Sustainability Best Practice Case Study. Reducing Waste, Reducing Cost. The UK construction industry waste challenge

Similar documents
Railways: Waste less and save money

Design out. Waste Workshop. A guidance document produced by Network Rail in collaboration with:

Reducing construction waste saves money Bridge Learning Campus, Bristol Contractor: Skanska

Costs and benefits of reducing waste in construction. Defence sector new build Woolwich single living accommodation modernisation (SLAM)

Assessing the costs and benefits of reducing waste in construction trade packages

Halving Waste to Landfill, SEESA

Structures - steel. Structures - steel

Halving Waste to Landfill

Assessing the costs and benefits of reducing waste in construction

Agenda. What is CEEQUAL The benefits of CEEQUAL some case studies What does CEEQUAL assess? The future Q&A Award presentations

Assessing the costs and benefits of reducing waste in construction

Defence sector: recycling waste in construction Defence Estates Regional Prime Contract East, Babcock DynCorp

Designing Out Waste In the Civil Engineering Sector Athens Dioni Spiliopoulou MCIWM Bob Hudson MCIWM

Innovative waste management approach achieves exemplary recovery rates

Resource efficiency pursued through design coordination and waste management

A metric for the construction sector. The Net Waste Method testing a new standard for measuring waste neutrality

Best Practice Construction Waste Procurement: Office Fit-Out of 15 Canada Square, Canary Wharf

PLASTERBOARD SUSTAINABILITY INITIATIVE PSP (UK) 13 November 2012, European Parliament Brussels Presented by: Malcolm Waddell, WRAP UK

Achieving effective Waste Minimisation

Utilities: Waste less and save money

McGrath works in partnership with Hackney Homes

Benefits of the WRAP SWMP Template. Birmingham, 1 April 2008

A blueprint for reducing waste and cutting costs

Site Waste management Plan (SWMP)

Minimising construction waste through project design

Environmental Sustainability Overview UK&I FY2016

Cambridgeshire County Council County Planning, Minerals and Waste

London Bridge Station, London

Aberdeen Harbour Expansion Project. Construction Environmental Management Document

Structures concrete. Structures concrete

Appendix I -1 Demolition Waste Estimates

Piling, retaining walls and tunnels

Contractor follows nine-step plan to achieve best practice in construction waste management

The emphasis should be on the contractor to develop the targets for waste reduction and recovery. What is good practice?

Can sustainability win you more work? 10th April 2013

Environmental Policy Document

PORTAKABIN DELIVERS SUSTAINABLE MODULAR SOLUTION FOR A NEW NETWORK RAIL WASTE MANAGEMENT FACILITY

SRUC PROCUREMENT: SUSTAINABLE PROCUREMENT STRATEGY. Andrew Tennant Senior Procurement Manager

Construction Method Statement

Construction Waste Measurement Guide

SMARTWaste: Overview and data Maggie Blackwell. Part of the BRE Trust

Avoiding the Landfill

Measuring the Impact of Building Materials and the Opportunity for Wood- Based Construction. 12 October 2010 Dr Ed Suttie BRE Timber

Construction Site Waste Management Process.

Material resource efficiency in construction

Construction Waste Management Plan Guidelines. A resource for Western Australian Local Government, Developers, Property Owners and Builders

Circular economy in the construction sector

The Demolition Protocol: Aggregates Resource Efficiency in Demolition and Construction. Volume 3. For Contractors

Waste sustainability in action

For guidance on disposal of Polychlorinated Biphenyl (PCB) contaminated equipment or fluids, please refer to the Guidance Note NR/GN/ESD03.

End of Project Report : Newtown Secondary School

BNPB3: Plasterboard - legislation and policy drivers

BUILDING PRODUCTS DIVISION

Our Supply Chain Charter

Construction Strategy: Newtown Secondary School

connection.uk.com Corporate Social Responsibility

New Tredegar Flood Alleviation Scheme

The efficient use of materials in regeneration projects

Zero waste to landfill: Construction waste collection good practice

Environmental Design Principles. For New Buildings and Refurbishments. MMU Environmental Management System

There will be no significant impact from solid waste arising during the development of the proposed power plant.

