GOLD MALLINCKRODT LABORATORY BUILDING, 12 OXFORD ST, CAMBRIDGE, MA Jacobsen Lab

Similar documents
LEED Facts GOLD NAITO BUILDING, 12 OXFORD ST, CAMBRIDGE, MA PROJECT HIGHLIGHTS 56% 82% 41% 88% 100% Zhuang Lab

37% 100% 100% PROJECT HIGHLIGHTS LEED Facts. Wiener Auditorium

88.2% 32% 23% WEITZ LABORATORY GOLD. PROJECT HIGHLIGHTS LEED Facts. of on-site generated construction waste was diverted from landfills.

GOLD 24 OXFORD STREET, CAMBRIDGE, MA 02138

EPS MUSEUM RENOVATION. PROJECT HIGHLIGHTS LEED Facts GOLD (PENDING) 34% reduction of Wastewater by plumbing fixtures. 69% 38% EPS Museum

HARVARD FACULTY OF ARTS AND SCIENCES

54% reduction in water consumption 35% 78%

GOLD EAST WING OFFICES - NORTHWEST LABS BUILDING. PROJECT HIGHLIGHTS LEED Facts 18% 14% 23% 100% 30%

38.7% 25% PROJECT HIGHLIGHTS. LEED Facts. Reduction in water use compared to EPAct 1992 baselines.

96% 33% 30% PLATINUM B1 ANNEX - NORTHWEST LABS BUILDING. PROJECT HIGHLIGHTS LEED Facts

86% 35% 52% WYSS INSTITUTE - ENGINEERING & SCIENCE LABORATORY PLATINUM PROJECT HIGHLIGHTS. LEED Facts

30% 85% 37% PROJECT HIGHLIGHTS LEED Facts. Lecture Hall BioLabs Building

Larsen Classrooms Photo: Harvard Office for Sustainability PROJECT HIGHLIGHTS. > 22% of the total value of materials has recycled content

641 HUNTINGTON AVENUE PROJECT HIGHLIGHTS. LEED Facts 95% 36% 20% reduction in lighting power density was achieved. 37% 76% 26% 641 Huntington Avenue

43% reduction in water use below code maximum 100% 100% 14% reduction in lighting power density. 56% of offices have thermal comfort controls 100%

FACULTY OF ARTS AND SCIENCES

Griswold Hall 2-South Suite and Main Entry Renovation LEED-CI Platinum September 2008

35% reduction in water use below code maximum 100% 100% 32% reduction in lighting power density 100%

SILVER LONGFELLOW HALL PROJECT HIGHLIGHTS. LEED Facts. 89% of construction waste was recycled. 66% 41%

75% 40% reduction in water consumption. 43% 68% 90%

Murthy Lab Renovation Photo: Harvard Office for Sustainability % of the project waste was diverted from landfills

McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007

35% reduction in water use below code maximum 83% 88% 49% reduction in lighting power density 12%

42% 32% reduction in lighting power density. 98% of lighting load is tied to occupancy sensors 99% 100%

44% 45% 93% 81% 58 Plympton Street, Cambridge, ma Project Profile. LEED Facts. reduction in water use below EPAct 1992 baseline

Genentech Building 20 Office LEED-CI Gold XL CONSTRUCTION

26% 13% reduction in lighting power density 83% 19% 44%

HMS HIM 4th Floor Renovation LEED-CI v3 4 Blackfan Circle, Boston, MA LEED GOLD Project Profile 2016 LEED Facts Harvard University HIM 4th Floor 36%

Eaton Center - Shanghai LEED CI Certification Project

ASC New Building 400 Masthead Street Albuquerque, NM

Project location includes access to existing roads, existing water and wastewater infrastructure, and within or contiguous to existing development.

Sugen Building 3 LEED-CI Pilot Project

L E E D S C O R E C A R D ( B U I L D I N G D E S I G N & C O N S T R U C T I O N )

5 Cowperthwaite Street Harvard Real Estate Services LEED-NC GOLD, August 2007

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability

26% 48% 38% 14% 90% LEED Facts. Harvard University Wyss Institute - Center for Life Sciences Building

2012 USGBC Central Florida Chapter LEEDership Awards Outstanding Green Building of the Year: Valencia College, Lake Nona Campus Valencia College s

Jersey City Public Safety Communications Center

SANTA MONICA PLACE 395 Santa Monica Place, Santa Monica, CA 90401

Project Summary. Sustainability Facts. LEED for New Construction Rating (out of 69 possible points) Total Score 40 Sustainable Sites 7

