Solar Photovoltaic System Permit

Similar documents
Commercial Remodel Permit

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

PENNSAFE BUILDING INSPECTION SERVICES LLC Deck and Roof Cross Section Submittal

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Application for Commercial Plan Review and Building Permit. Address:

Residential Building Permit Application

B U I L D I N G P E R M I T A P P L I C A T I O N

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

APPLICATION FOR PORCH / DECK PERMIT

Application Requirements for obtaining a Building Permit

Property Address: Builder: Phone #: Address:

Last Updated March 15, 2016

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

APPLICATION FOR SOLAR PERMIT

BUILDING PERMIT APPLICATION

New York State Unified Solar Permit Expedited Solar Permit Process for Small-Scale Roof-Mounted Residential and Commercial Solar Electric

All new construction, mobile home placement & additions.

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT PHOTOVOLTAIC PERMITTING GUIDELINES

CONTACT INFORMATION. PV System will require a separate Electrical Permit.

Addition to Section 4 - Special Use Regulations

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

The following materials and documents are required in order for you to obtain a Building Permit:

MARBLEHEAD FIRE DEPARTMENT Standard Operating Guideline Draft for Photovoltaic/Solar Installations

NY State Unified Solar Permit

RESIDENTIAL BUILDING PERMIT INFORMATION

City of Donnelly. Permit Application Information and Instructions

Code Change Alert: Permitting of Solar Photovoltaic Systems in Washington State

Building Codes in Effect: 2010 California Building, Residential, Fire, Energy and Electrical Codes, including Article 690.

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

THE DEVELOPMENT REVIEW BOARD. 1. New construction or relocation of single-family homes, including mobile/modular and manufactured homes.

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

FENCE PERMIT APPLICATION

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

Beverly Hills Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS

Ordinance No Lot Surface Drainage

CITY OF MERCER ISLAND

4. Number of drawings required: ( ) Locations of nearest streets

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

RESIDENTIAL BUILDING PERMIT INFORMATION

II. IDENTIFICATION A. OWNER OR LESSEE ADDRESS (number, street, P. O. Box, Apt., etc.)

Residential Building Permit & Inspection Procedures

SOLAR ENERGY SYSTEMS APPLICATION

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

ADMINISTRATIVE SITE PLAN REVIEW FOR SINGLE- AND TWO-FAMILY DWELLINGS AND MULTIPLE-FAMILY DWELLINGS HAVING THREE OR FOUR DWELLING UNITS

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

PERMIT APPLICATION REQUIREMENTS INTERIOR RENOVATIONS/BUILD OUTS CODES USED: ADOPTED FLORIDA BUILDING CODE & NEC

RESIDENTIAL BUILDING PERMIT CHECKLIST FOR THE CITY OF SANTA ROSA

Residential Electrical Upgrade Permit Revised: 11/15/17

Residential Accessory Structure Application Packet (Carport, Shed, Garage, Pool)

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

Building Regulations; Construction 11

Building Permit Documentation Required:

PIKES PEAK REGIONAL BUILDING DEPARTMENT

City of Branson APPLICATION FOR CONSTRUCTION PERMIT

TOWAMENCIN TOWNSHIP BUILDING PERMIT PROCEDURES

Building Permit Application Office Use Only Please Print Clearly in Ink or Type

Building a Detached Garage

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

PERMIT APPLICATION REQUIREMENTS NEW COMMERCIAL BUILDING/CONSTRUCTION CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC

SCHEDULE B RESIDENTIAL BUILDING FEES

WITH THE TITLE 24. replacement. story. stories, etc. R disconnects. to, PV. unit and any. supporting frame. conditions. greater than the main

Madison County Property Improvement Check List

COMMUNITY DEVELOPMENT

CONTRACTOR INFORMATION NAME, ADDRESS, CITY, STATE, ZIP LICENSE# 058- LICENSE# SIGNATURE OF APPLICANT ADDRESS PHONE NUMBER

RESIDENTIAL BUILDING PERMIT PROCEDURES

INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS)

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

BUILDING PERMIT PROCEDURE PLEASE READ CAREFULLY AND FILL OUT COMPLETELY TO ASSURE QUICK AND ACCURATE SERVICE

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

EXETER TOWNSHIP HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS

A homeowners/applicants guide to understanding and making application for a building permit.

