COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER TO MARCH-2017

Similar documents
COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL 2013 TO SEPTEMBER M/s. Subham Planners Ltd.

Health and safety norms of CPWD should be followed during construction.

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF MARCH TO AUGUST -2013

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

GENERAL CONDITIONS. 7. The Applicant will adopt the prescribed norms, and standards provided in the national Building Code of India 2005.

TATA STEEL LIMITED. Environment Compliance Report (Oct 2017 to Mar 2018)

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests

Department of Ecology and Environment Room No.709, 7 th Floor, IV-Gate, M.S. Building, Bangalore ,

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests

Environment Compliance Report (Apr 2017 to Sep 2017)

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests Telefax:

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SEIAA: 42 (B): CON: 2007 STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, KARNATAKA

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

No. SEIAA: 71: CON: 2011 STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, KARNATAKA (Constituted by Ministry of Environment & Forests, Government

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017

SEIAA: 6: CON: 2013 STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, KARNATAKA

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India. Registered

Construction of Residential Group Housing Project

No /2009-1A.III Government of India Ministry of Environment & Forests

From : April 2015 To : October 2015 Status of conditions stipulated in Environmental and CRZ clearance. Adani Vizag Coal Terminal Private Limited

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India. Registered

SEIAA: 25: CON: 2012 STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, KARNATAKA

Municipal solid / hazardous waste

ENVIRONMENTAL MANAGEMENT PLAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

Registered. M/s Simmro Infrastructure & Developers Pvt. Ltd., B-3, Greater Kailash Enclave-2, New Delhi.

J-11011/45/2009- IA II (I)

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

Department of Ecology and Environment Room No.709, 7th Floor, IV-Gate, MS. Building, Bangalore , Date: 29th June To,

No. SEIAA/3225 Dated: To M/s The Greater Mohali Municipal Officers & Other Welfare Co-Operative House Building Society Ltd.

SIX MONTHLY COMPLIANCE REPORT DECEMBER- 2016

Registered. M/s Baba Jiwan Singh Baba Dalip Singh Educational Trust, Goindwal Sahib Road, Tarn Taran.

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

Registered. M/s N.H. Matcon Pvt. Ltd., S.C.O-3, Royal Estate, Chandigarh-Ambala Highway, Zirakpur, District SAS Nagar

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

No. SEIAA/2016/2161 Dated Sh. Rakesh Gupta, M/s GGP Buildtech (P) Ltd., Kharar Landran Road, Sector-115, Kharar.

Max. building height (m)

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I)

Item no. SEIAA/30.01: Confirmation of the proceedings of 29 th meeting of SEIAA held on

No. SEIAA/M.S./2014/2634 Dated Registered

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

G overnment Of India M inistry Of Environment & Forests R egional Office (Central Region) K endriya Bhawan, 5th Floor, Sector H Aliganj,Lucknow

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg.

GOVERNMENTOFHARYANA STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY HARY ANA Bay No , Prayatan Bhaw~m, Sector-2, PANCH KULA. l)lb ~ [PROVISIONAL]

Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006.

Environment protection measures / technology

SIX MONTHLY COMPLIANCE REPORT JUNE 2015

at Sy. Nos. 978 & 979, Kukatpally village, Balanagar Mandal, Ranga Reddy District, Telangana.

Hind Energy & Coal Beneficiation (India) Ltd.

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity)

Calcom Cement India Limited

No. SEIAA/2018/329 REGISTERED Dated:

No. SEIAA: 25 : IND: 2012

***** Department of Ecology and Environment Room No.709, 7 th Floor, IV-Gate, M.s. Building; Bangalore , Date: 23 rd September 2013.

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra

Utkarsh Sfatik Limited

Subject: Half yearly Report for the period of 1 st April 2013 to 30 th Sept., 2013 for Indmax Project

No. SEIAA/M.S./2016/1525 Dated To M/s Janta Land Promoters Ltd., SCO , Sector-82, Mohali.

Environmental Management Plan during Construction Phase

Check list for construction Project of EC [Category 8(a)]:

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

Rajasthan State Pollution Control Board

Name of the Project:- J&K Mineral Development Corporation Limited.

