 31, 2016 Metropolitan Water District of Southern California 1 Metropolitan Water District of of Southern California 2 Metropolitan
More informationWater and Power Policy Group
Water and Power Policy Group Retrospective Analysis of Changed Central Valley Project and State Water Project Conditions Due to Changes in Delta Regulations January 213 Retrospective Analysis January 213
More informationAmendment to EBMUD Retirement System Ordinance (No. 40) - Section 21 First Reading. Board of Directors March 10, 2015
Amendment to EBMUD Retirement System Ordinance (No. 40) - Section 21 First Reading Board of Directors March 10, 2015 Updates to Ordinance No. 40 Section 21 provides for an optional modification of a member
More informationWater Banking Projects Update for Municipal Water District of Orange County
Irvine Ranch Water District Water Banking Projects Update for Municipal Water District of Orange County February 3, 2014 1 Presentation Overview Purpose of IRWD Water Banking Projects Water Banking Projects
More informationSierra Mountains. LA Aqueduct. Supplies Conservation
Sierra Mountains LA Aqueduct Delta State Water Project Supplies Groundwater and Recycling Colorado River Aqueduct Supplies Conservation Groundwater Recovery CRA 21% SWP 29% Local Supplies & LA Aqueduct
More informationLong-Term Recapture and Recirculation of Restoration Flows Environmental Impact Statement. Public Scoping Meeting
Long-Term Recapture and Recirculation of Restoration Flows Environmental Impact Statement Public Scoping Meeting Sacramento Monday, August 10 1:00 3:00 p.m. USBR 2800 Cottage Way Café Conf. Room C-1002
More informationHollister Urban Area Water and Wastewater Master Plan Update
Hollister Urban Area Water and Wastewater Master Plan Update City of Hollister, San Benito County Water District, and Sunnyslope County Water District June 2017 Robert H. Ellis NO. 24679 EXP. 12/31/17
More informationSection V: Water Accounting and Water Supply Reliability
Section V: Accounting and Supply Reliability A. Quantifying the Supplier s Supplies 1. Agricultural Supplier Quantities Table 38 shows typical water diversions from the CA Aqueduct during the representative
More informationFreeport Regional Water Authority. c/o Gregg Ellis 2600 V Street Sacramento, CA 95818
Notice of Preparation and Notice of Intent for the Freeport Regional Water Project, Sacramento, Environmental Impact Report/Environmental Impact Statement Freeport Regional Water Authority U.S. Bureau
More informationState Water Resources Control Board
Linda S. Adams Srcrrtaqfir Er~viro~~r,,r,ltaI Protertiorz State Water Resources Control Board Division of Water Rights 1001 I Street, 14Ih Floor t Sacramento, California 95814 t 916.341.5300 P.O. Box 2000
More informationSANTA CLARA VALLEY WATER DISTRICT CALIFORNIA AQUEDUCT REVERSE FLOW
SANTA CLARA VALLEY WATER DISTRICT 5750 Almaden Expressway San Jose, CA 95118 SANTA CLARA VALLEY WATER DISTRICT CALIFORNIA AQUEDUCT REVERSE FLOW Draft Initial Study & Mitigated Negative Declaration August
More informationMUNICIPAL AND INDUSTRIAL WATER SHORTAGE POLICY CENTRAL VALLEY PROJECT, CALIFORNIA Environmental Assessment
MUNICIPAL AND INDUSTRIAL WATER SHORTAGE POLICY CENTRAL VALLEY PROJECT, CALIFORNIA Environmental Assessment October 2005 Table of Contents Items Page CHAPTER 1 PURPOSE AND NEED Introduction...1-1 Background
More informationSection V: Water Accounting and Water Supply Reliability
Section V: Water Accounting and Water Reliability A. Quantifying the Water Supplier s Water Supplies 1. Agricultural Water Supplier Water Quantities Table 41 shows typical water diversions from the CA
More informationPOTABLE REUSE PLANNING WATER SUPPLY SYSTEM MODELING REPORT
POTABLE REUSE PLANNING WATER SUPPLY SYSTEM MODELING REPORT PROJECT NO. 91304001-1215 Prepared by Tracy Hemmeter - Senior Project Manager, SCVWD Eric Olson Engineering Systems Analyst, SCVWD Kent Haake
More informationKERN COUNTY ECONOMIC SUMMIT THE FUTURE OF WATER AND ITS ECONOMIC IMPACT
KERN COUNTY ECONOMIC SUMMIT THE FUTURE OF WATER AND ITS ECONOMIC IMPACT CURTIS CREEL Kern County Water Agency Assistant General Manager CALIFORNIA S WATER SYSTEMS William Mulholland Los Angeles Aqueduct
More informationSan Francisco Water PowerS<
San Francisco Water PowerS< Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 DATE: TO:
