ADDENDUM NO. 2 Page 1 of 13

Similar documents
Mustang Substation Bank I Replacement Project MAJ 15-SP5054

CONTRA COSTA COMMUNITY COLLEGE 500 Court St, Martinez, CA 94553

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

DEAN + TYLER + BURNS ARCHITECTURE

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue

Main Building Auditorium

Addendum No. 1. Joliet Junior College 1215 Houbolt Road Joliet, IL DATE: October 11, 2017

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.

Dayton Metropolitan Housing Authority Rosemont/Hoch Electrical Upgrades

Bidding Conditions Attachment C

Addendum No. 1 Page 1 of 1

The Bid Date has changed to 03/16/2010 at 2:30 PM.

707 Minnesota Ave., Suite 506 Kansas City, Kansas Tel Fax

Addendum No. 1. Joliet Junior College 1215 Houbolt Road Joliet, IL DATE: October 16, 2017

Cattaraugus County Little Valley County Center Court Renovations Second Floor Little Valley, NY

Addendum No. 1 Page 1 of 2

The Home Depot U.S.A., Inc. Instructions to Bidders

DOCUMENT BID FORM. Village of Middle Point

SECTION BID FORM

PREQUALIFICATION OF PROSPECTIVE BIDDERS

The bid is being postponed to comply with State rules requiring 4 calendar days for receipt of bids after an addendum.

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

ADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4

A D D E N D U M. REPLACE: Project Summary with attached revised Project Summary. 1 Specification Section Project Summary

BID PROPOSAL CONTRACT NO. AOPC

Scott Eagle Attack Thermal Imaging Camera

COUNTY OF ALAMEDA. REVISED BID DUE DATE: 2:00 p.m., THURSDAY, NOVEMBER 17, 2016

John Barton Architect, LLC

2. Provide a revised bid form which includes revised language in Section II, Bidder Responsiveness Section. (attached to this Addendum 1)

ADDENDUM #1 FOR RFP #PC507 Tree Removal and Sewer/Water Line Rehab at Medical Center PH Community

BASE BID Description Written & Numeric Price

COTULLA-LA SALLE COUNTY AIRPORT TERMINAL BID FORM

PORTLAND COMMUNITY COLLEGE SW 49 th Avenue Portland, Oregon ADDENDUM NO. 4

BID FORM This Bid is submitted to: City of Glasgow 126 East Public Square Glasgow, KY 42141

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

PROJECT MANUAL FOR: CP AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP HULSTON HALL STAIR TOWER REPAIRS

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL

April 4, ADDENDUM NO. 1 This Addendum and attachments consists of: 47-Pages. ITB Northwood ABC Elementary School Roof Replacement

JEFCO GYM HVAC ADDITIONS TO ARCHITECT'S NO AES, BES, CES, PGES, SRES B.C. NO

BID NOTICE INVITATION FOR BIDS BID NUMBER: PW PARKWAY TREE MAINTENANCE PROGRAM 2018

I INVITATION TO BID City of Fort Morgan Water Distribution Department Waterline Isolation Project

Refer to Section Proposal Form/All Trades (issued) a. Revised Alternate No. 2 b. Added Alternate No. 3

REQUEST FOR PROPOSAL (RFP) No.: J-19 PRECONSTRUCTION AND CONSTRUCTION SERVICES, MEDIUM VOLTAGE SUBSTATION REPLACEMENT, LAS POSITAS COLLEGE

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX

ADDENDUM NO. B. TO THE BID DOCUMENTS, dated 1/5/16 FOR THE

ALASKA. Request for. Anchorage, AK. com. the following: a.) Offeror s Name b.) c.) Project title. e: A Pre-Bid

CITY OF OCEAN CITY COUNTY OF CAPE MAY, NEW JERSEY ADDENDUM #1 FEBRUARY 16, 2016 CITY CONTRACT NO

For Receipt Prior To 3:00 PM Local Time Wednesday, March 29, 2017 And Will Be Publicly Opened And Read At 3:30 PM.

MEMORANDUM. Taylor Schoel with Walter Schoel Engineering. DATE: August 29, Addendum 1 - Green Drive Culvert Replacement.

