REHABILITATION OF THE ROCKAWAY BEACH MISSOURI WASTEWATER TREATMENT PLANT TURNING AROUND A CHRONICALLY FAILED SYSTEM

Similar documents
MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:

MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System

Watertown Wastewater Facility Plan. August 11, 2015

MACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

2017 Performance Report for Bobcaygeon Waste Water Treatment Facility

Pleasing. Alternative. top performer wastewater:

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals

Yours very truly, Municipality of West Perth. Environmental Services

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

Wastewater Facility Plan City of Marshall, Minnesota

Facility & Operations Field Division

UPGRADING GAZA WASTEWATER TREATMENT PLANT. Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population.

~~~~ WWTP Master Plan Project

Using Process Optimization and Energy Audits to Reduce Energy Costs

SSO Reduction Program. WWTP Effluent Violation Corrective Actions

Wastewater Treatment clarifier

2015 HDR, Inc., all rights reserved.

Chapter 2: Description of Treatment Facilities

Feasibility Report of Proposed ETP cum STP. M/s. Zakiya Healthcare Plot No.39, Pharmacity Selaqui, Dehradun (Uttarakhand)

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant

WASTEWATER TREATMENT SYSTEM

American Water College 2010

AQUAROBIC MINI-PLANT TM

RMSAWWA/RMWEA Joint Technical Advisory Committee Presentation and Tour

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

BRACEBRIDGE WASTEWATER TREATMENT

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

WASTEWATER TREATMENT PLANT MASTER PLAN 3. EXISTING FACILITIES AND PERFORMANCE ASSESSMENT

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

THE COMAG SYSTEM FOR ENHANCED PRIMARY AND TERTIARY TREATMENT

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014

Chapter 5: Treatment Assessment Future Condition

The Municipality of North Grenville

Attachment N o F Control & Monitoring

PORT SEVERN WASTEWATER TREATMENT 2016 SUMMARY REPORT

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018

City of Enderby Water Treatment Plant

2/22/2011. Presentation Outline. Overview of Wastewater Aeration. Basic Equation. Some Acronyms. dc dt. dc dt TDS BP T C L

Hybrid Sequencing Batch Reactors (SBR) Offer an Efficient Wastewater Treatment

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012

BIOMAG/COMAG FREQUENTLY ASKED QUESTIONS

BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT

TABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update

Ditches for Energy Efficiency and Improved Nitrogen Removal

ENHANCED TECHNICAL ASSISTANCE EVALUATION

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility

DELTA WASTEWATER TREATMENT PLANT UPGRADES

