Tall wood buildings!

Similar documents
Very Tall Wooden Buildings with Cross Laminated Timber

LCT ONE: CASE STUDY OF AN EIGHT STORY WOOD OFFICE BUILDING

Numerical Analysis of Wood-Concrete Skyscraper by Using Spring Elements to Simulate Mechanical Connections

Panel System. Industrial Wood Construction Puu Atsushi Takano

Construction of Treet - How and Why

ctbuh.org/papers Developing Hybrid Timber Construction For Sustainable Tall Buildings Title:

New Innovative Wood Products Challenges and Opportunities

Multi-storey timber construction in the UK IRCC workshop, Vienna 7 June 2013 Dr Julie Bregulla Dipl-Ing, PhD, CEng, FICE

Fire%Safety%of%Timber%Buildings:% A%Research%Review% David&Barber& Arup,&Washington&DC& 24=26&September&2014&

INFLUENCES OF ADVANCED COMPOSITE MATERIALS ON STRUCTURAL CONCEPTS FOR BRIDGES AND BUILDINGS. Introduction. Bridges

Steel reinforced timber structures for multi storey buildings

Design guide to separating distances during construction, Part 4

LifeCycle Tower the Natural Change in Urban Architecture

CANADIAN DESIGN GUIDE TO TALL WOOD BUILDINGS

Building Enclosures for 5&6 Storey Mid-rise Buildings Lessons Learned & Best Practices

BROCK COMMONS PHASE 1

ECOLOGICAL CHALLENGE ENVIRONMENT & RESOURCES

Cross Laminated Timber (CLT)

Fire Safety of Tall Wood Buildings: A Research Review. Copyright Materials. Course Description. This presentation is protected by US and

Tall Building Design Innovations in Australia

Mjøstårnet Construction of an 81 m tall timber building. Rune Abrahamsen, CEO, Moelven Limtre AS

Stadthaus, 24 Murray Grove, London Eight storeys of apartments featuring cross-laminated timber panels

Development of wood based sustainable construction methods for high-rise buildings under lateral loading

Short report about 6 to 9-storey timber buildings in Switzerland and Italy

Insights into the behavior of structures in fire and the implication on practice

CLT The new use of timber in Australia Prepared for AIRAH Victoria Division Meeting, February 2014

Introduction to Structural Analysis TYPES OF STRUCTURES LOADS AND

CLT solid wood panels*

AISC Steel & Timber Research for High-Rise Residential Buildings

Renovation concepts of timber buildings using enlarged size of glazing Proholz workshop Maribor, 31 st of March 2016

Improve the environmental footprint

MSc Thesis. Modular cross-laminated timber buildings. Richard Gijzen

Mjøstårnet - Construction of an 81 m tall timber building

Mid-rise Timber Buildings Proposal for Change. Colin MacKenzie Technical Consultant

The Natural Change in Urban Architecture

Sustainable Prefabricated Modular Buildings

Cross Laminated Timber (CLT) Manufacturing in the Southeast U.S. Steve Lieberman, PE

WoodWisdom-Net Seminar Edinburgh 4-5 April 2017 HCLTP Hybrid Cross Laminated Timber Plates

Council on Tall Buildings

STEEL STRUCTURAL SYSTEMS

Architectural Concrete with UHPC for façades and interior design-recent application in Germany

Table of Contents Executive Summary 2 Introduction 3 Structural Systems Problem Statement 9 Proposed Solution 10 Breadth Topics 11 Tasks and Tools

S p a c e e l e v a t o r. Structure selection and design Prof Schierle 1

UBC BROCK COMMONS PROJECT

Erie on the Park. Timothy Moore Penn State University Architectural Engineering Structural Emphasis Advisor: Prof. Ali Memari

VARIOUS TYPES OF SLABS

Timber Building in the City of Tomorrow

CLT in the U.S. Manufacturing and Applications

Timber Grows Up Architects and engineers, drawn to wood for its environmental attributes, push the material to new limits. By Joann Gonchar, AIA

Prefabrication: an essential strategy for certainty in sustainable housing. Daiman Otto Tall Wood Limited PrefabNZ #SHSummit2016

DESIGN OF HIGH-RISE MODULAR OPEN BUILDINGS

CADS A3D MAX. How to model shear walls

Modular Wood Framing Goes Vertical

Mid-Rise Timber Buildings Boris Iskra

KLH Massivholz GmbH. Publisher and responsible for content: KLH Massivholz GmbH Version: Timber Concrete Composites, Version 01/2017