City of Eagle Point 2017 Paving Instruction to Bidders

AUTOMATIC METER READING SYSTEM DETAILED SPECIFICATION

Memphis Housing Authority Capital Improvements Department 700 Adams Street, Room 107 Memphis, Tennessee

Newport News Public Schools

A D D E N D U M N O. 4

Dick s Sporting Goods Demolition Package

NOTICE TO PROSPECTIVE BIDDERS REGARDING PRE-QUALIFICATION FOR CONTRACTS FOR ALISAL UNION SCHOOL DISTRICT. Revised February 11, 2015

The Housing Authority of the County of Marin ( MHA ) 4020 Civic Center Drive. San Rafael, CA Addendum #1. Released October 3, 2016

REQUEST FOR BID FOR HOLLY RIDGE WASTEWATER TREATMENT PLANT TREATMENT LAGOON AERATION EQUIPMENT

A D D E N D U M N O. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

THE CITY OF MT. PLEASANT, MICHIGAN

INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION

COMMUNICATIONS NETWORK UPGRADES AT VARIOUS LOCATIONS CITY OF SIOUX FALLS, SOUTH DAKOTA Bid Request No ADDENDUM NO.

I. CHANGES TO THE SPECIFICATIONS REISSUED WITH THIS ADDENDUM

ADDENDUM #001 Date: March 21, 2019

1. Pre-Bid Meeting: The Meeting was held on July 15, 2013 at 1:30PM at Kiser Middle School.

LEVEL I PREQUALIFICATION DOCUMENTS

Supply of Office Furniture, Fittings, Furnishings & other Equipments.

City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders

P MWC ADDENDUM # 3 Issue Date: July 5, 2017

NOTICE OF ADVERTISEMENT FOR BIDS. Furnishing and Delivery of 5kV Switchgear for Panora Municipal Electrical Utility Panora, Iowa, 50216

INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION

SECTION BID FORM JACKSON AVENUE / 15TH STREET WATER MAIN REPLACEMENT

SAN ANTONIO WATER SYSTEM DOS RIOS WATER RECYCLING CENTER (DRWRC) DIGESTER MIXING AND SYSTEM ENHANCEMENTS - PHASE 1

LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION

REQUEST FOR PROPOSAL NO. 1004/KB/08 For INFORMATION TECHNOLOGY SERVICES ADDENDUM NO. 2

All Approved Contractors / Interested Parties Re: ADDENDUM #1 Project: Burton ISD Rock Building Renovation Date: April 9, 2015

INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION

IMMEDIATE RESPONSE REQUESTED

DOCUMENT PROPOSAL FORM (Modified)

CITY OF MARSHALL, MINNESOTA

The following shall be incorporated into the Contract Documents dated November 12, 2018.

BID DOCUMENTS COVER SHEET CONTRACT DOCUMENTS FOR. Backup Generator Projects. Diablo Valley College. 321 Golf Club Road, Pleasant Hill, CA 94523

PREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR

BID PROPOSAL FORM C.I.P. NO PROJECT: VETERANS PARK SHOOTING RANGE LEAD ABATEMENT/DEMO

DOCUMENT BID PROPOSAL

Document Bid Form (General Contract) State of Ohio Standard Requirements for Public Facility Construction

SAN ANTONIO WATER SYSTEM University Pump Station Improvements Project SAWS Job No Solicitation No. B DD

REQUEST FOR PROPOSALS Garfield Charter Township Hall Sidewalk Snowmelt Heating System Repairs Garfield Township, Grand Traverse County

The Town will coordinate with the adjacent property Owner for access allowing work to the East side of the building.

1. Provide a revised bid form that reflects revisions to Bidder Responsiveness Section(attached)

ACKNOWLEDGMENT OF RECEIPT OF ADDENDUM NO.

