ARTIK ART & ARCHITECTURE STAGE FLOORING ASSEMBLY SECTION STAGE FLOORING ASSEMBLY

Similar documents
D. Maintenance data for resilient floor tile to include in Operating and Maintenance Manual specified in Division 1.

Union County Vocational - Technical Schools Scotch Plains, New Jersey

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

A. Drawings and general provisions of the Contract apply to this Section including all documentation provided in RFP#

RESILIENT ACCESSORIES

RESILIENT CORK TILE 3 PART SPECIFICATION #Z 624

Section RESILIENT TILE FLOORING INCLUDING ECONATURALS RUBBER FLOOR TILE

B. Store products in dry spaces protected from the weather, with ambient temperatures maintained between 50 and 90 deg F (10 and 32 deg C).

SECTION RESILIENT TILE FLOORING. A. Section includes vinyl composition floor tile and accessories indicated and as specified.

Section STATIC DISSIPATIVE RESILIENT FLOORING

RESILIENT PHOTOLUMINESCENT STAIR TREADS

Student Services & Classroom Addition

Section RESILIENT SAFE-T VINYL SHEET FLOORING

SECTION RESILIENT SHEET FLOORING

SECTION RESILIENT FLOORING ACCESSORIES

1. Division 09 Section "Rough Carpentry."

CONDUCTIVE RESILIENT FLOORING

SECTION WOOD ATHLETIC FLOORING

SECTION TILE CARPETING

Section RESILIENT TILE FLOORING INCLUDING VINYL COMPOSITION TILE

Section RESILIENT TILE FLOORING INCLUDING SOLID VINYL FLOOR TILE

LINOLEUM SHEET FLOORING

SECTION RESILIENT SHEET FLOORING

CONDUCTIVE RESILIENT FLOORING

RESILIENT ECO NATURALS, DEFIANT, AND PHOTOLUMINESCENT STAIR TREADS

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.

Section Performance Floor Asemblies (Also Dance Floor Assemblies)

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE

Section JOHNSONITE WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF THE USE OF ANY INFORMATION OR SPECIFICATIONS FOUND IN THIS DOCUMENT.

BuildingName The Description of the Project P DOCUMENTS

SECTION PREFINISHED FSC MAPLE FLOORING. This is a template: edit this specification carefully to suit specific project requirements.

SECTION SHEET VINYL FLOORING Cast-In-Place Concrete Hardwood Strip Flooring System.

ARCHITECTURAL GUIDE SPECIFICATIONS

End of Addendum No. 3

RESILIENT TILE FLOORING

PART 1 GENERAL RESILIENT ACCESSORIES

SPECIFICATIONS - CARPET TILE 09681

SECTION (09620) - RESILIENT ATHLETIC FLOORING

RESILIENT RUBBER STAIR TREADS WITH RISER

Technical Services. Product MM INCH Installation direction Seam treatment GTI CONTROL (welded) 625 X 625 mm 24.5 x 24.

SECTION RESILIENT ATHLETIC SURFACING. B. Related Sections: Section(s) related to this section include:

SECTION RESINOUS FLOORING

SECTION ORCHESTRA PIT FILLER

Bid No. B14-09 Building 900 Cafeteria, Multi-Purpose Room Renovation Flooring

LOOSE LAY INSTALLATION GUIDE PAGE 1 of 6

SECTION RESILIENT TILE FLOORING

GUIDE SPECIFICATION

Installation Guidelines: Magnolia

C. Low-Emitting Materials: Provide doors made with adhesives and composite wood products that do not contain urea formaldehyde.

PART 1 GENERAL RESILIENT SHEET FLOORING

Powerdek Fleck. SECTION Resilient Athletic Flooring

SECTION RESILIENT SHEET FLOORING

RESILIENT FLOORING: Hot and Heavy - Secoya

SECTION PREFINISHED WIDE PLANK KNOTTY PINE FLOORING

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

EXPANKO RESILIENT FLOORING PRE-INSTALLATION GUIDELINES

ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX Products

SECTION ARDEX TILE AND STONE INSTALLATION MATERIALS AND SYSTEMS

A2.0 TRIPLE M DEVELOPMENT EXTERIOR ELEVATIONS. Rochester, MN Hwy 52 North. Apr 07, phone fax

GUIDE SPECIFICATION

SECTION RESILIENT FLOORING

WARNING: SHOULD THE INSTALLATION SEQUENCE NOT FOLLOWED. THE INSTALLATION WILL FAIL IMPORTANT: SEE PAGE 6 0F THIS DOCUMENT