Sheraton Lincoln Harbor Weehawken, NJ

2011 Enterprise Green Communities Criteria Checklist

Harvard Business School Wyss Hall Renovation

SOUTHERN CALIFORNIA EDISON DATA CENTER GREEN BUILDING EDUCATION: VIRTUAL TOUR

45% 39% 17% 92% 100% All paints and adhesives are low VOC

Case Study: Element PROJECT DESCRIPTION

CE Option 1 and 2 - Provide the pre-development site run -off rate (cfs) CE Option 1 and 2 - Provide the pre-development site run -off quantity (cf)

Taylor Institute. LEED Certification : GOLD

LEED-CI ANALYSIS 1 LANDMARK SQUARE STAMFORD, CT

ENERGY AND ENVIRONMENT DESIGN AND CONSTRUCTION STANDARDS ENERGY AND ENVIRONMENT

10 Akron Street Harvard Real Estate Services LEED GOLD

LEED-CI ANALYSIS 6 LANDMARK SQUARE STAMFORD, CT

Note year for Reference as Specified in the LEED V Manual.

GLADYS VALLEY HALL. Materials & Resources Innovation & Design Process

LEED Facts Harvard Management Company 2010 Interior Renovation GOLD PROJECT HIGHLIGHTS GOLD

APPENDIX 01: SAMPLE PRODUCT SUBMITTAL FORM (3 pages) URBAN ARTS ARCHITECTURE Abbott St, Vancouver, BC V6B 2K4 (604)

LEED-CI ANALYSIS 115 STEVENS AVENUE VALHALLA, NY

LEED for Commercial Interiors

UBC Residential Environmental Assessment Program

City of Millbrae 2016 CALIFORNIA GREEN BUILDING CODE CHECKLIST FOR NEW NONRESIDENTIAL BUILDINGS

How to Interpret this Report

Decatur Fire Station No. 2

LEED-CI ANALYSIS 4 LANDMARK SQUARE STAMFORD, CT

LEED BUDGET IMPACTS. LEED Architectural Credits

SACRAMENTO County New Animal Care Facility LEED Elements

Leased Space Environmental and Energy Efficiency Attributes Tenant Instructions

CAMP BLANDING JOINT TRAINING CENTER CONSTRUCTION AND FACILITY MANAGEMENT OFFICE ARCHITECT S PROJECT # CFMO PROJECT #

The Application of LEED Green Building Rating System in Indonesia

LEED-CI ANALYSIS 140 GRAND STREET WHITE PLAINS, NY

Sustainable Design A DIVISION OF SHIVE-HATTERY

Building Sustainability

360 HAMILTON AVENUE WHITE PLAINS, NY

Analysis 1. LEED Analysis of Laboratory Buildings. Penn State School of Forest Resources University Park, PA

The entry vestibule provides a transparent, welcoming experience for guests while graphics painted on the exposed concrete columns nod to interior

CITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction

The Fort Collins Discovery Museum LEED stands for Leadership in Energy and Environmental Design.

SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR

SECTION SUSTAINABLE DESIGN REQUIREMENTS LEED FOR NEW CONSTRUCTION AND MAJOR RENOVATIONS

Colorado Mountain College: Sustainable Design Standards

500 WEST PUTNAM AVENUE GREENWICH, CT

LEED 2009 for Commercial Interiors. Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP

LEED Application Guide for Multiple Buildings and On Campus Building Projects

PACKARD HOUSE 2010 LEED-NC GOLD PENDING PROJECT HIGHLIGHTS

GREEN FEATURES. A partial list of the facility s adopted sustainable site strategies is as follows:

LEED Certified Health Center

IFMA Central Pennsylvania Chapter August 20, 2014

As a company involved in the transmission and distribution of energy, we must be a part of the solution to the global issue of climate change

Dell Seton Medical Center at The University of Texas Overview

California State University, Sacramento February 24, 2010

CITY COUNCIL AGENDA REPORT

In 2010, after 20 years in North Burnaby, we relocated to our offices to 3605 Gilmore Way.