ADDENDUM NO. 2 PROJECT: Omaha Nation Food Distribution Building Macy, Nebraska Project No ARCHITECT:

BIDDING INFORMATION FOR HOLLY HILL ADMINISTRATION COMPLEX RENOVATION AND ADDITION. for the COUNTY OF ORANGEBURG. Project Number: FY

Sunnycrest Manor Roosevelt Street Dubuque, IA Sunnycrest Manor Kitchen Ventilation MEP Engineers Project #1735

Oak Park Unified School District Request for Proposal Bid Packet 16-04C Wireless Expansion

Town of Skowhegan BOAT

CITY OF PANAMA CITY BEACH WWTF INFLUENT SCREENS REPLACEMENT April 14, 2017

Transcription:

ADDENDUM NO. 2 Page of 3 TO THE CAMPUS WIDE ENERGY MANAGEMENT METERING SYSTEM BID (PROJECT # SBCMP0000027800) FOR THE CAMPUS OF CALIFORNIA STATE UNIVERSITY, SAN BERNARDINO. Prepared by: Procurement and Support Services Officer Sierra Hall Building, Room SH25 California State University, San Bernardino 5500 University Parkway San Bernardino, CA 924072397 February, 200 The following corrections, additions, deletions, and/or modifications to the above proposal package, by this reference, shall be incorporated therein: DETAILED SPECIFICATIONS: Add the attached scope of work as Additive Alternate # BID PROPOSAL FORM: Replace Bid Proposal Form with revised attached Bid Proposal Form ALL OTHER TERMS AND CONDITIONS TO REMAIN THE SAME. PLEASE NOTE: THIS ADDENDUM SHALL BE NOTED AS RECEIVED AND ACKNOWLEDGED ON BID PROPOSAL FORM WHEN SUBMITTED AS OUTLINED IN BID PACKAGE REFERENCED ABOVE. FAILURE TO PROPERLY ACKNOWLEDGE ADDENDUM MAY BE CAUSE FOR REJECTION OF BID.

BID PROPOSAL FORM (Revised 2//200) TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY ing System Project # SBCMP0000027800 California State University, San Bernardino 5500 University Parkway San Bernardino, CA 924072397 The Trustees of the California State University, on behalf of the State of California (hereinafter called the Trustees): The undersigned bidder hereby offers, in the amount stated below, to furnish all labor, materials, tools, equipment, apparatus, facilities, transportation, and permits for Project Number SBCMP0000027800 Campus Wide Energy Management ing System at San Bernardino campus and Palm Desert Campus, and hereby agrees to enter into contract for Project Number SBCMP0000027800 if this offer is accepted by the Trustees. TOTAL AMOUNT OF BASE BID $ Lump Sum (Use Figures Only) The above amount is to be stated in figures only and is the total amount bid for the entire contract work including all applicable taxes. Any alteration, erasure, or change must be clearly indicated and initialed by the bidder. The bidder agrees that if there are any discrepancies or questions in the figures, the Trustees will use the lower figure despite the bidder s intent. The Trustees reserve the right to reject any and all bids and to waive any irregularities. The Trustees estimated construction budget for project including the additive alternative is $300,000.00. Alternative ADDITIVE ALTERNATIVE The following additive alternative is an integral part of this proposal, and to be responsive, the bidder shall quote for the Base Bid, and also for the following listed additive alternative. If the Base Bid is lower than the Construction Budget, the Trustees reserve the right to award a contract on the basis of Base Bid alone, or, if the budget allows, on the basis of Base Bid plus the additive alternative as the Construction Budget allows. Additive Alternative No. : Arrowhead Village & Serrano Village per specifications $ Lump Sum (Use Figures Only) The above amount is to be stated in figures only and is the total amount bid for the alternative including all applicable taxes. Any alteration, erasure, or change must be clearly indicated and initialed by the bidder. The bidder agrees that if there are any discrepancies or questions in the figures, the Trustees will use the lower figure despite the bidder s intent. The Bidder shall hold the lump sum prices for all alternatives for 60 calendar days after the start date of the Notice to Proceed. The Trustees reserve their right, within 60 calendar days after the start date of the Notice to Proceed, to add into or deduct from the awarded contract amount by change order, any or all alternatives that were not previously awarded at the listed lump sum amounts, without any delay or impact to the project and with no markup or markdown. We are hereby requesting the 5% Small Business Preference. YES NO Bidders requesting a 5% Small Business Preference must submit Small Business Preference and Certification Request form with bid proposal. ACKNOWLEDGE EACH ADDENDUM RECEIVED.

