Frequently Asked Questions (FAQs) For Communications Based Overlay Signal System (CBOSS) Positive Train Control (PTC)

Similar documents
CALTRAIN S PTC SOLUTION FOR 2015 CBOSS

Peninsula Corridor Electrification Project. Draft Environmental Impact Report

William W. Hay Railroad Engineering Seminar. #2 Capacity Allocation in Vertically Integrated Railway Systems: A Sequential Bargaining Game Approach

ACT OF 2008 RAIL SAFETY IMPROVEMENT

Positive Train Control (PTC) Amtrak s Northeast Corridor

Caltrain Business Plan

Caltrain Business Plan

Caltrain Rapid Rail Plan

Fixing America s Surface Transportation Act: Safety Provisions Affecting Rail Operations. Presented by Justin J. Marks FEBRUARY 22, 2016

Caltrain 2025 Program Information and Findings March 2008

The Use of E-ATC as a PTC System By

PENINSULA CORRIDOR JOINT POWERS BOARD STAFF REPORT. Executive Officer, Caltrain Modernization Program

MEETING DATE: July 28, 2017 ITEM 20. Update on Coordination with the California High Speed Rail, Link US Projects, and Freight Railroads

TESTIMONY OF JEFFREY D. KNUEPPEL, P.E. GENERAL MANAGER SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY (SEPTA) ON BEHALF OF THE

TESTIMONY OF JEFFREY D. KNUEPPEL, P.E. GENERAL MANAGER SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY (SEPTA) ON BEHALF OF THE

Peninsula Corridor Electrification Project Final Environmental Impact Report

Peninsula Corridor Electrification Project Final Environmental Impact Report

EXHIBIT C OPERATING SYSTEM INTERFACE (OSI)

Chapter 5. Congestion Management Program. Chapter 5

Texas Transportation Forum The Fast Track: Passenger Rail In Texas. Federal Railroad Administration Karen Rae, Deputy Administrator

This memo provides a brief update on key CalMod activities since the January LPMG meeting.

Re: REQUEST TO EXTEND DEADLINE AND REJECT PENINSULA CORRIDOR JOINT POWERS BOARD - PETITION FOR DECLARATORY ORDER Finance Docket No.

Capitol Corridor Vision Implementation Plan Vision for the Megaregion. CCJPA November 2017

TESTIMONY OF PAUL P. SKOUTELAS PRESIDENT AND CEO AMERICAN PUBLIC TRANSPORTATION ASSOCIATION BEFORE THE

2004 FEASIBILITY STUDY UPDATE

ARINC PROPRIETARY. Overview of PTC. Gary Pruitt Senior Director Advanced Technology Programs ARINC

California State Rail Plan. Santa Cruz County Regional Transportation Commission November 2, 2017

SUPPLEMENTAL NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT. ACEforward Notice of Additional Project Element Niles Junction Connections

An Approach to Predicting Passenger Operation Performance from Commuter System Performance

Regulatory Update. Southwest Association of Rail Shippers Dallas, Texas October 8, 2015

1. Evaluation of route and service alternatives; 2. Tier 1 Environmental Impact Analysis; and 3. Service Development Plan.

Twin Cities-Milwaukee-Chicago Intercity Passenger Rail Phase I Study Twin Cities- Milwaukee High Speed Rail to Chicago Corridor Study

Train Control Working Group Final Report. Presented to: The Advisory Council on Railway Safety

Rail Freight and Passenger

PRIIA Section 305 Executive Committee 10/20/2010. Version 3

ANTF September 7th, 2013

Interoperable Positive Train Control (PTC) William A Petit AREMA 2009 Annual Conference Communications and Signals Track

Attachment 2: Draft Business Plan Scope of Work

10-PCJPB-T Design/Procure/Install A Positive Train Control System For Caltrain Questions Received and Answers No. 6

Freight Railroads: Linking Pennsylvania to the World. Rudy Husband Lehigh Valley Planning Commission April 4, 2018 Allentown, Pennsylvania

Federal Railroad Administration Report to Congress. Railroads Progress Toward Implementation of Positive Train Control Systems

NORTHERN CALIFORNIA PROGRAM UPDATE

STAFF REPORT. MEETING DATE: June 19, 2008 AGENDA ITEM: 6A

CHAPTER 2.0: INTRODUCTION

REGIONAL EXPRESS RAIL (RER)

Pacific Northwest High Speed Rail Corridor Amtrak Cascades Passenger Service Update

Section IMPLEMENTATION PLAN. 7. Implementation Plan

High-speed rail will have a profound and transformational impact on the Bay Area. Some of the many benefits include:

PART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express

Modeling Risk for Positive Train Control (PTC) Systems

ASSOCIATION 0 OF AMERICAN RAILROADS

Board of Directors Meeting Monday May 22, :30 p.m.

