LIST OF DRAWINGS PLAN TITLE

Similar documents

PLUMBING BUILDING SCOPE OF WORK

ISSUE DATE JANUARY 1st, 2008 SECTION 5G FIBERGLASS PACKAGE LIFT STATION

SECTION PLUMBING PIPING

SUPPORT AND ANCHORS SECTION 15090

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

Engineering Design Center. Standard Drawings. 1st Edition -January 2016

SECTION BASIC FIRE SUPPRESSION MATERIALS AND METHODS. A. Section includes pipe, fittings, valves, and connections for sprinkler systems.

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities

SECTION HANGERS AND SUPPORTS FOR PLUMBING

September 6, 2016 Page 1 of 5

Bid Opportunity PLUMBING SYSTEMS Section Installation of Boiler Heating Systems Page 1 of 7 Centennial Pool, 90 Sinclair

SECTION CHEMICAL FEED SYSTEM

YOUR SPLASH PAD RESOURCE

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

A101 S001 1 SUB-BASEMENT 3/16" = 1'-0" SHEET (906) PH (906) FX 2 S101 NEW CONCRETE WALLS TO FORM WAVE TANK 3' - 0" 5' - 5"

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

t y p e V S A S E W A G E P U M P

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1 SECTION SUPPORTING DEVICES

40'-0" PIPE SUPPORT (TYP.) (SEE DWG. NO. SK-2 OR DWG. NO. SK-4)

Diffused Aeration Piping Equipment

Inground Pool Liners

Inground Pool Liners

Inground Pool Liners

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.

MAXIMUM TRENCH WIDTH AS REQUIRED SEE MEASUREMENT AND PAYMENT SECTION OF SPECIFICATIONS

A. Piping materials shall bear label, stamp, or other markings of specified testing agency.

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section AUTOMATIC CONTROL VALVE INSULATED ENCLOSURE (HOT BOX)

REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS

SECTION COOLING TOWER

DIVISION 22 PLUMBING SECTION INTERIOR SANITARY WASTE AND VENT PIPING SYSTEM

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

Section 7: Specifications

BASIC MATERIALS & METHODS

Table of Contents... 1, 2. (EF) Equipment Floor... VISR EF 102 Water Heater VISR EF 104 Chiller VISR EF 105 End Suction Pump...

ROAD CLOSURE GATE PLAN ESTIMATED QUANTITIES CONCRETE FOOTINGS FOR S. D. DEPT. OF TRANSPORTATION DECEMBER 1996 ELEVATION CABLE TIE DOWN FOOTING

A. ASTM F Standard Specification for Pressure-rated Polypropylene (PP) Piping Systems.

Technical and Dimensional Data. Saf-T Vent SC

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD

SECTION WELDED STEEL WATER STORAGE TANKS

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

Roof Replacement. Notes: T-1 (Title Page) 709 Bull Street Columbia, South Carolina. University of South Carolina. Callcott Social Science

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

DESIGN PACKAGE. COMMONS PARK Twin Falls, Idaho

Building Permit Application

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION NON-PENETRATING PORTABLE ROOFTOP SUPPORTS AND WALKWAYS. For best results, display hidden notes to specifier.

Project No

Toll Free Order Line: or Fax: Advantage Leisure Products Ltd. All rights reserved.

MODELS: 475 WM & 475 WMSS

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following storm drainage piping inside the building.

NOTES: 2. THE PIPING CONFIGURATION IS ILLUSTRATIVE. FIELD ADJUSTMENTS TO ACCOMMODATE ACTUAL CONDITIONS ARE ALLOWED WITH APPROVAL FROM JEA.

Bid Package 22A Plumbing Systems


McDuff WTP High Service Pump Replacement

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

All our products Quality Assurance QUALITY Ensure quality control and it strive for the following:

SECTION FACILITY STORM DRAINAGE PIPING

SECTION GROUNDING AND BONDING

SECTION VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street

CONSTRUCTION OF ELEVATED WATER TANK & WATER WELL VAULT INTERNATIONAL CAMPUS AUGUST 2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

East Central College HANSEN HALL LEVEL 300/400 RENOVATIONS CONSTRUCTION PACKAGE

The University of Texas Health Science at Houston Swimming Pool Renovation Project Phase 1: New Filter System

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans.

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION HVAC PIPES AND TUBES

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans.

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

SECTION SANITARY WASTE INTERCEPTORS

Section 12 Hydraulics.

ANY SPECIFICATION DRAWINGS OR DATED PRIOR TO SEPTEMBER 2015 WILL NOT BE HONORED.

