BELLARY THERMAL POWER PROJECT PROJECT INFORMATION

PRICE BID FOR. Processing zone of Special Economic Zone, MAHINDRA WORLD CITY (JAIPUR) LIMITED, JAIPUR MWCJL/HR/INFRA/HC ZONE/STP/ /T-32

City of Fairfax, Virginia City Council Regular Meeting. Honorable Mayor and Members of Cfy ;ouncil Robert L. Sisson, City Manager /I.

Addendum-1. Ref. Original clause Amended Clause

Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

Progressive Design Build Services for the th Street, 6217 Wilson Blvd., 7703 Blanding Blvd. and Robitzsch Ln. Wastewater Pump Station

Description of the Work

M Observations for Water Treatment Plant

EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT

HAZOP Checklist for Sewage Treatment Plant

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD

KANPUR SMART CITY LIMITED

TENDER FOR " Work for 24 x 7 Water Supply System under Smart City Mission in ABD area of VMC including

SCHEDULE-A MODIFIED CLAUSES/ PAGE NUMBERS: Vol. No. Section/ Description SECTION IA/ ANNEXURE XII :INPUT DRAWINGS (PT plant) Clause no of 920

Need-to-Know Criteria Wastewater Treatment Operator Class I

Central Power Research Institute Prof Sir C V Raman Road, Sadashivnagar Post Office Post Box No: 8066, Bangalore

EVALUATION OF A WATER TREATMENT PLANT PERFORMANCE CASE STUDY

PCI AFRICA RANGE OF PRE-ENGINEERED WATER TREATMENT PLANTS

MOROGORO URBAN WATER SUPPLY AND SANITATION AUTHORITY

There will be a technical and financial evaluation. Technical evaluation will be 70% and 30% for financial.

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali

Compiled by: Civil Works Department, SSA Punjab.

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI

Construction works for Establishment of School in Al-Najaf M 2 2,600 M 2 750

Need-to-Know Criteria Wastewater Treatment Operator Class II

McDuff WTP High Service Pump Replacement

RUWAIS HOUSING COMPLEX PHASE IV CIVIL & ELECTROMECHANICAL WORKS

WHAT TO CONSIDER IN CHOOSING A SYSTEM

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:

Construction works for Establishment of School in Al-Latifiyah. Al-Latifiyah BoQ for constructing a 6-pre-fab Classroom School

MILESTONES : JAIPUR PROJECT

Need-to-Know Criteria Wastewater Treatment Operator Class III

Jungzhina Water Treatment Plant Thimpu, Bhutan

Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka

Rehoboth Beach Commissioners Meeting Ocean Outfall & Treatment Plant Project Update July 26, Jeff Sturdevant Principal Kelvin George Principal

California Water Environment Association Technical Certification Program

Saraswathi. Floor Plans

ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE...

Transit campus, Govt ITI Berhampur (2nd Floor), Engineering School Junction N.H-59, Berhampur Notice Inviting Tender

Existing Condition: (Date: May 2000) Evaluation: In good working condition but the facility is not secured.

Chapter 5: Treatment Assessment Future Condition

PROGRESS MEERUT PROJECT AS ON 15 MAY 2017

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

Zero Liquid Discharge Project Extends Potable Water Supplies

i LAWSS Capital & Major Maintenance 2019 Recommended Capital/Major Maintenance from 2019 to 2024 The Ontario Clean Water Agency has identified the fol

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

Bill of Quantity (BOQ)

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Labugama Kalatuwawa WTP Rehabilitation Project for Web site updating

REFLECTION ISF INFORMATION RWTS.CO.NZ. Pure. Wastewater. Solutions.

1 X 500 MW FGUTPP THERMAL POWER PLANT STAGE IV DETAILS OF CIVIL, STRUCTURAL AND ARCHITECTURAL WORKS. RCC framed

IND: Tamil Nadu Urban Flagship Investment Program (TNUFIP) Due Diligence Report for Water Treatment Plant

Damages and risks which are attributed to water leaks are summarized as follows:

ITEM No. D E S C R I P T I O N UNIT QTY. 5-E343.2 In class III material m³ 1,260 - Max. Depth: m For disposal

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv

TABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope

SUM i) Carry out calibration of 100,000 litres day tank. ii) Pipes, valves and other fittings connection to fuel offloading SUM

Facility & Operations Field Division

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager

PRICED BILL OF QUANTITIES

Nairobi Funeral Home and Forensics BOREHOLE BILLS OF QUANTITIES

PRE-BID QUERRIES REPLY, PAHARI SEWERAGE NETWORK ZONE V

6.5 Filtration General

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT. Ref:NITT/COW/EMD/Civil Works/Enq.No.01. Date:

Calculation of requirement of Labour. for construction of IAY/CMRHM

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title

United Nations Development Programme

SECTION 807 PUMP STATION REHABILITATION

KGN-BDD TENDER FOR SUPPLY OF LABORATORY EQUIPMENT AND PROVISION OF CIVIL WORKS FOR THE OLKARIA CIVIL ENGINEERING LABORATORY.

