EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS

Similar documents
BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

Bill No.1: Preliminaries

SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR

Estimate FOR THE SEPTIC TANK

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL Bill of Quantity : Package2 - Lot 3

July Bill No.1: Preliminaries

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount

SECTION STORM DRAINAGE

Bill of Quantity (BOQ)

Construction works for Establishment of School in Al-Najaf M 2 2,600 M 2 750

Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill No Description Unit Qty

Construction works for Establishment of School in Al-Latifiyah. Al-Latifiyah BoQ for constructing a 6-pre-fab Classroom School

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES

BOQ for Plumbing, Sanitary Works

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT

A Provide for Contractor's Office, Store etc. Sum

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2

Description Unit Quantity Rate Kshs. Amount Kshs.

Bill of Quantity (BOQ)

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

SECTION MEASUREMENT AND PAYMENT

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT

PND Training Hall Conex Building, Kabul ABSTRACT OF COST

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

Islamic Republic of Afghanistan Ministry of Interior Affairs Central Prison Directorate

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY

SCHEDULE OF ITEMS & QUANTITIES FOR CIVIL WORKS OF PROPOSED GIRLS/ BOYS TOILET BLOCK

Annex II- Lot 2. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State

COUNTY GOVERNMENT OF SIAYA: PROPOSED ECD BLOCK

0.75 " transparent hose w/ valve for head measurements fixed to screws 20 MIL PVC liner. 6" gate valve

Annex III- Lot 3. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 8 Admin Units in localities of Sinar State

Annex I- Lot 1. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 7 Admin Units in localities of Sinar State

Subject: Quotation for Erection of Pre fabricated Buildings in Turbat and Gawadar for UNODC Country Office Pakistan,

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.

ONE PIPE LENGTH MAX (REFER TO 1/4"/FT SLOPE (MIN) 5'-0" (MIN) OR 4" LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4"x6" REFER TO TYPICAL EXCAVATION,

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT

Amendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents

SINAR AHS BILL OF QUANTITIES Cost code Description Unit Qty 1 SINAR AHS Contractors General Conditions Site Works Setting out works: Rates

CATCHMENT STRUCTURE 13M X 15M

B. Fiberglass for construction in back lot easements placed on cast-in-place base.

***************************************************************************************************************

UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ. Original Issue Bamyan MAC Site Services - Phase 1 Bamyan, Bamyan, Afghanistan

Jericho Agro Industrial Park

CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

1. Division 01 Section General Requirements - Temporary Facilities and Controls. 2. Division 31 Section Earthwork.

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CW 3235 RENEWAL OF EXISTING MISCELLANEOUS CONCRETE SLABS TABLE OF CONTENTS

UNDP / PAPP OFFICE BUILDING RAMALLAH HVAC WORKS

TABLE OF CONTENTS

PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER

The International Committee of the Red Cross

DRAFT. Draft Bill of Quantities. Drainage

ITEM 432 TUNNEL CONSTRUCTION

BILLS OF QUANTITIES FOR CONSTRUCTION OF MODEL DISPENSARY BLOCK AT MGUNGANI / SALAITA

Extension of Water Network to Service Jericho Souther Area Mainly the Future Jericho Agro-Industrial Park (JIAP) Elevated Water Tank.

PRICED BILL OF QUANTITIES

SECTION PUBLIC WATER SERVICE CONNECTIONS

TYPE "A" CATCH BASIN

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

Section 403. DRAINAGE STRUCTURES

SCHEDULE OF QUANTITIES CPUT BELLVILLE JOB NO: SECTION 1 : PRELIMINARY AND GENERAL ITEM PAYMENT DESCRIPTION UNIT QTY RATE AMOUNT

UNITED NATIONS DEVELOPMENT PROGRAMME ITB

PERMANENT PAVEMENT REPAIR NO SCALE

2.1.2 Minimum wall thickness shall be 90 mm Frames and covers shall be bitumen coated by dipping.

AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MANHOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

Ice Rink Renovation & New Clubhouse

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

Additional/ Rehabilitation works for Beit Jala secondary girls school (Chile School) Description Unit Quantity Unit Rate Amount

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.)