Feel free to contact me should you require any additional information regarding the report. I can be reached at

North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of

Capital Improvement Plan Update:

Your Guide to the. Budd Inlet Treatment Plant

BIOLOGICAL WASTEWATER BASICS

TABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope

DRAFT SUBMITTED TO: TOWNSHIP OF LONG HILL PREPARED BY: KLEINFELDER

Trident. Package Water Treatment System

Town of Robbinsville Constructs Cheoah River BNR Wastewater Treatment Facility to Meet New Nitrogen and Phosphorus Permit Limits

COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System

By Jack Wendler/Ripon WWTF

Wastewater Treatment. Where does wastewater go when it leaves your house?

Severn Trent Services Wastewater Solutions End-to-End Wastewater Treatment Solutions

Wastewater Treatment Processes

ONTARIO ROCK ROAD LIFT STATION EQUALIZATION FACILITY

Appendix D JWPCP Background and NDN

New York State Department of Environmental Conservation

PERMIT TO OPERATE SILVER CLOUD CT., MONTEREY, CA TELEPHONE (831) FAX (831)

EnviroServer Extended Storage Owners Manual

Case Study. Biological Help for the Human Race. Bathurst Municipal Wastewater Treatment Works, New South Wales, Australia.

Bracebridge Wastewater Treatment 2017 Summary Report

Biological Phosphorus Removal Technology. Presented by: Eugene Laschinger, P.E.

The Superior Jet Aeration System

BOC Hydrogen Sulfide Odor Control Reduction Program

PACKAGE TERTIARY FILTER SYSTEM SPECIFICATIONS MODELS TF-2-39-C THROUGH TF-2-53-C

Case Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia.

Bitterroot River Nutrient TMDL Technical Report WASTEWATER TREATMENT

CASE STUDY - A Tale of Two industries Pretreatment of Confectionary and Bakery Wastewaters

Stonecrest Estates Sewage Treatment Plant 2017 Annual Report

Decentralized Wastewater Systems

Water and Wastewater Treatment Energy Savings Guide

BIO-BATCH TM. Sequencing Batch Reactor (SBR) Water & Wastewater Treatment

The operator stated that the rollers in one of the drum filters was recently replaced.

NTMWD REGIONAL WASTEWATER SYSTEM

NC-PC Industry Day Pretreatment 101. Industrial Waste Impacts on POTW Treatment Processes. Dawn Padgett Operations Manager Charlotte Water

Gross Receipts Tax Exemption for Equipment Installed in a Wastewater Treatment Facility Opinion Number

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION

CORPORATION THE EXPERIENCED LEADER IN SEQUENCING BATCH REACTOR TECHNOLOGY

SPECIFICATIONS. GAINEY SEWAGE Treatment Plants 2,500 G.P.D.

Transcription:

REHABILITATION OF THE ROCKAWAY BEACH MISSOURI WASTEWATER TREATMENT PLANT TURNING AROUND A CHRONICALLY FAILED SYSTEM