Action Responsibility Baseline data Targets Milestones

Corporate Social Responsibility.

Learning Legacy Document Duration of data recorded (approx.) 1

North West Site Waste Management Plan September 2011

Sustainable Procurement Case Study Natural History Museum

Excavated Material and Waste Management

PBL Environmental Management System. Staff Awareness Training. This package has been developed by the Parsons Brinckerhoff Ltd, Environment Group

James Fisher Prolec. Leading construction equipment safety and productivity solutions.

Asset Management Policy

Developing a sustainable business for the future

Site Waste Management Plans A guide for the construction industry and supply chain

UKCG Built Environment Commitment

Resource Recovery TIMBER Collection and Transportation

Environmental Sustainability Strategy

Network Rail s Strategic Business Plans for Control Period 6

ASSET MANAGEMENT SUSTAINABILITY POLICY 2016

Environmental Policy and Guide December 2010

CONSTRUCTIVE THINKING

Raploch: urban regeneration

Striving for Zero to Landfill

Constructing Excellence: The SME s quick guide to Sustainability

HOW DO YOU IDENTIFY THE BEST PRACTICABLE ENVIRONMENTAL OPTION FOR CONSTRUCTION AND DEMOLITION WASTE?

Toilets and baths to aggregate paths

Thameslink Programme. Sustainability Strategy. Strategy. Document Reference Number. Infrastructure Projects Thameslink Programme.

The efficient use of materials in regeneration projects

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following:

Greater Manchester Waste Disposal Authority ENVIRONMENTAL STRATEGY. Foreword

Waste FY Introduction. 2. Waste. 3. Management Approach

Greater Lincolnshire MOVE Project Partnership. Sustainable Development Policy

ASSET MANAGEMENT SUSTAINABILITY POLICY

Designing for Deconstruction in the Context of the Passivhaus Standard.

Environmental Sustainability. Securing the Future: Our Sustainable Development Policy

Site Waste Management Plan (SWMP) London Road East Waste Transfer Station

Hinksey Flood Alleviation Scheme Sink or Swim

OVERVIEW OF PRESENTATION

Construction Method Statement

Volvo Research Foundation Future Urban Transport Symposium

Sustainability Performance Report 2nd report: 2012 performance data

Transcription:

Sustainability Best Practice Case Study Reducing Waste, Reducing Cost With the construction industry sending 17% of its total waste produced to landfill each year and spiralling landfill costs the UK government has set a target to achieve zero waste to landfill by 2020. To support the industry and reduce our environmental impact and costs to the business, Network Rail Infrastructure Projects has committed to lead the industry in achieving zero waste to landfill by 2019. This sustainability best practice case study sets outs how the Thameslink Programme has reduced waste and reduced cost to support the zero waste to landfill challenge. The UK construction industry waste challenge The UK construction industry produces around 120 million tonnes of waste per year of which 20 million tonnes are sent to landfill unused (WRAP). Due to the large amount of waste generated by the industry the UK government has identified that reducing the volume of waste produced and disposed of needs to be significantly improved to conserve our natural resources and prevent damage to our environment. A study by WRAP also demonstrates that a reduction of waste by 5 million tonnes over 4 years generated 400million of savings to the industry. To meet the current UK waste challenge the government is aiming for zero waste to landfill by 2020 and all organisations, including Network Rail (NR), has a role to play in delivering this. Reducing waste in Network Rail Infrastructure Projects Infrastructure Projects (IP) is delivering the biggest investment in the railway since the Victorian era. All our work from designing and building iconic new stations, signalling upgrades, electrification, track renewals and bridges produces waste. The waste we produce has a significant impact on both our environment and the costs to our business. Over 2015 to 2016 IP alone produced approximately 2.3 million tonnes of waste and diverted on average 75% of all waste produced from landfill. With landfill tax rates at 84.40 per tonne it makes good business sense to reduce the amount of waste we produce and dispose. To support NR s Sustainable Development Strategy (2013-2024), NR IPs Control Period 5 business plan objectives and Sustainability Charter IP has committed to lead the industry in zero waste to landfill by 2019. A sustainable Thameslink Programme The Thameslink Programme (TLP) will transform travel north to south through London. When Thameslink completes in 2018 journeys and connections will be improved giving customers better travel options to more destinations than ever before and modern track and trains will make journeys more reliable. Sustainability is right at the heart of the Thameslink Programme and our vision is to deliver transport benefits to budget that represents value for money and creates an overall positive impact on the community and the environment. To do this we re working to ensure that not only do we achieve the highest standards in sustainability, but we uphold this principle on all fronts. As part of our vision the TLP has committed to reduce waste generated and disposed of on TLP through reducing waste during the design process and diverting at least 90% of our waste from landfill using the waste hierarchy. Between 2012 and 2016 the TLP successfully diverted on average 99% of its waste from landfill, a total of 569,000 tonnes. Through reducing our waste we have generated approximately 12,000,000 cost savings to our business.

