The emphasis should be on the contractor to develop the targets for waste reduction and recovery. What is good practice?

Similar documents
The efficient use of materials in regeneration projects

The efficient use of materials in regeneration projects

A metric for the construction sector. The Net Waste Method testing a new standard for measuring waste neutrality

Defence sector: recycling waste in construction Defence Estates Regional Prime Contract East, Babcock DynCorp

Reducing construction waste saves money Bridge Learning Campus, Bristol Contractor: Skanska

Waste management contractors selling the benefits of your Halving Waste to Landfill Commitment to construction clients

Railways: Waste less and save money

Utilities: Waste less and save money

Achieving effective Waste Minimisation

Material Logistics Plan Good Practice Guidance

Benefits of off site manufacture

Benefits of the WRAP SWMP Template. Birmingham, 1 April 2008

Executive summary. Meeting the UK climate change challenge: The contribution of resource efficiency

A blueprint for reducing waste and cutting costs

Construction waste collection good practice: Gloucester Quays

Halving Waste to Landfill, SEESA

Halving Waste to Landfill

Raploch: urban regeneration

Laying the foundations to double re-use

Assessing the costs and benefits of reducing waste in construction

Non-packaging plastics

Assessing the costs and benefits of reducing waste in construction trade packages

Reducing and recycling plasterboard waste on a site where space is a constraint

McGrath works in partnership with Hackney Homes

Costs and benefits of reducing waste in construction. Defence sector new build Woolwich single living accommodation modernisation (SLAM)

Assessing the costs and benefits of reducing waste in construction

Comparing the cost of alternative waste treatment options

The Demolition Protocol: Aggregates Resource Efficiency in Demolition and Construction. Volume 3. For Contractors

Best Practice Construction Waste Procurement: Office Fit-Out of 15 Canada Square, Canary Wharf

Trialling the re-use of used EEE from Leeds City Council HWRCs

Innovative waste management approach achieves exemplary recovery rates

Zero waste to landfill: Construction waste collection good practice

Resource efficient remediation

Delivering higher recycled content in construction projects

Resource efficiency pursued through design coordination and waste management

Material resource efficiency in construction

European Pathway to Zero Waste: embedding sustainable procurement for public sector organisations in south east England

Delivering Sustainability with Prestige: at the BMW PGA Championships

Contractor follows nine-step plan to achieve best practice in construction waste management

WAS Final report. Applying & Testing Waste Management Quick Wins

Plasterboard Case Study

BNPB3: Plasterboard - legislation and policy drivers

Sustainable Procurement Case Study Natural History Museum

Site Waste management Plan (SWMP)

Grays Waste Management

Reducing Food and Packaging Waste in the Egg Supply Chain

Construction Site Waste Management Process.

Small WEEE collections checklist: Third Sector Organisation

Minimising construction waste through project design

Waste FY Introduction. 2. Waste. 3. Management Approach

Site Waste Management Plans A guide for the construction industry and supply chain

Assessment form for packaging recyclability

Use of recycled asphalt and recycled aggregate in the A34 Chieveley/M4 Junction 13 improvement

Engaging with suppliers on waste prevention

Waste Management Plan Template (SC6.11)

GUIDE TO REVIEWING WASTE AND RECYCLING CONTRACTS

Reducing Waste in Sainsbury s Supermarket Refits through off site fabrication

Baselines and benchmarks 2009

Tool for measuring the recovery rates in CDEW MRFs

Construction Waste Management Plan Guidelines. A resource for Western Australian Local Government, Developers, Property Owners and Builders

Summary Guide to Identifying Raw Materials Risks

There will be no significant impact from solid waste arising during the development of the proposed power plant.

CASE STUDY: NEVIS RANGE MOUNTAIN EXPERIENCE

Benefits of off site manufacture

Plasterboard Recycling Service

Waste Reduction Potential of Light Steel

Structures concrete. Structures concrete

Aberdeen Harbour Expansion Project. Construction Environmental Management Document

Opportunities for contract changes in recycling collection in the hospitality sector

Waste Management Plan

DEFRA Consultation on Site Waste Management Plans for the Construction Industry (April 2007)

Constructing Excellence: The SME s quick guide to Sustainability

Structures - steel. Structures - steel

The Recycling Industry. Help for your recycling business

FLOORING RESOURCE EFFICIENCY PLAN 1 ST BROADLOOM CARPET MAP MEETING 13 TH OCTOBER 2009

Reducing weight, reducing cost: lightweighting can ends

Demolition Waste Management Plan Guidelines

Cost Assessment of Wales Environment Bill Measures on Business Waste Producers in the Construction & Demolition Sector

Sustainability Best Practice Case Study. Reducing Waste, Reducing Cost. The UK construction industry waste challenge

Design out. Waste Workshop. A guidance document produced by Network Rail in collaboration with:

Vinyl flooring: Making take-back schemes pay back on refurbishment projects

DEMOLITION TRADE SPECIFICATION

recycled roads overview

left over, or an unwanted by-product, from an industrial, commercial, domestic or other activity; or