THE PROBLEMS POOR EFFLUENT QUALITY BOD 5 87 MG/L TSS 105 MG/L E.COLI - > 2420 MPN TOTAL P - 10 MG/L AMMONIA 108 MG/L OIL AND GREASE 8.6 MG/L ALUMINUM 0.44 MG/L SEVERE ODOR COMPLAINTS PLANT IS LOCATED IN A RESIDENTIAL NEIGHBORHOOD SEVERE ODORS RESULTING IN NUMEROUS COMPLAINTS TO LOCAL, REGIONAL AND STATE REGULATORS ENFORCEMENT FACILITY AND CITY FACING THIRD EPA ENFORCEMENT ACTION IN TEN YEARS $186,000 FINE AGGRESSIVE SCHEDULE FOR IMPROVEMENTS IN PLANT PERFORMANCE

THE CAUSES DEFERRED MAINTENANCE AND REPAIRS LACK OF ADHERENCE TO PROPER OPERATIONAL PROCEDURES EXCESSIVE SOLIDS INVENTORY INSUFFICIENT BLOWER CAPACITY POOR SAMPLING AND RECORD KEEPING PROCEDURES

SOUTH OXIDATION DITCH 4/28/2016

ANOTHER SHOT OF THE SOUTH OXIDATION DITCH ON 4/28/2016

CLARIFIER ON 4/28/16

EFFLUENT ON 4/28/2016

THE EFFECT

SPECIFIC PROBLEMS AND HOW THEY WERE RESOLVED INOPERATIVE MOTIVE PUMP, SOUTH TREATMENT TRAIN REPLACED FAILED MOTOR STARTER CONTACTOR

SPECIFIC PROBLEMS AND HOW THEY WERE RESOLVED EXCESSIVE DRY SOLIDS AND WEEDS IN NORTH TREATMENT TRAIN AERATION BASIN. RETAIN VACTOR CONTRACTOR TO ENTER BASIN AND REMOVE SOLIDS AND WEEDS

SPECIFIC PROBLEMS AND HOW THEY WERE RESOLVED CLOGS IN AIR AND LIQUID MIXING PIPING OF JET AERATION SYSTEM, NORTH BASIN ENTER BASIN, REMOVE SOLIDS FROM LIQUID MIXING PIPING, DISASSEMBLE CLOGGED SECTIONS OF AIR PIPING, REMOVE SOLIDS TEST AIR PIPING TEST LIQUID PIPING

SPECIFIC PROBLEMS AND HOW THEY WERE RESOLVED AERATION BASIN DISSOLVED OXYGEN < 0.2 MG/L INSTALL THIRD BLOWER THAT WAS ON-SITE SITTING NEW IN BOX CHANGE PULLEY SIZE TO SPEED BLOWERS UP TO MAXIMUM DESIGN SPEED

SPECIFIC PROBLEMS AND HOW THEY WERE RESOLVED INOPERATIVE MOTIVE PUMP, NORTH TREATMENT TRAIN PULL MOTIVE PUMP, MANUALLY FREE IMPELLER TEST MOTIVE PUMP

MOTIVE PUMP

SPECIFIC PROBLEMS AND HOW THEY WERE RESOLVED TWO INOPERATIVE MIXERS IN ANOXIC SELECTOR BASINS REPAIR ONE MOTOR STARTER COIL REPLACE ONE MOTOR STARTER

SPECIFIC PROBLEMS AND HOW THEY WERE RESOLVED FAILED SELF CLEANING BAR SCREEN REPLACE CONTROL FLOAT REPLACE FAILED HAND/OFF/AUTO SELECTOR

NORTH TREATMENT TRAIN NOW OPERABLE DIVERT ALL INFLUENT FLOW TO NORTH TREATMENT TRAIN SEED NORTH TREATMENT TRAIN WITH FRESH WASTE ACTIVATED SLUDGE IMMEDIATE IMPROVEMENT IN AERATION BASIN DISSOLVED OXYGEN LEVELS IMMEDIATE IMPROVEMENT IN SLUDGE SETTLING CHARACTERISTICS IMMEDIATE IMPROVEMENTS IN EFFLUENT QUALITY IMMEDIATE DRASTIC REDUCTION IN ODORS FROM THE FACILITY

ANOTHER PROBLEM AND HOW IT IS BEING RESOLVED POOR PHOSPHORUS REMOVAL 10 MG/L EFFLUENT TOTAL P ON 4/28/2016 MODIFY ALUM FEED POINT TO NEAR SUCTION OF MOTIVE PUMP 0.6 MG/L EFFLUENT TOTAL P ON 6/2/2016 WITHOUT TERTIARY FILTRATION INCREASE ALUM FEED RATE RETURN TERTIARY FILTERS TO OPERATION MORE ON THAT ONE TO COME

OTHER WORK, DEFERRED AND OTHERWISE INSTALL THREE NEW ULTRASONIC FLOW METERS SITTING NEW IN BOX AT FACILITY INSTALL SIX NEW ULTRAVIOLET LAMP RACKS SITTING NEW IN BOX AT FACILITY INSTALL TEMPORARY WASTE ACTIVATED SLUDGE PUMPING SYSTEM START THE PROCESS OF REMOVING EXCESS SOLIDS INVENTORY TRI LAKES BIOSOLIDS COALITION OVER 375,000 GALLONS OF SLUDGE REMOVED OVER 30 DRY TONS OF SOLIDS REMOVED