PROPOSED TERMS OF REFERENCE

M.S.SEIAA Panchkula, Haryana

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011

Cement Manufacturing Company Ltd. Page 1

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P.

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB

Mangalam Cement Ltd. (Unit-II) Stack No.

EIA NOTIFICATION

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Dated: 18th June, 2015

Additional Proposed (TPA) Total after Expansion (TPA) 3,500 2,500 6, ,880 2,720 5,600 As above under item No. 1.

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai.

Agreed. 8 The project proponent shall ensure that no natural watercourse and/or water resources shall Shall be complied with.

State Environment Impact Assessment Authority (SEIAA), Bihar BELTRON Bhawan, 2 nd Floor, Shastri Nagar, Bailey Road, Patna

COMPLIANCE REPORT THE CONDITIONS ENVIRONMENTAL CLEARANCE ORDER NO: 35/SEIAA/KL/6090/2012 DT

6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA

This project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report.

5. ENVIRONMENT MANAGEMENT PLAN

Dated: 23 rd June, To M/s Mohd. Hussain Jalaluddin Nirban, 21/23, Kambekar Street, 2 nd Floor, Ismail Habib Building, Dongari, Mumbai

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Proposed Terms of Reference for EIA studies

Transcription:

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER - 2016 TO MARCH-2017 F.No. SEIAA 281/2014/EC/110 SUBMITTED BY- M/S. TERON CONSTRUCTION PVT. LTD MAA PADMA COMMERCIAL COMPLEX, H/N- 289, A.T ROAD, BHARALUMUKH GUWAHATI- 781009

Name of The Company: M/s. Teron Construction Pvt. Ltd. Project : Proposed Residential Complex UTTARAYAN VILLE located at Narakasur Ganesh Turning Kahilipara, Guwahati-781019, Assam Environmental : Clearance Letter F.No. SEIAA 281/2014/EC/110, Dated 29 th January, 2015. PART A - SPECIFIC CONDITIONS I. Construction Phase SN. EC CONDITIONS COMPLIANCE STATUS 1. "Consent for establishment" shall be obtained from Assam Pollution Control Board under Air and Water Act and a copy shall be submitted to the SEIAA, Assam. 2. All required sanitary and hygienic measures should be in place before starting construction activities and to be maintained throughout the construction phase. 3. Adequate drinking water and sanitary facilities should be provided for construction workers at site. The safe disposal of waste water and solid wastes generated during construction phase should be ensured. 4. Provision shall be made for the supply of fuel (kerosene or cooking gas), utensils such as pressure cookers etc to the labourers during construction phase. 5. All the labourers to be engaged for construction should be screened for health and adequately treated before engaged them to work at the site. Consent for establishment is obtained from Assam Pollution Control Board vide letter No. WB/GUW/T-2860/14-15/264/1307 dated 10/03/2015 and already submitted to the SEIAA, Assam. Necessary hygienic and sanitary measures are undertaken in the construction site and are being maintained throughout the construction phase. Drinking water and sanitary facilities is being provided at the site for construction workers. Provision for waste water & solid waste disposal are provided too. Agreed upon. Is being complied. 6. For disinfection of waste water, use ultra violet radiation, not chlorination. 7. A First Aid Room shall be provided in the project both during construction and operation of the project. 8. All the topsoil excavated during construction activities should be stored for use in horticulture/landscape development within the project site. 9. Disposal of muck during construction phase should not create any adverse effect on the neighboring communities and be disposed taking the necessary precautions for general safety and health aspects of We will use ultra violet radiation as per our requirement for disinfection of waste water instead of chlorination. First aid kit facilities are being provided for the construction labourers in the site. Excavated topsoil is stored in the site and were using for refilling, road work, and will be used for landscaping and horticulture purpose too. Muck generated is being used for site leveling and filling low lying areas.