Urban Revitalization Plan For Responsible and Sustainable Growth and Development City of Adel, Iowa

Sustainable Sites (SS): where the building is located matters. SSc1 Site Selection

LEED 2009 for New Construction and Major Renovations

MANDATORY GREEN CODE STANDARDS NEW NONRESIDENTIAL CHECKLIST & CERTIFICATION

LEED & INCENTIVES. Alison Y. Rivenburgh, LEED AP

The Road Home Small Rental Property Program Guide to Green Building Standards

Sustainable Design and Green Building Approaches. Ashley Schenkel, M.S. College & Career Coordinator University High School, Irvine, CA

BUILDING FOR OUR FUTURE

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Transcription:

HARVARD FACULTY OF ARTS AND SCIENCES LEED CI V2.0 JACOBSEN LAB RENOVATION GOLD MALLINCKRODT LABORATORY BUILDING, 12 OXFORD ST, CAMBRIDGE, MA 02138 PROJECT HIGHLIGHTS Certified LEED-CI Gold in June 2010, Jacobsen Lab is an approximately 6,000 square foot organic chemistry lab located on the second floor of the Mallinckrodt Laboratory Building at 12 Oxford Street in Cambridge, MA. Mallinckrodt, originally constructed in 1928, is one of the four buildings within the Cabot Science Complex that together house all 278,000 sq.ft. of laboratories for Harvard s Department of Chemistry and Chemical Biology (CCB). The project was a complete renovation of an existing, functionally obsolete lab space into an energy efficient 20-person synthetic organic lab. In order to support the research activities of Professor Jacobsen and his lab group, the space was renovated to accommodate 21 fume hoods, island and wall benches, write-up rooms, a kitchenette, seminar room, glove box room, instrument room and three chemical storage spaces, as well as new men's and women's bathrooms. Sustainability was a focus throughout the project - with Harvard s Green Building Guidelines and the LEED-CI rating system guiding the selection of materials and the design of the mechanical, electrical and plumbing (MEP) systems. Jacobsen Lab serves as an example of the importance of sustainable design and construction combined with proactive strategies for sustainability within labs. Jacobsen Lab Photo: Jessica Eisenman Parks. Harvard Office for Sustainability. 2009 LEED Facts Jacobsen Lab Harvard Faculty of Arts and Sciences 2009 Renovation Location Cambridge, Massachusetts Rating System...Commercial Interiors v2.0 Certification Achieved Gold Total Points Achieved 38 / 57 84% 19% 48% 6% of on-site generated construction waste was diverted from landfills. of the total material value came from postconsumer and/or pre-consumer recycled materials. of the total material value came from materials manufactured within 500 miles of the project site. of the total material value came from rapidly renewable materials. Sustainable Sites...4/7 Water Efficiency...2/2 Energy and Atmosphere......6/12 Materials and Resources.....7/14 Indoor Environmental Quality...14/17 Innovation and Design 5/5 50% reduction in water consumption over EPAct 1992 compliant fixtures. Part of the Shut the Sash Program to achieve greater energy efficiency in the lab. All regularly occupied spaces have occupancy and daylight sensors to reduce the lighting levels and ventilation rates as appropriate.

PROJECT OVERVIEW JACOBSEN LAB ARCHITECTURAL DRAWINGS & LEED BOUNDARY Write-up Lab SECTION (NORTH) Chemical Vision Glass Cold Storage Instrument Chemical Storage Men s Women s Glove Box Thesis LAB FLOOR PLAN N Write-up s Pantry Seminar PROJECT TEAM Lab looking West towards a Write-up Photo: JBM General Contractors. 2009 Owner Project Manager Architect Contractor HVAC Engineer Commissioning Authority Sustainability Consultant Harvard Faculty of Arts & Sciences Harvard University, Department of Chemistry & Chemical Biology Ellenzweig JBM General Contractors Bard, Rao + Athanas Consulting Engineers, LLC Energy Management Associates Harvard University, Office for Sustainability Green Building Services 2