RESIDENTIAL CONSTRUCTION PERMIT FEES

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

THIS IS NOT A PERMIT DO NO START CONSTRUCTION. City of Pell City. Commercial Building Permit Application

City of Santa Monica Building and Safety Division Submittal Requirements Expedited Solar Photovoltaic (10 kw or Less)

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

DOUGLAS COUNTY BUILDING PERMIT APPLICATION

Job Site Address. Lot/Parcel# Permit To: New Addition Alter/Remodel Code Compliance

THE FOLLOWING INFORMATION IS REQUIRED TO OBTAIN A CITY OF OTHELLO COMMERCIAL BUILDING PERMIT:

Town of Pittstown. Office of the Building Inspector / Code Enforcement Officer

An Applicants Guide to Residential Building Permits City of Galt Building Department

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

BUILDING PERMIT APPLICATION PACKAGE

Town of Wilton Building Department

TOWN OF WINDSOR CONSTRUCTION GUIDELINES

One and Two Family Additions

BUILDING CODES & DESIGN CRITERIA

BOROUGH OF SWARTHMORE APPLICATION FOR BUILDING PERMIT 121 Park Ave, Swarthmore, PA (p) / (f)

Building Permit Submittal Requirements

2013 R-1 Building Permit Package For Additions, Decks, Fences & Garages

MONROE COUNTY ZONING OFFICE

EXCAVATION PERMIT CHECKLIST

Detached Garage Construction Information

HOW TO OBTAIN A BUILDING PERMIT

BUILDING PERMIT GUIDELINES - RESIDENTIAL

Transcription:

Solar Photovoltaic System Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each with minimum lot size, building height, setback, parking, landscaping, and other requirements. Copies of the Zoning Map and Zoning Ordinance can be purchased at City Hall, and the Zoning Ordinance can be accessed online for free in Chapter 27 of the Code of City Ordinances at www.municode.com/library/mo/warrensburg/. For zoning questions please contact Amanda Jacobson, City Planner, at 660-747-9135. Adopted Code The City has adopted the 2012 International Residential Code. Single family houses, duplexes, and accessory structures must be designed according to this code and all applicable local codes such as zoning, floodplain, and erosion control requirements. Submission Requirements 1) Building permit application 2) Solar Photovoltaic System Scope of Work form 3) Plans 2 sets (professional plans NOT required) which include: a) Electric riser plan for house & new solar photovoltaic system b) Plans/specifications for solar panels & all electrical equipment c) Roof plan showing location of all solar panels 4) Ground mounted systems require additional plans to be submitted as follows: a) Land Disturbance application b) Site plan to scale showing location and/or dimensions of: i. Property lines ii. Existing and proposed structures iii. Driveways, Adjacent street(s), Sidewalks & Utility easements iv. Front, rear & side setbacks v. Erosion controls & direction of flow vi. Address, Subdivision & Lot number (if applicable) vii. North arrow, scale bar & text Fees Permit fees are due at the time the building permit is issued. Fees for solar photovoltaic system construction are calculated by multiplying the cost of the system & installation times the permit fee modifier of: 0.00302. Review time After all applications and plans have been received, the Plan Review Team will begin the review process. This process generally takes 2 business days. After the review, you will be contacted regarding the results of the review. Contractor licensing All general and sub-contractors are required to have a current Warrensburg Business License. To obtain a business license contact Carl Larkerbrink in the Collections Department at 660-747-9131. Contractors licenses will be verified by City staff prior to issuing a building permit. Inspections Contact Sandi Anstine, Permit Clerk, at 660-747-9135 to schedule an inspection. Failure to request a required inspection could result in project modifications at the owner s expense. No inspections will be made until required permits have been obtained.

Schematic Site Plan/Roof Plan Scope of Work: Solar Photovoltaic System 1. Show the North directional indicator on the site plan. 2. Show the building footprint with distances to property lines. 3. Show the location of the solar panels on the roof. 4. Indicate the roof slope on all sides where panels will be installed. 5. Show the location of the main service. 6. Show the interior and exterior location of all equipment and disconnects. 6. Show the locations of other structures (if any) on the property. Electrical Plan 1. What is the size of the existing electric service: amps 2. What is the kw rating of the system to be installed? 3. Is the system: utility interactive stand alone ground mounted 4. Are complete electrical calculations included with the permit application for this system? Yes No (required) 5. What is the power source short circuit current rating? 6. What is the conductor size: and type: to be used? 7. What is the conduit size: and type: to be used? 8. Are the following shown on the electrical plan? (check those that apply) Grounding points Wiring location and lengths of run Inverter location Disconnect locations Battery locations (if applicable) Point of connection to existing electrical system

