I-70 East PACT DRAFT EVALUATION DATA

Similar documents
State Route 8 Bridge Replacement Project

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

I-70 East ROD 1: Phase 1 (Central 70 Project) Air Quality Conformity Technical Report

SH 34 Corridor Study & Environmental Assessment:

State Road (S.R.) 12 (Florida Arts Trail PD&E)

West Seattle and Ballard Link Extensions. Stakeholder Advisory Group March 14, 2018

Sunrise Project South I-205 Corridor Improvement Project

Northwest State Route 138 Corridor Improvement Project

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS

Atlanta BeltLine Corridor Environmental Study. Technical Advisory Committee/Agency Coordination. Kick-Off Meeting

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation

Attachment A FTA DCE Worksheet Section II, NEPA Class of Action

Categorical Exclusion (CE)

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

CHAPTER 8: PHASED PROJECT IMPLEMENTATION

Green Line Extension EOT. Project Location. Project Purpose. Environmental Impact Report Public Scoping Session

Downtown Estes Loop Project Frequently Asked Questions

An Overview and Comparison of the Tennessee Department of Transportation s Environmental Evaluation Process

I-10 CONNECT. Public Meeting #1

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

Appendix C Presentation Slides with Script

APPENDIX A. NEPA Assessment Checklist

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Transportation Workshop. FORA Staff 9/8/17

NORTH I-75 MASTER PLAN Summary Report

6.0 Indirect Effects and Cumulative Impacts

Programmatic Categorical Exclusions

PROGRAMMATIC AGREEMENT FOR APPROVAL OF CERTAIN CATEGORICAL EXCLUSIONS

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

PUBLIC HEARING LOOP 9

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing

3 INTERSTATES. The Carolina Crossroads Project Team Welcomes You

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

TEXAS FREIGHT MOBILITY PLAN 2017

TCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm

Metro Board Action: Motion 22.1

Working with Transportation Concurrency Exception Areas

3.0 COMMENTS AND RESPONSES

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

IX. STRATEGIC PLAN ELEMENT

Logistics Park Kansas City (LPKC) Edgerton, KS. Infrastructure, Development And Transportation. September 30, 2013

Members of the Board of Directors. Laurena Weinert, Clerk of the Board

MULTI-MODAL TRANSPORTATION

Project Initiation Form

U S H I G H W A Y 1 4 F I N A L E N V I R O N M E N T A L I M P A C T S T A T E M E N T ( F E I S

APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT

I-10 Mobile River Bridge. & Bayway Widening

Appendix H Mitigation Plan

Factor Potential Effects Mitigation Measures

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

Public Meeting. US Highways 18 & 281 and SD Highway 50 From Douglas County Line to SD46 Charles Mix County

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

SR 710 North Study. Technical Advisory Committee Meeting No. 16 August 13, 2014 Stakeholder Outreach Advisory Committee Meeting No. 12 August 14, 2014

Exposition Light Rail Transit Project

4.17 Environmental Justice

California High-Speed Train Program FEIR/EIS

Notwithstanding article VII of this chapter, the following conditional uses may be permitted in the planned mixed use development (PMUD) zone:

Abbreviated State Final Environmental Impact Statement

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

APPENDIX A TIER 1 ANALYSIS

VDOT Land Use Overview. Brad Shelton, AICP Transportation and Mobility Planning Division June 2015

III. Regional TSM&O Overview from the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.)

COEXISTING: FREIGHT FACILITIES & COMMUNITIES. The Capital District Intermodal and Automotive Terminal Rick Crawford, Norfolk Southern April 24, 2013

5.3 Air Quality and Greenhouse Gas Emissions

Chapter 4: Alternatives Analysis

The purpose of the interchange working group is to discuss the interchanges on the I-70 corridor, not to choose the interchanges.

Niagara s Transportation Strategy 1. Introduction:

COMMUNITY IMPACT ASSESSMENT TECHNICAL MEMORANDUM 5 TH STREET WIDENING AND IMPROVEMENT PROJECT FEDERAL PROJECT NUMBER:

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA

Standard Performance Attributes for Transportation Projects

Technical Advisory Committee / Policy Advisory Committee. Solution Assessment 5/25/2017. Photo: City of Richmond COMMERCE CORRIDOR STUDY 1

Environmental Assessment May 2007

The term Significant as used in NEPA is defined at 40 CFR and requires consideration of both context and intensity.