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS

1.02 RELATED WORK: Refer to the following sections for related work:

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

SECTION FACILITY SANITARY SEWERS

1. Remove worn-out old plaster (or any other finishing).

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

Summary of the 2011 Changes

BID FORM (LUMP SUM CONTRACT)

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT]

CONSTRUCTION WORK AT THE AU MEDICAL CENTER

Storm Drainage

ARCHITECTURAL DRAWINGS

SCALE BAR 1:2500 RM OF WOODLANDS OVERALL PLAN - LOW PRESSURE SEWER MAIN. Certificate of Authorization JESSICA MANNESS ENGINEERING, INC. No.

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

Transcription:

BILLS OF QUANTITIES - Name of Project CONSULTANT: Name of Office DATE:APR. 2008 External Works EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS page 1

BILLS OF QUANTITIES - Name of Project CONSULTANT: Name of Office DATE:APR. 2008 BILL NO. 1 EXCAVATION AND BACK FILLING ITEM RATE AMOUNT DESCRIPTION UNIT QUANTITY NO. US$ CENT US$ CENT Excavation, Back filling and Site Works. 1.1 Site Leveling. (Excavation in the streets and where required). Cut in any kind of soil, rock, concrete, or asphalt; to the required Levels (reduced Level bottom of base coarse under ground slab ). 1.2 The price to include back filling with excavated suitable materials, or imported approved materials, removal of extra soil, debris, and organic materials to a suitable place approved by the engineer. Back filling material shall be applied on layers, 20cm thick, watered and compacted to min 95% to comply with modified AASHTO Density Test (T-80) Import and fill with selected Imported Approved Fill; to the required levels and where directed by the Engineer, only for the quantities that are extra and above the quantities included in item 1.1 M.C 270 Filling shall be on layers not to exceed 200 mm. thick. Price to include leveling, watering and compacting to 100 % field density. Complying with Modified AASHTO Density Test T-80. M.C 3,700 Contingency CARRIED TO SUMMARY page 2

BILLS OF QUANTITIES - CONSULTANT: DATE: APR.2008 SUMMARY Bill No. Title Amount USA $ CENT 1 Excavation, Backfilling And Site Works 2 Concrete Works 3 Plastering Works 4 External Tiles and Flooring 5 Steel Works 6 Main Gate Works 7 Asphalt Works 8 External Electrical works 9 External Mechanical Works Grand Total Percentage % Discount or Addition Net Grand Total All Prices exclude taxes of any kind except income Taxes. The Sum of : and -------------------------------------------------------------------- USA($) -------------------------------------------------------------------- Cent Signed and Sealed:- ------------------------------------------------------------- Authorized :- -------------------------------------------------------------- Title:- --------------------------------------------------------------- Signature:- -------------------------------------------------------------------- Date:----------------- Page 13

BILL No. (9) Item Rate Total DESCRIPTION Unit Quantity NO. USD CENT USD CENT EXTERNAL MECHANICAL WORKS Preamble. 9.1 Supply, installation, testing and commissioning Galvanized steel main water pipes, according to specifications (Bs1387) and outer insulation with three layers (AWWA C214), price to include all necessary fittings, e.g elbow, T, union, reducers.etc all of approved quality, price also to include trenches excavation in all type of soil (earth or rock), leveling bottom of trenches manually, backfilling using suitable sand 10cm under, above and around the pipes, and completing the backfilling with basecorse layers not exceeding 20cm, watering and compacting these layers. price also to include testing, cleaning and all what is required to complete the work acording to drawings, specifications and engineers approval and also according to Municipality requirements. a) 3" pipes, wall thickness 4mm, includes trench excavation 70cm depth and 50cm wide and backfilling as mentioned above b) 2", wall thickness 3.6 mm, includes trench excavation 60cm depth and 40 cm wide and backfilling as mentioned above M.R 100 M.R 115 c) 1 1/2", wall thickness 3.2 mm, includes trench excavation 40cm depth and 30 cm wide and backfilling as mentioned above M.R 215 d) 1 1/4", wall thickness 3.2 mm, includes trench excavation 40cm depth and 30 cm wide M.R 18 9.2 Supply and install manhole for water valves to be constructed of reinforced concrete 100X100X100 cm, and C.I cover 25 Ton, Price shall include for concrete, steel, plastering, excavating, backfilling and disposal of surplus excavated materials. Excavation shall be in any type of soil or rock. and according to Municipality requirements. Mechanical Works N.O 1 CARRIED TO NEXT PAGE Page 11