BID PROPOSAL FORM (Revised 2//200) TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY The bid is subject to the provisions contained in the Contract General Conditions (note especially Article 2.00 et seq. regarding instructions to bidders), and the bidder agrees that failure to comply with the conditions thereof shall be basis for rejection of this bid. The bid must be submitted on this Proposal Form, completely filled out and in a sealed envelope and delivered to Procurement and Support Services, Sierra Hall, Room SH25, at California State University, San Bernardino, before 2:00 PM on Thursday, March 4, 200, or it will be disregarded. Only bids from licensed contractors with current C0 General Electrical and/or C7 Low Voltage Communications and Wiring Systems Contractor s licenses will be accepted. Bidder shall enclose with this Proposal Form bidder s security in the amount equal to at least ten (0) percent of the amount of bid (see Article 2.04(c) of the Contract General Conditions). If the bidder is awarded the contract and then fails to execute the contract, this bidder s security shall be forfeited to the State. Bidders are required to submit with bid proposal, on the reference form provided, evidence of successful completion of three (3) jobs of similar size and nature which have been successfully completed by bidder within the last three (3) years. References must include contact names and telephone numbers, description of work completed, date and amount of contract. Failure to submit list of references with bid proposal may result in rejection of bid. The time period for completion of the project shall be forty five (45) Calendar Days from the construction start date as stated on the Notice to Proceed. Liquidated damages shall be five hundred dollars ($500.00) for each calendar day completion is delayed beyond the time prescribed for the project.

BID PROPOSAL FORM SIGNATURE PAGE Date: Project No. SBCMP0000027800 The undersigned bidder hereby submits this bid pursuant to the contract documents: A. If bidder is an individual proprietorship: (Name of Firm)* (License No.) (Postal Address of Firm) (Signature of Individual)** (Printed Name of Person Who Signs) (Phone Number) (Fax Number) B. If bidder is a partnership: (Name of Firm)* (License No.) (Postal Address of Firm) (Signatures)** (Printed Name of Person(s) Who Signs) (Phone Number) (Fax Number) C. If bidder is a corporation: (Name of Corporation)* (License No.) (Postal Address of Principal Office of Corporation) (Signature of Person Who Signs for Corporation)*** (Printed Name of Person Who Signs) (Title of Person Who Signs Above)** (State of Incorporation) (Phone Number) (Fax Number) D. If bidder is a joint venture: (Name of Joint Venture) (License No., if known)**** An Affidavit of Joint Venture form must be filed five days prior to bid opening and each member of the joint venture must be prequalified one day prior to bid opening as provided in Article 2.02 of the Contract General Conditions. Each member of the joint venture shall fill in the information below corresponding to the member s type of business organization. If the joint venture has more than one of the same types of business organizations, additional copies of this page containing the required information and signatures shall be added and attached to this proposal form. Any such attachments are a part of this proposal form. First Member of the Joint Venture Second Member of the Joint Venture (Name of Firm or Corporation)* (License No.) (Name of Firm or Corporation)* (License No.) (Postal Address of Principal Office of Corporation) (State of Incorporation) (Postal Address of Principal Office of Corporation) (State of Incorporation) (Signature and Printed Name of Person Who Signs for Corporation)*** (Signature and Printed Name of Person Who Signs for Corporation)*** (Title of Person Who Signs Above)** (Phone Number) (Title of Person Who Signs Above)** (Phone Number) * Name must be same as appears on state contractor s license and on prequalification. ** If signature is by an agent, other than an officer of a corporation or a member of a partnership, a power of attorney must be on file with the Trustees before bid opening or be submitted with this bid. *** A certified copy of corporate board action authorizing execution of this contract must be submitted on Trusteesprescribed forms.. ****The Joint Venture must have the required license in place at time of award of contract. Construction Mgmt. 70.06 0/06