TRANSPORTATION IMPACT ANALYSIS GUIDELINES FOR ENVIRONMENTAL REVIEW

HORIZON 2030: Plan Projects November 2005

US 70 Corridor James City Project Update. Craig Young, Three Oaks Engineering US 70 Corridor Commission May 21, 2015

407 TRANSITWAY. Planning & Preliminary Design

Concept, Feasibility & Mobility Studies. Southport Connector Expressway

Interchange Workshop Report (August 2004)

Significant Unavoidable Adverse Impacts

FACT SHEETS SAN BERNARDINO COUNTY

Executive Summary October 2017

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\

Planning Commission Study Session. Presentation

THE NEW BUCK O'NEIL (U.S. 169) CROSSING

3.6 Construction Methods

IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange. Public Meeting. Thursday April 4, 2013

TRAFFIC STUDY GUIDELINES

Chapter 4: Transportation and Land Use

APPENDIX C NOISE STUDY TECHNICAL REPORT

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe:

Chapter 8. Transportation Element

LARKSPUR SMART STATION AREA PLAN. Public Workshop December 3, 2013

IOWA TRANSPORTATION BY THE NUMBERS:

October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects

Arizona Association of County Engineers New Rules for Categorical Exclusions for FHWA Projects

Transcription:

I-70 East PACT DRAFT EVALUATION DATA Future Current Alignment NEIGHORHOOD QUALITY: Maintain quality of life and protect community values. Improve or maintain neighborhood connectivity Assess neighborhood cohesion and barriers within community Increased barrier effect in residential and other portions of Elyria Swansea due to wider I- 70. Increased barrier from traffic from Brighton Blvd diverting to 48th and Race on south in Elyria and Swansea. I-70 aligns with existing barrier of Brighton Bl., NWSS, industrial land uses and creek. Avoid/minimize impacts to neighborhood education facilities Number of local schools relocated 1 0 0 Acres of ROW 204 198 415 336 Minimize impact on neighborhoods from highway infrastructure Number of residential units displaced Number of partial residential property acquisitions 93 64 18 53 7 7 12 9 Number of local community resources lost; markets, school, P.O., rescue mission. 4 2 2 Maintain Neighborhood connection to the South Platte River Assess I-70 as barrier Maintains existing connection I-70 aligns with existing barrier of Brighton Bl., NWSS, industrial land uses. Increased barrier effect along Brighton Bl., NWSS, industrial land uses. DRAFT PACT Working Document - November, 11, 2010 1

TRANSPORTATION: Provide mobility, access and safety improvements to the corridor A) Mobility: Provide for the seamless movement of goods and people through all modes of transportation. Increase mobility for highway through traffic Improve local traffic operation Improve transit Improve freight rail facilities Improve travel time between I-25 and Tower Rd. Changes to local street networks Changes to grade separations or use of lines, leads and spurs. Heavier traffic on Brighton between I-70 and 44th Ave.; on Colorado Bl. Between I-70 and Smith Rd.; and on Quebec St. between I-70 and Sandown Rd.; changes to 46th Ave. result in changes to circulation and connectivity of numerous roadways. 18-22 minutes No effect Brighton St. becomes more circuitous; changes to 46th Ave. result in changes to circulation and connectivity of numerous roadways. UPRR spur track relocation at Havana; all current grade-separated crossings retained. Improvements in some locations may be offset by impacts at other locations. All alternatives decrease cut-through traffic on neighborhood streets. Improve freight movement by truck York St. interchange removal marginally increase truck traffic on local streets, mainly through changing routes. Increase in truck traffic on 46th Ave. due to conversion from freeway. Improvements in some locations may be offset by impacts at other locations. Improve bicycle facilities I-70 crossings Loss of Columbine and Clayton Street crossings under I-70, creates need reroute D-2. No change to existing crossings New crossings and facilities can be added to all alternatives. Improve pedestrian facilities I-70 crossings Loss of Columbine and Clayton Street crossings under I-70 Underpass crossings of I-70 become at grade crossings of 46th Ave. New crossings and facilities can be added to all alternatives. Prepare for changing transportation needs Alignment with local, regional and state planning Doesn't align with Elyria Swansea plan. Aligns with Elyria Swansea plan. NWSS Station planning not completed; analysis uses DRCOG's 2030 traffic model; Elyria Swansea plan features revitalized 46th Ave. with I-70 removed; all alternatives align with Commerce City Comp plan. DRAFT PACT Working Document - November, 11, 2010 2