Expenditure. Vehicles. Call centre cost. Marketing. Cost of reuse. Disposal

Waste Management Policy

Collection of carpet tiles for closed loop recycling through manufacturer take-back scheme

12 WASTE. Introduction. Review of proposed development

Construction Waste Measurement Guide

Barts Hospital, London

Using quality compost to benefit potato crops

Garth Hill College WASTE MANAGEMENT POLICY

Packaging trial for tackling mushroom waste in the home

Appendix I -1 Demolition Waste Estimates

Surface Polymerisation of Retreaded

Waste Strategy for Herefordshire and Worcestershire: A Review

Post-industrial landscapes bolster energy crops with the help of PAS 100 Compost

Regulations & Opportunities. Claire Guerin, Zero Waste Scotland

OPERATIONAL WASTE GUIDELINES: procurement, management and reporting

How to use the Clothing Longevity Protocol

Transcription:

Material change for a better environment Procurement guidance for construction Setting a requirement for Waste Minimisation and Management

2 Setting a requirement for Waste Minimisation and Management Setting a requirement for Waste Minimisation and Management This guidance sets out the business case for construction clients and developers to adopt good practice waste minimisation and management on their construction projects. It explains why good practice waste minimisation and management is important, how it is delivered and the crucial role that clients can play in its delivery. Why take action? Reduce the cost of materials supplied and associated waste disposal. Increase competitive advantage through differentiation. Improve performance against CSR objectives. Lower CO 2 emissions. Meet planning requirements. Complement other aspects of sustainable design. Respond to and pre-empt changes in public policy, such as increases in Landfill Tax. Who is taking action? Construction clients, developers, policy-makers and planning authorities are increasingly asking design teams and contractors to implement good practice in waste minimisation and management. Major organisations at the forefront of the initiative include: property developers such as British Land, Hammerson and Stanhope; members of the Major Contractors Group such as Bovis Lend Lease, Skanska and Wates; and national Governments proposing to make Site Waste Management Plans mandatory. What is good practice? Waste minimisation and management follows the principles of the waste hierarchy: reduce the quantity of waste generated, then maximise the amount that can be reused or recycled. Good practice involves going beyond the current baseline performance of the construction industry, which has historically focused on meeting its legal obligations only. Waste minimisation includes a range of methods to design-out waste from a project and limit waste arisings during the construction phase. Examples include: efficient design solutions; improved materials logistics and storage; off site construction; and minimising over-ordering. Using a single skip for all waste types is a missed opportunity to implement good practice The emphasis should be on the contractor to develop the targets for waste reduction and recovery

3 Setting a requirement for Waste Minimisation and Management Case study Langley Park, Beckenham A large development by Laing Homes is an example of how cost savings can be achieved through segregating waste streams and reusing materials. Measures on this development included: waste streams separated for easier reuse and recovery; reuse of materials from demolition; and efficient storage of reusable products, e.g. timber pallets returned for reuse. The resulting savings included: recovery of 500,000 roofing tiles from demolished buildings for reuse; reuse of 40,000 tonnes of demolition spoil as sub-base; and total cost savings of 525,000 3.5% of project costs. The benefits of implementing a SWMP have been found to be: 15% less waste onsite; 43% less waste to landfill; 50% savings in waste handling charges; and 40% saving on waste management costs compared to landfill disposal. (source: Report C536 from CIRIA) Waste management involves identifying potential waste streams, setting target recovery rates and managing the process to ensure that these targets are met. To assist the process of setting targets, WRAP has identified good practice recovery rates for a range of waste streams. On any project, there are certain key waste streams that can offer significant savings, otherwise known as Quick Wins. By implementing good practice for three to four of these Quick Wins, there is potential to increase overall recycling rates of construction waste from standard industry performance by more than 20%. Waste streams that commonly offer Quick Wins across a range of projects include: timber; plasterboard; packaging; concrete; inert material; and plastics. Projects vary of course, and individual projects will need to evaluate their own waste streams to identify potential Quick Wins. Will it increase cost? No for the majority of projects, achieving good practice will either be cost neutral or will generate cost savings. Only a minor change in working practices will be required. How is good practice delivered? The key tool for minimising and managing waste on a project is the Site Waste Management Plan (SWMP). The SWMP is not just an on site management tool. It should be initiated at an early stage of the project and used to: steer the design to minimise waste; and optimise plans for onsite practice. The SWMP is used to identify potential waste streams and set waste reduction and recovery targets. Subsequently the contractor will measure actual waste produced and monitor performance. This will allow them to demonstrate their achievements to clients and save more on future projects.