Multi-Institutional Academic Health Science & Research Center Evansville, IN

A. Access doors and frames are part of an access door and frame allowance.

SECTION PREFINISHED ENGINEERED WIDE-PLANK FSC OAK FLOORING

ARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment

Construction Standards PAGE

Control XT SECTION Resilient Athletic Flooring

A. This section includes pre-finished Higuera Hardwoods bamboo flooring and accessories for floors and stairs.

SECTION PREFINISHED FSC WIDE PLANK MAPLE FLOORING

SECTION SUBSURFACE PREPARATION FOR FLOOR FINISHES

4 COMMERCIAL RUBBER TILES (GRANITO, HARMONI, KAYAR, UNI, TERRANOVA AND ZEUS)

SECTION EPOXY RESIN FLOORING WITH INTEGRAL COVE BASE

SECTION BROADLOOM CARPET

Section II Subfloor Guidelines & Specifications Page Chapter 4 Wood Subfloor Guidelines 23 Chapter 5 Concrete Subfloor Guidelines 26 Chapter 6

B. Samples: For each exposed product and for each color and pattern specified.

ALETTE GLUE DOWN INSTALLATION INSTRUCTIONS

SECTION EPOXY RESIN FLOORING WITH INTEGRAL COVE BASE

Installation Instructions

Installation Instruction. Plyboo Quiet Acoustical Underlayment

SECTION POLYPROPYLENE FABRIC WALL COVERING

Suggested Specification for Tri-Patch Versatile Concrete Patching Compound

American Guild Vinyl Flooring - Steadcrest Collection Installation Instructions

SECTION WOOD STRIP FLOORING

SECTION and/or Resilient Sheet Flooring and/or Resilient Tile Flooring

SECTION WOOD GYMNASIUM FLOORING

Spec Master 5/7/ For each product requiring color and texture selection, provide full size samples.

HARO SPORTS FLOOR C.S.I. GUIDE SPECIFICATION Helsinki-Gymnasium Floor System 10/2010 SECTION WOOD ATHLETIC FLOORING

UNDERLAYMENT INSTALLATION INSTRUCTIONS

VESDURA ENGINEERED VINYL PLANK INSTALLATION GUIDE

SECTION WOOD FLOORING SYSTEM

Prefinished Cork Flooring Installation and Maintenance SECTION I. INSTALLATION MANUAL SUB-FLOOR PREPARATION

ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX Underlayments and Toppings

1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards

1.6 QUALITY ASSURANCE A. Source Limitations for Tile: Obtain tile of each type and color or finish from one source or producer.

INSTALLATION INSTRUCTIONS

SECTION GYPSUM WALLBOARD SYSTEMS. A. Gypsum board at new wall partitions or where indicated on drawings. B. ASTM C442 - Gypsum Backing Board

SECTION ORNAMENTAL ALUMINUM RAILING

Transcription:

SECTION 09 65 40 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes stage floor covering. 1.3 SUBMITTALS A. Product Data: For each type of product indicated. 1.4 QUALITY ASSURANCE A. Fire-Test-Response Characteristics: Provide products identical to those tested for fire-exposure behavior per test method indicated by a testing and inspecting agency acceptable to authorities having jurisdiction. 1.5 DELIVERY, STORAGE, AND HANDLING A. Store floor coverings and installation materials in dry spaces protected from the weather, with ambient temperatures maintained within range recommended by manufacturer, but not less than 50 deg F or more than 90 deg F. Store rolls upright. 1.6 PROJECT CONDITIONS A. Maintain temperatures within range recommended by manufacturer, but not less than 70 deg F or more than 85 deg F Insert temperature, in spaces to receive flooring during the following time periods: 1. 60 hours before installation. 2. During installation. 3. 48 hours after installation. B. After post-installation period, maintain temperatures within range recommended by manufacturer, but not less than 55 deg F or more than 95 deg F. TAEI STAGE FLOOR SURFACE REPLACEMENT - #31130-01 PAGE 1

C. Close spaces to traffic during floor covering installation. D. Close spaces to traffic for 48 hours after floor covering installation. PART 2 - PRODUCTS 2.1 HARDBOARD FLOOR COVERING A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the following: 1. Masonite Industries, Inc. 2. Or equal. B. Fiberboard Panels: Masonite Panel 1. Thickness: 1/4 inch. 2. Tempered both sides. C. Sheet Size: 4 feet by 8 feet. D. Adhesive: 1. Loctite PL Premium Construction Adhesive which is a one component, polyurethane based, moisture-curing adhesive at existing concrete slab. E. Fire-Test-Response Characteristics: 1. Critical Radiant Flux Classification: Class I, not less than 0.45 W/sq. cm per ASTM E 648. F. Paint: 1. Paint finish of floor shall be of Satin black theatrical paint: Rosco Toughprime or BREAKTHROUGH by Vanex. No substitutions. G. Thermoset Rubber Base: 1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: a. Burke Mercer Flooring Products, Division of Burke Industries Inc. b. Roppe Corporation, USA. 2. Product Standard: ASTM F 1861, Type TS (rubber, vulcanized thermoset), Group I (solid, homogeneous). 3. Thickness: 0.125 inch (3.2 mm). 4. Height: 4 inches (102 mm). 5. Lengths: Coils in manufacturer's standard length. 6. Outside Corners: Job formed. 7. Inside Corners: Job formed. 8. Color: Black TAEI STAGE FLOOR SURFACE REPLACEMENT - #31130-01 PAGE 2