SITE To encourage alternatives to driving, all occupants of the Mallinckrodt Laboratory building have access to Harvard s comprehensive CommuterChoice Program, which provides incentives and discounts for alternative transportation, carpooling and fuel-efficient vehicles. Four Bike Racks are located at the building s entrances. Mallinckrodt Laboratory Building 12 Oxford Street, Cambridge, MA Within 1/4-mile radius of the building there is access to: 7 MBTA Bus Lines 2 Harvard Shuttle Bus Lines 1 MBTA Subway Station (0.27 miles) These transit lines provide connections to the extensive public transportation network throughout the Greater Boston Area. The building is located in a dense urban area, which allows occupants to walk and easily access amenities such as restaurants, banks, churches, and retail stores. Mallinckrodt Laboratory Building MBTA Bus Stops Harvard University Shuttle Bus Stops MBTA Subway Station Bike Racks at Mallinckrodt Photo: Jessica Eisenman Parks. Harvard Office for Sustainability. 2009 WATER EFFICIENCY The Energy Policy Act of 1992 (EPAct 1992) established the first water conserving standards for plumbing fixtures. Since 1992, it has been determined that with even lower standards plumbing fixtures can still effectively serve their intended purpose. The Jacobsen Lab project included the renovation of two bathrooms and a kitchenette. Per project specifications, only water efficient fixtures were installed, which reduces domestic water consumption by 50.12% over standard EPAct 1992 fixtures. This is the equivalent of saving over 20,000 gallons per year. FIXTURES IN JACOBSEN PROJECT SCOPE SLOAN UPPERCUT Dual-Flush Flushometer (Up 1.1 gpf and Down 1.6 gpf) Grohe Relaxa Deluxe Hand Held Showerhead (1.5 gpm) Differences in the Flush & Flow Rates for EPAct 1992 Standard Fixtures and the fixtures installed for the Jacobsen Lab Project Fixture Type Jacobsen Lab Flush & Flow Rates EPAct 1992 Standard Flush & Flow Rates SLOAN Solis EAF-275 Solar Powered Sensor Activated Lavatory Faucet (0.5 gpm) Water Closet [GPF] Urinal [GPF] Dual-Flush 1.6 & 1.1 Waterless 0.0 1.6 1.0 Bathroom Sink [GPM] 0.5 2.5 Shower [GPM] 1.5 2.5 Kitchen Sink [GPM] 2.2 2.5 0.5 gpm VR Aerator Spray Head (# EAF-15) GPF - Gallons Per Flush GPM - Gallons Per Minute 3

ENERGY EFFICIENCY The Faculty of Arts and Sciences (FAS) has committed, along with Harvard University as a whole, to reduce greenhouse gas emissions 30% below 2006 levels by 2016, inclusive of growth. Therefore, energy efficiency was a main goal of this renovation project. MECHANICAL SYSTEMS Demand Control Ventilation: Sensors located in the Seminar take real time, continuous CO2 measurements throughout the day and adjusts ventilation rates depending on the readings. This ensures that the HVAC only provides the actual of ventilation necessary based on occupancy level. Occupancy and Temperature Sensors: Each room has occupancy sensors that are tied to the building s control system allowing the supply air and temperature set-points to set back whenever spaces are unoccupied. The type of space and the activities carried out within it dictate the appropriate occupied and unoccupied setpoints for temperature and ventilation. High Performance Fume Hoods Jacobsen Lab has 21 Variable Air Volume (VAV) fume hoods, which run at a face velocity of 80 feet per minute instead of 100 feet per minute, thus reducing air flow by 20% and conserving the energy that would have been required to condition the air. Real-time displays: Hood exhaust rates are displayed in real time, reminding occupants to keep hood sashes closed when not in use. "Shut the Sash : A competition between labs aimed at reducing the extreme energy consumption due to open fume hoods. ELECTRICAL SYSTEMS Plug Loads: 85% (by rated power) of the equipment and appliances in the space are Energy Star, which includes such items as the computers, printers and refrigerator. Light Fixtures: Energy-efficient and low-mercury fluorescent lighting fixtures and lamps were carefully chosen and strategically located within each space to reduce electricity consumption while maintaining adequate lighting levels for each type of space. Lighting controls: The lighting design consists of overhead lighting controlled by multiple switches/zones and task lights at the desks. This design allows occupants to adjust the lighting to suit their individual preferences, which not only increases productivity and comfort, but also decreases energy use. Light Sensors: All rooms in the Jacobsen Lab without specific lighting needs have both Occupancy Sensors (turn lights off when not activated by motion for a set period of time) and Daylight Sensors (dim lighting in response to the amount of natural light coming through the windows). Commissioning: The mechanical and electrical systems were fully commissioned by a third-party Commissioning Authority, which ensured that all energyrelated systems were installed as designed, and operating efficiently prior to occupancy. Renewable Energy: Renewable Energy Certificates (RECs) have been purchased from Sterling Planet (wind power) equivalent to 100% of the anticipated electricity over two years. Face Velocity Meter Lab Bench and Real Time Display Photo: Jessica Eisenman Parks. Office for Sustainability, 2009 4