UV LAMP RACKS IN OPERATION

OLD OXIDATION DITCH FULL OF WASTE SOLIDS

WORKING TOWARDS A FULLY OPERABLE TREATMENT FACILITY TOTH AND ASSOCIATES IN CONCERT WITH ALGIER MARTIN AND ASSOCIATES PREPARE ENGINEERING EVALUATION OF THE FACILITY FIELD WORK COMPLETED EARLY IN 2016 PRIMARY FINDING INSUFFICIENT AERATION CAPACITY UNDERSIZED BLOWERS INVENTORY OTHER ISSUES AT THE FACILITY REQUIRING REPAIR OR REHABILITATION PREPARE COST ESTIMATES FOR THE EMERGENCY WORK NEEDED SEEK EMERGENCY FUNDING FROM TANEY COUNTY SEWER SALES TAX FUNDS APPROXIMATELY $140,000 IN EMERGENCY FUNDING APPROVED BY TANEY COUNTY COMMISSION AND TANEY COUNTY REGIONAL SEWER DISTRICT

THE EMERGENCY WORK REPAIR FAILED GORMAN RUPP SELF PRIMING INFLUENT PUMP INSTALL NEW IMPELLER AND WET END, GORMAN RUPP SELF PRIMING PUMP

INFLUENT PUMP WET END REPLACEMENT

REPAIR RUSTED GRATES AND BROKEN VALVE OPERATOR EXTENSIONS ON FIVE VALVES IN RAS/WAS BASIN NEW STAINLESS STEEL BAR STOCK NEW HANDWHEEL OPERATORS INSTALLATION IN CONFINED SPACE PERFORMED BY SUBCONTRACTOR INSTALL NEW FIBERGLASS GRATING

NEW VALVE OPERATORS AND GRATE

THE EMERGENCY WORK - CONTINUED PURCHASE THREE NEW COMPOSITE SAMPLERS UTILIZE INDEPENDENT THIRD PARTY LABORATORY FOR REPORTABLE MONITORING PURCHASE AND INSTALL THREE NEW BLOWER PACKAGES REMOVE EXISTING15 HP BLOWERS INSTALL NEW 40 HP BLOWERS UPGRADE ELECTRICAL COMPONENTS FOR NEW HIGHER HP BLOWERS NEW SWITCHGEAR TIGHT FIT! LARGER WIRE SIZE - OLD #8 TO NEW # 6 EXISTING CONDUIT ADEQUATELY SIZED WHEW!

REMOVING OLD BLOWERS

ELECTRICAL SWITCH GEAR

INSTALLING NEW BLOWERS

RETURNING SOUTH TREATMENT TRAIN TO OPERATING CONDITION THE SOUTH TREATMENT TRAIN EXHIBITED SIGNIFICANT PROBLEMS WITH THE AERATION SYSTEM. THE DECISION WAS TAKEN TO FULLY DRAIN THE TREATMENT TRAIN, ENTER THE BASIN AND PERFORM ESSENTIALLY THE SAME TASKS THAT WERE UNDERTAKEN TO SUCCESSFULLY RETURN THE NORTH TREATMENT TRAIN TO OPERATING CONDITION. STEP ONE, DRAIN CLARIFIER ACCOMPLISHED BY GRAVITY AND RETURNING SLUDGE TO NORTH TREATMENT TRAIN STEP TWO, DRAIN AERATION BASIN PLANT PIPING ONLY ALLOWS GRAVITY FLOW TO HEAD OF PLANT NOT ACCEPTABLE AS THIS WOULD CAUSE MAJOR UPSET TO NORTH TREATMENT TRAIN EXCESS SOLIDS THAT WERE INADEQUATELY TREATED THE ONLY AVAILABLE OPTION IS THEN TO UTILIZE THE TEMPORARY SLUDGE WASTING PUMP TO TRANSFER MIXED LIQUOR TO SLUDGE HOLDING BASIN(S) THIS WAS AN EXTENSIVE PROCESS AND TOOK NEARLY 45 DAYS TO COMPLETE

RETURNING SOUTH TREATMENT TRAIN TO OPERATING CONDITION - CONTINUED STEP THREE IN THE PROCESS WAS TO ENTER BASIN AND REMOVE SOLIDS FROM LIQUID PIPING STEP FOUR IN THE PROCESS WAS TO REPAIR AND REHAB AIR PIPING. A FAILED BUTTERFLY AIR CONTROL VALVE WAS REMOVED AND REPLACED. AIR PIPING WAS TESTED LIQUID PIPING WAS TESTED

SOUTH TREATMENT TRAIN WORK