people, only in approved sites with the approval of competent authority. 10. Soil and ground water samples shall be tested to ascertain that there is no threat to ground water quality by leaching of heavy metals and other toxic contaminants. 11. Construction spoils, including bituminous material and other hazardous materials, must not be allowed to contaminate watercourses and the dump sites for such material must be secured so that they should not leach into the ground water. 12. The diesel generators sets and concrete mixture to be used during construction phase should be low sulphur diesel type and should conform to Environment (Protection) Rules prescribed for air and noise emission standards. 13. Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and amended as on 27 th August, 2003 subject to availability of the same. Analysis report of soil will be submitted in due course and Ground water analysis report is enclosed as Annexure-I. According to the analysis report all parameters are within the permissible limit so, there is no threat to ground water quality by leaching of heavy metals and other toxic contaminants. Necessary precautions like, storing in impervious area, proper disposal of spoils etc are being taken to avoid leaching from Construction spoils including bituminous material. Agreed to maintain the emission standards by the Ready Mix Mobile Plant. Fly ash will be used as building material. 14. Ready mixed concrete must be use in building construction. Ready mixed concrete will be used during building construction. 15. Vehicles hired for bringing construction material to the site should be in good condition and should have a pollution check certificate and should conform to applicable air and noise emission standards and should be operated only during non-peak hours. 16. Ambient noise level should conform to residential standards both during day and night. Incremental pollution loads on the ambient air and noise quality should be closely monitored during construction phase. Adequate measures should be made to reduce ambient air and noise level during construction phase, so as to conform to the stipulated standards by CPCB. 17. Storm water control and its re-use as per CGWB and BIS standards for various applications are maintained. 18. Water demand during construction should be reduced by use of premixed concrete, curing agents and other best practices referred. 19. Permission to drawl of ground water shall be obtained from the competent Authority prior to construction/operation of the project. 20. Separation of grey and black water should be done by the use of dual plumbing line for separation of grey and black water. Good condition vehicles having PUC certificate is being used in our construction site for bringing materials. All the construction machineries/equipments used are of high standard and adhere to standards. So incremental noise level due to the construction is of negligible amount. Noise level within the site has adhered to ambient noise level. Water sprinkling done to mitigate dust suppression. Ambient noise level and ambient air quality is being monitored. -Monitoring reports is enclosed as Annexure-II. Storm water to be stored in underground tank for curing and construction purpose. Ready Mix Concrete is being used from outside vendor for all major slab casting. Already boring was done on 2010 before development agreement. Dual plumbing line will be adopted for separation of grey and black water. 21. Treatment of 100% grey water by decentralized treatment should be Noted and will be complied.

done. 22. Fixtures for showers, toilet flushing and drinking should be low flow either by use of aerators or pressure reducing devices or sensor based control. 23. Use of glass may be reduced by up to 40% to reduce the electricity consumption and load on air-conditioning. If necessary, use high quality low E value glass. 24. Roof should meet prescriptive requirement as per Energy Conservation Building Code by using appropriate thermal insulation materials to fulfill requirement. 25. Adequate measures to reduce air and noise pollution during construction keeping in mine CPCB norms on noise limits. 26. Opaque wall should meet prescriptive requirement as per Energy Conservation Building Code which is proposed to be mandatory for all air-conditioned spaces while it is inspirational for non-air-conditioned spaces by use of appropriate thermal insulation material to fulfill requirement. 27. Width of the internal road and exist & entry road shall be as per MoEF Guidelines. 28. The approval of the competent authority shall be obtained for structural safety of the buildings due to earthquake, adequacy of fire fighting equipments, etc. as per National Building Code including protection measures from lightening etc. 29. The storm water drainage shall be worked out after analyzing the contour levels of the site and the surrounding area and the capacity of the storm water drainage. 30. Provision shall be made for housing of construction labour within the site with all necessary infrastructure and facilities such as fuel for cooking, toilets, mobile STP, safe drinking water, medical health care, crèche, etc. The housing may be in the form of temporary structures to be removed after the completion of the project. 31. Any hazardous waste generated during construction phase, should be disposed off as per applicable rules and norms. 32. The diesel required for operating DG sets shall be stored in underground tanks and if required, clearance from Chief Controller of Explosives shall be taken. Every feasible option will be adopted to reduce the flow of water for showers, toilet flushing and drinking purpose. Will be complied. Will be complied. Control measures like good conditioned vehicles, machines and wetting of road, etc. were adopted to reduce ambient air and noise pollution during construction phase. Refer Monitoring Reports as Annexure-II. All the D.G. sets of the proposed project would attach necessary Acoustic Enclosure to reduce the noise from D.G. sets and will be attached with stacks height as per CPCB norms. Will be complied. -The approval of the structural safety of the buildings due to earthquake has been applied. -Provisional Approval of State Fire Service Organization, Assam, Guwahati is conveyed vide letter No. F&ESS/FPW/2140/640/15, dated 12/05/2015 for the adequacy of fire fighting equipments etc. -Lightening arrestor will be provided as per the guidelines. Final calculation will be provided by our MEP consultant considering the final level of all the towers. Necessary infrastructure & required facilities considering hygienic conditions to construction labour within site is provided If any hazardous waste is generated then it will be disposed as per applicable rules and norms. We purchase only the required diesel as per the tank requirement of the DG.