More informationRegional water wholesaler Serves 6 counties, 19 million people Growth: 170,000 people/yr. $1 trillion regional economy
Regional water wholesaler Serves 6 counties, 19 million people Growth: 170,000 people/yr. $1 trillion regional economy 50%+ of region s supply (4 million acre-ft/yr) 2 State Water Project (DWR) Delta
More informationJose Gutierrez - Chief Operating Officer. Water Education Foundation, April 4,2019
Jose Gutierrez - Chief Operating Officer Water Education Foundation, April 4,2019 Presentation Overview Who We Are CVP South of Delta Allocation Groundwater Conditions Sustainable Groundwater Management
More informationChapter 8 National Economic Development and Locally Preferred Alternative
Chapter 8 National Economic Development and Locally Preferred Alternative Determination of Feasibility This chapter considers the feasibility of the NED Plan and the Locally Preferred Alternative. As indicated
More informationPutting Title 22 Water to Beneficial Use in the Central Valley
Central Valley Watereuse Chapter Meeting April 17 th, 2014 Putting Title 22 Water to Beneficial Use in the Central Valley North Valley Regional Recycled Water Program (NVRRWP) Presenters: Will Wong, City
More informationCalifornia League of Cities Briefing on Water Supply Issues
California League of Cities Briefing on Water Supply Issues Stephen N. Arakawa Manager, Bay-Delta Initiatives The Metropolitan Water District of Southern California May 5, 2016 California WaterFix: Securing
More informationZEBRA MUSSEL PROJECT STATUS
ZEBRA MUSSEL PROJECT STATUS San Benito County Water District July 8, 2008 Reviewed by: Prepared by: Ali Hasan Christopher Dinsmore, PE Introduction HDR has been contracted with San Benito County Water
More informationBAWSCA-EBMUD Short-Term Pilot Water Transfer Plan. September 2013
BAWSCA-EBMUD Short-Term Pilot Water Transfer Plan BAWSCA-EBMUD Short-Term Pilot Water Transfer Plan Executive Summary Prepared by: Bay Area Water Supply and Conservation Agency East Bay Municipal Utility
More informationNotice of Preparation of an Environmental Impact Report and Scoping Meeting
Notice of Preparation of an Environmental Impact Report and Scoping Meeting Date: August 15, 2017 To: Project Sponsor and Lead Agency: Staff Contact: Project Title: Location: General Plan Designation:
More informationRevised 8-4. Board of Directors Water Planning and Stewardship Committee. September 11, 2007 Board Meeting. Subject. Description
Board of Directors Water Planning and Stewardship Committee September 11, 2007 Board Meeting Subject Adopt criteria for conveyance options in implementation of Long Term Delta Plan Description Revised
More informationFriant Dam and Millerton Reservoir
San Joaquin River Restoration Program Floodplain Management Association Presentation SJRRP Update Continued: Impacts from Subsidence April 18, 2013 1 Friant Dam and Millerton Reservoir Completed in 1942
More informationCHAPTER 7 POWER PRODUCTION AND ENERGY CONSUMPTION
CHAPTER 7 POWER PRODUCTION AND ENERGY CONSUMPTION Hydroelectric facilities generate a significant portion of California s energy requirements. Private electric utilities and water agencies own and operate
More informationECONOMICS OF SUSTAINABLE WATER REUSE IN THE NAPA VALLEY
ECONOMICS OF SUSTAINABLE WATER REUSE IN THE NAPA VALLEY Graham Wadsworth PE, Town of Yountville, Yountville CA Donald E. Moore, Utility Operations Supervisor, Town of Yountville Theodore Whiton PE, GHD,
More informationA Retrospective Estimate of the Economic Impacts of Reduced Water Supplies to the San Joaquin Valley in 2009
A Retrospective Estimate of the Economic Impacts of Reduced Water Supplies to the San Joaquin Valley in 2009 By Jeffrey Michael, Richard Howitt, Josué Medellín-Azuara, and Duncan MacEwan 1 September 28,
More informationIMPACT ON FINANCIAL AND PERSONNEL RESOURCES:
MEMORANDUM TO: FROM: CITY COUNCIL GEOFF ENGLISH, DIRECTOR OF PUBLIC WORKS SUBJECT: CONSIDERATION OF PLACING A MEASURE ON THE BALLOT AT THE NOVEMBER 8, 2016 ELECTION TO AUTHORIZE THE PURCHASE OF STATE WATER
More informationFrequently Asked Questions Updated July 17, 2015
Frequently Asked Questions Updated July 17, 2015 1. What is California WaterFix? California WaterFix is a proposal backed by the administrations of Governor Edmund G. Brown Jr. and President Barack Obama