EARTHSAFE OWNERS MANUAL WASTEWATER TREATMENT SYSTEMS. All information contained within this manual is the property of EcoWater (QLD) Pty Ltd.

Estimate FOR THE SEPTIC TANK

Dipti Shah, Town of Gilbert Tuesday, January 25, 2011

DEPARTMENT OF CIVIL ENGINEERING

120 MLD Water Treatment Plant & 24 MLD Zero Liquid Discharge Plant

Water and Waste Department

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

PUR-1241 ADDENDUM NO. 2 INVITATION TO BID GREENSAND FILTER SYSTEM AT ELK RIDGE WATER TREATMENT PLANT

WASTEWATER FACILITIES OPERATOR I WASTEWATER FACILITIES OPERATOR II

a. Unless otherwise specified, all lengths shall be horizontal distances.

Regulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES

MIEL I Hydroelectric Power Plant

Sand Interceptor Sector Control Policy For Automotive Shops, Car Washes, & Facilities with Significant Potential for Sand or Inert Debris Discharge

Scanned by CamScanner

Client: City of Pontiac Project Name: Regional WWTP Feasibility Location: Pontiac, MI Project Number: Issue Date: October 23, 2006

TENDER FOR PREMISES AND FACILITY MANAGEMENT SERVICES CONTRACT FOR SIDBI S OFFICE BUILDING AT BKC, MUMBAI. (PART III- Financial Bid)

NOTICE INVITING QUOTATION

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

RCC PRECAST TOILET UNITS

D R A F T - 02/22/08

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT

Trident. Package Water Treatment System

Ali Leeds, MWH Austin Peters, MWH

SEPTIC TANK CONSTRUCTION GUIDELINES

Nairobi Funeral Home and Forensics INCINERATOR BILLS OF QUANTITIES

PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR

United Nations Development Programme

Transcription:

Schedule-1 Overall Project BOQ Sl. No. Item/Description Quantity Unit Total Price excluding GST 1 2 3 4 5 Lot 1 Design and Detailed Engineering 1 Lot Lot 2 Intake works 1 Lot Lot 3 Raw water reservoir and Pump house inside WTP campus 1 Lot Lot 4 Water Treatment Plant 1 Lot Lot 5 Clear/Treated water storage reservoir and pump house 1 Lot Lot 6 Site development works at both Intake and WTP campus 1 Lot Lot 7 Operation and Maintenance for 3 Years period 1 Lot Total Project Cost (Lot 1 to Lot 7)

Schedule 2 - Detailed BOQ Lot 1 Design and Detailed Engineering Civil Mechanical 1.01 Design & Engineering including Process Design, Sizing, Hydraulic Design and Layout of Intake and WTP, Structural design, Electrical system design, Control Instrumentation system and Automation design works and all related drawings and documents Lump Sum Total Total Lot 2 Intake Works Civil Mechanical Total Complete Civil works including earthwork, foundation, superstructure, finishes, testing and commissioning etc. Complete Mechanical Items Including Pumps, Motors, Valves, Header piping, Specials, Hoists/Cranes, AC & ventilation system etc. Complete Electrical, Instrumentation, Control & Automation Items including Transformers, Panels, incomers, breakers, relays, Cables, etc Total Cost of Unit / Structure 2.01 Raw Water Reservoir 2.02 Raw Water Pump House 2.03 HT Room with Toilet and Transformer Area 2.04 Guard Room 2.05 Store Room 2.06 Valve Chamber 2.07 Septic Tank Sub Total Lot 2 Lot 3 Raw water Reservoir works Civil Mechanical 3.01 Raw water reservoir in WTP 3.02 Raw water Pump House in WTP Sub Total Lot 3 Total

Lot 4 Water Treatment works Civil Mechanical 4.01 Stilling chamber, parshall flume (throat width), flash mixer. 4.02 Clariflocculator Filter house and rapid sand gravity filter with annex building and pipe 4.03 gallery 4.04 Clarified sludge sump 4.05 Sludge thickener 4.06 Thickened sludge sump 4.07 Centrifuge building 4.08 Filter b/w water recovery sump 4.09 DG room 4.10 MCC room & substation 4.11 Transformer yard 4.12 Admin building, SCADA / operator room 4.13 Security cabin 4.14 Workshop 4.15 Chlorination building 4.16 Air blower room 4.17 Chemical House 4.18 Back Wash Tank 4.19 Laboratory 4.20 Valve Chamber and Inplant piping 4.21 Septic Tank 4.22 RCC Channel 200 RM approx Sub Total Lot 4 Total