4 Setting a requirement for Waste Minimisation and Management Onsite waste minimisation techniques, for example, leaner ordering of materials and better site storage to prevent material damage, should be incorporated into the SWMP as well as strategies for segregating and reusing waste materials. This can result in less waste produced on site, and so less waste sent to landfill, therefore savings in waste handling, disposal and landfill costs. The use of a SWMP is currently a voluntary undertaking on construction projects. However, it is expected that the use of SWMPs will become a mandatory requirement in the near future for many projects throughout the UK. By making it an immediate requirement for all projects to implement a SWMP to good practice levels in accordance with WRAP guidance, clients can minimise the potential impact of the regulatory change and take advantage of the benefits at an earlier date. Which projects are suitable? Good practice can be applied to all types of construction project, irrespective of location or complexity, including new build, refurbishment and infrastructure works. The benefits are expected to outweigh the costs of implementing an SWMP for projects over 250,000 in value. One practical application of good practice waste management can be to use wheeled bins at the work area Waste hierarchy The key tool for minimising and managing waste on a project is the Site Waste Management Plan Waste Reduction Reuse Recycling and composting Energy recovery with heat and power Landfill with energy Landfill

5 Setting a requirement for Waste Minimisation and Management What do clients and developers need to do? To obtain the most benefit, adopt good practice at the earliest possible stage, preferably with a clear mandate from the client through procurement requirements. The targeted elements of good practice (Quick Wins) should then be communicated and implemented by the design team, contractor, sub-contractors and waste management contractors through all project phases from outline design to project completion. The process is illustrated below: Client Design team Contractor and sub-contractors 1. Set project requirement for good practice WMM 2. Identify key opportunities for waste minimisation Pre-design Design & procurement 3. Plan waste management by developing a SWMP 4. Tender and contractual requirements for good practice SWMP implementation and targeting of Quick Wins 5. Set targets and Key Performance Indicators 6. Define responsibilities and contracts 7. Identify waste arisings, reuse and recycling routes 8. Site design and training Pre-construction Report outcomes and Quick Wins 9. Monitor waste management Construction Report outcomes and Quick Wins 10. Review performance of the SWMP and lessons learnt Postconstruction Disclaimer This report has been published in good faith by WRAP with the help of Cyril Sweett, and neither WRAP nor Cyril Sweett shall incur any liability for any action or omission arising out of any reliance being placed on the report by any organisation or other person. Any organisation or other person in receipt of this report should take their own legal, financial and other relevant professional advice when considering what action (if any) to take in respect of any initiative, proposal, or other involvement with any procurement process, or before placing any reliance on anything contained therein. By receiving the report and acting on it, any party relying on it accepts that no individual is personally liable in contract, tort or breach of statutory duty (including negligence). While steps have been taken to ensure its accuracy, WRAP cannot accept responsibility or be held liable to any person for any loss or damage arising out of or in connection with the information in this report being inaccurate, incomplete or misleading. The listing or featuring of a particular product or organisation does not constitute an endorsement by WRAP and WRAP cannot guarantee the performance of individual products or materials. For more detail, please refer to our Terms & Conditions on our website www.wrap.org.uk.

6 Setting a requirement for Waste Minimisation and Management What are the next steps? See the other documents in this suite, Achieving good practice waste minimisation and management and Delivering good practice waste management. Setting a requirement In order to mandate the process of adopting good practice on a project, clients and developers can include the following core requirement in the project procurement documentation:.we require a Site Waste Management Plan (SWMP) to be developed from the pre-design stage to inform the adoption of good practice waste minimisation in design, and for the SWMP to be implemented in all construction site activities in line with good practice published by WRAP. The SWMP is required to set targets for waste reduction and recovery based on an assessment of the likely composition and quantity of waste arisings and identification of the most significant cost-effective options for improvement (Quick Wins). This should be supplemented by information on how the targets will be achieved during construction activities and how the actual levels of waste reduction and recovery will be monitored for comparison with the targets set. The emphasis should be on the contractor to develop the targets for waste reduction and recovery, in conjunction with the design team, after identifying which waste streams to focus on and the appropriate methods to adopt. This is because the contractor is best placed to identify opportunities for improved performance and cost saving, given their position at the interface between the design and construction phases of the project, taking into account the supply chain to be employed. Guidance for design teams and contractors To enable design teams to develop a detailed response to the client s requirement, and to help contractors deliver good practice, WRAP have produced more detailed documents providing procedural guidance for setting requirements, including model contract clauses, and technical guidance for practical implementation. These reference documents are freely available at www.wrap.org.uk/construction. These resources contain template wording and model contract clauses for use in corporate policy statements, project briefs and prequalification processes, and subsequently in tender, appointment and contractual processes for traditional and design and build procurement processes. Further information WRAP provides guidance and tools covering all aspects of materials efficiency in construction, including waste reduction, recycling and recycled content. These are freely available at www.wrap.org.uk/construction. Published by: The Old Academy Tel: 01295 819 900 Helpline freephone Waste & Resources 21 Horse Fair Fax: 01295 819 911 0808 100 2040 Action Programme Banbury, Oxon E-mail: info@wrap.org.uk OX16 0AH www.wrap.org.uk/construction Printed on 75% recycled content paper