INTRODUCTION ENVIRONMENTAL STATEMENT

Similar documents
Himachal Pradesh State Pollution Control Board

Hind Energy & Coal Beneficiation (India) Ltd.

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

Rajasthan State Pollution Control Board

Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

Hind Energy & Coal Beneficiation (India) Ltd.

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

ENVIRONMENTAL STATEMENT FOR D.G.SETS OF M/s SHREE CEMENT LIMITED, BEAWAR (RAJASTHAN) FOR THE PERIOD FROM, APRIL 2009 TO MARCH 2010 PART A

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

Rajasthan State Pollution Control Board

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

EXECUTIVE SUMMARY TABLE - 1

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A

Roquette Riddhi Siddhi Private Limited

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.

2 NECESSITY OF THE PROPOSED PROJECT

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

Mangalam Cement Ltd. (Unit-II) Stack No.

Environmental Clearance Compliance Half Yearly Report

Mangalam Cement Ltd.(Unit I)

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

.in Dated 9th August, Sharma ;

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at

PRE-FEASIBILITY REPORT

PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK. for the. Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT

SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

Environmental Management Plan Report

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

THE RAMCO CEMENTS LIMITED

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION IN CASE NO. OA-121/11-12 IN RE THE APPLICATION SUBMITTED UNDER REGULATION

Environmental Clearance Compliance Half Yearly Report

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg.

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

Health and safety norms of CPWD should be followed during construction.

Environmental Impact Assessment

Mangalam Cement Ltd.

Ministry of Environment and Forests Telefax : 011: M/s Posco India Private Limited

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

Executive summary. EIA STUDY for 1320MW Coal Based Super-critical Thermal Power Plant at Deosar, District Singrauli, Madhya Pradesh 13-13

Bamboo-based. Charcoal Production INFO-SHEET IS 03 09/05

JANUARY Prepared by:

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

PROJECT FEASIBILITY REPORT

ACC Limited CHAIBASA CEMENT WORKS

Environmental Clearance Compliance Half Yearly Report

Gold Standard Passport CONTENTS

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

ppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP)

- 1 S. NO. PARTICULARS DETAILS

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests

PRE FEASIBILITY REPORT

LANCO ANPARA POWER PVT. LTD

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

NTPC, Simhadri, 4X500MW, Visakhapatnam, Andhra Pradesh

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)

N.H. 6 is 50 km away from the proposed plant boundary; in N direction;

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information

Jhajjar Project Management An Insight. March 4, 2013

Pre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Revised FORM - I & PRE-FEASIBILITY REPORT

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016)

THE CONCEPT OF ORGANIC FARMING:

Telefax : 011: Dated 1 st March, 2013

MCDR INSPECTION REPORT

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

THERMAL ENGINEERING & TECHNOLOGY DEVELOPMENT DIVISION, CEA

PROPOSED TERM OF REFERENCE

Ministry of Environment & Forests (C.P. Division) Revised Guidelines for the Centrally Sponsored Scheme of Common Effluent Treatment Plants (CETPs)

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM

No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

Registered. M/s Baba Jiwan Singh Baba Dalip Singh Educational Trust, Goindwal Sahib Road, Tarn Taran.

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014

AUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS. Steag Energy Training Center EEC WORKSHOP to

Ⅰ. Introduction of Samcheok Green Power

FORM V Environmental Audit Report for the financial Year ending the 31st March 2016 Company Information

PRE-FEASIBILITY REPORT

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

HINDUJA NATIONAL POWER CORPORATION LIMITED. HNPCL, (2X520 MW). VIZAG Technical Enquiry Specification for PU Coated Pipe For Ash Water Recovery System

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

Presentation on Radhe s Advanced Gasification Technologies

Transcription:

