Los Angeles Unified School District. Assets and Work Management System (AWMS) Work Order Working Group Sequential Planning Quick Reference Guide

Similar documents
Revised AWMS Procurement Working Group. AWMS Procurement Working Group Return Issued Inventory Items to Stores in AWMS

TEAMS User Guide. Requisitions. First Edition

Los Angeles Unified School District Workforce Manager Assignment and Time Reporting Guide. Post Date: 5/24/17

AWMS Procurement Low Value and Annual Contract Purchasing Guide

Los Angeles Unified School District Maximo 7.5 / Procurement Desktop Requisition Guide / Planned Job. Post Date: 8/17/15

Work Instructions for using the Specials Requests functionality in eprocurement

Record. Copy Record. Done

Los Angeles Unified School District M&O POLARIS Work Management System Assignment and Time Reporting Guide rev.4

Scheduling Work at IPSC

Managing Invoices. Page 1 of 15. Author/Owner: Financial Services Training

PeopleSoft Requisition Manual Using the PeopleSoft Requisition System

Los Angeles Unified School District Maximo 7.5 / General Time Card Reporting and Approving Guide / Labor Reporting Application. Post Date: 3/24/17

Appoint, Change and Terminate (ACT) Documentation Rehire ACT Document

IPSC Training MAXIMO BASICS

Post Date: 7/18/13. Los Angeles Unified School District Maximo 7.5 / General Time Card Reporting Guide / WO Tracking Application

Module 5 Timesheet. Step by Step Guide PSA Suite Basic for CRM Timesheet calendar view 5.2 Timer 5.3 Timesheet by line

Lab 2: Work Management From Service Request to Work Completion

AASHTOWare Project TM Civil Rights Labor (CRL) Module Contractor Entering a Payroll Manually Guide

Create and Dispatch a Job to a Job Lead

ONESolution Accounts Payable Special District User Guide

Unit4 PSA Suite Business Performance Edition

Several new features have been added to the Attendance Code Maintenance.

Reading Sample. Banking. Contents. Index. The Authors. First-hand knowledge.

CHAPTER 12 - REMOTE TIME ENTRY ADD-ON OPTION

Oracle FLEXCUBE General Ledger Oracle FLEXCUBE Universal Banking Release 12.0 [May] [2012] Oracle Part Number E

Scheduler s Responsibility in Schedule Optimizer. Cheat Sheet

CHAPTER 6: Preventive Maintenance

NEISD SUPPLEMENTAL PAY PROCEDURES FOR EMPLOYEES TIME ENTRY PROCEDURES

Kronos Workforce Timekeeper. Time and Attendence System Computer Training Manual

PSA for Microsoft Dynamics CRM

Manage Employee Access

Time Reporting Quick Reference For Non-Exempt Employees

Salary Transfer and Effort Certification Reporting

Welcome. Logging into the system

AiM User Guide Inventory Management Module

Kronos Workforce Central v8.0 Upgrade Guide for Timecard Approvers

David Douglas School District #40 Secretary Training November 19, 2014 SmartFindExpress (SFE)

How to set up an Employee Payroll Template

Employee Changes: Request Compensation Change Manager

Enhanced Time & Attendance

PAC Timesheet Entry Training Guide. Visit the PAC Time and Absence page for more information on HR related policies, processes and training.

Purchase Requisition for Goods in Lawson Financials

Personnel Master Data & Terminal

Purchase Requisitions and Receiving

Using Enterprise etime

Board of Regents of the University System of Georgia etime Employee User Guide

Enterprise etime. Getting Started Participant Guide V.6.1. ADP Time & Labor Management

Student Hiring. Table of Contents

PERFORMANCE EVALUATION USER S GUIDE

Table of content. B1 Time Task Manual

How to complete an electronic timesheet

ADP Bi-weekly Employee etime Instructions

Helpful Hint Users will only have access to those employees who fall within their security role.

Supervisor Overview for Staffing and Scheduling Log In and Home Screen

California Institute of Technology

MRI General Ledger for Web Operational Training Guide Version 4.2

Online Certified Payroll Systems (OCPS)

George Washington University Workforce Timekeeper 6.0 Upgrade Training

It All Starts Here. WEB WORK v.7 USER MANUAL Chapter 8 Preventive Maintenance (PM) Module Maintenance section of Azzier. Tero Consulting Ltd.

Automated PAN Functions in UltiPro

Or, from the View and Manage RFx(s) page, click the Create RFx button. Create New RFx - Use this button to create an RFQ from scratch.

The Force is Strong With This One Darth Vader, Star Wars Episode IV, Quick Start Page 1 of 14 Workamajig

PAC Absence Entry Training Guide. Visit the PAC Time and Absence page for more information on HR related policies, processes and training.

