CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS

Similar documents
CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION TRENCHING & BACKFILLING

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

Surface Infrastructure Restoration for Utility Cuts DIVISION 14 Shallow Buried Utilities Section _Mar29_2016.pdf Page 1 of 20 INDEX

Construction Specification for Utility Adjustments

SECTION 10 - TRENCHING AND BACKFILLING

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

2.1 Backfill - General

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

SECTION FLEXIBLE PAVING

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF CONTENTS

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

PUBLIC WORKS DEPARTMENT GENERAL NOTES

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

SECTION BITUMINOUS CONCRETE PAVEMENT

SECTION TRENCH EXCAVATION AND BACKFILL

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS

Information Bulletin:

SECTION TRENCHING, BACKFILL AND COMPACTION

CITY OF WHITEHORSE SERVICING STANDARDS MANUAL SECTION 2 - CONSTRUCTION DESIGN CRITERIA SUB-SECTION ROADS

SECTION 4 - TRENCH EXCAVATION, BEDDING AND BACKFILL CONTENTS

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

C. Foundation stabilization for pipe and utility structures.

FULL - DEPTH RECYCLING OF ASPHALT PAVEMENTS WITH PORTLAND CEMENT

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

SECTION UNCLASSIFIED EXCAVATION AND GRADING

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

Construction Specification for Concrete Unit Pavers

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING

SECTION CONTROLLED LOW STRENGTH MATERIAL

BASE CONSTRUCTION MATERIALS A Aggregate

PERMEABLE INTERLOCKING PAVERS

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

SECTION RIPRAP, BOULDERS, AND BEDDING

CITY OF LETHBRIDGE INFRASTRUCTURE SERVICES DEPT. CONSULTING ENGINEER S LAND DEVELOPMENT FIELD SERVICES GUIDELINES

SECTION EARTH MOVING

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SECTION A1 EXCAVATION AND BACKFILL GENERAL

PART 5 WATER SYSTEMS

CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS

DIVISION 3 - AGGREGATE

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

CONSTRUCTION SPECIFICATION FOR COMPACTING

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

MICHIGAN DEPARTMENT OF TRANSPORTATION

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

Utility Cut Restoration

Construction Specification for Concrete Bus Pad

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

SECTION STORM DRAIN

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION

SECTION CONCRETE. B. ACI 318 Building Code Requirements for Structural Concrete and Commentary

Chapter 3: Permit Procedures and Requirements

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

BIO-AQUIFER STORM SYSTEM

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

Municipality of Waterville Public Sidewalk Repair Policy

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

Special Provision No. 405F03 March 2005

CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES

SECTION 3: SUB BASE AND BASE COURSES

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

CONSTRUCTION SPECIFICATION FOR UTILITY CUT AND RESTORATION TABLE OF CONTENTS TS REFERENCES... 2 TS DEFINITIONS...

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC SECTION 500 PORTLAND CEMENT CONCRETE CONSTRUCTION 501 CONCRETE - GENERAL

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

ROAD PAVEMENTS GENERAL

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Transcription:

Construction Specifications Page 1 of 7 1. GENERAL 1.1 The following specifications apply to compaction of all water, sewer and shallow utility service cuts, repairs, replacements, mainbreaks, extensions, etc., and all shallow cuts by utility companies on all existing or proposed streets, lanes or easements for full width of the right-of-way where the City of Lethbridge is responsible for maintenance. 1.2 A trench or cut is defined as that portion of any excavation extending from within 300 mm below the pipe to the finished subgrade surface at a 1:1 side slope. 1.3 With regard to the area from the bottom of the bedding to 300 mm above the pipe, method of backfill and compaction and type of equipment used in water, sewer and shallow utility installations must comply with the Standard Specification, Environmental Utilities Department. 1.4 All trenches or cuts are backfilled in uniform lifts, and each lift is mechanically compacted and keyed into existing trench walls. Thickness of lifts are determined by testing procedures during the construction process. In addition all trench walls will be a minimum slope of 1:1 from the pipe zone to the top of subgrade unless agreed to by the Transportation Business Unit. 1.5 When soils removed from any trench appeal unsuitable for replacement in the trench due to excessive moisture content, or for any other reason, and suitable material is not available on site, the trench shall be backfilled with granular material or non-shrinkable backfill. Under no circumstances shall frozen material be used for backfill. 1.6 An excavation permit must be obtained before beginning any excavation in the City of Lethbridge for the installation of utilities or other purpose regardless of whether the area is paved, graveled or unimproved. These excavation permits are to be obtained from the Technical Services Department at City Hall, 910 4 th Avenue South, 5 th Floor. The applicant will receive two copies of each excavation permit and as soon as the work involved is completed, one form is to be returned immediately so that the Streets Division or Maintenance Section, can carry our additional rehabilitation work required. 2. MOISTURE REQUIREMENTS 2.1 Soil used for trench or cut backfill must be within + or three (3%) percent of its optimum moisture content.