MODELS: SM & SMSS

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

SECTION PLUMBING SPECIALTIES

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

SECTION DUCTS PART 1 GENERAL 1.01 SUMMARY

Fig. 1 - Standard Clevis Hanger

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

Fiberstars Lighted Laminar Flow Fountains

200 Series In-Slab Pool Fittings

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

Design and Construction Standards SECTION HYDRONIC PIPING

Electrical Services Standard Specification Cable Tray Installation. May For ROYAL HOLLOWAY UNIVERSITY OF LONDON

SECTION GROUND WATER STORAGE TANKS

SECTION PLUMBING PIPING

SECTION HYDRONIC PIPING

VSS S U B M E R S I B L E S E W A G E P U M P S

East Central College

Toll Free Order Line: or Fax: Advantage Leisure Products Ltd. All rights reserved.

SECTION PLUMBING SPECIALTIES

Gas Station & C Store SECTION CWM Job No

SECTION SANITARY WASTE INTERCEPTORS

Student Services & Classroom Addition SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

Transcription:

LANDFILL SITE [CLOSED 00] PLAN.... 5. TITLE LIST OF DRAWINGS EXISTING PROCESS DIAGRAM PROPOSED PROCESS DIAGRAM EXISTING EQUIPMENT LAYOUT PLAN PROPOSED EQUIPMENT LAYOUT PLAN ELEVATION D AND DETAILS

TREATMENT ISOLATION VALVE FLOAT VALVE MANIFOLD TO PRESSURE REDUCING VALVE 5Ø PVC 8Ø PVC FILTERED WATER. ALL DIMENSIONS ARE SHOWN IN MILLIMETRES BASKET STRAINER. ITEMS TO BE REMOVED SHALL BE TURNED OVER TO THE. PRESSURE GAUGE 5Ø 5Ø UNION 8Ø PVC INCREASER/DECREASER WATER SUPPLY DRAIN LINE FEATURE FILTER 8Ø PVC TO FOUNTAIN FILTER ITEMS TO BE REMOVED PVC 8Ø PVC Ø HOSE Ø HOSE PRIMING CONNECTIONS 8Ø PVC BACKWASH DISCHARGE Ø MAKE-UP WATER BACK FLOW PREVENTER FLOAT VALVE - COMPARTMENT CONCRETE TANK 000 GALLON WATERMAIN SANITARY SEWER 0// ISSUED FOR TENDER GAP 0/0/ ISSUED FOR APPROVAL GAP ITEM No. ITEM DESCRIPTION REMARKS - COMPARTMENT CONCRETE TANK, 000 GALLON FILTER - JACUZZI MODEL -MAG-U-S, HP 5 GPM @ 55 FT TDH PAC-FAB TAGELUS SAND FILTER MODEL TA0 CHLORINE DISPENSER PENTAIR RAINBOW LIFEGARD MODEL HC-0 5 CHLORINE ANALYZER FEATURE - JACUZZI MODEL 5VMB-T5.5HP 00 GPM @ 0FT TDH PORTABLE TESTER (TAYLOR POOL WATER TEST KIT), APOLLO MODEL RPA, mmø 8 MANIFOLD TO N/A MARCH 0-0- March, 0 0--.dwg

/ / / / GENERATER TREATMENT 00Ø ST. STL 00Ø ST. STL 5Ø PH ORP 5Ø PVC MANIFOLD TO / / / / FLANGED CONNECTION OR TRANSITION COUPLING (TYP. x) / / STARTER (EXISTING) DRAIN DRAIN 5Ø 5Ø Ø PRIMING LINE / S Ø / / S 5Ø PVC FILTERED WATER BACK FLOW PREVENTER 5Ø 5Ø PVC FM 5Ø CLEAR PVC SIGHT TUBE 500mm LONG. ALL DIMENSIONS ARE SHOWN IN MILLIMETRES. MAIN PROCESS PIPING TO BE SCHEDULE 80 PVC. PLUMBING LINES TO BE TYPE L COPPER UNLESS. PROVIDE PIPE BANDING TAPE WITH FLOW ITEM No. ITEM DESCRIPTION REMARKS - COMPARTMENT CONCRETE TANK, 000 GALLON FILTER REMOVED - COMPARTMENT CONCRETE TANK 000 GALLON WATERMAIN SANITARY SEWER CHLORINE DISPENSER ISOLATION VALVE ARV AIR RELEASE VALVE WATER SUPPLY 0// ISSUED FOR TENDER GAP 0/0/ ISSUED FOR APPROVAL GAP, APOLLO MODEL RPA, mmø S ELECTRIC SOLENOID VALVE FM CHEMICAL FEED LINE MANIFOLD TO FLOAT VALVE BASKET STRAINER DRAIN LINE PRV PRESSURE RELIEF VALVE PRESSURE GAUGE / COMMUNICATION LINE PRESSURE REDUCING VALVE UNION NORMALLY CLOSED INCREASER/DECREASER SAMPLE VALVE mmø HOSE BIB CONNECTION MARCH 0-0- March, 0 0--.dwg