INTRODUCTION MB Power (Madhya Pradesh) Limited (MBPMPL) is a 100% owned subsidiary of Moser Baer Power & Infrastructure Limited (MBPIL). Moser Baer group headquartered in New Delhi, is leading global technology company and is the world s second largest manufacturer of optical storage media like CDs, DVDs etc. MBPMPL has entered into MOU with Government of MP to set up a 2520 MW coal based power plant. MBPMPL is already implementing 2 X 600 MW subcritical coal based power plant at Tehsil Anuppur and Jaitahari. An area of 403 Ha (996 acre) has been acquired for phase-i and coal will be sourced from SECL/CIL. The Project has been granted Consent to establish for 2 x 600 MW TPP from M.P. Pollution control board. It is now proposed to expand the capacity by adding 2 x 660 MW supercritical unit at same location, as per the terms of the MOU signed with Government of Madhya Pradesh. Environmental Impacts Assessment (EIA) study carried out for the proposed power plant to get prior Environmental Clearance (EC) from the Ministry of Environment and Forests (MOEF), New Delhi. Draft EIA Report has been prepared based on the Terms of Reference (TOR) approved by MoEF, vide letter no J-13012/198/2010-IA II(T) dated 20 th April 2011 and based on the primary data collected during pre monsoon season 2011.

SALIENT FEATURES OF THE PROJECT Item Location of the Plant Main Design Parameters Murra, Guwari, Belia, Jaithari Village Dist- Anuppur (MP) Longitude 81 0 47 28.68 E Latitude 23 0 04 5.16 N Net Capacity 1200 MW No. of units and configuration 2 X 600 MW Technology Conventional Steam Generator Sub critical Pressure at SH outlet 175 KG/cm 2 Temperature at SH outlet 540 o C Turbo generator Turbine 167 KG/ cm 2 (a), 535 o C, 3000 RPM, Generator- 600 MW each Main Fuel : Coal Annual requirement 6.6 MTP at 85% PLF Source - SECL mines Grade E/F, Avg. GCV 3280 Kcal/KG No. of stack 01 Stack height (meter) 275 No. of flue 02 Additional equipment ESP Manpower utilization 425 Persons (Proposed for operation) Water requirement (Annual ) 48 MCM Water Source Son river Cooling System Induced draft cooling system proposed Total discharge of water Minimum discharge guideline will be followed Pollution level Within the prescribed norms

ANEXURE ENVIRONMENTAL STATEMENT FORM V (See rule 14) Environmental Statement For The Financial Year, Ending March 2011-12 PART A i. Name and address of Sri Ratul Puri Owner / occupier of the industry : Moserbaer Projects Pvt. Limited, 235 Okhla Industrial Area, Phase-III, New Delhi-110020 Ph No. 011-47624200,300 Operation or process. ii Industry category Primary-(stc code) : Large scale industry Secondary-(stc code) (Thermal Power Plant) iii. Production Capacity : 1200 MW iv. Year of establishment : NA (Under construction) v. Date of last environment Statement submitted : 27.09.2011 PART- B Water and Raw Material Consumption: Not applicable plant is under construction stage. i. Water consumption in m3/d Process : NA Cooling : NA Domestic : 49

Name of Products Process water consumption per unit of products During the previous financial During the current financial year year 1. NA NA NA ii. Raw material consumption Name of raw materials Name of Products Consumption of raw material per unit of output During the previous financial year During the current financial year NA NA NA NA Industry may use codes if disclosing details of raw material would violate contractual obligations, otherwise all industries have to name the raw material used. PART-C Pollution discharged to environment/unit of output: Not applicable plant is under Construction stage. (Parameter as specified in the consent issued) Pollutants Quantity of Pollutants discharged (mass/day) Concentration of pollutants discharged (mass/volume) Percentage of variation from prescribed standards with reasons (a) Water NA NA NA (b) Air NA NA NA Environment monitoring for ground water and surface water is attached as Annex- I & II Ambient air quality report is attached as Annex - III HAZARDOUS WASTES PART D As specified under the hazardous wastes (management, handling and trans boundary movement) rule 2008 and amendment as on 2010 TOTAL QUANTITY HAZARDOUS WASTES DURING THE PREVIOUS FINANCIAL YEAR 2010 2011 DURING THE CURRENT FINANCIAL YEAR 2011 2012 FROM PROCESS NA NA FROM POLLUTION CONTROL FACILITY NA NA