BILL No. (9) Mechanical Works Item Rate Total NO. DESCRIPTION Unit Quantity USD CENT USD CENT (SECTION NO. 6) MECHANICAL WORKS FORWARDED 9.3 Supply and install valves inside manhole or water meter boxes, price to include unions, complements and what is required to complete the work according to drawings, specifications and engineers approval and also according to Municipality reqiurements a) 3" N.O 1 b) 1 1/2" N.O 12 c) 1 1/4" N.O 1 9.4 Septic Tank works: supply and install heavy duty cast iron cover, vent siphones and vent pipes to the nearest wall and what is required to complete the work according to drawings, specifications and engineers approval (Construction works including excavations, reinforced concrete,...etc is considered in concrete work) L.S 1 9.5 Supply and install concrete water culvert 40cm diameter, price to include two gully gutters (grates) to collect rain water from streets of size 835mmX335mmX50mm with proper frame, price to include casting in the site reinforced concrete manhole of internal diameter 34cmX84cm, reinforced concrete base 15cm thick, and walls 10cm thick. the price also includes concrete pipes 40cm diameter, and what is required for proper pipes jointing and a precast circular manhole 100X100X100 cm, includes excavation, backfilling, manhole base, cast iron cover 25 ton, connceting to reinforced concrete pipes to transfer rain water to the nearest lands, also price to include excavations in any type of soil or rock for pipes and manholes, also backfilling with sand under, above and around the pipes 20cm thick, and completing the backfilling with compacted basecorse layers and what is required to complete the work according to specifications and engineers approval and according to municipality requirements. 9.6 Supply and install steel fire fighting outlets 2", price to include complements, painting, fixing, galvanized steel pipes and what is required to complete the work according to specifications, engineers approval and municipality requirements. L.S 1 No. 5 Page 12

CARRIED TO SUMMARY Page 13

BILL No. (8) EXTERNAL WORKS Item DESCRIPTION Unit Quantity Rate Total NO. USD CENT USD CENT ELECTRICAL WORKS Preamble: Supply, install and commissioning, connect and test all external works: poles, manholes, overhead lines, excavations, backfilling,ducts, pipes cables and what is required to complete the work according to to drawings, specifications, engineers approval and according to Municipality and Electrical company and Paltel requirements. 8.1 Supply, install 9m galvanized steel low tension pole, price to include anchoring clamps, stays, excavation in any type of soil (1X1X1.3)m,fixing and what is required to complete the work according to specifications and Municipality and electrical company requirements No. 12 8.2 Supply, Install and Connect APC(aerial bundle cables), price to include galvanized anchoring clamps, suspension clamps,screws, plastic straps, fixing, calibration of cables and any other accessories required to complete installing the cables according to specifications and engineers approval and electrical company requirements. a) 4X95+2X25mm2 M.R 220 b) 4X50+2X25mm2 M.R 100 8.3 Supply and install complete street lighting unit suitable to be connected on the poles, price to include the shell and (100W) lamp Gaash or equal and the internal parts starters,...etc type Hashofet or equal, fixing and testing and what is required to complete the work according to specifications and engineers approval and also according to electrical company and municipality requirements. NO 14 CARRIED TO NEXT PAGE Page 9

Item NO. DESCRIPTION Unit Quantity (SECTION NO. ' 5 ) Rate Total USD CENT USD CENT ELECTRICAL WORKS FORWARDED 8.4 Supply and install lighting panel consists of main switch 3X63A moller or equal, magnetic switch 3X50A, three branch switches 25A capacity and a photocell and what is required to complete the work and according to engineers approval and electrical company requirements No. 1 8.5 supply and install (100X100X100)cm electrical manholes, price to include, excavation, medium duty cast iron cover and all what is required according to engineers approval and electrical company requirements. No. 5 8.6 a) supply and install (80X80X80)cm telephone manhole, price to include excavation, 8ton cast iron cover and all what is required according to specifications,engineers approval and paltel company requirements. No. 6 b) Ditto but 25 ton cast iron cover No. 11 8.7 Supply and install XLPE cables to buildings and where required from the pole to the main distribution boards of buildings price to include 4" pvc pipes, excavation, backfilling, 6m steel pipes and what is required to complete the work according to drawings specifications and engineers approval and also according to electrical company requirements. a) 3X35+1X16+16mm2 XLPE cable M.R 350 b) 3X25+1X16+16mm2 XLPE cable M.R 18 8.8 a) Supply and install 4" PVC pipes for telephone main feeders, price to include excavation, backfilling and what is required to complete the work according to drawings, specifications and engineers approval and according to PALTEL requirements. M.R 470 b) Ditto but 2" PVC pipes M.R 15 8.9 Supply and install telephone cables 10Pair Teldor or equal M.R 1 CARRIED TO SUMMARY Page 10