More informationNOTICE OF PREPARATION. Notice of Preparation of an Environmental Impact Report for the Kern Water Bank Conservation and Storage Project
NOTICE OF PREPARATION To: Responsible, Federal and Trustee Agencies (Agency) From: Kern Water Bank Authority 1620 Mill Rock Way, Suite 500 Bakersfield, California 93311 (Address) Subject: Notice of Preparation
More informationProject Labor Agreements. Board Meeting February 11, 2014
Project Labor Agreements Board Meeting February 11, 2014 Outline PLA Background PLA History at the District Other Agency Experiences Pilot PLA Recommended Next Steps PLA Background Project-specific agreement
More informationClimate Change and the Future of Groundwater in California: Conjunctive-Use and Aquifer Recharge
Climate Change and the Future of Groundwater in California: Conjunctive-Use and Aquifer Recharge Adam S. Hutchinson Recharge Planning Manager, Orange County Water District Presentation to CCWAS IGERT Climate
More informationKern Water Bank. Kern Water Bank Authority
Kern Water Bank Kern Water Bank Authority THE KERN WATER BANK Ensuring a Reliable Water Supply to the Southern San Joaquin Valley Providing for Exceptional Upland and Riparian Habitat Kern Water Bank Authority
More informationC I R P A C P R E S E N T A T I O N B Y R O N T H O M P S O N J U N E 1 6,
WATER UPDATE C I R P A C P R E S E N T A T I O N B Y R O N T H O M P S O N J U N E 1 6, 2 0 1 6 W A T E R S U P P L Y, C O N S E R V A T I O N A N D D E V E L O P M E N T CURRENT WATER CONDITIONS 102%*
More informationA7. Economic Analysis Water Supply Cost and Benefits
A7. Economic Analysis Water Supply Cost and Benefits Attachment 7 identifies the costs and water supply benefits attributed to the seven projects proposed for implementation in the Santa Barbara County
More informationIrrigation District Efficiencies and Potential Water Savings in the Lower Rio Grande Valley of Texas
Irrigation District Efficiencies and Potential Water Savings in the Lower Rio Grande Valley of Texas Guy Fipps and Craig Pope1 Abstract Agriculture holds about 90 percent of all the water rights in the
More informationAGENDA DATE: November 14, 2018
ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT, ZONE 7 100 NORTH CANYONS PARKWAY, LIVERMORE, CA 94551 PHONE (925) 454-5000 FAX (925) 454-5727 ORIGINATING SECTION: INTEGRATED PLANNING CONTACT:
More informationSUMMARY OF METROPOLITAN S RESPONSES TO COMMENTS REGARDING METROPOLITAN S DRAFT 2015 URBAN WATER MANAGEMENT PLAN
SUMMARY OF METROPOLITAN S RESPONSES TO COMMENTS REGARDING METROPOLITAN S DRAFT 2015 URBAN WATER MANAGEMENT PLAN The Metropolitan Water District of Southern California ( Metropolitan ) received comments
More information3.14. UTILITIES AND SERVICE SYSTEMS
3.14. UTILITIES AND SERVICE SYSTEMS 3.14.1. ENVIRONMENTAL SETTING Westlands Solar Park Water Supply Agricultural water supply for crop irrigation within the WSP plan area is mainly provided from surface
More informationSection V: Water Accounting and Water Supply Reliability
Section V: Accounting and Supply Reliability A. Quantifying the Supplier s Supplies 1. Agricultural Supplier Quantities Table 46 illustrate the District s water. The District routinely transfers and/or
More informationWater Supply Board Briefing. Water Operations Department March 22, 2016
Water Supply Board Briefing Water Operations Department March 22, 2016 Water Supply Briefing California Water Supply District Water Supply Water Supply Projections Water Supply Schedule 2 California Water
More information2013 WATER RESOURCES SERVICE RELIABILITY REPORT AND. El Dorado Irrigation District 2890 Mosquito Road Placerville, California 95667
2013 WATER RESOURCES AND SERVICE RELIABILITY REPORT El Dorado Irrigation District 2890 Mosquito Road Placerville, California 95667 Presented to the EID Board of Directors August 12, 2013 TABLE OF CONTENTS
More informationWATER MANAGEMENT PLAN
WATER MANAGEMENT PLAN REPORT TO THE UNITED STATES BUREAU OF RECLAMATION ON CCWD s WATER CONSERVATION PROGRAM AND ACTIVITIES FINAL DRAFT This page left intentionally blank Water Management Plan REPORT TO
More informationCross Valley Canal Contractors
Cross Valley Canal Contractors Renewal of Conveyance Contracts Draft Environmental Report June 2016 State Clearinghouse. 2011051022 Document Information Prepared for Project Name State Clearinghouse.