PART-E SOLID WASTE Solid Wastes Total quantity (kg) During the previous financial year During the current financial year a. From process NA NA b. From pollution control NA NA facility c. Quantity recycled or reutilized within the unit NA NA PART F Please specify the characteristics (in terms of concentration and quantum) of hazardous as well as solid wastes and indicate disposal practice adopted for both these categories of wastes. Plant is under construction stage therefore no solid wastes generated in the year 2011-12. PART-G Impact of pollution control measures taken on conservations of natural resources and consequently on the cost of production. Ground water quality, surface water quality and ambient air quality monitoring confirm that there is no adverse effect in environment out of construction activity. PART - H Additional measures / investment proposals for environmental protection including abatement of pollution.

Expenditure on pollution abatement Particulars FY 2010-11 FY 2011-12 Environmental Monitoring & Study 1,515,522 408,110 Water Flow Measurement - 77,210 Water Availablity Study 794,160 529,440 Hydrogeology study 297,810 198,540 Review of Hydrogeological Report 275,750 - Hydrological report & topographical report to carryout water availability study, water storage facility & raw water - intake system - Diversion Scheme of Nallahas / Drains at Site - 132,360 Consultancy for Barrage - 110,300 Fees for Air, Water & Barrage Consent 600,000 300,000 Net Present Value of Forest Trees 33,881,977 - Plantation/Horticulture 241,158 1020724 Environmental Monitoring Equipment 1. Water level indicator 36,053-2. Construction of piezometer 76,349 376805 3. WIND MONITOR - 213,761 4. Noise level meter - 75,445 5. Cumulative Environment and Social Economic Study - 447818 6. WIND MONITOR - 213,761 7. Noise level meter - 75,445 Total 37,718,779 38,90,513 Miscellaneous PART I OTHER PARTICULARS OF IMPROVING OF QUALITY OF THE ENVIRONMENT POLLUTION CONTROL EQUIPMENT The plant is under construction stage and therefore having no source of air pollution emission. Fugitive emission is being generated out of vehicular movement which is controlled by water sprinkling.

HOUSE KEEPING Good house keeping contributes greatly to efficient operations, improved employee morale, better productivity and reduction of accidents. House keeping standards reflect an organization s work culture. Good house keeping can only be achieved by proper planning. This includes a well-planned process layout, orderly arrangement of equipment; systematic material storage stacking and movement with day-to-day maintenance of cleanliness and tidiness. Water tanker has engaged for water spaying round the clock on all the internal roads. PLANTATION Plantation efforts will be carried-on to the maximum possible extend in and around MBPMPL campus. In this direction, we are making efforts for avenue plantation from, near by villages and their school, community building etc. which shows our sincerity in making efforts for continual improvement in quality of environment not only inside the MBPMPL campus, but also in the adjascent area. Our effort is not only economical, but also viable and easily adoptable as the saplings are well familiar to survive and grow in the same atmosphere prevailing in the campus. Details of Plantation are as follows. SN NAME OF THE TREE NO OF TREES PLANTED IN FY 2010-11 NO OF TREES PLANTED IN 2011-12 (UP TO AUG.) TOTAL (up to 31 st Mar 12) 1 NEEM 50 639 689 2 SIRISH 0 590 590 3 AMLA 200 1440 1640 4 KARANJ 700 3975 4675 5 TEAK 1200 2523 3723 6 KHAMAR 0 212 212 7 ARJUN 0 47 47 8 ASHOKA 0 49 49 9 GULMOHAR 0 221 221 10 SHISAM 50 1512 1562 11 BAMBOO 0 108 108 12 KATHAL 0 610 610 13 CASSIA 0 296 296 14 ACASSIA 0 373 373 15 PELTAPHORUM 0 428 428 16 MANGO 0 3 3 17 ANAR 0 4 4 18 AMROOD 0 6 6 19 LEMON 0 4 4 TOTAL 2200 13040 15240

SOCIO ECONOMIC DEVELOPMENT MB Power (MP) Limited has provided basic amenities like development of Roads, Drinking water facility, Health Care & ambulance, Primary school building, it self for the project affected villages. A detail is attached as Annex. - IV