Site Survey in Project Info Structural Info Electrical Info

Similar documents
Please fill out as much as information as possible and do not hesitate to contact us at 844-Solerus if you need any help. AHJ Name: Snow Load:

SUBMITTAL REQUIREMENTS FOR EXPEDITED ROOF TOP SOLAR PERMITTING

Reference Information:

MARBLEHEAD FIRE DEPARTMENT Standard Operating Guideline Draft for Photovoltaic/Solar Installations

Code Change Alert: Permitting of Solar Photovoltaic Systems in Washington State

POST AND FRAME STRUCTURES (Pole Barns)

Building Codes in Effect: 2010 California Building, Residential, Fire, Energy and Electrical Codes, including Article 690.

POST AND FRAME STRUCTURES (Pole Barns)

1. The plan needs to show compliance with the 2013 CEC, 2013 CBC and 2013 CRC. [ CBC] RESPONSE:

PITCHED ROOF DESIGN GUIDE A WALKTHROUGH OF THE SOLAR MOUNTING DESIGN PROCESS

Railed Systems: How to Be Competitive While Still Maintaining Value

EcolibriumSolar. Customer Info. Project Info. System Info. Project Design Variables. Name: Phone:

NABCEP PV Technical Sales Job Task Analysis

FY2017 SREC Registration Program (SRP) Final As-Built Technical Worksheet Instructions Page 1

HUMBOLDT COUNTY BUILDING & SAFETY DEPARTMENT CITY OF WINNEMUCCA BUILDING DEPARTMENT

APPENDIX. WOOD JOIST/RAFTER MAXIMUM SPANS ( for 16 o.c. spacing) WITH SINGLE ROW OF PV PANELS AT MIDSPAN (ft.) AND PANEL SUPPORT AT 32 o.c.

ACCESSORY STRUCTURES (Garages/Sheds) BUILDING AND ZONING REQUIREMENTS (REVISED 4/21/16)

Building and Safety Division Public Information

This permit is issued under OAR Permits expire if work is not started within 180 days of issuance or if work is suspended for 180 days.

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

Structural Criteria for Residential Rooftop Solar Energy Installations

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

MOUNTING SYSTEMS PRODUCT CATALOG

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT PHOTOVOLTAIC PERMITTING GUIDELINES

PHOTOVOLTAIC (PV) SUBMITTAL REQUIREMENTS

Address of Installation Building Permit #

BERNALILLO COUNTY SOLAR PACKET

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

Santa Monica Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS

Beverly Hills Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS

Streamline Solar Photovoltaic Structural Criteria for Residential Rooftop Solar Energy Installations (Streamline Solar Form 5)

City of Santa Monica Building and Safety Division Submittal Requirements Expedited Solar Photovoltaic (10 kw or Less)

WITH THE TITLE 24. replacement. story. stories, etc. R disconnects. to, PV. unit and any. supporting frame. conditions. greater than the main

Structural Criteria for Residential Rooftop Solar Energy Installations

NY State Unified Solar Permit

NY State Unified Solar Permit

Structural Criteria for Residential Rooftop Solar Energy Installations

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2011 LARC)

Structural Criteria for Residential Rooftop Solar Energy Installations

Prescriptive Design for Pole Barns Using the Larimer County Prescriptive Handout

City of Santa Monica Building and Safety Division

Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2014 LARC)

RESIDENTIAL BUILDING PLAN REQUIREMENTS

SOLAR PACKET BUILDING SECTION SOLAR PACKET. This packet contains: Building Permit Application. Solar Installation Requirements

6KW Grid Interactive Photovoltaic System

CONTACT INFORMATION. PV System will require a separate Electrical Permit.

Structural Criteria for Residential Rooftop Solar Energy Installations

POST FRAME BUILDING STANDARDS

Structural Criteria for Residential Rooftop Solar Energy Installations

New Creation Builders 5309 Barkwill Ave Cleveland Oh

Reference: Photovoltaic Systems, p. 255

Property Condition Assessment

Structural Criteria for Residential Rooftop Solar Energy Installations

Small Scale Solar Permit Application

Town of Wilton Building Department

City of Rome, NY Site Plan Review Application Checklist Consult Chapter 80 of the City of Rome Code of Ordinances.