How Thameslink reduced waste and reduced cost Using our role as client to raise the bar As client we have the power to set and raise the performance of our programme and our supply chain to reduce waste. Each action that we take as a client has the potential to drive a positive change across our business, supply chain and the industry. To play our part as client we benchmarked ourselves against the industry average waste recovering benchmarks of 80% (for demolition and construction) and committed to go above this by setting a target to divert a minimum of 90% of waste from landfill. As well as setting challenging targets we also publicly signed up to the WRAP Halving Waste to Landfill Commitment alongside 800 other signatories where we committed to;.playing our part in halving the amount of construction, demolition and excavation waste going to landfill by 2012. We will work to adopt and implement standards for good practice in reducing waste, recycling more, and increasing the use of recycled and recovered materials" Embedding our waste requirements across our management system and supply chain As a client it was important that our design, construction teams and our supply chain were fully aware of our waste requirements. To achieve this we embedded our waste objective, targets and key performance indicators (KPIs) into our ISO14001 Environmental Management System and cascaded these requirements to our supply chain via our procurement and contract process. Challenging the design and construction process We also held a series of Designing Out Waste workshops at the design phase with our programme teams and suppliers using the WRAP (Waste and Resources Action Programme) Designing out Waste toolkit. The objective of these workshops was to collaboratively challenge the design and construction process to identify where we could reduce waste in design and construction through; Reuse and recovery of materials reuse of recycled or re-salvaged materials Offsite construction use of prefabrication Material optimisation minimising excavation or standardising components Waste efficient procurement to reduce waste in the supply chain Deconstruction and flexibility allowing for recovery of materials Waste hierarchy is key Compliance to the waste hierarchy is at the core of our communications. Whilst compliance was driven primarily driven through legal compliance at the early stages of TLP through regular training and engagement of our teams and suppliers it is now part of what we do day to day. The value of Site Waste Management Plans As part of our ISO14001 management system and contract requirements we required all our projects and suppliers to produce Site Waste Management Plans (SWMP) during the design and construction phases. Even after the revocation of the Site Waste Management Plan 2008 regulations we continued to stipulate this requirement as we recognised the value these plans provided. SWMPs were reviewed every 6 months and were regularly audited by our internal sustainability team and external ISO14001 auditors. As part of project close out we also checked final documents were fully compliant (e.g. full waste monitoring forms, wste transfer notes, waste quantities, predicted and actual costs) regularly captured lessons learnt and cost savings to inform better waste management across the programme. The importance of monitoring delivery As part of our commitment to reducing waste we regularly undertook waste inspections and audits of our projects and suppliers and monitored how our suppliers were assuring their waste management contractors and suppliers. We tracked our delivery through our monthly waste KPIs and regularly challenged our waste returns to be fully confident we were meeting the diversion levels we reported.