Structural Plan 1. Roof Slope. Provide the roof slope for each side of the roof where panels are to be installed: North: East: South : West: 1. Hip Roof. For hip roof layouts with a slope of 2:12 or greater, does the roof plan show a 3-foot wide clear access pathway from the eave to the ridge on each roof slope where solar panels are located? Yes No N/A (Sec. 605.11.3.2.1/IFC/2012) 2. Single Ridge Roof. For a roof with a single ridge with a slope of 2:12 or greater, does the roof plan show two, 3-foot-wide access pathways from the eave to the ridge on each roof slope where solar panels are located? Yes No N/A (Sec. 605.11.3.2.2/IFC/2012) 3. Hips and Valley Roof. For a roof with hips and valleys with a slope of 2:12 or greater, does the roof plan show that the solar panels are located no closer than 18 inches to a hip or valley where solar panels are to be placed on both sides of the hip or valley? (Where solar panels are only to be placed on one side of a hip or valley that is of equal length, the panels are permitted to be placed directly adjacent to the hip or valley). Yes No N/A (Sec. 605.11.3.2.3/IFC/2012) 4. Ridge Clearance. Does the roof plan show that solar panels shall not be placed closer than 3 feet to the ridge to allow for fire department smoke ventilation operations? Yes No (Sec. 605.11.3.2.4/IFC/2012) 5. Panel Listing. Are the panels and modules listed and labeled in accordance with UL 1703? Yes No (Sec. M2302.3/IRC/2012) 6. Inverter Listing. Is the inverter listed and labeled in accordance with UL 1741? Yes No (Sec. M2302.4/IRC/2012)

BUILDING PERMIT APPLICATION Single Family Duplex City of Warrensburg, 102 S. Holden St., Warrensburg, MO 64093 Phone: 660-747-9135 Fax: 660-747-2349 www.warrensburg-mo.com Date: Permit # Construction Value: $ Construction Address: IF NEW CONSTRUCTION: Subdivision: Lot: Zoning: APPLICANT/CONTACT INFORMATION GENERAL CONTRACTOR INFORMATION Owner Contractor Tenant Other Same as Applicant Name: Merchant License #: Mailing Address City, State, Zip: Company Name: Mailing Address: Phone: Cell: City, State & Zip: Fax: Phone: Cell: Email: Fax: mark or click here if you would like to receive code updates OWNER INFORMATION: Same as Applicant and Information via email from the department Name: Does owner live at this address? Yes No Phone: Cell: PERMIT TYPE (Please check all that apply) New Single Family Electrical Upgrade Deck New Duplex Foundation Repair Pool Basement Finish Repair/Replacement Shed/Accessory Bld. Interior Remodel Reroof Type of Roof Garage Addition Carport OTHER PROJECT INFORMATION FOR NEW CONSTRUCTION Lot size in Sq. Feet: Structure To Be: Ft. Wide Ft. High Ft. Long Total Sq. Feet Of Garage: Total Sq. Feet Of Basement: Total Finished Floor Above Grade: # Of Bedrooms Per Unit: # Of Stories: Basement Is To Be: Finished Unfinished Will new House or Duplex have a deck? Yes No Is this site located in the 100 year floodplain? Yes No Is foundation or any part of foundation, to be placed on engineered fill? Yes No

SUBCONTRACTORS NAME PHONE MERCHANT LICENSE # **Electrical **Plumbing Mechanical Concrete Framing Roofing **Must be able to provide proof of completion of Block Test or Trade License for town of similar size. LAND DISTURBANCE PERMIT When soil is disturbed on a construction site, a land disturbance permit is required to be issued along with the building permit. If your project will disturb the soils on the site, please complete and return the attached Land Disturbance Permit Application with the building permit application. PERMIT FEES FOR NOT FOR PROFIT CORPORATIONS In October 2012, City Council approved the waiving of building permit, zoning, and public works fees for construction projects on property owned by any political subdivision or organization that has obtained an exemption from the payment of federal income taxes as provided in certain sections of the US Internal Revenue Code. If you are a tax exempt entity, please provide a copy of your tax exempt letter to see if you qualify to have your permit fees waived. BUILDING PLANS Please submit two sets of the site/civil plans & building plans. One set will be returned to you at the time the permit is issued. RIGHT OF ENTRY: In the discharge of his/her duties, the Code Official or his/her designated representative shall have the authority to enter at any reasonable hour any building, structure or premise in this jurisdiction to enforce the provisions of the building codes adopted by the city of Warrensburg. I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make the application as his/her authorized agent and we agree to conform to all applicable laws of this jurisdiction. APPLICANT NAME (PLEASE PRINT) ADDRESS OF APPLICANT SIGNATURE OF APPLICANT FOR OFFICE USE ONLY NEW CONSTRUCTION FEES WILL BE CALCULATED AS FOLLOWS: Finished Floor Area Above Grade Garage Area Gross Area X Cost per Sq. Ft. $ $ $ X Permit Fee Modifier = $ $ $ BUILDING PERMIT FEE $ LAND DISTURBANCE PERMIT FEE $ 0.00 SIDEWALK PERMIT $ SEWER TAP $ APPROVED DRIVEWAY PERMIT $ DATE OTHER FEE $ BY TOTAL $ Basement