OUTSIDE B OUTSIDE WASH DIESEL A A TREATMENT FD FD. ALL DIMENSIONS ARE SHOWN IN MILLIMETRES WATER HEATER MOUNTED ABOVE DOOR SEE NOTE & RELOCATE CORK BOARD RELOCATE SHELF. MAIN PROCESS PIPING TO BE SCHEDULE 80 PVC. PLUMBING LINES TO BE TYPE L COPPER UNLESS. PROVIDE PIPE BANDING TAPE WITH FLOW B ELECTRICAL EMERGENCY LIGHTING CABINETS ELECTRICAL BOXES. REMOVE FILTER, CABLES, CONDUIT, STARTER & ELECTRICAL BOXES. TERMINATE PER ELECTRICAL CODE.. ITEMS TO BE REMOVED SHALL BE TURNED OVER TO THE. 8. EX. CORK BOARD AND SHELF TO BE RELOCATED PER INSTRUCTIONS. SCALE: :5 GYM SCALE: :0 ITEM No. ITEM DESCRIPTION REMARKS - COMPARTMENT CONCRETE TANK, 000 GALLON FILTER - JACUZZI MODEL -MAG-U-S, HP 5 GPM @ 55 FT TDH EXISTING -TO REMAIN EX. INSULATED ROOF DRAIN OUTSIDE TO WALL HYDRANT INSIDE 00 50 50 BFP HEATER EX. INSULATED ROOF DRAIN 00 0// ISSUED FOR TENDER GAP 0/0/ ISSUED FOR APPROVAL GAP PAC-FAB TAGIELLIS SAND FILTER MODEL TA0 CHLORINE DISPENSER PENTAIR RAINBOW LIFEGARD MODEL HC-0 5 CHLORINE ANALYZER PORTABLE TESTER USED FEATURE - JACUZZI MODEL 5VMB-T5.5HP 00 GPM @ 0FT TDH EXISTING - TO BE REPLACED 8 N/A 0 MANIFOLD TO SCALE: :0 SCALE: :0 SCALE: :0 MARCH 0-0- March, 0 0--.dwg

OUTSIDE C WASH TREATMENT DIESEL OUTSIDE D FROM UV. ALL DIMENSIONS ARE SHOWN IN MILLIMETRES ELECTRICAL PROVIDE UNI-STRUT SUPPORTS UNDER FRONT OF UV CONTROL PANEL & UNDER UV REACTOR ANCHORED TO THE FLOOR D FEATURE H-O-A SWITCH E-STOP MEDIA FILTERS (x) BACKWASH WATER FILTERED WATER TO UV. MAIN PROCESS PIPING TO BE SCHEDULE 80 PVC. PLUMBING LINES TO BE TYPE L COPPER UNLESS. PROVIDE PIPE BANDING TAPE WITH FLOW. UV SYSTEM HAS 00mm ( INCH) FLANGED CONNECTIONS.. ALL MAIN LINE ISOLATION VALVES 00mmØ OR LARGER TO BE FLANGED PVC BUTTERFLY VALVES WITH LEVER OPERATORS. 8. ALL MAIN LINE ISOLATION VALVES 5mmØ OR SMALLER TO BE TRUE UNION PVC BALL VALVES. C ELECTRICAL BOXES (REMOVE ELECTRICAL BOXES FOR FILTER ). CONTRACTOR SHALL ARRANGE AND PAY FOR ESA INSPECTION AND PROVIDE ESA CLEARANCE CERTIFICATION TO PRIOR TO SUBSTANTIAL PERFORMANCE. GYM SCALE: :0 SCALE: :5 ITEM No. ITEM DESCRIPTION REMARKS - COMPARTMENT CONCRETE TANK, 000 GALLON FILTER CHLORINE DISPENSER MANIFOLD TO REMOVED 00 000 00 0// ISSUED FOR TENDER GAP 0/0/ ISSUED FOR APPROVAL GAP 00 000 500 CLEARANCE FOR UV MAINTENANCE SCALE: :0 0 SCALE: :0 MARCH 0-0- March, 0 0--.dwg