More informationAppendix B PLANNING AND OPERATION COORDINATION FOR THE VERNALIS ADAPTIVE MANAGEMENT PLAN
Appendix B PLANNING AND OPERATION COORDINATION FOR THE VERNALIS ADAPTIVE MANAGEMENT PLAN Successful implementation of the Vernalis Adaptive Management Plan (VAMP) will require communication and coordination
More informationPROPOSAL OF, a corporation. an individual doing business as
PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to instructions and invitations to bidders, the undersigned proposes
More information1. PURPOSE OF AND NEED FOR ACTION
1. PURPOSE OF AND NEED FOR ACTION INTRODUCTION The Bureau of Reclamation (Reclamation) and the San Joaquin River Group Authority (Authority) are jointly preparing this Environmental Impact Statement/Environmental
More informationMEMORANDUM FC 14 ( )
MEMORANDUM FC 14 (01-02-07) TO: Santa Clara Valley Water District Board of Directors FROM: Directors Tony Estremera, Barbara Keegan, and Gary Kremen SUBJECT: Suggested Waterfix Guiding Principles Incorporated
More information3.2 SURFACE WATER RESOURCES
3.2 SURFACE WATER RESOURCES 3. Affected Environment This section of the EIR/EIS focuses on the surface waters of the San Joaquin River Basin and the resulting flows from the basin into the Delta as measured
More informationCalifornia Water: Looking to the Future. Statistical Appendix
Golden Gate University School of Law GGU Law Digital Commons California Agencies California Documents 1-1988 California Water: Looking to the Future. Statistical Appendix California Department of Water
More informationPoso Creek. Integrated Regional Water Management Plan
Poso Creek Integrated Regional Water Management Plan Adopted July 2007 Poso Creek IRWMP Regional Management Group and Region The Poso Creek Regional Management Group (Regional Management Group) comprises
More informationPajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form
Pajaro River Watershed Integrated Regional Water Management Plan Update PROJECT OVERVIEW General Project Information Project Title: South County Recycled Water Pipeline - Short-Term CIP Implementation
More informationWater Supply Planning for the Morongo Basin Area
Water Supply Planning for the Morongo Basin Area Overview The Morongo Basin is located in California s High Desert, east of the San Bernardino Mountains. The study area includes the Town of Yucca Valley
More informationPacheco Reservoir Expansion
California Water Commission Pacheco Reservoir Expansion Unique Opportunity for Fisheries Recovery, Flood Risk Reduction and Emergency Water Supply December 13, 2017 1 of 33 Project Partners Pacheco Pass
More informationCalifornia Urban Water Agencies Water Supply Reliability Report
Progress Update on Water Conservation, Supply Diversification and Resource Management California Urban Water Agencies Water Supply Reliability Report August 2012 San Francisco Public Utilities Commission;
More informationCalifornia s Water Market, By the Numbers: Update 2012
Technical Appendices California s Water Market, By the Numbers: Update 2012 Ellen Hanak and Elizabeth Stryjewski Contents Appendix A. Data Sources and Caveats Appendix B. Detailed Water Transfer Tables
More information3. AFFECTED ENVIRONMENT
3. AFFECTED ENVIRONMENT This chapter presents a general description of the physical environment of the project area and vicinity. The existing condition of resources sets the baseline against which the
More informationWater Supply Study for the Lyons Canyon Project
for the Lyons Canyon Project Prepared by: Science Applications International Corporation TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Lyons Canyon Project... 1 1.2 Purpose of the Water Supply Study...
