Florida Department of Transportation District Four KICK-OFF MEETING. I-95 at Southern Boulevard (SR 80) Project Development and Environment Study

Similar documents
SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

MARTINSVILLE SOUTHERN CONNECTOR STUDY CITIZEN INFORMATION MEETING Magna Vista High School 701 Magna Vista School Road Ridgeway, Virginia May 8,

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

State Road (S.R.) 12 (Florida Arts Trail PD&E)

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

Chapter 2 Transportation Element Goals, Objectives and Policies

ENVIRONMENTAL ADVISORY GROUP MEETING NO. 2

HSM APPLICATION USING IHSDM (I-12 TO BUSH) April Renard, P.E. LADOTD Highway Safety

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014

1.4 Analysis of Alignment Alternatives

LOCATION HYDRAULIC REPORT

Project Study Area. Presentation. July 8, 2008

2050 VISION WORKSHOP

SR 50 PD&E Study

Final Air Quality Report

Palm Beach MPO Board Meeting December 7, 2015

Public Meeting. US Highways 18 & 281 and SD Highway 50 From Douglas County Line to SD46 Charles Mix County

I-4 Beyond the Ultimate Project Development & Environment (PD&E) Reevaluation Study FROM WEST OF SR 528 (BEACHLINE EXPRESSWAY)

Northwest State Route 138 Corridor Improvement Project

D R A F T. SECTION 4(f) EVALUATION. INTERSTATE 73 From I-95 to the Myrtle Beach Region

NOISE STUDY REPORT. for the WEKIVA PARKWAY (SR 429)/SR 46 REALIGNMENT PD&E STUDY. Orange, Lake, and Seminole Counties, Florida

Alternatives Evaluation Methodology

CHAPTER 2. VISION, GOALS AND MTP FRAMEWORK

CENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study

Statewide Acceleration Transformation (SWAT)

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4G. Intergovernmental Coordination and Review Log

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD

Chester Bridge Environmental Assessment (EA) CAG Meeting #2. October 12, 2017

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES

All Aboard Florida Project Status Update TREASURE COAST REGIONAL PLANNING COUNCIL

Stakeholder Interview Information Packet December 14-17, 2015

MEETING SUMMARY FOR APRIL 13, 2017

Public Meeting. US Highway 81 From 306 th St. to 303 rd St. & 300 th St. Yankton County NH 0081(103)6 PCN 04G5. Brandon Riss, PE Road Design Engineer

Comprehensive Transportation Study for Glencoe, MN

Livability 2050 Regional Transportation Plan Update. RTPAC #4 October 16, 2018

Concept, Feasibility & Mobility Studies. Southport Connector Expressway

State Route 8 Bridge Replacement Project

Background Study Goals and Objectives

I-17 and Happy Valley Road Diverging Diamond Interchange (DDI)

Harrison Community Center November 21, 2016

NORTH I-75 MASTER PLAN Summary Report

Interstate 66 Tier 1 Environmental Impact Statement Public Hearing

I-20 East Transit Initiative

Transportation Study related to the Redevelopment of NASB

INTERCHANGE MODIFICATION REPORT

AIR QUALITY TECHNICAL MEMORANDUM

SR 60 Grade Separation over CSX Railroad Traffic Technical Memorandum

Land Use Vision and Transportation Strategy

Appendix. Sample EA/EIS Scope of Work

Shoulder Widening Prioritization Discussion

Reconstruction Project Update

TYPE 2 CATEGORICAL EXCLUSION DETERMINATION FORM

HILLSBOROUGH COUNTY METROPOLITAN PLANNING ORGANIZATION

Barrington Road. at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study. Community Advisory Group Meeting #1

Beckett Bridge PD& E Study Elected Officials Kick-Off Meeting

Joe Santos Transportation Safety Engineer Florida Department of Transportation

FTP Implementation Element Worksheet

Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc.

