Marketing Opportunities for Asphalt Pavements

Similar documents
State-of-the-Practice Porous Asphalt Pavements. Kent R. Hansen, P.E. Director of Engineering National Asphalt Pavement Association

POROUS ASPHALT Presented By: David Vogt Construction Division Manager Hooker Creek Companies, LLC February 24th, 2009

BRADLEY UNIVERSITY. The Performance and Sustainability of Permeable Pavement Progress Report on the Work Performed Under IAPA Scholarship

Infiltration Guidelines

Presentation to the 60 th Annual NJ Asphalt Paving Conference March 14, 2017 Ewing, NJ

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

PROJECT AT THE DENVER

The University of Rhode Island Porous Asphalt Parking Lots

Stormwater Management Fact Sheet: Porous Pavement

East Manawa Porous Paving Project Council Bluffs, Iowa. Project Location. Phase 1 Project Location 9/2/2011

DATE: December 10, 2012 REPORT NO. PW CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION

Paraprofessional Training Session 1

At least 2 feet above the seasonal high water table Overflow path or structure provided

Porous Pavement Flow Paths

Porous Pavement Pilot Project

WQ-16 Pervious Pavement

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

Escondido Best Management Practices (BMP s)

BMP 6.4.4: Infiltration Trench

StormwaterWise Landscapes: Pervious Surfaces Specifications

PERMEABLE INTERLOCKING PAVERS

Porous Asphalt Pavements w/ Stone Recharge Beds. Brandon Milar California Asphalt Pavement Association

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

City of Wheat Ridge Site Drainage Requirements

Storm Drain Inlet Protection for Construction Sites (1060)

4.3 Permeable Pavement Systems

Evaluation of Structural Performance of Pervious Concrete in Construction

Class V Well Definition

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

16.0 Water Quality Management Criteria for Developed Land

DRAFT Guidance Specification for Porous or Dense-Graded Asphalt Pavement Structures for Storm Water Management Revised July 28, 2016

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

Photo explanation: Left: interlocking concrete pavingstones Middle: Pervious concrete Right: Porous asphalt

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

Storm Water Technology Fact Sheet Porous Pavement

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

Greening the Black Porous Pavement Demonstration Project City of Boston

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

New Administration Building

File No Supplemental November Geotechnical and Environmental Consulting Engineers

Reduced stormwater peak flows by at least 75% for 10-year storm events and 40% for 100-year storm events.

DRAINAGE DESIGN AND RUTTING PERFORMANACE GUIDELINES FOR PERMEABLE PAVEMENT

SECTION CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES. Part 1 - General Work Included Related Requirements...

integrated Site Design Point System Exercise

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

Indiana LTAP Road Scholar Core Course #10 Porous Pavement. Presented by Megan Elberts, PE Christopher B. Burke Engineering, Ltd.

Stormwater Treatment Practice (STP) Calculator Instructions

4.2 Permeable Pavement Systems

Asphalt Paving

SITE DESIGN ENGINEER'S STATEMENT:

Sherman Library Maintenance Handbook for Porous Asphalt

Sand Filter T-6. Description. Site Selection

RCFC&WCD LID TESTING AND DEMONSTRATION PROJECT

Porous Pavement

Integrated. Management

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

VA DEQ STORMWATER DESIGN SPECIFICATION NO. 7 PERMEABLE PAVEMENT. VERSION 1.8 March 1, 2011 SECTION 1: DESCRIPTION

ANDREW BILLING, P.E., CFM, LEED GREEN ASSOCIATE Lead Stormwater Reviewer CITY OF CHICAGO, DEPARTMENT OF BUILDINGS

a tankage process. delivery. 4. Avoid 6x6 T-bar Page 1 of 7 POLY Tank

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

GRAY WATER RECYCLING SYSTEMS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

MOA Project # Golden View Drive Intersection & Safety Upgrades

A Design Review of Waterproofing Codes

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

GWINNETT COUNTY STORM SEWER PIPE STANDARDS

Bio-Filter TM Stormwater Biofiltration System

A detailed guide and sizing manual for the application of Silva Cells to meet the requirements of bioretention under paving.