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

NY State Unified Solar Permit

NY State Unified Solar Permit

NY State Unified Solar Permit

In addition to standard plan requirements, all plans submitted for PV installation shall include the following details:

NY State Unified Solar Permit

Request for Proposals for Photovoltaic System Installation

Home PV System Design

NY State Unified Solar Permit

CITY OF ANDREWS 111 LOGSDON ANDREWS, TEXAS (432)

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY

BERKELEY UNIFIED SCHOOL DISTRICT (BUSD) Chapter 3. Structural Evaluations

PV SYSTEMS AND WORKMANSHIP

GARAGES/ONE-STORY City of Grand Rapids Building Safety Division

Structural Criteria for Residential Rooftop Solar Energy Installations

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL

NY State Unified Solar Permit

Bulletin Grounding and bonding of solar photovoltaic systems Rules , , , and

NY State Unified Solar Permit

NY State Unified Solar Permit

Residential Deck Safety, Construction and Repair. Juneau Permit Center, 4 th Floor Marine View Center,(907) February 2016

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

INCORPORATED VILLAGE OF OYSTER BAY COVE BUILDING DEPARTMENT 68 WEST MAIN ST., OYSTER BAY NEW YORK (516)

Structural Criteria for Residential Rooftop Solar Energy Installations

Understanding Solar PV Permitting and Inspecting in New York State

Natrona County Development Department 200 North Center Street, Room 205 Casper, WY Phone: Fax:

Radiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

HelioFix Solar mounting Systems

Broward County Advantage Marketing Program In-Kind Exchange Agreement

POOLS, SPAS AND HOT TUBS

Understanding the roof top access and ventilation requirements as described in Section R324 of the 2015 International Residential Code

Radiant PV-Solar Tripod System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

NY State Unified Solar Permit

RESIDENTIAL GARAGE AND DRIVEWAY

Solar Photovoltaic System Permit

FLORIDA PHOTOVOLTAIC BUILDINGS PROGRAM

#G445 Plans, 48'x28' x 10' detached garage with bonus room By SDS-CAD Specialized Design Systems

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

Transcription:

PROJECT INFORMATION Project Name: Site Survey in 1 2 3 Project Info Structural Info Electrical Info ***ASTERISK COLOR CODE KEY*** = Required Field = Account Preference HOMEOWNER INFORMATION First Name: Last Name: Address: City, State, Zip: AHJ INFORMATION AHJ Name: Utility Name: Special AHJ/Utility Requirements (If Known) Project s Assessor s Parcel #: CONTRACTOR INFORMATION Company Name: Phone: Address (Street, City, State, Zip): License Numbers: Snow & Wind Loads (If Known) Snow Load: Wind Load: PROJECT MANAGER First Name: Last Name: Phone: Application Type: Please select the appropriate racking application types. Tilt-Up Flush-Mount Integrated Racking Flat Roof (Use 2b on pages 8 and 9 instead) Ground Mount (Use 2c on pages 10 and 11 instead) Project (Site) Photos Checklist: Photos will be used to understand site conditions and project site and are essential to generate an accurate permit package. Utility Meter Location (Zoomed out View) Main Service Panel Location Close-up of Main Service Panel Label Close-up of Main Breaker Close-up of Main Breaker Label Sub-Panel Main Breaker (If used) Sub-Panel Location (If used) Subpanel Location (If used) Close-up of Sub-Panel Breaker Label Proposed Inverter Location (Zoomed out View) Array Location(s) (if possible) Entire Roof with Obstructions (If possible) Ground Mount Location (If applicable) Rafter/Truss Size and Spacing (Show tape mesure in photo if possible) Attic Space - Show existing roof rafter/truss for each roof structure (Show tape measure if possible) 1