More informationStudy Authorization The Federal government received initial study authorization in 2003 under Public Law (P.L.) 108-7, which states,
Executive Summary Introduction The purpose of this North-of-the-Delta Offstream Storage (NODOS) Investigation Draft Feasibility Report is to evaluate new offstream surface storage north of the Delta. This
More informationChapter 2 Project Objectives and Purpose and Need
Chapter Project Objectives and Purpose and Need The BDCP sets out a comprehensive conservation strategy for the Delta designed to restore and protect ecosystem health, water supply reliability, and water
More informationTABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...
TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed
More informationExecutive Summary. ES.1 Introduction
ES.1 Introduction This Environmental Report/Environmental Statement (EIR/EIS) has been prepared by the Sites Project Authority (Authority) and the U.S. Department of the Interior, Bureau of Reclamation,
More informationAdministrative Final 1
1 For the (ARWA), we appreciate the opportunity to comment on the final environmental impact report/environmental impact statement (FEIR/EIS) for the California WaterFix project. These agencies rely, in
More informationUpdate on California WaterFix and Metropolitan Water District s (MWD s) Review Process (Presentation)
August 16, 2017 Attention: Imported Water Committee Update on California WaterFix and Metropolitan Water District s (MWD s) Review Process (Presentation) Purpose The purpose of this memo is to provide
More information2.1 Overview. Chapter 2 Project Objectives and Purpose and Need
1 Chapter The BDCP sets out a comprehensive conservation strategy for the Delta designed to restore and protect ecosystem health, water supply, and water quality within a stable regulatory framework. The
More informationDrinking Water Source Assessment. Patterson Pass Water Treatment Plant Intake on South Bay Aqueduct
Drinking Water Source Assessment Patterson Pass Water Treatment Plant Intake on South Bay Aqueduct Source Name Patterson Pass WTP Raw Water Reservoir Source Number - 0110010-009 Zone 7 Water Agency of
More informationA Tale of Two Dams and a dry river. November 1, 2011 Planning, Resources and Technology Committee Mojave Water Agency
A Tale of Two Dams and a dry river November 1, 2011 Planning, Resources and Technology Committee Mojave Water Agency The Mojave River Headwaters San Bernardino Mountains Terminus (mouth) Soda Lake (Baker,
More informationCalifornia WaterFix (Alternative 4A)/Recirculated Environmental Analysis Frequently Asked Questions
Updated August 2015 California WaterFix (Alternative 4A)/Recirculated Environmental Analysis Frequently Asked Questions 1. What is the purpose and need for California WaterFix (Alternative 4A)? The California
More informationSanta Barbara County Region
Attachment 3 Santa Barbara County Region IRWM Implementation Grant Proposal Attachment 3 consists of the following items:. Attachment 3 provides a project description, estimated physical benefits, technical
More informationNOTICE OF PREPARATION OFA PARTIALLY REVISED, RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING FOR THE FRIANT RANCH PROJECT
County of Fresno DEPARTMENT OF PUBLIC WORKS AND PLANNING NOTICE OF PREPARATION OFA PARTIALLY REVISED, RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING FOR THE FRIANT RANCH PROJECT
More information2016 WATER RESOURCES SERVICE RELIABILITY REPORT AND. El Dorado Irrigation District 2890 Mosquito Road Placerville, California 95667
2016 WATER RESOURCES AND SERVICE RELIABILITY REPORT El Dorado Irrigation District 2890 Mosquito Road Placerville, California 95667 Presented to the EID Board of Directors September 12, 2016 This page intentionally
More informationPresented at the annual technical conference of The Irrigation Association San Antonio, Texas December 2, 2009
WATER CONSERVATION S ROLE IN CALIFORNIA WATER TRANSFERS Charles M. Burt, Ph.D., P.E. Chairman, Irrigation Training and Research Center (ITRC) California Polytechnic State University (Cal Poly) San Luis
More informationCalifornia Drought, Water, Parks, Climate, Coastal Protection, and Outdoor Access for All Act of 2018 (Proposition 68) Item 5.7