Time Reporting User Guide

Release Notes Assistance PSA Suite 2016 Spring Release

Setting up billing rate tables

Original Hire GRADUATE ASSISTANTS (OHGTA & OHGRA)

Sage 100. Payroll User Guide. August 2017

Index 99, 625. Master User Guide

Table of Contents. Login Screen Introduction...2 Login Screen Navigation...2 Passwords Requirements...3 Logging Into People First...

Time and Attendance Self Service - Exception Training Guide University of Massachusetts Boston Human Resources Department

Invoice Manager Admin Guide Basware P2P 17.3

EmpowerTime Supervisor User Guide Table of Contents

Quick Reference. Virtual OneStop (VOS) Employer User. Logging In

Eagle Business Management System - Manufacturing

A hands-on session to teach/review implementation steps for Asset Management. This session will also cover some new enhancements.

Manager Dashboard User Manual

Staff Connect Self Service User Guide Timesheets

DATABASICS Time User s Guide v3.1

HOW INTEGRATION WORKS...3

Saint Louis University. Business and Finance

Process Temporary Assignment Changes in WorkForce (That have not been filled by the posting process)

INSTRUCTIONAL GUIDE. Timekeeping For Non-Exempt AnyTime Employees MARCH 7, UNIVERSITY OF CALIFORNIA, BERKELEY Kronos Version 8

Epicor ERP Project Billing - Fixed Fee Course

EXPRESS VOUCHER USER MANUAL Chapter 4

Assistance PSA Suite for Microsoft CRM. PSA (Release ) Blueprint

Project and Portfolio Management Center

About SMART Practice Aids - Field Work

Integrating PPC s SMART Practice Aids with Engagement CS (Best Practices)

CHAPTER 10 ACQUISITION AND PAYMENTS

Sage 100. Payroll User Guide. April 2018

Job Costing Module. Administrator. Quick Start Guide

Product Oracle FLEXCUBE Universal Banking Release [April] [2014] Oracle Part Number E

Table of Contents. Getting Started 3 Family Account 3. Using Your Wallet 18 ScripNow in the Wallet 18 Reload in the Wallet 19

How to submit a Timesheet online

ACCESSING TIME FROM THE WORKSPACE

12/05/2017. Geneva Service Management

Virtual Training Workbook

Quick Reference: Creating a Job Opening (Requisition)

Using NPA Works. Prepared by Matthew Chance Applied Behavioral Learning Services Page 1! of 17!

Transcription:

Los Angeles Unified School District Assets and Work Management System (AWMS) Powered by Work Order Working Group Sequential Planning Quick Reference Guide DRAFT 1

THE WORK ORDER Enter information in these fields These fields auto-populate Optional Status Changes are reflected in this field. Brief Job Description Click on the field button and choose Open Drilldown to select the Location of Work at the lowest possible level. If a number appears in this field, you are in a Child WO. Use the arrow icon to travel to the Parent WO. Choose Move To: from the dropdown menu. Planned Jobs are always Priority 1 Save the record Use these arrows to move to previous and next Work Order when working from a queried list of Work Orders. Check with Administrator for number to enter in this field that will place the job on the Planning List. Click on this icon to change the WO Status. Section Code of Office/Department responsible for performing the work. Click here to create a new Work Order Click here to enter Scope of Work Run the Work Order Details Report. The IFS/BTS Clerk will enter the Special Job Number. Requestor & Title can be used to search for Work Orders requested by this entity. This field defaults to N. Placing a Y in this field will remove the Work Order from Work Order Tracking and place it in the Projects module. Work Orders related to an Agency (e.g. OEHS corrective WO) will populate this field, as well as the related fields, Agency ID and Agency Date. The Funding Line or GL Account will appear here after it is entered on the Work Order Details tab. It can also be entered directly in this field without dashes. Dashes will appear after the record is Saved. Enter the Job Plan (template of tasks created in the Plans module) number here to import a Job Plan into a Work Order. It is important to enter Target Dates here as they auto-populate the Target Date fields in the Tasks. Enter the Job Schedule Date obtained from the Weekly Book Meeting here. H. HILTY Actual dates are entered when Labor Charges are applied to the Job. In addition, Status changes of Funded or greater auto-populate this field with the current date. These fields autopopulate from the Routing Code. Optional Click on the field button to select the type of work. Describes category of work to be performed. Use the field button for selection. Clerical will remove this checkmark when the job is Funded. This enables the Task Status and Date to be changed independent of the WO Status/Date. If the Work Order was generated as a PM (Preventative Maintenance) WO, the PM number will appear here. Description of Lead Craft. Use the field button to choose correct naming convention. After selecting the Category Code, the system filters the selection of Routing Codes to show only those appropriate for the Category you have chosen. For Planned Jobs, the first two letters indicate the responsible section, the second two = Craft, and the last two = Planned Job. This is a commonly used field for queries of Area Planned Jobs. 2