ing System Addendum #2: Prepared by: Miguel Martin Facilities Services Assistant Project Manager FM09 San Bernardino, CA 92407 (909)537566 (909)537785 fax Additive Alternate #. Furnish and install Square D PowerLogic meters in the following locations on the California State University, San Bernardino campus. Installation of meters to be a turnkey installation. Contractor to provide and install all other components necessary to ensure a fully operational system. 28) Arrowhead Village Building #2 Install new ION7350 Ethernet meter. Connect Ethernet LAN. Install new CT s (Contractor to verify required CT rating), use existing shorting block and fused disconnect. Connect Ethernet LAN. 29) Arrowhead Village Building #3 Install new ION7350 Ethernet meter. Connect Ethernet LAN. Install new CT s (Contractor to verify required CT rating), use existing shorting block and fused disconnect. Connect Ethernet LAN. 30) Arrowhead Village Building #4 Install new ION7350 Ethernet meter. Connect Ethernet LAN. Install new CT s (Contractor to verify required CT rating), use existing shorting block and fused disconnect. Connect Ethernet LAN. 3) Arrowhead Village Building #5 Install new ION7350 Ethernet meter. Connect Ethernet LAN. Install new CT s (Contractor to verify required CT rating), use existing shorting block and fused disconnect. Connect Ethernet LAN. 32) Arrowhead Village Building #6 Install new ION7350 Ethernet meter. Connect Ethernet LAN. Install new CT s (Contractor to verify required CT rating), use existing shorting block and fused disconnect. Connect Ethernet LAN. 33) Serrano Village Badger Building Install new ION7350 Ethernet meter. Connect Ethernet LAN. Install new CT s (Contractor to verify required CT rating), shorting block and fused disconnect. Connect Ethernet LAN. 2. Supply 6 additional ION Enterprise device licenses. 3. Furnish and install a new data outlet at each meter location. All new data outlets will be surface mounted on a surface adjacent to the location of the electrical meter. Conduit, wiring and data jacks will be provided by the contractor. Provide all rigid pathways from the data outlet to the meter and make final connection. Connect meter to data outlet using a patch cable routed inside the rigid pathway. Coordinate final locations of data outlets with John Muir, the campus RCDD. Refer to telecom specifications in bid package for this work. 4. Provide all necessary fire stopping when penetrating through fire walls. All penetrations shall be above the ceilings of any space. 5. All pathway penetrations through building exteriors shall be sealed using Dow Corning 790 silicone building sealant; color to match building. ing System Addendum #2 2//200

6. Bidders will place an order with Square D to provide the following engineering services related to the Square D PowerLogic metering system: PMCS Conceptual Design PMCS Network Configuration ION Enterprise Server Configuration & Programming Device Configuration Graphical User Screen Development Report & Alarm Configuration Onsite startup and commissioning 7. Provide, install and commission new server with latest ION Enterprise base software. Contractor to obtain Square D services to commission new server and ION Enterprise. s at CSUSB Palm Desert Campus to report to same server used for CSUSB San Bernardino campus. 8. Contractor to contract with Square D to provide 2 day onsite Operator training to commence after installation and commissioning of Square D PowerLogic metering system. 9. Submit shop drawings and submittals for approval prior to start of installation. 0. Supply the University with final Asbuilt drawings and O&M manuals. ing System Addendum #2 2//200

Telecom Room located in room on 2nd flr directly above San Bernardino, CA 924072393 Telecom Room ing System Additive Alternate # 3 Arrowhead Village Building #2 of 7

Telecom Room located in room on 2nd flr directly above San Bernardino, CA 924072393 Telecom Room ing System Additive Alternate # 3 Arrowhead Village Building #3 2 of 7

San Bernardino, CA 924072393 Telecom Room located in room on 2nd flr directly above ing System Additive Alternate # 3 Arrowhead Village Building #4 3 of 7

San Bernardino, CA 924072393 Telecom Room ing System Additive Alternate # 3 Arrowhead Village Building #4 4 of 7

Telecom Room located in room on 2nd flr directly above San Bernardino, CA 924072393 Telecom Room ing System Additive Alternate # 3 Arrowhead Village Building #5 5 of 7

San Bernardino, CA 924072393 Telecom Room located in room on 2nd flr directly above ing System Additive Alternate # 3 Arrowhead Village Building #6 6 of 7

San Bernardino, CA 924072393 Telecom Room ing System Additive Alternate # 3 Arrowhead Village Building #6 7 of 7