B) Access: Provide convenient, direct, and efficient access around neighborhoods. Improve neighborhood access from I-70. Changes to key interchanges Remove York St. interchange, Use of 46th Ave. instead of I-70 to access Elyria Swansea neighborhoods. All interchanges would be improved to operate at LOS D, regardless of alternative chosen. Improve access to neighborhood recreation centers, schools I-70 crossings Loss of Columbine and Clayton Sts. crossings under I-70 Underpass crossings of I-70 become at grade crossings of 46th Ave. All alternatives have improvement to local neighborhood mobility. Maintain truck stops Number of stops impacted 1 0 0 Existing alignment north alternatives require acquisition of Pilot truck stop on Steele St. Maintain access to manufacturers, warehouses and other local employers for truck and employee traffic Distance to I-70 No change 46th Ave. will be able to carry the traffic that was previously on I-70, so distance will be maintained. Access Maintain access to Riverside Changes to access Cemetery for visitors and neighbors No change Brighton St. becomes more circuitous; I-70 becomes part of existing barrier of industrial uses. is maintained with all alternatives, realignment modifies access DRAFT PACT Working Document - November, 11, 2010 3

C) Safety: Provide a safe traveling and living environment Protect health and safety of people living near the corridor Number of residential units within 500 feet of the construction limits 899 883 604 612 More people live near existing alignment, so more people would be exposed to highway. Emergency response times are dependent on routes determined by Efficient emergency response times local agencies once the facility is constructed. Emergency response times could improve. Emergency response times on I-70 improvement is more dependent on managed lanes alternatives than on alignments. Provide a safe travel environment (roadway, access ramps and other facilities) Facility rebuilt to current safety standards. Facility will be safe if rebuilt, and it will be rebuilt under all alternatives. Maintain safe and effective hazardous materials routing Facility rebuilt to current safety standards for hazmat routing. Facility will be safe if rebuilt, and it will be rebuilt under all alternatives. DRAFT PACT Working Document - November, 11, 2010 4

ECONOMIC: Promote economic activity in the corridor Number of businesses displaced 45 42 58 52 Avoid economic impacts to individuals or businesses Building square footage removed 972,737, 1,272,070 595,368 588,832 In some cases, multiple properties may be needed for the operation of a single business, or multiple businesses may be on one property. Properties acquired (full(partial)) 48 (75) 46 (80) 142 (97) 101 (98) Create economic opportunities and allow for future growth number of jobs created during construction 2,500 2,900 4,000-4,300 4,500-4,800 Based on cost of construction. Loss of property tax revenues Based on 2005 valuations Denver: -0.14% to -0.16%; Aurora: -0.02% Denver: -0.11%; Aurora -0.02%; Commerce City: -0.6% to -0.7% Maintain NWSS as an economic anchor Relocation of NWSS No Yes No DRAFT PACT Working Document - November, 11, 2010 5

ENVIRONMENTAL: Minimize impacts to human and natural environment Protect natural resources (e.g. South Platte River, Sand Creek, the Sand Creek Greenway) Number of additional crossings 3 5 Additional stream crossings impacts natural resources including water quality, wetlands, habitat and open space. Improve air quality Conformity with air quality regulations Will not exceed National Ambient Air Quality Standards There are no significant differences between the alternatives, and none will cause violations of air quality standards. More people live near existing alignment, so more people would be exposed to emissions. Minimize noise impacts Length of noise mitigation anticipated 9,000 ft 12,000 ft Minimize impacts to historic resources Number of adverse effects to historic properties Number of adverse effects to historic districts 34 6 11 14 1 0 1 0 Wessel district affected by existing alignment north, and NWSS affected by realignment west. Avoid disproportionate impacts to poor and minority communities Percent minority population where residential displacements occur Percent low-income where residential displacements occur 91% 93% 85-95% 87-89% 26% 46% 28-30% 27% Fulfill state and federal regulations (NEPA, Section 106,wetlands etc.) Yes All alternatives will fulfill regulatory requirements prior to construction. DRAFT PACT Working Document - November, 11, 2010 6