SR 15 SECTION 088 CSVT SOUTHERN SECTION PUBLIC MEETING MAY 25, 2017

Final Air Quality Report

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing

Welcome. Elk River to Zimmerman. Highway 169 Interchange & Frontage Road Study:

AGENCY MEETING. I-10E Planning & Environmental Linkages Meeting #1 TxDOT Houston District

Downtown Estes Loop Project Frequently Asked Questions

Purpose of the Public Hearing

CMNAA. Central Manatee Network Alternatives Analysis Alternatives Public Meeting CMNAA STUDY PROCESS. STUDY AREA 17th St. W

2018 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM

Central Manatee Network Alternatives Analysis

Work Breakdown Structure Element Dictionary Preliminary Engineering

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

I-10 KENDALL EXTENSION. Open House

IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange. Public Meeting. Thursday April 4, 2013

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM

NEPA and Design Public Hearings

Kentucky River Area Development District

CORRIDOR ALTERNATIVES EVALUATION SUMMARY REPORT

Regional Transportation Studies Regional Council

VENETIAN CAUSEWAY. (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE. FM No.

FY 2019 Unified Planning Work Program FINAL. Regional Intergovernmental Council. June 14, Kanawha Putnam Metropolitan Planning Organization

US 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL

Air Quality Analysis Technical Memorandum

Environmental Impact Statement; Lone Star Regional Rail Project Williamson, Travis, Bastrop, Hays, Caldwell, Comal, Guadalupe, and Bexar Counties, TX

5.3 Noise Impact Analysis

SH 35 Public Meeting

Torbram Road Improvements From Queen Street East to Bovaird Drive

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

RESOLUTION NO:

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Proposed SM Wright Project on I-45 / US 175 / SH 310

Lee County Artesian Well Abandonment Project

Long Range Transportation Plan

High Desert Corridor Draft EIS/EIR Public Hearings

I-15/US 93 Garnet Interchange & US 93 Improvements WELCOME. Public Information Meeting October 6, 2016

River Valley. Intermodal Facilities. February Prepared by: Federal Highway Administration Draft Environmental Impact Statement

Public Notice. Between County Road 700 South and County Road 500 South near Francesville, Pulaski County, Indiana.

Decision Support Systems for FDOT District 4 TSM&O

MOBILITY 2045: A FOCUS ON TRANSPORTATION CHOICE:

I-20 East Transit Initiative

Transcription:

Florida Department of Transportation District Four KICK-OFF MEETING I-95 at Southern Boulevard (SR 80) Project Development and Environment Study Palm Beach County, Florida Financial Project ID No.: 435516-1-22-02 ETDM No.: 14183 November 17, 2015 1

Meeting Purpose Introduce the Project Outline the Study Process and Schedule Share Information About the Project Receive Input from Residents and Stakeholders Questions and Concerns Comment Forms Request a Group Meeting Website: www.i95atsouthern.com 2

Project Development and Environment (PD&E) Study PD&E Study Objectives: To perform the necessary social, environmental and engineering studies regarding a proposed transportation improvement to support decisions concerning if and where it should be built, and what the basic design concepts will be. 3

The Transportation Project Process 4

The PD&E Study Process Data Collection: A review of all existing conditions Engineering Analysis: Develop alternatives that meet the needs of the study area Environmental Evaluations: Potential impacts to the social, natural and physical environments Public Involvement: Continuous community outreach and stakeholder coordination 1 2 3 4 5 6 7 8 Project Initiation: Data Collection Identify Transportation Issues & Develop Solutions Public Kick-off Meeting: Introduce the Study to the Public & Receive Input Environmental & Engineering Analysis Alternatives Public Meeting: Present the Alternatives to the Public & Receive Input Draft Environmental & Engineering Documents Public Hearing: Final Opportunity for the Public to Make Verbal or Written Statements about the Study Final Environmental & Engineering Documents Federal Highway Administration (FHWA) Location and Design Concept Acceptance A continuous community outreach process is integrated into every step of the project to ensure that the corridor residents, businesses, the traveling public and other interested parties have meaningful opportunities for participation throughout the PD&E Study. COMMUNITY OUTREACH 5