Site Survey in 1 2 3 Project Info Pitched Roof Structural Info Electrical Info ARRAY 1 - PITCHED ROOF APPLICATIONS PITCHED ROOF & STRUCTURAL INFO Roof Material: Please select the appropriate roof material from the options below. (Asphalt) shingles Standing Seam Metal Corrugated Metal Clay S-Tile Flat Tile Rubber Membrane Wave Tile Other: Wood Shake RACKING INFO Attachment Type: Flashed L-Foot Tile Hook Standoff Integrated intoracking Standing Seam Clamp Corrubracket Other: Racking Manufacturer: Layers of Roof Material Racking Model: One Two Structure Type: Please select the appropriate Structure Type from the options below. Attachment Manufacturer: Truss (Wood) Metal Beam Supported Interior bearing wall (Wood) Purlins Knee Wall Knee Wall + Collar Tie Collar Tie (Wood) Single Span Rafter (Wood) Wood Supported Strut Steel Frame Attachment Model: Maximum Rail Span: Please select the default maximum distance between mounting points accross the rail layout used for this project. Rafter Size: 2x4 2x6 2x8 2x10 Other: Rafter Spacing: Please select the typical distance between each rafter (in inches): 16 24 32 48 72 96 Other: Pitch (Degrees): 12 14 16 24 48 Other: Roof Structure Measurements: A: B: 2

ARRAY 2 - PITCHED ROOF APPLICATIONS (Only if roof structure is different) PITCHED ROOF & STRUCTURAL INFO Roof Material: Please select the appropriate roof material from the options below. (Asphalt) shingles Standing Seam Metal Corrugated Metal Clay S-Tile Flat Tile Rubber Membrane Wave Tile Other: Wood Shake RACKING INFO Attachment Type: Flashed L-Foot Tile Hook Standoff Integrated intoracking Standing Seam Clamp Corrubracket Other: Racking Manufacturer: Layers of Roof Material Racking Model: One Two Structure Type: Please select the appropriate Structure Type from the options below. Attachment Manufacturer: Truss (Wood) Metal Beam Supported Interior bearing wall (Wood) Purlins Knee Wall Knee Wall + Collar Tie Collar Tie (Wood) Single Span Rafter (Wood) Wood Supported Strut Steel Frame Attachment Model: Maximum Rail Span: Please select the default maximum distance between mounting points accross the rail layout used for this project. Rafter Size: 2x4 2x6 2x8 2x10 Other: Rafter Spacing: Please select the typical distance between each rafter (in inches): 16 24 32 48 72 96 Other: Pitch (Degrees): 12 14 16 24 48 Other: Roof Structure Measurements: A: B: 3

Site Survey in 1 2 3 Project Info Structural Info Electrical Info ELECTRICAL INFORMATION NEW EQUIPMENT INFORMATION Module Manufacturer & Model Number: Module Manufacturer: Model Number: Quantity: /Micro Manufacturer & Model Number: Inverter Manufacturer: Model Number: Quantity: Optimizer Manufacturer & Model Number (If Applicable): Optimizer Manufacturer: Model Number: Quantity: Inverter DC Disconnect Options (If Applicable): Inverter Location: Please select intended location of inverter and electrical equipment. 1. Exterior Interior 2. House Garage Barn Pole Mounted Other: 3. North South East West NE NW SE SW Wire Transition Enclosure: Please select the appropriate wire transition enclosure between modules and inverter. Junction Box Soladeck Combiner Box None Combining AC Circuits: Select how to combine the inverter(s) AC outputs. Multiple inverters or micros only. Soladeck (Rooftop) Existing Subpanel Service AC Disconnect: (N) AC Panel Board Typically the utility requires a lockable utility disconnect for the AC output in case of an emergency or service. Yes No Utilize Integrated DC Disconnect Utilize Standalone DC Disconnect (Rooftop or Ground Array) Standalone DC Disconnect Location (If Used): Utility Disconnect Location: Please describe the Utility Disconnect location. 1. Exterior Interior 2. House Garage Barn Pole Mounted 1. Exterior Interior Next to Utility Meter Other: 2. House Garage Barn Pole Mounted Rooftop At Ground Array Other: 3. North South East West NE NW SE SW 3. North South East West NE NW SE SW PV Revenue Meter: Is there a PV Revenue Meter? The Production meter measures and tracks the production for the solar array. Yes No (Net Meter) 4