Reducing waste in stations and civils All our major station and civils projects such as Blackfriars, Farringdon, London Bridge and Bermondsey Dive Under identified actions to reduce waste during design and construction. Specific actions included; Modular and pre-fabrication At Blackfriars and London Bridge we used modular and pre-fabricated components for bridge decks, platforms units, lifts, escalators and station furniture and standardised components for station glazing. Modular and pre-fabrication reduces material use and waste, reduces risk of pollution, minimises impacts on our neighbours through quieter construction and less road congestion from deliveries. It also provided a number of economic benefits such as improved product quality, reduced installation programme, reduced materials double handling and improved site logistics. Reducing packaging At Farringdon we arranged for our PPE suppliers to remove packaging from all our orders and take back pallets and at Borough Viaduct we recycled hard hats thus reducing waste to landfill, costs and saving space on site. Re-use of demolition materials at Farringdon we re-used on site demolition materials for the construction of the piling mat and delivery ramp. This reduced the need to import 8,500 tonnes of material to site saving 70,000 and removed 850 lorries from congested London roads, reducing CO2 emissions by 30 tonnes and minimising disruption to our neighbours. At London Bridge we crushed insert waste arising s throughout the demolition works for re-use within the stations and at neighbouring TLP projects such as Bermondsey Dive Under to reduce disposal. Recycling hazardous waste hazardous waste is typically disposed of to landfill however on TLP we always look for ways to avoid sending waste to landfill. At Borough Viaduct we used high density polystyrene as lightweight fill for the vaults so we agreed with the supplier to take the polystyrene back for re-manufacturing into insulation products thus reducing waste, carbon emissions, impacts from transportation and cost. At Farringdon and London Bridge we recycled aerosols through a specialist Aerosol Piercing Unit enabling aerosol cans to be recycled like any other metal thus diverting waste from landfill. Recycling plasterboard At London Bridge we use plasterboard to fit out the station accommodation, which is a difficult material to dispose of as all gypsum based wastes must be disposed of to landfill thus increasing our impacts and costs. By working with our suppliers we were able to return our plasterboard waste products for recycling and reuse into a variety of products that are sold again to construction projects. To date we have saved over 6,000 in landfill costs. Segregating waste all our projects segregated waste on site as part of standard activities, however for complex and space constrained sites we maximised off-site segregation and recycling. At London Bridge we used dedicated off-site storage areas for storage of construction materials supported by just in time deliveries to reduce volume of material held on site. This was supported by returning surplus materials to the storage area for reuse during construction. A solution to soil waste! Recycling soils 200,000 tonnes of excavated soils at London Bridge were tested and segregated on site into inert, hazardous, non-hazardous and special non-hazardous waste to prevent mixing of waste and costly waste disposal to landfill. All soils were treated at a soil treatment facility according to their type, for example through soil stabilisation or bioremediation. Treated soils were then transported along the River Thames by barge and incorporated into other land reclamation projects. The project successfully reused 100% of non-hazardous and hazardous waste. Each barge carrying 1000 tonnes removed 50 lorries from congested London roads and reduced carbon emissions by 60%. Prefabricated platforms being delivered by barge to Blackfriars Prefabricated canopies at London Bridge Station Use of demolition material as a piling mat at Farringdon