California Drought, Water, Parks, Climate, Coastal Protection, and Outdoor Access for All Act of 2018 (Proposition 68) Item 5.7 1 Potential Funding Availability California Drought, Water, Parks, Climate,
More informationSLIDES: Status of Southern Nevada Water Authority (SNWA): Third Intake into Lake Mead and Groundwater Project
University of Colorado Law School Colorado Law Scholarly Commons Western Water Law, Policy and Management: Ripples, Currents, and New Channels for Inquiry (Martz Summer Conference, June 3-5) Getches-Wilkinson
More informationShortage on the Colorado River: Analysis of Impacts to Water Users in Central Arizona. Ken Seasholes
Shortage on the Colorado River: Analysis of Impacts to Water Users in Central Arizona Ken Seasholes Manager, Resource Planning & Analysis AWRA Annual Conference, Denver November 19, 2015 Colorado River
More informationSan Diego County Water Authority Special Water Planning Committee Meeting October 10, 2012
Public Workshop on issues related to the Carlsbad Desalination Project San Diego County Water Authority Special Water Planning Committee Meeting 1 October 10, 2012 Wholesale water agency created by State
More informationFrequently Asked Questions*
Pacheco Reservoir Expansion Project Frequently Asked Questions* The Santa Clara Valley Water District, the Pacheco Pass Water District, and the San Benito County Water District are working together to
More information35. Cumulative Impacts
35. Cumulative Impacts 35.1 Introduction Cumulative impacts are defined in the California Environmental Quality Act (CEQA) CEQA Guidelines Section 15355(b) as two or more individual effects which, when
More informationCONTRA COSTA LOCAL AGENCY FORMATION COMMISSION EXECUTIVE OFFICER'S REPORT July 12, 2017 (Agenda)
CONTRA COSTA LOCAL AGENCY FORMATION COMMISSION EXECUTIVE OFFICER'S REPORT July 12, 2017 (Agenda) LAFCO 14-01 APPLICANT ACREAGE & LOCATION PURPOSE Sphere of Influence Amendment Contra Costa Water District
More informationSubject: Notice of Preparation of a Draft Environmental Impact Report
NOTICE OF PREPARATION From: Santa Clara Valley Water District 5750 Almaden Expressway San Jose, CA 95118 Subject: Notice of Preparation of a Draft Environmental Impact Report Project Title: Calero Dam
More informationPotomac Basin Case Study
Potomac Basin Case Study Cooperative Water Supply Planning & Operations AWWA Regional Collaboration Webinar September 24, 2018 Cherie Schultz, Ph.D. Section for Cooperative Water Supply Operations on the
More informationTAUSSIG. & Associates, Inc. DAVID. Public Finance Facilities Planning Urban Economics CAPACITY FEE STUDY FOR SAN GORGONIO PASS WATER AGENCY
DAVID TAUSSIG & Associates, Inc. CAPACITY FEE STUDY FOR SAN GORGONIO PASS WATER AGENCY JULY 21, 2015 Public Finance Facilities Planning Urban Economics Newport Beach Riverside San Francisco Chicago CAPACITY
More informationAppendix A: CalSimII Modeling
Appendix A: CalSimII Modeling Table of Contents Appendix A CalSim II Modeling... 1 1.0 General CalSim II Assumptions... 1 1.1 CalSim II Version... 1 1.2 System-Wide Assumptions... 1 2.0 WCM Updates to
More informationReport. Office of the General Manager. Colorado River Management Report. Summary. Detailed Report
Report Office of the General Manager Summary Colorado River Management Report This report provides a summary of the activities related to the Colorado River during April and a response to a request from
More informationSanta Clarita Valley Hydrogeology. Production Cost = $100 / acre foot
August 2014 Santa Clarita Valley Hydrogeology Production Cost = $100 / acre foot State Water Project 5,000 to 95,000 AFY Kern County Partners 11,000 AFY 158,000 AF Banked Local Groundwater 37,500 to 55,000
More informationPacheco Reservoir Expansion Project Initial Study and Notice of Preparation
Pacheco Reservoir Expansion Project Initial Study and Notice of Preparation August 2017 This page left blank intentionally. Contents Contents Page CHAPTER 1 Project Description... 1-1 1.1 Introduction...
More informationTHE CALIFORNIA WATER FIX SUPPLY CONVEYANCE OPERATION
THE CALIFORNIA WATER FIX SUPPLY CONVEYANCE OPERATION October 26, 2018 EDUCATION ADVOCACY LEADERSHIP Presenter Michael Patrick George Delta Watermaster State Water Resources Control Board SUSTAINABILITY