PD&E Study Components Public Involvement Engineering Environmental 6

Location: I-95 at Southern Boulevard (SR 80) Interchange City of West Palm Beach Palm Beach County Southern Boulevard from Australian Avenue on the west side, to Parker Avenue on the east side of the interchange Study Area 7

Project Purpose and Need Enhance overall traffic operations at the Southern Boulevard (SR 80) Interchange Improve capacity and meet future travel demand resulting from: Population growth Employment growth Consistent with local transportation plans 8

Engineering and Environment Data Collection and Analysis Some of the data gathered includes: Traffic counts Crash records Existing roadway conditions Existing drainage systems and patterns Identification of wetlands Threatened/Endangered species and habitat Existing land use property information Census Data Planned developments Contamination sites Archaeological/Historical sites 9

Traffic Conditions Roadway doesn t handle existing traffic Average Daily Traffic (ADT) anticipated to increase Degraded traffic operations unless improvements are made 10

Safety Collisions on I-95 at Southern Boulevard (SR 80) (2010-2014) Total crashes: 1,330 Average crashes per year: 266 Predominant Rear end 27% crash types: Angle 9% Fixed object 19% Fatalities: 4 Injuries: 885 11

Emergency Evacuation Part of the Palm Beach County emergency evacuation route network Major east-west and north-south corridors Connects with other major arterials and highways 12

Alternatives Analysis Meet future travel demand Avoid or minimize impacts to the community and environment Developed with input from the the public, local governments and environmental agencies Criteria for comparison of alternatives: - Community and environmental impacts - Costs for design and construction, engineering inspection/maintenance, right-of-way acquisition, and environmental mitigation 13

Environmental Analysis Social and Cultural Environment Natural Environment Physical Environment Environmental Reports 14

Social and Cultural Environment Socio-Economic Effects Socio-Cultural Effects Archaeological and Historic Sites Visual Impacts and Aesthetics Parks and Recreational Resources 15

Natural Environment Endangered Species Wildlife Habitat Water Resources Wetlands 16

Physical Environment Pedestrian and Bicycle Facilities Contamination Sites Visual Impacts Air Quality Noise Construction 17

Project Schedule Study Begins Data Collection Public Kick-off Meeting Develop and Evaluate Alternatives Environmental Evaluations Alternatives Public Meeting Finalize Draft Engineering & Environmental Documents Public Hearing Submit Project Document to Federal Highway Administration (FHWA) FHWA Location Design and Concept Acceptance PD&E I-95 at Southern Boulevard (SR 80) Interchange Project Development and Environment (PD&E) Study SCHEDULE 2015 2016 TASK Quarter 2 Quarter 3 Quarter 4 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Quarter 1 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A continuous community outreach process is integrated into every step of the project to ensure that the corridor residents, businesses, the traveling public and other interested parties have meaningful participation in the process. 2017 2018 Quarter 2 Quarter 3 Quarter 4 Quarter 1 LEGEND: Study Begins Tasks Public Meeting Public Hearing Study Complete 18

What s Next? Continuous Public Involvement City of West Palm Beach Palm Beach County Town of Cloud Lake Town of Glen Ridge Vedado-Hillcrest Neighborhood Association Local agencies Area stakeholders Available to give presentations upon request 19

What s Next? Evaluate future traffic levels and operations Review engineering data collected Develop viable alternatives Evaluate environmental impacts 20

Public Involvement Elected and Appointed Officials/Agencies Kick-off Meeting Public Kick-off Meeting Alternatives Public Meeting Public Hearing Project Website: www.i95atsouthern.com Local Outreach 21

How Can You Get Involved? Comment Forms Place in the comment box tonight Mail to the address on the form Website: www.i95atsouthern.com Request a Group Meeting Neighborhood association Special interest group 22

Contact Information FDOT Project Manager Anson Sonnett, P.E. Florida Department of Transportation, District Four 3400 West Commercial Boulevard Fort Lauderdale, Florida 33309 Phone: 954-777-4474 Toll free: 1-866-336-8435 ext. 4474 Email: anson.sonnett@dot.state.fl.us 23

Thank you for attending this Kick-off Meeting and for sharing your thoughts and concerns! 24

Questions? 25