ELECTRICAL INFORMATION (Continued) Location of PV Meter: Select the location of the PV meter in reference to the AC disconnect. Interconnection Location Please select the electrical location the tap will occur. Between inverter and disconnect Between disconnect and point of interconnection (MEP, Tap, Etc.) EXISTING EQUIPMENT INFORMATION Meter Main Combo? Yes No Main Electrical Panel Rating: Write the Bus and main circuit breaker rating. Bus Rating (amps): Existing Main Electrical Panel (MEP) Existing Meter New Sub-Panel Renewable Meter Adapter (RMA) at Meter (E)xisting Meter Location: 1. Exterior Interior 2. MEP Location Pole Mounted New Tap Box Automatic Transfer Switch (ATS) Existing Sub-Panel New Main Electrical Panel Upgrade Main Breaker Rating (amps): Are there spaces available in the panel? Main Breaker Location: Top-fed Center-fed Bottom-fed Main Electrical Panel Location: Please select where the Main Electrical Panel is located. 1. Exterior Interior 2. House Garage Barn Pole Mounted Other: 3. North South East West NE NW SE SW *Location of the Pole in relation to the house: *For pole mounted utility meters and main electrical panels. Cardinal Direction: Distance: Utility Entrance: Other: Overhead Under Ground 3. North South East West NE NW SE SW (N)ew Main Breaker Derating or Panel Upgrade: Write the new ratings that the main breaker will be derated to. Bus Rating (amps): Existing Electrical Grounding: Current or Original Bond of existing electrical system? Please select from the options below. Ground Rod Ufer Cold Water Pipe Project Notes & Special Requirements: Main Breaker Rating (amps): Interconnection Strategy: Please select the appropriate interconnection strategy from the choices below: Panel upgrades or choose Backfeed Breaker. Backfeed Breaker Line Side Tap Derate Main Breaker Load Side Tap 5

ELECTRICAL INFORMATION (Continued) Array 1 2 3 4 5 6 Module Quantity Azimuth Pitch or Tilt Shading (Optional) Mounting Plane # (From Sketch) Rafting Span(s) in Feet (list as necessary) Inverter Mftr. & Model # MPPT s s s s s s 1 2 1 2 1 2 1 2 Please list plan for stringing modules under each array. Indicate if arrays are to be combined on a given string. *Important NOTE: If the next selection below ( Design) is Designer s Discretion then the inverter table above does NOT need to be filled out. 6

Sales Sketch: A rough sketch or drawing of the solar panel layout on the project residence or site including roof measurements where possible and plan for equipment locations from the provided key. This sketch will be used to create the base site plan and array layout. I placed the modules on the roof sketch below I DC/AC INVERTER UM (E) UTILITY METER M1 MODULE # PNL AC PANELBOARD V PV REVENUE METER X ROOF OBSTRUCTION S AC DISCONNECT MEP MAIN ELECTRICAL PANEL DSW DC DISCONNECT JB JUNCTION BOX I want the designer to place the modules The Sales Sketch is attached as a separate document N W E S 7

Site Survey in 1 2 3 Project Info Flat Roof Structural Info Electrical Info ARRAY 1 - FLAT ROOF APPLICATIONS (Only if applicable) FLAT ROOF & STRUCTURAL INFO Roof Material: Please select the appropriate roof material from the options below. Rubber Membrane Rolled Asphalt Gravel EDPM Duralast Corrugated Metal Roof Layers of Roof Material RACKING INFO Racking Manufacturer: Racking Model: Attachment Manufacturer: Attachment Model: One Two Structure Type: Please select the appropriate Structure Type from the options below. Truss Single Span Rafter Supported by Metal Beams Supported by Wood Beams Rafter/Beam Size: Maximum Rail Span: Please select the default maximum distance between mounting points accross the rail layout used for this project. 16 24 32 48 72 96 Other: Module Orientation: Portrait Tilt(s): Landscape 2x4 2x6 2x8 2x10 Other: Rafter/Beam Spacing: Please select the typical distance between each rafter (in inches): 12 14 16 24 48 Other: Roof Structure Measurements: A: 8