The South treatment train was placed on line on August 12, 2016, further improving facility performance and enhancing ability to deal with peak flows (surprise there is an I&I issue here)

THE EMERGENCY WORK LAST ITEM PREPARE TERTIARY FILTRATION SYSTEM FOR RETURN TO OPERABLE STATUS CLEAN AND FLUSH BACKWASH WATER STORAGE A LOT OF SOLIDS PRESENT THERE REPAIR AND REHAB CONTROL SYSTEM TO INCLUDE FUNCTION TESTING ALL COMPONENTS REPLACE CONTROL SYSTEM INTERFACE PURCHASE AND INSTALL FILTER MEDIA FILTERS DESIGNED FOR 30 MEDIA DEPTH LESS THAN 6 MEDIA PRESENT AT THE TIME OES BECAME INVOLVED WITH THE FACILITY 950 BAGS OF ANTHRACITE WEIGHING 50 POUNDS EACH WERE HAND PLACED ON SATURDAY, AUGUST 27

FINALLY, A FULLY OPERABLE FACILITY AS OF 4/28/2016 WE HAD: A TREATMENT PLANT THAT HAD ONE OF TWO TREATMENT TRAINS ON LINE AND BARELY FUNCTIONING TWO INOPERABLE MIXERS IN SELECTOR BASINS INOPERABLE SELF CLEANING BAR SCREEN INOPERABLE VALVES IN WAS/RAS BASIN ONE INOPERABLE INFLUENT PUMP INOPERABLE TERTIARY FILTRATION SYSTEM

FINALLY, A FULLY OPERABLE FACILITY, CONTINUED AS OF 4/28/2016 WE HAD: NO FUNCTIONING COMPOSITE SAMPLERS INSUFFICIENT AERATION CAPACITY ONE OF TWO REQUIRED BANKS OF ULTRAVIOLET DISINFECTION LAMPS UNINSTALLED FLOW MEASUREMENT EQUIPMENT EVERY BASIN IN THE FACILITY 100% FILLED WITH WASTE ACTIVATED SLUDGE EVERY SPACE IN EVERY BUILDING NEEDED CLEANING

As of August 28, 2016, the facility was fully functioning with all components and processes available and on line. And neat clean buildings and grounds. An accomplishment we are all proud to have played a part in bringing to pass.

EFFLUENT ON 4/28/2016

EFFLUENT TODAY

"THERE WAS A LOT OF MURK AND ALGAE GROWING IN THE WATER," SAID RESIDENT DANIEL HUGH. "I WAS LOOKING AT IT WHEN I FIRST MOVED HERE BEFORE WHEN I FIRST MOVED HERE, AND YOU COULD NOT SEE BUT MAYBE TWO FEET OUT." YOU NOW CAN SEE AND SMELL THE DIFFERENCE. "I JUST SAW ONE OF THE GUYS THAT WORKED THERE AND I TOLD HIM THEY WERE DOING A GREAT JOB AND I AM REALLY IMPRESSED BY IT." HE ADDED, "THE FISH ARE AROUND MORE. IT IS CLEARER. IT IS GETTING BETTER AND BETTER BY THE DAYS," SAID DANIEL HUGH, ROCKAWAY BEACH RESIDENT.

EFFLUENT QUALITY 4/28/2016 AVERAGE SINCE 6/1/2016 BOD 87 MG/L BOD 7.1 MG/L TSS 105 MG/L TSS 3.3 MG/L E. COLI >2420 MPN/100 ML E. COLI <10 MPN/100 ML AMMONIA 108 MG/L AMMONIA 1.6 MG/L TOTAL P 10 MG/L TOTAL P 1.8 MG/L O&G 8.6 MG/L O&G <5.1 MG/L ALUMINUM 0.44 MG/L ALUMINUM 0.10 MG/L

ACKNOWLEDGEMENTS CITY COUNCIL OF THE CITY OF ROCKAWAY BEACH MISSOURI, CITY STAFF AND CITIZENS TANEY COUNTY COMMISSION AND ENVIRONMENTAL DEPARTMENT TANEY COUNTY REGIONAL SEWER DISTRICT BOARD OF DIRECTORS AND STAFF THE CITIZENS AND TAXPAYERS OF TANEY COUNTY MISSOURI TRI LAKES BIOSOLIDS COALITION TOTH AND ASSOCIATES ALGIER MARTIN AND ASSOCIATES THE BOARD OF DIRECTORS, MANAGEMENT AND STAFF OF OZARKS ENVIRONMENTAL SERVICES