33. Regular supervision of the above and other measures for monitoring should be in place all through the construction phase, so as to avoid disturbance to the surroundings. 34. Under the provisions of Environment (Protection) Act, 1986, legal action shall be initiated against the project proponent if it was found that construction of the project has been started without obtaining environmental clearance. Regular supervision of safety and other measures for monitoring during construction phase is carried out. II. Operation Phase SN. EC CONDITIONS COMPLIANCE STATUS 1. The installation of the Sewage Treatment Plant (STP) should be certified by an independent expert and a report in this regard should be submitted to the SEIAA, Assam before the project is commissioned for operation. Discharge of treated sewage shall confirm to the norms & standards prescribed by CPCB. Treated waste water shall not be discharged to nearest river stream any way. 2. Rain water harvesting for roof run-off and surface run-off should be implemented. Before recharging the surface run off, pre-treatment must be done to remove suspended matter, oil and grease. The bore well for rainwater recharging should be kept at least 5mts. above the highest of ground water table. 3. The solid waste generated should be properly collected and segregated. Wet garbage should be composted and dry / inert solid waste should be disposed off to the approved sites for land filling after recovering recyclable material. 4. Any hazardous waste biomedical waste should be disposed of as per rules framed under EP Act, 1986. 5. The green belt design along the periphery of the plot shall achieve attenuation factor conforming to the day and night standards prescribed for residential land use. The open spaces inside the plot should be suitably landscaped and covered with vegetation of indigenous variety 33% Green Belt shall be developed Peripheral plantation width should not be less than 1 mtr. 6. Incremental pollution loads on the ambient air quality, noise and water quality should be periodically monitored after commissioning of the project. 7. Application of solar energy should be incorporated for illumination of common areas. Lighting for gardens and street lighting in addition to provisions for solar water heating. A hybrid system or fully solar system for a portion of the apartments should be provided. 8. Traffic congestion near the entry and exist points from the roads adjoining the proposed project site must be avoided. Parking should be fully internalized and no public space should be utilized. -Report of certified Sewage Treatment Plant (STP) will be prepared & submitted after installation to SEIAA, Assam. -Treated effluent will be recycled/ reused for the flushing and gardening purpose. -Regular maintained of STP will be carried out to mitigate odour problem. Construction of Rainwater harvesting structure will be constructed as per our lay out plan. We will adopt practice of segregation of biodegradable and non biodegradable waste. There will be provision of door to door collection facility. The waste will be sent to a centralized collection facility. All the organic waste will be converted in to compost used for horticulture work and non biodegradable waste will be disposed off through GMC. Noted. Will be monitored periodically. Will be complied. 9. Proper seepage control measures shall be adopted.

