KEYWORDS: Barge Stability, Steel Truss Erection, Horizontal Sliding of Steel Trusses

Similar documents
Grade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc.

Replacing the Aging US 52 Mississippi River Bridge

It must be lowered 5 feet (1.5 meters) onto the bearings. Waterway clearance is decreased.

ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA

Bonner Bridge Replacement Update:

DESIGN AND FLOAT-IN CONSTRUCTION OF A 500 FT. TRUSS SPAN

MEMORANDUM. From: Moffatt & Nichol. Date: April 3, Subj: Wharf J-10 Evaluation of Structure for EIR Document. M&N File No:

Society of Women Engineers Region H Conference

DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE

CASE STUDY OF LONG SPAN STEEL BRIDGE STABILITY DURING DESIGN AND CONSTRUCTION

The construction technology of Chongqing Chaotianmen Bridge

APPENDIX B. LOAD FRAME. This Appendix will describe the philosophy in the design and operation of the loading system.

I-94/I-69 Interchange Bridge Construction

2014 HDR, all rights reserved.

Ironton Russell Bridge Project

John James Audubon Bridge

Strengthened Bascule Piers for the Newly Rehabilitated Bridge of Lions

Innovations in Tied Arch Bridges

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Ironton Russell Bridge Project

ENTRY FORM. DVASE 2014 Excellence in Structural Engineering Awards Program

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE

OCTAGONAL SHAPE REDUCES AIRPLANE HANGAR COSTS

103rd Annual T.H.E. Conference February 28 & March 1, 2017 University of Illinois at Urbana-Champaign. Planning and Design. of IL-104 BRIDGE OVER

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

MINNESOTA HISTORIC PROPERTY RECORD PART I. PROPERTY IDENTIFICATION AND GENERAL INFORMATION

RETROFIT AND REPLACEMENT OF DUMBARTON RAILROAD BRIDGES

MOVABLE ROOF THE DESIGN OF A STADIUM

Replacement of BNSF Bridges near Princeton, IL & near Wyanet, IL. Authors. Number of Words 6875

CSX BRIDGE OVER TENNESSEE RIVER SLOUGH NEAR BRIDGEPORT, ALABAMA BRIDGE REPLACEMENT AND TRACK IMPROVEMENTS. Introduction

NSBA. Prize Bridge. Awards

Roll-in along. New Pawtucket River Bridge is. complete and on time largely due. to innovative means and methods implemented. at the 11th hour.

Steve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) ,

Maritime Work Plan for the High Rise Bridge Construction

US 84 Mississippi River Bridge

Design & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By:

Traci Peterson Option: Structural Faculty Consultant: Memari. Executive Summary

Challenging Skew: Higgins Road Bridge over I-90

BNSF RAILWAY COMPANY

REHABILITATION PACKAGE 4-a

ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING. Kansas City Terminal Railway Company

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Fort (M-85) Street Bascule Bridge

Interior Hangers. Application

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series

SEPARATE PLACING BOOMS

Distriubted by Material Storage Systems, Inc CANTILEVER. Distriubted by Material Storage Systems, Inc

REHABILITATION AND STRENGTHENING OF BURLINGTON NORTHERN SANTA FE RAILWAY BRIDGE OVER THE MISSISSIPPI RIVER MEMPHIS, TENNESSEE.

130TH STREET AND TORRENCE AVENUE RAILROAD TRUSS BRIDGE

Odin s Bridge Northern Europe s Longest Twin Swing Bridge.

Replacement of old Truss spans with new TPG s at La Crosse, WI. Description of bridges between and La Crosse, WI and La Crescent, MN

CONSTRUCTABILITY IMPROVEMENT OF BRIDGES USING STEPPING FORMWORK

AREMA 2008 Annual Conference. LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota

MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS

Creative Approaches to Truss Analysis Using BrR

I-70 over SR 121 Bridge Slide Construction and Engineering

Burgoyne Bridge Replacement Design and Erection

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options

Ironton Russell Bridge Project

TECHNICAL REPORT II STRUCTURAL STUDY OF ALTERNATE FLOOR SYSTEMS

The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure

JFK Airport Light Rail Transit System

Ironton Russell Bridge Project

US 34 Over the Missouri River Philip Rossbach, PE - HDR

INCREMENTAL LAUNCH METHOD FOR STEEL TRUSS BRIDGE ERECTION

US 84 Mississippi River Bridge

US 84 MISSISSIPPI RIVER BRIDGE TRUSS PIN AND LINK REPLACEMENT

National Truss for Historic Preservation

SECTION PLATE CONNECTED WOOD TRUSSES

Ironton Russell Bridge Project

Modjeski and Masters, Inc. Consulting Engineers 04/18/06 St. Croix River Bridge 3D Analysis Report Introduction