ARRAY 2 - FLAT ROOF APPLICATIONS (Only if flat roof structure is different) FLAT ROOF & STRUCTURAL INFO Roof Material: Please select the appropriate roof material from the options below. Rubber Membrane Rolled Asphalt Gravel EDPM Duralast Corrugated Metal Roof Layers of Roof Material RACKING INFO Racking Manufacturer: Racking Model: Attachment Manufacturer: Attachment Model: One Two Structure Type: Please select the appropriate Structure Type from the options below. Truss Single Span Rafter Supported by Metal Beams Supported by Wood Beams Rafter/Beam Size: Maximum Rail Span: Please select the default maximum distance between mounting points accross the rail layout used for this project. 16 24 32 48 72 96 Other: Module Orientation: Portrait Tilt(s): Landscape 2x4 2x6 2x8 2x10 Other: Rafter /Beam Spacing: Please select the typical distance between each rafter (in inches): 12 14 16 24 48 Other: Roof Structure Measurements: A: 9

Site Survey in 1 2 3 Project Info Ground Mount Structural Info Electrical Info ARRAY 1 - GROUND MOUNT APPLICATIONS (Only if applicable) GROUND MOUNT STRUCTURAL INFO Total Number of Legs/Supports: Ground Mount Racking Manufacturer: Cross Brace? (If Applicable): Ground Mount Racking Model: None Horizontal Diagonal Module Orientation: Ground Mount Foundation: Select the foundation that will be used to secure the poles. Helical Piling Driven Piling Earth Screw Concrete Pad Drill & Pour Pole Embedment Depth: Concrete Pad Helical Pile Concrete Pad Driven Pile This is how deep in the ground the mounting pole is below grade. Portrait Landscape Quantity of Module Rows: Quantity of Module Columns: Tilt(s): Footing Diameter This is how wide the footing is (in inches). Front Clearance: This is the clearance from the ground to the front of the array. Concrete Depth (If Applicable) Rear Clearance: This is the clearance from the ground to the top of the array. Horizontal Support Spacing in Feet (East/West): Please input the horizontal distance between the poles. Setback Requirement from the Property Lines in Feet (If Applicable): Inner-Row Support Spacing in Feet (North/South) (If Applicable): Please input the North/South spacing between poles (if applicable). 10

ARRAY 2 - GROUND MOUNT APPLICATIONS (Only if ground mount is different) GROUND MOUNT STRUCTURAL INFO Module Orientation: Ground Mount Racking Manufacturer: Portrait Landscape Quantity of Module Rows: Ground Mount Racking Model: Quantity of Module Columns: Ground Mount Foundation: Select the foundation that will be used to secure the poles. Tilt(s): Helical Piling Driven Piling Earth Screw Concrete Pad Drill & Pour Concrete Pad Helical Pile Concrete Pad Driven Pile Front Clearance: This is the clearance from the ground to the front of the array. Pole Embedment Depth: This is how deep in the ground the mounting pole is below grade. Footing Diameter This is how wide the footing is (in inches). Rear Clearance: This is the clearance from the ground to the top of the array. Setback Requirement from the Property Lines in Feet (If Applicable): Concrete Depth (If Applicable) Horizontal Support Spacing in Feet (East/West): Please input the horizontal distance between the poles. Inner-Row Support Spacing in Feet (North/South) (If Applicable): Please input the North/South spacing between poles (if applicable). Total Number of Legs/Supports: Cross Brace? (If Applicable): None Horizontal Diagonal 11