Pervious Pavement Systems

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO)

PERMEABLE PAVEMENT MAINTENANCE

Rhode Island Stormwater Design and Installation Standards Manual

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

PERMEABLE PAVEMENTS FOR ROADWAY SHOULDERS

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,

PERMEABLE PAVERS PHYSICAL AND GEOMETRICAL CHARACTERISTICS - PAVERS DRIVEWAYS, PERMEABLE DRIVEWAYS & PATIOS CHARACTERISTICS CSA A231.

Appendix B: Green Infrastructure Typical Details and Specifications

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

Porous Pavement SMP One-Sheet - download a summary of this tool, with quick reference facts for clients. and developers.

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

Chapter 5 Hydraulic Structures

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

Projects Using Porous Asphalt

Transcription:

Marketing Opportunities for Asphalt Pavements Key Elements in designing, constructing and marketing porous asphalt pavements with stone reservoirs Tom Clayton, SET Director of Training Colorado Asphalt Pavement Association Centennial, CO The project: Ball Aerospace & Technologies Corp., a Boulder based subsidiary of Ball Corporation, Boulder,Colorado 1

The project: In planning since 2004, involves construction of 90,000 sf of building space with approximately 3.6 acres of surface parking. Based in a community that has pioneered sustainable living, the plant s location just east of Boulder Creek created concerns regarding immediate run off flowing into the creek from the new development, further justifying the company s decision to look for an environmentally friendly way of managing storm runoff from the new parking lot. The project: About three quarters of the new parking lot location required fill to be imported to raise the lot s elevation to the code allowed d elevation in the floodplain, l Because we were expecting some costs for the grade change, we were open to looking at alternative designs. A water quality and detention pond would require an area of 12,000 square feet which translates into the loss of up to 40 of the 288 parking spaces An additional cost the owner would incur is the City Storm water plant investment fee for discharging water from the site. This fee is $1.78 per square foot or $279132.48 for the site discharge permit 2

The project: Ball Aerospace & Technologies Corp., a Boulder based subsidiary of Ball Corporation, Boulder,Colorado The Problem The problem: The City of Boulder Colorado would not allow for the underground storage of runoff. Ball, the City and Martin/Martin studied the project thoroughly, beginning with commissioning soil studies to determine permeability. Lakewood based, Martin/Martin Consulting Engineers, ProjectEngineer during the initial stages of discussion and design, Ms. Debbie Fisher, requested help from the Colorado Asphalt Pavement Associations Tom Clayton. 3

The problem: Tom, Debbie and Guy Fromme, P.E the program Manager from Ball Bllbegan discussions i with the City of Boulder for them to allow the construction of the lot. Several meetings were held to show the City representatives no water would be stored only detained, no differently than an a detention pond. The problem: In 2006, Englewood based, Ground Engineering Consultants completed its study of subgrade conditions and determined that materials encountered in our test holes consist of fine to coarse grained sand in the upper 5 feet. According to the National Asphalt Pavement Association (IS 131), these materials appear to be suitable for a porous pavement section. 4

The project: Ball Aerospace & Technologies Corp., a Boulder based subsidiary of Ball Corporation, Boulder,Colorado The Problem The Solution The solution: Based on the information presented by the Geotechnical Engineer, the Owner and Consultant requested the City reconsider their stand on prohibiting the use of a Free Draining pavement system With porous asphalt mix design guidelines and reservoir design specifications provided by provided by NAPA through the Colorado AsphaltPavement Association, the City and Martin/Martin were comfortable that such a sustainable vision could be achieved in this instance. 5