2.0 Purpose. 3.0 Work Plan. Page 1 of 7

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring

Executive Summary. ES-1 Introduction. ES-2 Background

Pulaski Skyway Rocker-Bent Investigation Contract at Span 47 and 97

SEISMIC DESIGN AND RETROFIT OF BRIDGES ON MISSOURI S EARTHQUAKE PRIORITY ROUTES

Jeffrey D. Knueppel, P.E. General Manager. Robert L. Lund, Jr., P.E. Assistant General Manager EM&C

BRIDGE SUPERSTRUCTURE REPLACEMENT AT MILE 50.4 RIVERS SUBDIVISION CANADIAN NATIONAL RAILWAY

SCCRTC- MP San Lorenzo River Bridge Walkway Widening Feasibility Report

Conceptual Design Report

Danielle Shetler - Structural option Courtyard by Marriott Lancaster, PA

Ironton Russell Bridge Project

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

Design & technology characteristics of main bridge of Chaotianmen Yangtze River Bridge

Basarab Cable Stayed Bridge in Bucharest

CASE STUDIES FOR STEEL BRIDGE ERECTION: CONVENTIONAL, LATERAL SLIDES, AND INCREMENTAL LAUNCHING

NEWS & INFORMATION FROM HAMILTON FORM SPRING

Mark L. Reno, P.E. September 11, 2015

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

UNION STATION EXPANSION AND RESTORATION

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

BRIDGE MAINTENACE EMERGENCY PROJECTS

Investigation for the Removal of Steel Tie Rods in a Historic Segmental Arch Floor

N Scale Double Track Lift Bridge v1.2

STEEL STRUCTURAL SYSTEMS

Simplified Building Schematic for Typical Floor (Levels 9 through 22):

Transcription:

Replacement of the BNSF Approach Spans over the Mississippi River DAVID ROGOWSKI, P.E. AND JOSH CRAIN, Genesis Structures Inc., Kansas City, Missouri and DAN SIEVE AND KEVIN BECKER, Walsh Construction Company, Chicago, Illinois IBC-13-32 KEYWORDS: Barge Stability, Steel Truss Erection, Horizontal Sliding of Steel Trusses ABSTRACT: The BNSF Railroad crosses the Mississippi River at Burlington, Iowa. The original 120-year old bridge consisted of six 250-foot approach spans, one 360-foot swing span and two 80-foot girder spans. This paper will focus on the complex planning, equipment and construction activities required to replace the approach structures in five 36-hour closures. PROJECT DESCRIPTION The BNSF Railroad spans the Mississippi River as part of the BNSF s Chicago to Denver corridor connecting Burlington, IA to Gulf Port, IL. The original bridge structure, constructed in 1891, consisted of six 250 foot approach span trusses, one 360 foot swing span truss and two 80 foot approach span girders (see Figure 1). The original bridge had seen significant strengthening and rehabilitation throughout its life but eventually proved unable to keep up with the capacity of its daily train volume, limited in large part by the bridge s 10 mph speed restriction. The new bridge replaced the existing on the same alignment with new piers offset 90 feet from the existing piers. Due to the value of minimizing time of track closure, the new bridge was installed through a series of five 36 hour track closures. The new bridge structure consists of six 250 foot approach span trusses, one 360 foot vertical lift span truss and two approach span girders spanning 92 feet and 132 feet. The short track closures required extensive planning, precise execution and careful coordination to ensure success during the closure periods. The techniques utilized to accomplish the accelerated construction included: the construction of new foundations under the existing bridge spans while maintaining full operation of the existing bridge; erecting all six new 250 foot approach span trusses offline from the bridge alignment while constructing the foundations with a casing oscillator and reaction frame; removing the existing girder spans with high capacity barge cranes; rolling and floating in the new approach span trusses; removing each existing approach span truss using barges and floating in the new girder spans in on barges. The focus of this paper will be on the following construction activities: Approach Span Truss Erection Offline Horizontal Sliding of Approach Span Trusses Installation Procedures of Approach Span Trusses as part of five 36 hour track closures Demolition of Existing Approach Span Trusses on Barges Figure 1 Existing 120 year old bridge structure with 360 foot Swing Span