Lot 5 Clear/Treated water Storage works Civil Mechanical 5.01 Clear wáter reservoir Total 5.02 5.03 5.04 Clear wáter pump house with Motor floor room Flowmeter chamber on outlet header Surge Protection Bladder type Air vessel 35 m3 capacity and Surge anticipation valves Sub Total Lot 5 Lot 6 Site Development Works Civil Mechanical Total 6.01 Site Clearing & Grading: Clearing the site, removing trees/bushes and Earthwork excavation for leveling the ground to required level including spreading the earth in low areas and disposal of excess earth, Garden and Lawn, as directed by the Engineer at Both Intake and WTP location 6.02 6.03 6.04 Compound Walls: Providing compound wall all-round the INTAKE premises with necessary gates Compound Walls: Providing compound wall all-round the WTP premises with necessary gates Roads; Providing, laying Bitumen Topped internal roads in suitable formation as per approved lay out within WTP premises and also connecting roads for the proposed units in the WTP area with side drains 6.05 Roads; Providing, laying Bitumen Topped internal roads in suitable formation as per approved lay out within Intake premises and also connecting roads for the proposed units in the Intake area with side drains Sub-total Lot 6

Lot 7 Operation and Maintenance (for 3 years) Cost Rs. / month Months Total 7.01 Manpower including accomodation,transportation etc. 36 7.02 Chemical Usage 36 7.03 Diesel Usage 36 7.04 Disposal of Sludge 36 7.05 Civil repairs works during O&M - after DLP 24 7.06 E&M repair works during O&M - after DLP 24 Sub total Lot 7 Note : *Payments shall be made on pro rata basis as per payment terms specified in Schedule 3 *Payments shall be on approval of Engineer in charge of respective works Total - Lot 1 to Lot 7

Item Schedule 3: Payment Terms Description % Payment of total cost against each item 1 Lot 1 : Design and Detailed Engineering 1.01 Process Design, Drawings, and Documentation for Both Intake and WTP works 1.02 Structural Design, Drawings, and Documentation for all components under this DBO tender at Both Intake and WTP works 1.03 Mechanical Design, Drawings, and Documentation for all components under this DBO tender at Both Intake and WTP works 1.04 Electrical Design, Drawings, and Documentation for all components under this DBO tender at Both Intake and WTP works 1.05 Instrumentation, Control, and Automation Design, Drawings, and Documentation for all components under this DBO tender at Both Intake and WTP works 1.06 As Built Drawings for both Intake and WTP works components 20% 1.07 Other Documentation (O&M Manuals, testing and Training manuals) 20% 2 Civil Works (Lot 2 to Lot 5) 2.01 Completion of Excavation / Earthwork 5% 2.02 Completion of Sub-structure /piling /raft upto plinth level 2.03 Completion of Super Structure 45% 20% 2.04 Completion of allied items such as handrail, painting, epoxy coat, finishes, doors/windows installation etc. 2.05 Completion of satisfactory Hydro Test As applicable /Testing & Commissioning 20% 2.06 Within 90 days of successful Performance Test and issue of Commissioning/ completion

3 Mechanical Works (Lot 2 to Lot 5) 3.01 Supply & Delivery of equipment / material at Site 25% 3.02 Completion of Installation of equipment at Site 35% 3.03 Successful Testing & Commissioning at Site 30% 3.04 Within 90 days of successful Performance Test and issue of Commissioning/ completion 4 (Lot 2 to Lot 5) 4.01 Supply & Delivery of equipment / material at Site 25% 4.02 Completion of Installation of equipment at Site 35% 4.03 Successful Testing & Commissioning at Site 30% 4.04 Within 90 days of successful Performance Test and issue of Commissioning/ completion 5 Site Development Works (Lot 6) 5.01 On completion of work (Pro-rata basis) 90% 5.02 Within 90 days of successful Performance Test and issue of Commissioning/ completion 6 Operation and Maintenance (Lot 7) 6.01 Monthly payment for Manpower 100% 6.02 Chemical Usage in proportion to treated water per month 100% 6.03 Diesel Usage on the basis of norms per hour 100% 6.04 Disposal of Sludge in proportion to treated water per month 100% 6.05 Monthly payment for Civil repairs works 100% 6.06 Monthly payment for E&M repair works 100%