The solution: The last hurdle was cleared when officials agreed that the porous asphalt pavement system would suffice to provide the required water quality treatment, and the City issued the necessary permits. Design continued and based on the recommendations from the Geotechnical Engineer the porous asphalt should consist of approximately 4 inches with a void space of at least 16 percent. The project: Ball Aerospace & Technologies Corp., a Boulder based subsidiary of Ball Corporation, Boulder,Colorado The Problem The Solution The Construction 6

General contractor GH Phipps Construction Company Project over site was accomplished by CPI Group Site excavation, fill placement, scarification and placement of filter fabric, fbi sand and #2 gravel was performed by Denver based Gilbert Contracting Inc. 7

Cut and fill placement brought elevations for the parking lot to grade before curb, gutter and were poured, creating islands for trees and other vegetation in accordance with the overall design. All landscaping was completed before commencing construction ti of the porous pavement section to minimize contamination of the pavement by soil. 8

Installation of the recharge bed began with scarifying i the subgrade to a minimum i 12 inch depth to ensure ground permeability Geotextile filter fabric was then placed over the scarified subgrade and covered with a 6 inch lift of sand. The next step involved importing and placement of a 26 inch deep layer of large rock (#2 gravel) followed by placement of a 3 in. deep choker course of a smaller rock (#57 gravel). 9

The choker course was placed by CAPA member, Brannan Sand and Gravel lco. utilizing an asphalt paver to provide the best opportunity to maintain the required grade, according to Brannan Project Manager Brian Moon. Paving of the 3 in. section of 1/2 NMAS porous asphalt hltpavement by Brannan Sand and Gravel completed the porous pavement system. By design, porosity of the total pavement section increases from the wearing course down. 10

There will be signs throughout the parking lot that t tout tthe parking lot tdesign as sustainable ti The pavement design also includes an emergency overflow drain in the lowest corner of the combined parking area. Should successive storm events exceed the percolation ability of the underlying soils, or should the pavement become seriously plugged, water will drain through a pipe installed within the sand filter into a nearby storm sewer. 11

The conclusions: I see this as a very viable parking lot paving method, said Debbie Fisher, PE, This Porous Asphalt lot is an environmental prize, as it provides very important reintroduction of water into the water table and saves the owner from the need to obtain additional land for detention and water quality ponds. 12

The conclusions: Run off demonstrations already conducted on the lot thave been impressive i and clearly l will address keeping the rainwater events on the site, The conclusions: But we are also looking forward to all of the performance benefits that t we expect to see regarding maintenance and accelerated passive snow melt. 13

The conclusions: Pavement marking and signage: We found dthe striping ti i of a porous asphaltic hlti surface to be really no different than that of a smoother asphaltic surface. We applied 2 coats of paint with a lower pressure to keep the mill thickness of the paint to a minimum so we could keep the surface as pervious as possible. Troy Beer, Precise Striping The conclusions: Pavement marking and signage: As for the signage and parking blocks installed on this project t we found no difference during installation except for the containment of the slurry from running down the surface while coring of the sign posts. When coring, we would recommend a wet & dry vacuum to properly contain & clean up the slurry mix produced from this procedure. 14

The conclusions: If this project were attempting to achieve LEED accreditation, it would be eligible for several LEED points. Utilizing Porous Asphalt Pavement would allow for points for drainage, innovative technology. Runoff and more. Using the points available may allow a one or two category upgrade. LEED points can be determined from a chart at http://www.co asphalt.com/documents/leed HMA_contribution_points CAPA.pdf Marketing Opportunities for Asphalt Pavements Questions? References: Ball Aerospace and Technologies Corp, Boulder, CO Martin /Martin Engineers, Lakewood Colorado CPI Group, Greenwood Village, CO Gilbert Construction, Denver, CO Brannan Sand and Gravel CO Denver, CO Precise Striping, Commerce City, CO Debbie Fisher, P.E. NAPA publication, IS 131 15

Marketing Opportunities for Asphalt Pavements Tom Clayton Director of Training and Member Services Colorado Asphalt Pavement Association Centennial, CO 303 741 6150 Extension 151 tomclayton@co asphalt.com www.co asphalt.com 16