APPROACH SPAN TRUSS ERECTION OFFLINE With the first phase of the five 36 hour track closures completed including the replacement of the existing 360 foot swing span with a vertical lift span the focus of the project immediately turned to the replacement of the approach span structures and the installation of the new piers. It was determined that the simplest and most efficient way to accomplish the replacement of the approach span trusses in the four remaining 36 hour tracks closures would be to install the new piers while the track remained in service and simultaneously erect the new 250 foot approach span trusses. In total, six approach span trusses were erected remotely from the bridge alignment while the new piers were installed. Approach span truss # 1 was erected at the job location because it spanned the existing abutment and was not accessible to any form of barge float in installation (see Figure 2). The remaining five trusses, Spans 2 6, were erected offline at a location 13 miles downstream from the job site referred to as Green Bay (see Figure 3). Figure 3 Approach span trusses 2 6 erected on track system at Green Bay location The offline location, Green Bay, was selected for several reasons, including its close proximity and easy access for steel delivery, its location upstream of the next major bridge and outside of the navigation channel, and its minimal elevation change between water and land. The main truss erection activities at Green Bay took place behind a levee for both protection and to enable the contractor to assemble the structure as a land based operation. After the steel trusses were assembled, they were rolled or slid outside of the levee protection over the water and loaded onto barges a few days before track closure periods. The approach span trusses, erected at the job site and at Green Bay, were built on similar work platform systems (see Figure 4). The work platforms were comprised of (18) 48 x3/4 support pipe piles with W33 cribbing located under each panel point (24 6 on center). The support piles were tied together with W36x135 struts. The W36 struts also supported the work platform walkway surface comprised of W18x46 s spanning the W36 struts and wood planking at the deck level. The work platform minimized the need for personal fall protection while assembling the bottom chords, bottom laterals and floor system. Figure 2 Approach span truss # 1 erected at job site Figure 4 Work platform used for truss erection

HORZONTAL SLIDING OF TRUSSES The approach span trusses required horizontal sliding for two reasons: (1) after the trusses had been erected at Green Bay they had to be moved from the erection work platform to a position over the water accessible to the barges (2) approach span truss # 1, erected at the job site, required horizontal sliding for final installation during one of the track closures. The horizontal sliding of the trusses was accomplished using a push/pull frame and reaction sled (see Figure 5). load to the track beams with (2) 3 1/4 inch Diameter 80 ksi pins. Figure 6 Push/Pull frame and reaction sled used for horizontal sliding of trusses shown at Green Bay location Figure 5 Push/Pull frame and reaction sled used for horizontal sliding of trusses The push/pull frame supported the truss at four primary bearing locations using (4) 150 Ton hydraulic jacks at each location. The hydraulic jacks were designed to handle the truss dead load reaction of 850 kips per bearing location plus an additional 150 kips for wind overturning forces. The push/pull system was installed under strengthened jacking points on the floorbeams (see Figure 6 & Figure 7). The horizontal movement of the truss was accomplished using (2) 100 Ton hydraulic rams with 36 inch strokes. The hydraulic rams, installed on the push/pull frame, push or pull against a stationary reaction sled pinned down to the track beams. As the rams pushed or pulled the reaction sled, the truss and push/pull frame would move along the top of the track beams by rolling on Hillman rollers [(2) 300 Ton rollers provided per bearing location]. The reaction sled delivered the Figure 7 Push/Pull frame and reaction sled shown at approach span truss # 1 The track beam system at the Green Bay location extended a distance over 300 feet in length (see Figure 2), allowing for multiple trusses to be stored in order to meet schedule. A similar track beam system was installed at approach span truss # 1, with a more modest total length equal to 150 ft. The track beam system was designed to handle the full 1000 kip roller reaction of the push/pull frame and reaction sled. The track beams consisted of (2) W36x302 s with 2 x 32 cover plates top and bottom. The track beams spanned between 2 pile bents (see Figure 8) consisting of (2) W36x260 cap beams and (2) 48 x3/4 pipe pile driven at 1000 kip capacity.

The jacking towers used for float in (comprised of heavy W36 s framing) were used to support (2) W36x302 lifting beams in direct contact with the lifted truss (see Figure 10 and Figure 11). The lifting beams spanning between the towers were supported at each end by (4) 2 1/4 Gr. 150 threaded rod which could raise the truss through a range of approximately 20 feet. Figure 8 Typical track beam system pile bent INSTALLATION PROCEDURES OF NEW APPROACH SPAN TRUSSES Once the approach span trusses had been erected at the Green Bay location and the completed trusses had been rolled or slid into position over the (4) 195 foot by 35 foot by 10 foot deep float in barges, the trusses were lifted off the track beam system onto the barges with the use of jacking towers. The jacking towers were designed to support the full 3400 kip weight of the new approach span trusses (see Figure 9). The barge draft generated by the weight of the approach span truss was approximately 2 6. At the time of the lift, ballasting had to be performed as a product of the eccentric tower placement on one set of barges. The eccentric tower placement was due to site conditions requiring the new trusses to be installed in between the existing and newly installed piers. Figure 10 Isometric view of jacking tower for truss float in Figure 11 Side view of jacking tower and lifting beam used for truss float in Figure 9 Approach span truss loaded onto float in barge jacking towers