TERRACE FACTORY - TYPE A1

Structural Fire Safety State of the Art Future Directions. Andy Buchanan University of Canterbury, New Zealand

Xyston Inn. NY. Proposal. Xiaodong Jiang. Structure Option. Advisor: Dr. Linda Hanagan

Xyston Inn. NY. Proposal. Xiaodong Jiang. Structure Option. Advisor: Dr. Linda Hanagan

6-Storey Residential Buildings Combustible Construction. A Regulator s Perspective City of Richmond, BC Canada

one structural behavior, systems, and design ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SUMMER 2015 lecture

ENR202 Mechanics of Materials Lecture 1A Slides and Notes

COMP ONENT CATA LO GUE FOR B UILDING YO UR OWN HOME

Structural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Building B

THE EMERGENCE OF MASS TIMBER IN THE US FIGHT AGAINST CLIMATE CHANGE: FROM FORESTS TO CITIES

one structural behavior, systems and design Course Description Course Description Syllabus & Student Understandings statics mechanics of materials

Scientific Seminar Design of Steel and Timber Structures SPbU, May 21, 2015

Office Building-G. Thesis Proposal. Carl Hubben. Structural Option. Advisor: Dr. Ali Memari

Introduction. Structures may be classified on the basis of materials used for construction, as follows: Steel structures. Aluminium structures

Another Architecture All Aboard!

Advances in Mass Timber Buildings

WOODEN TOWERS FOR WIND ENERGY PLANTS

Design of Tall RC Buildings: Core Supported Structures and Outrigger Braced Systems

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%

Fire Engineering, the BCA (NCC) & Bushfire Calculator. Keith Nicholls - Manager Product Testing and Assessments (Australia) Exova Group Limited

Introductory Note: August 3 rd 2018

KEYWORDS: Cross-laminated timber, fire resistance, model, tests

Experimental Study on the Outrigger Damping System for High-Rise Building

Pryda Floor & Rafter Truss Systems

Lateral System Analysis and Confirmation Design

The Design and Engineering of Fabric Membrane Clad Buildings

Less is more optimized ribbed CLTs the future

42#Story)Dewi.#Chestnut) Apartments)Re#imagined:) The)SOM)Timber)Tower) Research)Project)

Knowledge Objectives (3 of 3)

UNIVERSITY OF BOLTON SCHOOL OF ENGINEERING. BEng (Hons) CIVIL ENGINEERING

Distribution of Forces in Lateral Load Resisting Systems

The Tallest Wood Building in the World UBC Brock Commons Student Residence Base 3D Model to Product Delivery

CHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS

Ground + 4 floor RCC frame structure in Goa Floor to floor height is 3.0m Plan dimension, 24.0 m x 13.5 m SBC = 20 t/sqm, hard Strata is consider for

BOAST. West Coast. Set to open this spring, the tallest building on the West Coast resists wind and seismic drifts with massive braces.

CLIMATE. Eco-Building Cuts CO2 87%, Electricity 82%, Gas 87% and Water 72%: Eco-Building - Council House 2 (CH2) New Municipal Office Building

2016 DESIGN AND DRAWING OF REINFORCED CONCRETE STRUCTURES

ADVANCED TIMBER STRUCTURES

CLT Structural Design Sylvain Gagnon, Eng. February 8, 2011 Vancouver

Composite floor systems in highrise towers A very cost-effective construction using membrane action in fire design

Timber spatial trusses using hollow bars

Third Avenue New York, NY. Lateral System Analysis and Confirmation Design November 13, Michelle L. Mentzer.

Structural Timber Systems

Creep behavior of cross laminated timber in service class 2

Alexis Pacella Structural Option Dr. Schneider Lexington II, Washington D.C. Technical Report #3 November 21,

Transcription:

Tall wood buildings! Zhouyan Xia Jan-Willem van de Kuilen May 6, 2015 1 Vermelding onderdeel organisatie

Higher and higher. 100 m 52 m Roller Coaster Amusement Park, Heide-Park Soltau, Germany Height 52 m, length ca.1300 m, 120 km/h Timber Wind Turbine Tower Hannover Marienwerder/Germany 2012 100m height, 100t weight, 1.5 MW, supplies 1000 households with electricity

multi-storey buildings with wood is good for the environment! COST Action E5 Timber Frame Buildings 5-storeys HSB, Delft, Ecodus, 1992 May 6, 2015 Vermelding onderdeel organisatie

May 6, 2015 Vermelding onderdeel organisatie

Murray Grove KLH Apartment building in London 9 storeys 4 apartments / storey crosslam elevator shaft 17 weeks time saving during construction

