Irrigation Crossing Structures

Similar documents
Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur

Irrigation Structures 2. Dr. M. R. Kabir

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

Irrigation Design (1) IHD302

Flow Measuring Structures

Irrigation System. BWCDD Zanjero Training 2/13/2008

Water Control Structures Selected Design Guidelines Alberta Environment Page 17-1

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Operational Behaviour of Hydraulic Structures in Irrigation Canals in Sri Lanka G.G.A. Godaliyadda 1*

Outlet Structure Modeling

HYDRAULICS OF CULVERTS

2C-12 Detention Basin Outlet Structures

Application for resource consent Form B Damming and diversion of water

Types of cross drainage works

Fig: Alignment of a ridge or watershed canal (Head reach of a main canal in plains)

III. INVENTORY OF EXISTING FACILITIES

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

TVA Colbert Fossil Facility Ash Disposal Pond 4

Understanding. Hydraulics. palgrave macmillan. Les Hamill. University of Plymouth THIRD EDITION

ROOF AND PROPERTY DRAINAGE

HYDRAULIC DEMONSTRATION CHANNEL

V. DRAINAGE IMPROVEMENTS

Module 4 Hydraulic Structures for Flow Diversion and Storage

Irrigation Rehabilitation Program Design and Construction Standards

Prepared for Urban Drainage and Flood Control District

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

CONVEYANCE ANALYSIS OF THE MAINLINE TUNNEL USING ICAP

Software Applications for Runoff Hydrological Assessment

Wastewater Flow Monitoring Services

LOCATION AND DESIGN DIVISION

DETERMINATION OF DISCHARGE COEFFICIENT AND HEAD-DISCHARGE RELATIONSHIPS OF DIFFERENT HYDRAULIC STRUCTURES

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

Chapter 4 Bridge Program Drawings

4.2 Discharge measurement by Velocity Area Method (Chitale, 1974)

Filter Tube Barriers (Instream)

Analysis of Side Sluice in Trapezoidal Channel

Hydropower retrofitted onto existing water infrastructure assets

Sediment Basin. Fe= (Depends on soil type)

EART 204. Water. Dr. Slawek Tulaczyk. Earth Sciences, UCSC

Volume 2, Chapter 10 - Storage

Methods of Streamflow Analysis

TEMPORARY SEDIMENT TRAP CODE

EXPERIMENTAL AERODYNAMICS FLOW TROUGH AN ORIFICE LAB SHEET

MSMA 2 nd Edition DID Malaysia CHAPTER 18 CULVERT

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains

Appendix D - Evaluation of Interim Solutions

Pipe Flow Hydraulics

Chapter 11 Culverts and Bridges

STORM WATER MANAGEMENT REPORT

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

TxDOT Houston District Permit Requirements (Information contained herein is subject to change)

Breach Analyses of High Hazard Dams in Williamson County

Sanitary and Environmental Engineering I (4 th Year Civil)

Anti-vortex structures at hydropower dams

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan

Modeling and Analysis of Aqueduct using Staad. Pro

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

Chapter 11 Culverts and Bridges

Stormwater Local Design Manual For Houston County, Georgia

3.0 STORM DRAINAGE SYSTEM DESIGN

Brief Introduction of SH/MH Components and Civil Engineering aspects of SH/MH

level control gates Waterman Industries of Egypt WATERMAN

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

MODEL Stormwater Local Design Manual. City of Centerville

Glossary Irrigation Terminology

STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT

DRAINAGE DESIGN DOCUMENTATION

Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania

Cross-drainage and drop structures

Hydraulic Design of Highway Culverts HDS 5 September 1985

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Considerations In Estimating Tailwater Elevations

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA

Outlet Flow Velocity in Circular Culvert

Open Channel Flow. Ch 10 Young, Handouts

SECTION 6 STORMWATER AND LAND DRAINAGE

Lateral Outflow from Supercritical Channels

FLOW BEHAVIOUR OF COARSE-GRAINED SETTLING SLURRIES

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

SMALL POND APPROVAL Guidelines & Checklist

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

Design of Earthen Tanks Booklet No. 574 Soil and Water Conservation: SWCS - 574

Project Drainage Report

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

Retrofit of Small-scale Hydropower at Hartbeespoort Dam Pre-investment Investigation. Arno Ottermann (PULA) Bo Barta, Willem Slabber, UJ

Assignment I Design of a Marine Outfall

DAM AND CANAL SAFETY GUIDELINES

Richland County Department of Public Works Engineering (Land Development) Division

Lab 6 - Pumping Test. Pumping Test. Laboratory 6 HWR 431/

PART V - STORM DRAIN DESIGN CRITERIA

Table of Contents. 5-5 Release Rates Year Allowable Release Rate WQCV Release Rate EURV Release Rate...