Reducing waste in Railway Systems All our railway systems projects, which involve the design and construction of new train stabling facilities including sidings, accommodation buildings, carriage washing machines, controlled emission toilets and walkways, identified actions to reduce waste in design and construction. Specific actions included; Modular and pre-fabrication at Bedford we used Hering Bau modular precast concrete platform and reclaimed steel tubular piled foundations, which provided a number of benefits such as; reducing the volume of concrete used (320 tonnes) and volume of material requiring excavation (115m3), saved 15 lorry movements and reduced transport related carbon emissions, reduced the construction programme, disruption to the local community and improved safety on site through limiting possessions. Reduced track gradient At Peterborough we increased the gradient of the track in the sidings to reduce the volume excavated material and therefore waste. This led to a saving of 500m3 of excavated material, 1.5 tonnes of CO2 and 10,000 in disposal costs. At Horsham we reduced the need for excavation and subsequent fill materials site by also reducing track level and layout alterations. This identified opportunities to reuse 950 tonnes of material on and off-site generating 16,000 of savings. Signalling innovation is on point! Recycled points markers - For our signalling projects we replaced traditional cast iron points markers with a product made from 100% recycled milk bottle tops The benefits included reducing the use of virgin materials, recycling waste, reduced installation time from 20 minutes per marker to 7-8 minutes and reduced cost from 65 per marker to 38. The recycled markers also offered greater durability, did not compromise product quality or performance and offered a lifespan of 40yrs. Re-use of wood shuttering At Brighton we re-used 80% of wood shuttering from previous TLP project sites. Typically our wood shuttering was re-used up to 4 times across the project saving costs and disposal to landfill Reducing material in design we made simple design changes such as reducing the size of the concrete bases for our Relocatable Equipment Building and extending our existing signal structures rather than installing new cantilevers and supporting foundations. By reducing material in design we reduced both waste and costs and minimised disruption to our community through reduced noise, lighting, deliveries, time on site. Re-using materials on site - At Peterborough we reused 1,305 tonnes of soil and stones to raise levels around new TOC accommodation saving 10,000 and reducing transport related CO2 emissions. At Brighton we reused 100% of onsite materials use as bedding material along troughing routes, track works and to build up the ground level for roadways, access tracks and authorised walking routes saving over 450 tonnes and 43,000 in waste disposal costs. Recycled points marker Reusing NR NSC serviceable spares At Peterborough and Bedford we re-used serviceable spares such as concrete sleepers and rail from NR s National Supply Chain. At Peterborough the reuse of 3,400 concrete sleepers saved 92,000 and helped avoid 209 tonnes of embodied carbon. At Bedford the reuse of 2186 sleepers and 567 metres of rail saved over 75,000 and avoided 250 tonnes of waste. Community wood recycling Across our depots and stabling portfolio we donated all our waste wood that was not re-used on site to a Community Wood Recycling Project (a local not for profit social enterprise) which provides employment and training to long term employed and socially disadvantaged people. Donating materials At Blackfriars and Farringdon we donated redundant materials to the London Wildlife Trust for use in conservation and community projects. Prefabricated platforms at Bedford Station

Business and environmental benefits of reducing waste Minimises consumption of virgin materials thus conserving our natural resources Reduces volume of waste produced and requiring disposal to landfill Reduces our carbon emissions from transportation of materials and waste Reduces our impact on our neighbours such as decreased noise, improved air quality and reduced road congestion Enables Network Rail to meet its legal, planning and corporate sustainability commitments Reduces Network Rails material, waste disposal, transportation and construction costs With Thanks The Thameslink Programme would like to thank the following Network Rail project and suppliers London Bridge Station Redevelopment team and WSP and Costain Bermondsey Dive Under team and Tony Gee and Skanska Blackfriars Station project team and Jacobs, Tony Gee and Balfour Beatty Farringdon Station project team and Atkins and Costain Borough Viaduct project team and Skanska Track project team and Balfour Beatty Rail Signalling project team and Siemens Outer Areas project team and Carillion WRAP Further information For further information on the Thameslink programme and the Considerate Constructors Scheme please see below Thameslink Programme http://www.thameslinkprogramme.co.uk/ Thameslink Sustainable Development Policy http://www.thameslinkprogramme.co.uk/approach WRAP http://www.wrap.org.uk/?gclid=cpc8zrk00s0cfa0w0wodqwglya Network Rail Sustainable Development Strategy http://www.networkrail.co.uk/browse%20documents/strategicbusinessplan/cp5/supporting%20documents/ transforming%20network%20rail/sustainable%20development%20strategy.pdf