10. A report on the energy conservation measures confirming to energy conservation norms finalize by Bureau of Energy Efficiency should be prepared incorporating details about building materials & Technology, R & U Factors etc and submit to the SEIAA, Assam in three months time. 11. Diesel power generating sets proposed as source of power during operation phase should be of enclosed type and conform to rules made under the Environment (Protection) Act, 1986. The height of stack of DG sets should be equal to the height needed for the combined capacity of all proposed DG sets. Use of low sulphur diesel is obligatory. The location of the DG sets may be decided suitably without disturbance to the public. Will be complied, at present energy consumption is very low due to usage of LED Lights in every towers. Will be complied once the project is in the operation phase. 12. The ground water level and its quality should be monitored regularly. Will be monitored periodically. 13. Adequate measures shall be taken to prevent odour problem from solid waste processing plant and STP. 14. The building shall have adequate distance between them to allow movement of fresh air and passage of natural light, air, and ventilation. 15. The emergency evacuation plan shall be implemented as stated. 16. The internal roads shall be as per MoEF guidelines & there shall be separate exit and entry roads for residential buildings. Regular maintenance of STP will be done to prevent odour problem. It has been designed such that free passage of light and fresh air can pass. Noted. PART - B. GENERAL CONDITIONS SN. EC CONDITIONS COMPLIANCE STATUS 1. The project proponent shall also submit six monthly reports on the status of compliance of the stipulated EC conditions including results of monitored data (both in hard copies as well as by e-mail) to the SEIAA, Assam/ Regional Office of MoEF, Shillong. 2. Officials from the SEIAA, Assam, who would be monitoring the implementation of environmental safeguards, should be given full cooperation, facilities and documents/data by the project proponents during their inspection. 3. In the case of any change(s) in the scope of the project, the project would require a fresh appraisal by the SEIAA, Assam. Six monthly EC reports on the status of the stipulated EC conditions including results of monitored data are submitted to the SEIAA, Assam and Regional Office of MoEF, Shillong. -We ensure to provide full cooperation, facilities and documents/data required by the Officials from SEIAA, Assam during their inspection. A complete set of all the documents will be submitted to SEIAA, Assam. 4. The SEIAA, Assam reserves the right to add additional safeguard measures subsequently, if found necessary, and to take action including revoking of the environment clearance under the provisions of the Environmental (Protection) Act, 1986, to ensure effective implementation of the suggested safeguard measures in a time bound and satisfactory manner. 5. All other statutory clearances such as the approvals for storage of diesel from Chief Controller of Explosives, Fire Department, Forest Conservation Act, 1980 and Wildlife (Protection) Act, 1972 etc. shall be obtained, as applicable by project proponents from the respective competent authorities. Noted and will be complied when it will be required.

6. These stipulations would be enforced among others under the provisions of Water (Prevention and Control of Pollution) Act, 1974, the Air (Prevention and Control of Pollution) Act 1981, the Environment (Protection) Act, 1986, the Public Liability (Insurance) Act, 1991 and EIA Notification, 2006. 7. Environmental Clearance is subject to final order of the Hon ble Supreme Court of India in the matter of Goa Foundation Vs Union of India in Writ Petition (Civil) No. 460 of 2004 as may be applicable to this project. 8. The proponent shall upload the status of compliance of the stipulated EC conditions, including results of monitored data on their websites and shall update the same periodically. It shall simultaneously be sent to the SEIAA, Assam. The criteria pollution levels namely; PM 10, PM 2.5, SO 2, NO X, etc (ambient levels as well as stack emissions) or critical sectoral parameters, indicated for the project shall be monitored and a record be maintained for the public domain. 9. The environmental statement for each financial year ending 31 st March in Form-V as is mandated to be submitted by the project proponent to the SEIAA and State Pollution Control Board, Assam as prescribed under the Environment (Protection) Rules, 1986, as amended subsequently and shall also be sent to the respective Regional Offices of MoEF by e-mail. 10. The SEIAA, Assam may revoke or suspend the clearance, if implementation of any of the above conditions is not satisfactory. Status of compliance of the stipulated EC conditions is uploaded on our website i.e www.uttarayanville.com being updated periodically. Simultaneously is being regularly sent to the SEIAA, Assam. Environment Statement will be submitted to SEIAA, Assam & Pollution control Board, Assam. 11. The project proponent should advertise in at least two local News papers widely circulated in the region, one of which shall be in the vernacular language informing that the Project has been accorded Environmental Clearance & copies of clearance letters are available with the SEIAA, Assam. The advertisement should be made 10 days from the date of receipt of the Clearance letter and a copy of the same should be forwarded to the SEIAA, Assam. We have already complied it. Public notice is published in News Paper The Sentinel Guwahati dtd. 6 th Feb. /2015 in English and Janasadharan dtd. 6 th Feb./2015 in Assamese. ************************************

ANNEXURE-I GROUND WATER ANALYSIS REPORT

ANNEXURE-II MONITORING REPORTS