Construction Specifications Page 2 of 7 3. DENSITY REQUIREMENTS 3.1 PERCENT OF STANDARD PROCTOR LOCATION DENSITY Pipe or Cable Zone Minimum 95% Above Pipe or Cable Zone Minimum 98% 3.2 Requirements apply to the full width of the right-of-way with the exception of the boundary area from the property line up to one (1) meter from the constructed or designed surface installation. In the boundary area the soil must be compacted to a minimum of ninety (95%) percent of the soils maximum density. 3.3 Service Connection trenches shall be tested from pipe zone to finished base course. Testing will also be taken adjacent to manholes and water valves. 4. WINTER COMPACTION 4.1 During these portions of the year, when specified densities cannot be obtained due to cold weather, a minimum density of ninety (95%) percent of maximum density above the pipe zone will be acceptable. 4.2 Non Shrink Backfill and Hot Sand is an approved alternate and recommended during winter backfilling operations versus the use of native materials. 4.3 A cold mix will be used for the surface and it will be replaced with asphalt in early spring. All settlements related to winter backfill operations must be repaired by the Utility Division/Company prior to the spring asphalt patching. 5. NON SHRINK BACKFILL 5.1 Specifications:.1 Compressive Strength 0.2 to 0.5 Mpa..2 Maximum 56 day strength o.5 Mpa 5.2 Aggregate Gradation:.1 Aggregate shall consist of washed sand conforming to the requirements of Section C.S.A. Standard CAN#-A23.1- M77..2 Aggregate shall be graded within the following limits:

Construction Specifications Page 3 of 7 SIEVE SIZE PERCENT PASSING 10 mm 100 5 mm 95-100 2.5 mm 80 100 1.25 mm 50 100 630 um 25 65 315 um 10 35 160 um 2 15 80 um 0-10 5.3 Slump requirements:.1 Minimum slump 75 mm.2 Maximum slump 125 mm 5.4 Admixtures:.1 Calcium Chloride may be used..2 Air entraining admixtures may be used to improve workability. 5.5 Cold Weather Requirements:.1 Non shrink backfill delivered in cold weather shall conform to the requirements specified in Section 18 of C.A.A. Standard CAN3- A23.1-M77. 5.6 Placing:.1 Non shrink backfill shall be rodded or vibrated to eliminate voids, rough areas, honeycombing and to ensure contact with the sides of the excavation..2 Place materials using methods which do not lead to segregation..3 Pumping of material is permitted with the approval of the City Engineer..4 Temporary plating or other means of supporting traffic loads to be used to provide safe driving surface for traffic until pavement materials is replaced..5 Protect freshly placed material from heavy rain to prevent washout..6 A maximum curing period of 48 hours to ensure adequate strength is achieved.

Construction Specifications Page 4 of 7.7 Quality Control 6. SITE PREPARATION.1 Inspection and testing of non shrink fill will be carried out by a CSA certified laboratory designated by the City Engineer. 6.1 The Utility Divisions/Companies at their own expense shall clear and broom clean the surface of the pavement as may be necessary for full width and length of the work area and shall dispose of all refuse in am manner satisfactory to the City Inspector. 7. PAVEMENT OR SIDEWALK REMOVAL 7.1 Trenching across existing paved streets or lanes will be allowed only when it has been ascertained that coring/auguring is impossible or impractical. 7.2 The Utility Division/Company shall sawcut the asphalt to a minimum depth of 100 mm or when the depth of asphalt is greater than 100 mm, one-half the pavement thickness is required to ensure a neat edge. The Utility Division/Company will be responsible for all costs arising for sawcutting, replacing the asphalt structure, concrete for sidewalks, curb and gutters (both temporary and permanent) and damage occurring beyond the limits of the excavation. 7.3 Longitudinal excavations shall be a minimum of two (2) metres in width to facilitate the use of proper compaction equipment and an asphalt paving machine. Excavations greater than 100 m 2 in area shall be replaced by means of an asphalt paving machine. 7.4 Asphalt concrete shall not be placed in lifts greater than 150 mm and each lift shall be thoroughly compacted and cured prior to placing another lift of asphalt. 8. CONSTRUCTION JOINTS 8.1 Prior to backfilling, the excavation shall be completely free of debris, ponding water or drifted snow. 8.2 Materials unsuitable for backfill shall be removed from the site and disposed of at an approved site. Examples of unsuitable material are as follows:

Construction Specifications Page 5 of 7.1 organic material.2 frozen soil.3 soil with a moisture content is in excess of 4% above optimum.4 broken concrete, pavement or other construction debris. 8.3 On existing paved streets and lanes, clay backfill shall be brought up to the existing subgrade only. The pavement and base structure shall be rebuilt with properly compacted 75 mm size crushed granular sub-base, 25 mm size crushed granular base and hot-mix asphalt to match the existing structure. On existing graveled streets and lanes, the gravel surface shall be replaced to its original condition prior to completion of the work. If the roadway adjoining the trench has been contaminated by excessive amounts of moisture, this material shall be removed also and replaced with clean fill. 8.4 The Utility Division/Company will be responsible for the rehabilitation costs of failures due to settlement of the backfill within two years of excavation completion date. If any obvious major settlement occurs, the City may require the trench to be re-compacted for its full depth and length. 9. TESTS FOR COMPACTION CONTROL 9.1 The maximum density and optimum moisture content for each soil type is determined by A.S.T.M. Designation D698 (Moisture Density Relationships of Soils). 9.2 The field density of soils is determined by A.S.T.M. Designation D2933 (Determining Density of Soil and Soil Aggregate in Place by Nuclear Methods Shallow Depth). 9.3 For spot checks, the following methods are also acceptable:.1 A.S.T.M. Designation D1556 Density of Soils in Place by Sand Cone Method..2 A.S.T.M. Designation D2167 Density of Soils in Place by Rubber Balloon Method..3 A.S.T.M. Designation D2216 Laboratory Determination of Moisture Content of Soil. 9.4 Rapid drying of the soils to determine their field moisture content is permitted with a corresponding sample laboratory dried.

Construction Specifications Page 6 of 7 10. TESTING SERVICES AND REPORTS 10.1 The following is the minimum testing frequency:.1 Trenches more than 15 metres in length shall require a minimum of three (3) density tests per 500 mm of trench depth per 75 metres of trench length..2 Trenches less than 15 metres in length shall require a minimum two (2) density tests evenly distributed throughout the length of the trench, per 500 mm of trench depth..3 Maintenance excavations less than 6 square metres in area shall require one (1) density test per 500 mm of depth..4 Backfill adjacent to valves, manholes, catch basins and other structures shall require a minimum of two (2) density tests for every 500 mm of trench depth..5 Density tests shall be representative of the entire length, width and depth of trench backfill, including around catch basins, manholes, valves and service connections..6 The Engineer or the City Inspector may determine additional testing as necessary. 11. UTILITY MAINS TESTING REQUIREMENTS 11.1 All sewer, watermain and shallow utility installations within the City rightof-way are subject to continuous testing and inspection to verify compliance with current backfill and compaction specifications. Copies of all results shall be sent by the Testing Agency to the Transportation Department. 12. BACKFILL COMPLIANCE 12.1 It is the responsibility of the Consulting Engineer to submit a signed and sealed Letter of Certification signifying that all City of Lethbridge Backfill Regulations have been met or exceeded. This Letter of Certification must be accompanied by copies of all soil moisture/density tests and its related moisture and proctor testing, concrete material, asphalt material, and other such materials testing as deemed necessary by the City of Lethbridge in accordance with its published Specifications.

Construction Specifications Page 7 of 7 12.2 In the event that the entire street serviced area is deficient or irregular in testing coverage or fails to maintain the design cross-section and/or grade at any period prior to the issuing of a F.A.C., that portion of the right-of-way may be retested under observation by the Engineer or his representative prior to the issuing of a C.C.C. for the paving and concrete surface work. If such action is not undertaken, or the re-tests do not indicate compliance, the value of the surface improvements to be constructed in the affected area may be computed and a deposit in this amount may be required to serve as a guarantee against the failure of the surface improvement due to failures in the sub-base. The term of such a deposit is five (5) years and the deposit is required prior to construction of surface improvements. 13. EXCAVATIONS ON NEWLY CONSTRUCTED AND RE-SURFACED ROADS 13.1 Utility excavations shall not be permitted on roads that are either newly constructed or resurfaced within the past two (2) years. Exceptions shall be granted only where it can be proved that the excavation was beyond the control of the utility involved. Proposed excavations within the two (2) year period other than emergencies or redevelopment/development servicing shall be reviewed by the Streets Manager.