Stockton Freight & Passenger Rail Mobility Enhancement

Rounding out the 2040 Vision

TESTIMONY OF JOSEPH J. GIULIETTI, EXECUTIVE DIRECTOR SOUTH FLORIDA REGIONAL TRANSPORTATION AUTHORITY BEFORE THE

Positive Train Control Implementation on the Fast Track

Rail Division 2012 Annual Summary

All Aboard Florida. DRAFT Environmental Impact Statement. Martin Metropolitan Planning Organization (MPO) Staff Review. Photo courtesy Carla McMahon

Automated Ticket Validation for the Capitol Corridor Trains

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

South Sounder Capital Improvements Program

TECHNICAL MEMORANDUM

The California Public Utilities

[Docket No. FRA ; Notice No. 1] [Draft Safety Advisory ] Draft Safety Advisory Related to Temporary Signal Suspensions

Table of Contents. Table of Figures

2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan

Caltrain Downtown Extension Project

Texas A&M Transportation Short Course

Mental Health Awareness & Trespass Prevention Strategies

Central Valley Rail Working Group 1. INTRODUCTIONS

National Association of Counties

AGENCY: Federal Railroad Administration (FRA), Department of Transportation

NCHRP Report 657. Randy Wade HNTB Corporation

Supplemental Environmental Impact Statement/Environmental Impact Report (SEIS/EIR)

A Balancing Act: Positive Train Control

Policing America s Railroads A push is underway to allow rail officers to access public-safety interoperability frequencies.

Caltrain Business Plan Draft Business Strategy and Scope. Board of Directors December 7, 2017 Agenda Item 9

SEIS/EIR Update. March 9, 2017

PAJARO COMMUNITY PLAN PRINCIPAL FINDINGS Draft

Modernization Program Peninsula Corridor Electrification Project (PCEP) May 2017 Monthly Progress Report

Frequently Asked Questions Connecting Palo Alto

ABCs of Positive Train Control (PTC)

COMMUTER RAIL CEOS COMMITTEE Don Orseno, chair AGENDA

2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan. Minnesota Department of Transportation

TJPA CAC SEIS/EIR Update. March 7, 2017

AUSTIN S NEW COMMUTER RAIL SERVICE

Positive Train Control (PTC): Overview and Policy Issues

Wisconsin s Passenger Rail Development Program

Executive Summary. ES.1 Project Background

William W. Hay Railroad Engineering Seminar

Commuter Rail Positive Train Control (PTC)

Integrating High Speed Rail, Regional Rail, and Transit Services in California

Richard Clarke Executive Director Program Management. Capital Program Management

Connecting Communities: A Passenger Rail Symposium The Lone Star Rail District. May 25, 2010 Ross Milloy

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

Project Overview. A Collaborative Effort

Testimony by. Richard Anderson. President & Chief Executive Officer. National Railroad Passenger Corporation. Before the. United States Senate

Caltrain Planning Update

Impact of CBTC and ECP Brakes on Capacity

Transcription:

(FAQs) For Communications Based Overlay Signal System (CBOSS) Positive Train Control (PTC) 1. What is CBOSS PTC? CBOSS PTC stands for Communications Based Overlay Signal System (CBOSS) Positive Train Control (PTC). CBOSS PTC is an advanced signal system that can monitor and control train movements and provide safety enhancements including PTC, which is mandated by the Federal Rail Safety Act of 2008. PTC is intended to prevent train to train collisions, overspeed derailments, and movement into established work zones or through a misaligned switch. Caltrain s CBOSS project includes additional requirements such as, enhanced crossing safety and performance, improved headways and operational flexibility, enforcement of scheduled station stops, and schedule management. CBOSS PTC is also one of the core components of the Caltrain Modernization Program, which is designed to upgrade the performance, operating efficiency, capacity, safety and reliability of Caltrain s commuter rail service between San Francisco and San Jose. In addition to CBOSS PTC, the Caltrain Modernization Program includes the electrification of the existing Caltrain corridor between San Francisco and San Jose and the replacement of the Caltrain s diesel trains with high-performance electric trains called Electric Multiple Units. 2. Why is the CBOSS PTC Project needed for Caltrain? The is needed to meet two specific criteria: Comply with the Railroad Safety Improvement Act (RSIA) of 2008, which mandates implementation of PTC by December 2015; and Increase system operational capacity and performance to accommodate increases in ridership demand. The will also be necessary to facilitate the construction and operation of the Blended System that will support modernized Caltrain and future high-speed rail. 3. What is the Federal PTC Mandate? In response to a fatal train collision in September 2008, Congress passed the Rail Safety Improvement Act (RSIA) of 2008 which updated the Code of Federal Regulations (CFR) to require PTC to be installed along every passenger rail corridor prior to December 31, 2015. For Caltrain, the core safety enhancements provided by PTC include the prevention of: Train to train collisions by enforcing movement authority limits; Over speed derailments by enforcing speed limits; and Incursions into established work zones by protecting track work zones throughout the corridor.

The PTC mandate also requires that all tenant railroads must be equipped with PTC solutions that are interoperable, i.e. allow trains to freely and safely move between the different railroads. This is important to Caltrain as its tenant operators include other commuter and intercity railroads, freight, and future high speed train service. 4. How does Positive Train Control (PTC) work? The main concept in PTC is that the train receives information about its location and where it is allowed to safely travel, also known as movement authorities. Equipment on board the train then enforces these movement authorities, preventing unsafe travel. 5. What are the functions unique to the? The includes additional capabilities, beyond those required by the Federal PTC mandate. These additional functions include: Enhanced Crossing Safety and Performance travelers crossing the tracks will benefit from reduced gate-down time and improved local traffic circulation. Improved Headways and Operation Flexibility more frequent and dependable passenger service will be possible with trains that are able to travel closer together. Enforcement of Scheduled Station Stops a train will no longer be able to overshoot a station stop or platform. Schedule Management there will be better accountability and management of train schedules. Employee in Charge when work is being performed on the rail corridor, there will be an employee (in charge) that has a device that interfaces with the approaching train to enforce work zone safety measures. This helps removes human error and will increase worker safety. Integrated communications better communication among all subsystems, such as the Central Control Facility (CCF), train and Wayside, and a new Backup Central Control Facility (BCCF), for improved safety performance for highway vehicles and the riding public. 6. How is Caltrain s CBOSS PTC system being funded? The implementation of the High Speed Rail Early Investment Strategy is a $1.46 billion Caltrain Modernization Program that leverages local, regional and federal funding to match $706 million in high-speed rail bond revenues that were approved by the voters in California in November 2008. The CBOSS PTC project accounts for $231 million out of the $1.46 billion Caltrain Modernization Program. Local funds: $ 71 million (San Francisco, San Mateo and Santa Clara counties) State funds: $113 million (includes $106M in High Speed Rail Connectivity funds) Page 2