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance

HYDROLOGIC & HYDRAULIC ASPECTS of the Walnut Street Bridge over the Schuylkill River Philadelphia, PA

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water

PAPERWORK REDUCTION ACT A. GENERAL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

APPENDIX C: Infrastructure Assessment

Transcription:

Irrigation Crossing Structures Road Open channel H.R. Open Irrigation Canal Tail escape Water way + Road way Culvert Bridge Water way + Water way Syphon Aqueduct Retaining walls Lining ١

1- FUNCTION AND TYPES Irrigation canals are designed and operated to provide water requirements for their command areas at all times, i.e. QS = QD For QS less than QD = water level decrease (shortage of water). For QS more than QD= water level increase If number of water users may shut down after a rain and an overload may result further downstream with surplus of water level. excess canal discharge which have to be diverted ٢

To avoid the case of QS more than QD: 1. Improve control gates and introduce automation 2. Use off-line storage ponds if possible (available areas, environmental concerns, ) 3. Spill the excess water to the nearest drain by a structure called escape or spillway. All branch canals must be protected by escapes at the dead end of the canal. According to Egyptian practice for irrigation, the water level in the canals must not exceed MDWL by more than 0.25 or 0.50 m according to the canal size. ٣

2-TYPES OF ESCAPES The type of escape used in a given case depends upon: 1. the kind of structure (canal, dam,..), 2. the magnitude of the design discharge, 3. the topography and 4. the layout of the structures. 5. the location of the escape with respect to the canal (tail escape at the end of the canal or intermediate escapeadded to a syphon or aqueduct at the crossing of a canal with a drain). The common types of escapes used in Egypt are: Well escape (circular or rectangular) Straight weir or stepped weir. Tail regulator Siphon spillway. ٤

٠٩/٠٤/١٤٣٣ Well escape (circular or rectangular) For small canals or projects, the well type escape can be suitable for Discharges up to 10 m3/sec and water depths up to 3.0 m. For High different levels between the canal and the drain ٥

For Very High different levels between the canal and the drain To excess high amount of discharge ٦

Canal Regardless of the type, every spillway (escape) has three basic components: 1. A crest section which is the inlet to the spillway. 2. A conveyance section to convey the flow to level near the downstream water level. 3. A discharge section to enable the flow to enter the required stream (drain). ٧

Tail escape (Well Type) Tail escape is a structure constructed at the end of a canal to get rid of the excess water to the nearest drain to avoid overtopping in the canal. Tail escape consists of a well where its crest level at the high water level. It is also equipped with an orifice at its bottom to evacuate all the water in 24 hrs if necessary. A pipe evacuates the canal water to the drain under the road. Hydraulic design of the tail escape consists of three parts: 1. Automatic evacuation (Weir (Crest level, Well Diameter)) 2. Controlled evacuation (Orifice (Level, Diameter)) 3. Discharging excess water (Pipe (Slope, Diameter, material)) ٨

1. Automatic Evacuation (Weir = Crest level, Well Diameter) A weir with crest at the top of the well which is provided with curved lip at level exceeds 10 cm above the canal H.W.L. Crest Level = HWL + 10cm (Screen is needed at the top of the well to protect it from floating materials). The maximum acceptable rise in water level above the HWL in the canal is 25 cm. ٩

the discharge of water over the weir can be calculated as follows: 1. The excess discharge is usually taken between 10% and 30% of the canal flow. 2. Weir discharge can be calculated as follows: Where: Q w = the weir s discharge Q w = T s. h. V s, V s = 1.17 V w T s T s = the top width of the water surface h = the rise in water level above crest level V s = the surface water velocity Vw= the mean water velocity of the water way. H.W.L. 25 cm The flow towards the well escape is dependent on the head over the crest and may be calculated by the conventional weir Equation: 2 1.5 Q = w Cd B 2gh 3 Qw = Excess water to be evacuated through the weir Cd = Coefficient of weir discharge = 0.55 (less than the case of straight weir). h = Head over the weir crest not exceed 15 cm. B = Weir length (for circular type = ¾ the medium perimeter of the well. 3 B = πd w 4 D = D o. m inner w 5 Douter = Dw + o. 5m ١٠

Example1: A tail escape is required to be constructed at the end of a waterway according to the following data; Q c = 4.6 m 3 /sec, Canal last reach length = 3000 m, V c =0.45 m/sec, maximum allowable rising in canal water level is 25 cm. 7.6 m (10.00) 5.8 m 1.8 m 4 m Intermediate Escape ١١

Crest level = HWL+10cm Q w = 2 Cd B 3 2gh 1.5 ١٢

2. Controlled Evacuation An orifice at the bottom of the well which is provided with a steel gate supported on shoulders higher than the crest of the weir is designed to evacuate the waterway in 24 hrs. To determine the size of the orifice: π 2 a = d Q = c a gh 4 o o d o 2 Where: T is the time to empty the waterway = 24 * 60 *60 sec L is the waterway length in m, b e is the waterway average width in m, d is the depth of the waterway, Cd is the discharge coefficient = 0.55 a is the area of the orifice in m 2 and Q o is the discharge through the orifice L ١٣

L ١٤