THE SCOPE OF WORK Click on the field button at the end of the Job description in the Work Order to open a blank page. This is where the Scope of Work will be typed. A Craft Summary is optional. The List of Tasks in the Plans tab act as a Craft Summary. 3

THE JOB PLAN The Task ID is auto-generated by the system in increments of ten. This enables the Planner to return at a later date and insert additional tasks between the ones planned. T A S K S A Task is any amount of work that can be performed by a single Craft/Contractor without leaving the job due to dependence on another Craft/Contractor. Status of the Tasks shall be changed individually as work is performed by the Lead or Sub Labor Group. L A B O R M A T E R I A L Enter the Task ID and the corresponding Task Duration will autopopulate the Estimated Labor Hours field. Enter the Task ID for each estimate and the estimated Materials will be separated by Craft on Reports. 4

PLANS TAB - TASKS TASKS Click on this twisty to open and close the Details section. The Task ID is auto-generated by AWMS in increments of ten. This allows the Craft to return and insert Tasks between existing Tasks at a later time, if necessary. The Task ID can be changed as needed. This is the Task Summary Bar. The Details below roll up to this general summary. Estimate the hourly duration of this Task here. Click on this icon to change the Status of this Task. Click on this icon to Delete this line entry. Save the record. Type in the two-letter Craft Code, dash, and a brief Task Description. Enter the Actual Start and Finish Dates when Labor charges begin and end. Enter the Schedule Start Date when it is obtained in the weekly Book Meeting. Enter the Target Start and Finish Dates for each Task. Use this Reference WO number to run reports on Labor and Material Charges for this Task. Use the arrow icon to travel to the Reference Work Order. Choose Move To: from the dropdown menu. 5

LABOR ESTIMATE PLANS TAB CRAFT LABOR Highlighted fields indicate the fields to enter data in. Use the twisty to open and close the Line Detail Section. This Labor Entry corresponds with Task 10. Using the Task ID automatically populates the Hours field. Summary Line or Bar with corresponding Task ID Line Detail Section rolls up to Summary Bar The Section Code auto-populates from the Section Code on the Work Order. If the Labor is for an off-site location (e.g. Central Shops 1393) enter the appropriate Section Code here. For Design jobs enter FSCO. Click on the New Row button to create a new Line Entry. 6

MATERIAL ESTIMATE PLANS TAB MATERIALS SERVICE Planned Contract, Mileage, and Other are Unburdened. Use the twisty to open and close the Line Detail Section. Summary Line or Bar with corresponding Task ID Highlighted fields indicate the fields to enter data in. Line Detail Section rolls up to Summary Bar Use the Storeroom and Direct Issue fields to order Materials directly from Stores. See the Desktop Requisition Instructions for further details. 7

FUNDING WORK ORDER DETAILS TAB The type of fund the job will charged to. The identifying number corresponding to the Fund Type. For example, if the Fund Type is BB Bond, the Fund Ref: would be the BB- Bond Number. Indicate whether the job costs are Direct or Indirect. Indirect charges are costs such as Supervision. The reason the job was initiated. The category or type of work. This is a partial list of 40 selections. Most jobs are Routine (RT), but occasionally there is a need for Emergency Funding. Some jobs are paid from District funds and some are paid from outside District funds. Is this an Adult School? IFS Project No. consists of 8 characters. The first 5 characters are the total project budget, the last 3 characters are the sub-project budget (Planning, Inspection, etc.). The choices are Yes or No. Is the Seller eligible for Indirect Charges such as supervision? The choices are Yes or No. Is the job eligible for non-productive charges (Vacation, Illness, Jury Duty, etc.)? Four-number code (Seller) used in budget and accounting systems to identify which account will be expended. See the Buyer-Seller Crosswalk in the GJ-1 for more details. Enter the Seller Line in a string without dashes. AWMS will insert the dashes after the record is saved. Refer to Page 41-42 of Instructions for more details. Enter the Description that will appear on Reports in this field. Enter the Buyer Line on a separate line from the Seller Line, in a string without dashes. AWMS will insert the dashes after the record is saved. Refer to Page 42 of the Instructions for more details. The choices are Yes or No. Is the job eligible for Fringe Benefits (Dental, Health Ins., etc.). Enter the Buyer Percentage(s) here. If there is more than one Percentage, create a New Row for a separate line entry. This may occur when the job is being funded from different sources, each paying a percentage. 8