Federal funds: $ 47 million Total Budget: $231 million 7. When will CBOSS PTC be installed and fully operational? During the summer of 2013, CBOSS will be in its final design phase. Installation and testing is planned for Fall 2013 through Fall 2015. The system is expected to be in service in October 2015 with the final system acceptance in May 2016. 8. What is limiting Caltrain s system operational capacity? Caltrain has so far been able to meet the year to year increases in customer service demands. However, Caltrain s peak hour system capacity, the number of trains it can operate on the current infrastructure during the busiest commute times, has reached a point where significant service increases are not possible. Caltrain s wayside block signal system severely limits operational capacity in that it forces train separation based on the poorest performing type of train behaving in a worst case manner. The Caltrain CBOSS PTC project will minimize the separation of trains to match the safe braking needs based on specific train type(s). The CBOSS PTC project also will providing positive control over crossing warning systems, avoid missed stops, improving quality of service and reduces environmental impact. In addition to the capacity improvements offered by CBOSS PTC, Caltrain is proposing to operate high-performance electric multiple unit (EMU) trains that are more efficient than the current diesel powered locomotives. These EMUs will help improve operational capacity as EMUs can accelerate and decelerate faster than diesel trains. This means EMUs can provide faster and/or more frequent service to more stations and more riders. In May 2010, the Federal Railroad Administration (FRA) granted a waiver to Caltrain allowing EMUs to operate on the Caltrain corridor as long as the corridor is equipped with PTC technology. 9. How will Caltrain s CBOSS PTC interact with CA High Speed Rail? Federal law requires the CBOSS PTC system to be interoperable with all rail service along the Caltrain corridor including high-speed rail. Caltrain is working in close coordination with the California High Speed Rail Authority (CHSRA) to ensure the project is compatible with future high-speed rail service. 10. Interoperability: What is it, why is it needed, and how will it be achieved? A key provision of the Railroad Safety Improvement Act (RSIA) is that host and tenant railroads must be equipped with PTC solutions that are interoperable, i.e. allow trains to freely and safely move between the different railroads. The will ensure that Caltrain, the host railroad, is interoperable Page 3

with its tenant operators, which include: Union Pacific Railroad (UPRR), which operates freight rail service; and Passenger rail operators including Capitol Corridor Joint Power Authority, Altamont Commuter Express (ACE), and Amtrak. In addition, the California High Speed Rail Authority (CHSRA) or its designated operating agent is considered a future tenant operator with planned HSR service between San Francisco and San Jose. Class 1 railroads in the United States have formed the Interoperable Train Control Committee that is in the process of developing protocol/communications standards to provide for interoperability. Caltrain and its tenant operators, which are all Class 1 railroads, have committed to following the developed interoperability standards. The signal system and on board equipment being developed and procured through the will utilize these standards to ensure interoperability to enable transparent and seamless operation on tracks belonging to Caltrain and the UPRR. 11. Why not procure an off the shelf PTC product? The most promising radio based PTC technologies are in the development stage and, while they show great promise for the railroad industry, all have been designed largely to respond to the needs of the freight rail industry and are not tailored for unique requirements for passenger rail operations. PTC provides core safety capabilities that are intended to benefit all operators. However, the manner in which intervention mechanisms are implemented may result in decreased operating performance if care is not taken to incorporate specific passenger operating needs. The specifications of the signal system designed for the Caltrain CBOSS PTC Project have been developed to meet the core safety functions of PTC and to fill in the gaps by addressing specific passenger rail and Caltrain needs. 12. What is included in the Caltrain CBOSS PTC Scope of Work? Caltrain s CBOSS PTC includes a complete and fully functional PTC system that is integrated with its existing systems and complies with federally mandated requirements described in the Rail Safety Improvement Act (RSIA) and Federal Railroad Administration (FRA) Final Rule for PTC systems. The scope of work includes: Design, procurement, manufacture, installation, and testing, inclusive of any necessary modifications to Caltrain s systems, subsystems, vehicles and facilities Caltrain PTC system fixed infrastructure that is interoperable with Caltrain s tenant railroads PTC equipped trains Safety engineering and system safety certification Training simulator and training service Page 4

Updated Caltrain operating rules, maintenance and inspection procedures and other documents required to support the operation and maintenance of the Caltrain PTC system Coordination and support of FRA requirements System integration, project Coordination and management Caltrain CBOSS PTC system consists of the following major elements: Wayside Subsystem Data Communications Subsystem including backhaul system On Board Subsystem Back Office Subsystem Employee in Charge (EIC) Backup Control Center Facility (BCCF) 13. Will CBOSS Change a City s Existing Signaling Infrastructure? No. CBOSS is an overlay system and the existing wayside signal system will remain intact. The interface to the city s traffic signal system from the highway-grade crossing system will remain the same. 14. Would CBOSS PTC prevent the July 2013 train derailment in Spain? Yes, CBOSS PTC will prevent over speed derailments by enforcing speed limits. If an operator ignores the speed limits, the PTC equipped train will automatically enforce the brakes to slow down the train and prevent unsafe travel. 15. For more information: Visit www.caltrain.com/cbossptc Email caltrainptc@samtrans.com Call (650) 508-6499 Rev Sept 2013 Page 5