The support of the jacking towers (for all but one barge pair) was provided by a spine beam system that also linked together the dual 35 foot by 195 foot by 10 foot barges. The spine beams consisted of double W36x300 s and W40x431 s straddling the barge deck and secured to the barges with reinforcing plates welded to the sides of the barges. The one exception to the float in tower being supported on the spine beams arose because after field testing, two barges were determined to have only a minimal wall thickness of 5/16. The load for this barge pair had to therefore be distributed to a larger area on the barge deck using sandboxes (see Figure 12). Where possible, the sandbox detail is a more effective and preferable detail to get the load to the barge deck. However, this is only the case if the barges are loaded symmetrically. For this particular project, the sand box detail would not work to support each tower configuration because of the unsymmetrical tower placement on the barges required to accommodate interference issues with the existing and new piers. Figure 13 Tugs positioning truss near final bridge alignment Figure 14 Alignment of truss fine tuned once barges released by tugs DEMOLITION OF EXISTING APPROACH SPAN TRUSSES Figure 12 Sandboxes support method on barges The final challenge faced with the float in installation of the approach span trusses was positioning the dual 35 foot by 195 foot linked barges into final alignment without the use of spuds. The alignment method used, after the tugs positioned the barges within 2 3 feet of the final bridge alignment, was to use come a longs to fine tune the final position of the truss (see Figure 13 & Figure 14). Each of the five 250 foot existing approach span trusses were floated out during track closures in sequence with the new approach span truss floatins. The existing approach span trusses were efficient Morrison trusses with true tension members installed where tension members were needed (see Figure 15). That design philosophy presented a problem when attempting to pick the truss at panel point L1 where there was no compression capacity in the vertical hanger (Figure 16).

the track closure. Once track clearance was given, and the existing approach span truss was cut free, water was removed from the barges using 6 inch trash pumps until the load of the truss was fully taken by the barges and the truss was lifted off the pier 2 3 inches. Tugs then removed the barges from the bridge alignment (see Figure 19). Figure 15 Existing approach span truss Figure 16 Vertical hanger at panel point 1 The solution was to span to panel points L0 and L2 using the existing bottom chord in combination with a newly installed W24 underslung beam (see Figure 17). Figure 17 Bottom chord and W24 underslung beam used to deliver load around vertical hanger designed for tension Floating out the existing trusses did not have the luxury of a jacking tower with a 20 foot range similar to the float in towers. The float out barge configuration relied rather on predicting/monitoring river gages using NOAA stations and communicating with the dam upstream throughout the four seasons of change outs. The float out barge towers had to be able to be adjusted plus or minus 1 foot within one day s notice (see Figure 17). Two to three days prior to each float out the barge towers were built to heights that would accommodate the anticipated river gage. A day prior to track closures, the barges were aligned with the existing bottom chord and the newly installed underslung beam (see Figure 18). The barge was secured to the existing bridge and was held at that position until the beginning of Figure 18 Barge aligned with existing truss in preparation for track closure

Figure 19 Barges have truss. Tugs moving outside of bridge alignment. Once the existing approach span trusses were moved offline, they were taken across the river to be demolished and scrapped. The demolition took place on barges, and while the existing truss removal was achieved with two 55 foot by 120 foot barges, the demolition required a third barge be installed in order to control the relief of stresses as the truss was being deconstructed (see Figure 20 & Figure 21). Figure 21 View of third barge and additional tower support provided during demolition FINAL NOTES The installation of the approach structures for the BNSF Railroad crossing of the Mississippi near Burlington Iowa was completed March of 2012. One can only hope that the newly erected approach spans live as long and productive of a life as their Morrison style truss predecessors. The construction items not included in this paper: constructing the foundations with oscillator frame while existing structure remained in use; removing the existing girder spans with high capacity barge cranes and floating the new girder spans in on barges presented their own unique set of challenges that could be considered for their own technical paper. ACKNOWLEDGEMENTS Figure 20 Existing approach span truss with portion of top chord and diagonal removed Iowa Department of Transportation Office of Rail Transportation BNSF Railway Company Walsh Construction Company HNTB Corporation