2.2 SUB-FLOOR A. Existing. 2.3 INSTALLATION MATERIALS A. Trowelable Leveling and Patching Compounds: Latex-modified, portland cement based or blended hydraulic cement based formulation provided or approved by floor covering manufacturer for applications indicated. B. Wood filler: Abatron WoodEpox or equal. C. Screws: countersunk phillips head screws, zinc coated, #8 1 inch. PART 3 - EXECUTION 3.1 EXAMINATION A. Floor shall not be installed until the room is enclosed and the HVAC system is operational. Wood sub floor materials shall be acclimated. Top layer hardboard shall be leafed out flat in single sheets laid in place unfastened for a period of 60 hours minimum before fastening. No exceptions. B. Examine substrates, with Installer present, for compliance with requirements for installation tolerances, moisture content, and other conditions affecting performance. 1. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of floor coverings. 2. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Use trowelable leveling and patching compound to fill cracks, holes, and depressions in concrete substrates and epoxy wood filler in wood substrates. B. Grind smooth and flat to prepare concrete floor so glue will stick as required by the adhesive manufacturer. C. Remove existing muslin theatrical ground cloth. D. Remove all staples from the wood holding ground cloth to the stage floor. E. Removing old scenic show items installed into the floor and patch floor with the same existing wood fully supported. F. Full sanding with industrial floor sander of the existing wood floor planks and patches to provide a smooth surface. TAEI STAGE FLOOR SURFACE REPLACEMENT - #31130-01 PAGE 3

G. Precise cuts around floor pockets, trap floor platforms, orchestra pit, and other items at edges. H. The hardboard at the wings on either side downstage of the proscenium will require to be glued to the existing concrete fllor for a smooth transition from side stage wing to stage floor and orchestra lift. I. Repair, patch, level and sand the entire plywood subfloor to achieve flat, regular, quiet floor, level to 1/8 in 10-0. J. Top of floor box shall be flush with top of new hardboard. K. Top of box shall be black. L. Move floor coverings and installation materials into spaces where they will be installed at least 60 hours in advance of installation. 3.3 INSTALLATION A. Top Layer 1. Layout: a. Install for simple individual sheet replacement in uncut 4 x 8 sheets, only cut to fit as required at sides of room. After acclimation as specified, fasten with 1/8 gaps around all sides. b. Top layer shall be laid out with a 4 foot edge on the centerline between the edges of a stage proscenium and an 8 foot edge on plaster line (the back side of the proscenium arch). Sheets shall run with long edge parallel to proscenium wall. All seams shall line up. Refer to enlarged floor plan drawing. c. Floor assembly shall be cut to allow for 1 inch of expansion at all edges. 2. Installation at wood subfloors: a. Countersunk phillips head screws +/-12 o.c., 2 inside edges (except at walls) and on centerline of each sheet. b. Screws shall be countersunk using pre-drilled counter sunk holes. Selfcountersinking screws shall not be acceptable. c. Screw hole to be countersunk so that screw heads are flush with the surface, and no material mushrooms above the surface. d. Inset screws 4 at walls so they are not covered by the wall base. e. Use of glue for top layer is prohibited. f. Floor Pockets: cut hardboard at hinged door of stage lighting floor pockets. Attach hardboard with construction adhesive to the hinged door with cable holes cut out. g. Cut hardboard sheet 1/8 from all baseboards at stage walls. 3. Installation at concrete subfloor: a. Glue hardboard with adhesive as specified to concrete floor. b. Top of hardboard must be level to new hardboard screwed down to the stage floor. 4. Flush Transition: All perimeter transition conditions at doorways or transitions to concrete floors shall be flush. TAEI STAGE FLOOR SURFACE REPLACEMENT - #31130-01 PAGE 4

5. Finish: a. Top layer shall be finished with two coats of paint. END OF SECTION 09 65 40 TAEI STAGE FLOOR SURFACE REPLACEMENT - #31130-01 PAGE 5