Limnologen, Sweden 8 Storey CLT July, 2013 6

Limnologen, Sweden Floor plan CLT Walls and floors TF Internal walls Tension bars for prestressing Sprinkler system July, 2013 7

Limnologen, Sweden Sprinkler system Reduced requirements for: Combustible façade cladding up to eight storeys; Surface linings in apartments in multi storey buildings, down to class D s1,d0; Fire spread through windows in the same building; Walking distance in escape routes. July, 2013 8

LIFECYCLE TOWER Research projekt Highrise Timber Buildings (Austria) FÖRDERUNGSPROGRAMM HAUS DER ZUKUNFT May 6, 2015 TEAM: RHOMBERG BAU, OVE ARUP, WIHAG, ARCHITEKTENHERMANN KAUFMANN ZT GMBH Vermelding onderdeel organisatie

Lifecycle Tower, Dornbirn, Oostenrijk Architect Herman Kaufmann Prof. Holzbau TU München Construction speed: 8 dagen

Scale model, 20 storeys Stiffness of the core???

Prefabricated elements REI 90 (90 min. fire safety) (R= Load carrying capacity, E=Integrity, I=insulation) SPAN 8.50 M WIDTH 2.70 3.00 M Concrete D = 80 mm 2 x BSH 26/26

Timber-Concrete Floors

Core structures Modular surrounding

LCT DEMONSTRATION PROJECT Realisation of the building system to the high-rise building level: 8 storeys! May 6, 2015 Vermelding onderdeel organisatie

GK 5 21.94

http://www.youtube.com/watch?v=avzfdokernk May 6, 2015 27

Thanks to Hermann Kaufmann, Architect May 6, 2015 31

Forte Building, Melbourne 10 Storeys 32.2 Metres 23 appartements May 6, 2015 32

Forte Building, Melbourne Investor:..A ton of steel produces 1,5 tons of carbon in the making. A ton of cement 1,125 tons. And they aren t as interesting, as versatile, as expressive. A tree produces oxygen, and absorbs 1,42 tons of carbon for every ton of timber grown. Commercially speaking, the biggest thing is speed. With it being pre-fabricated, all of the main penetrations were already taken care of, and fixing into timber is a lot easier than fixing into concrete, so for the electricians, plumbers, plasterers and others, it s a lot easier job [working with a CLT structure] than working with concrete. May 6, 2015 33

May 6, 2015 Vermelding onderdeel organisatie

Wood-concrete skyscrapers

Skyscrapers Outrigger concepts May 6, 2015 Vermelding onderdeel organisatie

Dock tower (120 m) July, 2013 37

Outrigger function Providing stability to the core Providing a lever arm for the global bending moments Providing a division between timber sections for fire safety Allowing for building services (equipment) Shelter spaces in case of emergencies

Outrigger concept TU-E

Outrigger concept TU-E

Roof Wood-concrete skyscrapers Concrete(storey(as(outrigger Foundation

Typical Shanghai Building Lay-out

Model Lay-out with CLT - Concrete May 6, 2015 45

Modelling aspects Shell elements Springs Compression Tension Floor-floor (CLT) Wall-Wall (CLT) Wall-Wall (CLT-Concrete) May 6, 2015 46

Integrated tension bars Tension bars Wall element Floor element Couplers Wall element

M1: CLT + 2 Concrete (half) cores, rigid connections M2: CLT (Full) M3: Concrete (Full building) M4: CLT + 1 Concrete (Full) core M5: CLT + 1 CLT (Full) core May 6, 2015 50

May 6, 2015 51

Results Sway: 1/770H with H is building height Sway: shear/bending ratio 1 to 5 Compression stresses timber < 5 N/mm 2 Tension bars # 26, Ø 30 mm Reduction of bars over the building height For Architects: mechanically seen: 40 Storeys is possible, also with a wood core Architects need to make their buildings slightly more square (or less slender)

Building process

Building process

Crane times One-third of hoisting time. Building speed of 1 storey per day Cheaper cranes (> 6000 USD per month) Longer reach Fewer cranes

Environmental impact Wood stores CO 2 0.8 0.9 tons of CO 2 per m 3 Savings in other materials 1.1 tons of CO 2 26.300 m 3 for a 40 storey building 50.000 tons of CO 2 emissions can be avoided Eq. of 33000 car emissions/year.

Ongoing work on safety and robustness: : - What happens if I have local failures - How can fires develop? - What is the risk of 2nd flashover? - Do sprinklers bring enough safety? - What is the risk of moisture infiltration in the façade and how to repair? May 6, 2015 57