-00Ø 5S STAINLESS STEEL PIPES FLANGED TRANSITION CONNECTION (TYP. x) - PIPES NEW FILTER METER UV BYPASS VALVE EX. mmø MAKE-UP WATER LINE TO TANK 050 00 OWSJ TO EX. MANIFOLD TREATMENT FM 5xØ FROM NEW FILTERS NEW FILTER (TYP. x) SEE DETAIL FOR PIPE PENETRATION THROUGH WALL (TYP.) EX. 0 mm THICK CONCRETE PAD (TYP.) 50 00 50 50 EX. EXHAUST FAN EX. INTAKE DAMPER EX. DIESEL CLEARANCE BETWEEN WALL AND TO BE 800mm H x 00mm W 00 850 000 NEW UV CONTROL PANEL NEW UV REACTOR PROVIDE UNI-STRUT SUPPORTS UNDER FRONT OF UV CONTROL PANEL & UNDER UV REACTOR ANCHORED TO THE FLOOR CONCRETE FLOOR EX. CONCRETE BLOCK WALL (TYP.) 550 00 000 00 VENT HOLE AT TOP OF PIPE CUT BOTTOM END OF PIPE AT 5 ANGLE AND REMOVE SHARP EDGES TRANSDUCER TO BE ACCESSIBLE FROM ACCESS HATCH 00Ø CONTINUOUS SDR PVC PIPE C/W BLIND FLANGE TO SUIT INSTALLATION OF ULTRASONIC LEVEL TRANSDUCER 50 x 0 SS PIPE SUPPORTS FASTENED TO WALL WITH Ø SS CHEMICALLY BONDED ANCHORS @ MAX SPACING OF 000mm NOTES:. LOCATE PIPE AND TRANSDUCER NEAR HATCH FOR ACCESSIBLITY. PIPE SHALL HAVE NO HORIZONTAL SEAMS. ALL DIMENSIONS ARE SHOWN IN MILLIMETRES. MAIN PROCESS PIPING TO BE SCHEDULE 80 PVC. PLUMBING LINES TO BE TYPE L COPPER UNLESS. PROVIDE PIPE BANDING TAPE WITH FLOW. UV SYSTEM HAS 00mm ( INCH) FLANGED CONNECTIONS.. ALL MAIN LINE ISOLATION VALVES 00mmØ OR LARGER TO BE FLANGED PVC BUTTERFLY VALVES WITH LEVER OPERATORS. 8. ALL MAIN LINE ISOLATION VALVES 5mmØ OR SMALLER TO BE TRUE UNION PVC BALL VALVES.. CONTRACTOR SHALL ARRANGE AND PAY FOR ESA INSPECTION AND PROVIDE ESA CLEARANCE CERTIFICATION TO PRIOR TO SUBSTANTIAL PERFORMANCE. 00 50 00 8 8 SCALE: :0 5Ø AND 00Ø PIPE 0Ø PLASTIC COATED U-BOLT (EQUAL TO INTERNATIONAL FIG C) 50 x 50 x x 00 LONG ANGLE (TYP. x) Ø WASHER (TYP. x) Ø NUT (TYP. x) CONCRETE ANCHOR BOLT (TYP.) 50 x THICK PLATE WELDED TO ANGLES 5mm LONG SLOT FOR U-BOLTS C 00 L 00 0 x 0 x. SS HSS Ø SS ANCHOR BOLTS SS STRAP mm THICK x 50mm WIDE TO MATCH PIPE OD PIPE RUN 0 x 0 x ANGLE Ø SS HILTI HIT HY50 ANCHORS WITH SS RODS (TYP. x) SS BASE PLATE 50 x 50 x WELDED TO SS HSS TREATMENT/ INVERT EX. CONCRETE WALL STEEL PIPE SLEEVE w/ PUDDLE FLANGE NON-SHRINK GROUT FIRE STOP SEAL PIPE TOP CORD OF JOIST PIPE BOTTOM CORD OF JOIST HEAVY DUTY C-CLAMP (EQUAL TO ANVIL FIG. ) 5 8 " (mmø) THREADED ROD INSULATED CLEVIS HANGER (EQUAL TO ANVIL FIG. 0 ISS) 0// ISSUED FOR TENDER GAP 0/0/ ISSUED FOR APPROVAL GAP (FOR HORIZONTAL PIPE RUNS) (FOR VERTICAL PIPE RUNS) MAX SPACING.5m MAX SPACING.5m MAX SPACING.5m 0 SCALE: :0 MARCH 0-0- 5 March, 0 0--5.dwg