INDOOR ENVIRONMENTAL QUALITY FAS is committed to providing a healthy indoor environment for all occupants. The project team was careful to maintain healthy indoor air quality during construction and to also ensure the space is designed to promote healthy indoor air quality during occupancy. Indoor Air Quality During Construction: The building maintained occupancy throughout construction. Thus, a comprehensive indoor air quality management plan was implemented during construction to maintain healthy indoor air quality. Thermal Comfort Survey: Occupants will be surveyed about their thermal comfort once per season. The Operations team will adjust the temperature and ventilation as needed. Green Housekeeping: Jacobsen Lab participates in Harvard s Facilities and Maintenance Operations (FMO) Green Cleaning Program, which uses 100% recycled paper products and Green Seal certified cleaning solutions, among other green housekeeping practices. Daylight and Views: In 97% of the regularly occupied spaces occupants have direct line of sight to the outside. Construction IAQ Measures Implemented During Construction Photos: Harvard Office for Sustainability. 2009 Source Control: VOC-free Cove-Based Adhesive. Only Materials with Low or No VOC Content were used in the Jacobsen Lab project. Volatile Organic Compounds (VOCs) are chemical compounds and known carcinogens found in many construction materials that are considered detrimental to indoor air quality. Reducing the use of VOCs whenever possible improves indoor air quality and consequently occupant health and productivity. Composite Wood and Laminate Adhesives used have no added Urea Formaldehyde Carpet System: Mohawk Karastan, Quillen Carpet, a CIR Green Label Plus Certified product. Adhesives & Sealants and Paints & Coatings Examples of the products used: Housekeeping: Protection of porous building materials prior to installation. Product Category Product & Manufacturer VOC Content (g/l) VOC Limit (g/l) Standard Paints & Coatings Adhesives & Sealants Eco Spec Latex Flat, Benjamin Moore 0 50 Green Seal GS-11 M04 Acrylic Metal Primer (Benjamin Moore) 53.0 100.0 SCAQMD Rule #1113 Chapco 400 Cove Base Adhesive (Chicago Adhesive Products) Super 77 Multipurpose Spray Adhesive (3M Co.) 0.0 50 SCAQMD Rule #1168 51% by weight 70% by Weight Aerosol Adhesives VOC Limits (Green Seal) HVAC Protection: Ductwork sealed before installation New Connector between Mallinckrodt and Conant Photo: JBM General Contractors, 2009 Jacobsen Lab Instrument (in new connector) Photo: JBM General Contractors, 2009 5

MATERIALS & WASTE Material Selection was a very important part of the design process and done early on in the project to ensure that the materials would contribute to the over all green design project scope. Additionally, accounting for the long lead times associated with green casework, flooring and furniture from the beginning allowed the specified materials to remain in the project rather than being cut. 84% of the construction waste was diverted from landfills (109 TONS). 20% of the total material value came from post-consumer and/or pre-consumer recycled content materials. 48% of the total material value came from materials manufactured within 500 miles of the project site. 6% of the total material value came from rapidly renewable materials such as bamboo, which was used as a veneer for all of the lab and kitchen casework. Jacobsen Lab - Pantry Photo: JBM General Contractors, 2009 REGIONAL MATERIALS, MANUFACTURED G410 Energy Smart Roof Membrane (Silka Sarnafil, Inc.) - Canton, MA - 24 mi Bulletin Boards (Forbo) - Hazleton, PA - 273 mi RAPIDLY RENEWABLE CONTENT Bamboo (Cali Bamboo) - 93% Bulletin Boards (Forbo) - 75% (Linseed Oil, Granulated Cork, Pine Rosin binders, jute backing) RECYCLED CONTENT Seminar Photo: JBM General Contractors. 2009 Pre-consumer Batt Insulation (Guardian) - 5% Aries MDF (Sierra Pine)- 100% Bulletin Boards (Forbo) - 53% Post-consumer Batt Insulation (Guardian) - 30% Misc. Metals/Steel Products - 50%-92% Simple Chair (Keilhauer) - 18% ADDITIONAL RESOURCES Harvard FAS, Dept. of Chemistry and Chemical Biology: http://www.chem.harvard.edu Harvard FAS, Green Program: http://green.harvard.edu/fas Harvard FAS, Green Labs Program: http://green.harvard.edu/fas/green-labs Harvard OFS - Green Building Services: http://green.harvard.edu/green-building-services Harvard OFS - Green Building Resource: http://green.harvard.edu/theresource 6