BILL No. 3 PLASTERING ITEM RATE AMOUNT DESCRIPTION UNIT QUANTITY NO. US$ CENT US$ CENT PLASTERING. PREAMBLE. 3.1 Four Coats of Cement and Sand Plaster over one slurry coat for external walls and Wherever Required, The fourth coat is troweled (shabriz) Topping. Price to include waterproof additives. where required including galvanized metal Lath, angle beads, plaster stops and all required as per Specifications and Drawings. The price shall include all narrow widths, for taking out joints on block walls or backing concrete face for key, M.S 500 CARRIED TO SUMMARY Page 4

BILL NO. 4 EXTERNAL TILES AND FLOORING ITEM NO. DESCRIPTION UNIT QUANTITY RATE AMOUNT US$ CENT US$ CENT EXTERNAL TILES AND FLOORING 4.1 supply and spread agricultural soil brought from outside the site and from the upper layers of ground, price to include spread the soil in a smooth levels in gardens 50cm thick. Price also to include excavation and cleaning under the spread soil 4.2 Supply and install cement tiles (Interlock), grade A colored, 4cm thick for pavements and where required. Price to include curbs stone, sand layer and grouting and what is rrquired to complete the work according to drawings, specifications and engineers approval M.S 1200 M.S 1300 CARRIED TO SUMMARY Page 5

BILL No. 5 STEEL WORKS ITEM NO. DESCRIPTION UNIT QUANTITY RATE AMOUNT US$ CENT US$ CENT STEEL WORKS 5.1 Supply and Install Protection Steel Grilles(85cm)height measured in meter run. As detailed in the site plan drawings including fixation, accessories, welding, grinding, smoothening, Ironmongery, oil painting three coats in addition to two primer coats Special primer coats for galvanized steel,price also to include (30X30X100)cm stone columns each 4m spacing ( Site Detail no. 2) 5.2 M.R 24 Supply and install steel chain between two columns as in drawings (Site detail no. 3) No. 3 CARRIED TO SUMMARY Page 6

BILL No. 6 MAIN GATE WORKS ITEM NO. DESCRIPTION UNIT QUANTITY RATE AMOUNT US$ CENT US$ CENT MAIN GATE WORKS 6.1 Supply and install the project gate as in the drawings (Site Detail no. 1) the price to include excavations, reinforced concrete, stone, block, finishing and writing on the stone, and special boxes or points for lighting fixtures and what is required to complete the work as in the drawings, details and engineers approval L.S 1 CARRIED TO SUMMARY Page 7

ITEM NO. BILL No.7 DESCRIPTION UNIT Asphalt Works RATE AMOUNT QUANTITY US$ CENT US$ CENT Asphalt Work 7.1 Supply and Well Compact Base Coarse, average 20 cm thick plus 50 cm offset all around streets and where required according to drawings and where directed by the engineer. basecoarse shall be applied on layers, 20cm thick, watered and compacted to 100% to comply with modified AASHTO F.D.T (T-80).Price includes watering, leveling and compacting of ground (sub-base) under base coarse to min 100% according to Field Density Test. 7.2 Supply and apply 7cm asphalt layer, price to include liquid asphalt prime coat (MC-70) 1.2Kg. Per square meter, and spread them in amooth and dry surface using finisher, price also to include the mixture, compacting, mixture testing and what is required according to drawings, specifications and engineers approval CARRIED TO SUMMARY M.S 2,800 M.S 2,500 Page 8

BILL NO. 2 CONCRETE WORKS ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT NO. US$ CENT US$ CENT CONCRETE WORKS. 2.1 Supply and Cast Reinforced Concrete Grade 'B280 With a minimum cement content of 325 Kg. per cubic meter. Price to include for painting with two coats of hot bitumen (75/25) (for the buried parts). or cold applied rubberized bitumen emulsion protective coating with fiber reinforcement for Foundations of reinforced concrete walls M.C 20.0 2.2 Ditto but Reinforced concrete walls with two coats of hot bitumen (75/25) (for the buried parts) and insulation boards M.C 60.0 2.3 construct Reinforced concrete for septic tank (6X7X4)m (see septic tank detail) price to include all construction and finishing work and what is required to comlete the work according to specifications, drawings and engineers approval L.S 1.0 CARRIED TO SUMMARY Page 3