Environmental Management Plan during Construction Phase

Similar documents
CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA

Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006.

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity)

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

Health and safety norms of CPWD should be followed during construction.

ENVIRONMENTAL MANAGEMENT PLAN

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

5. ENVIRONMENT MANAGEMENT PLAN

The emphasis on the EMP development is on the following;

ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION 1.2 EMP DURING CONSTRUCTION PHASE

ENVIRONMENT MANAGEMENT PLAN

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

GENERAL CONDITIONS. 7. The Applicant will adopt the prescribed norms, and standards provided in the national Building Code of India 2005.

ENVIRONMENTAL MANAGEMENT PLAN

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Air Traffic Control Tower and Technical Block, Netaji Subhash Chandra Bose International Airport, Kolkata

TATA STEEL LIMITED. Environment Compliance Report (Oct 2017 to Mar 2018)

The emphasis on the EMP development is on the following;

The emphasis on the EMP development is on the following;

PROPOSED TERMS OF REFERENCE

FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS

ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

Environmental Assessment Registration Destination RV Resort

ENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks)

Max. building height (m)

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER TO MARCH-2017

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

PROPOSED TERMS OF REFERENCE

MECC Draft EMP Approval Letter

Municipal solid / hazardous waste

CHAPTER 15 MITIGATION AND MONITORING

Building Better Storm Water Quality

Environment Clearance for Multi Level Parking with Commercial Development

Larsen & Turbo Limited ENVIRONMENTAL MANAGEMENT PLAN

Environment Management Plan. SEZ Phase III Residential Project,

Environmental Assessment Matrix

Works, services and infrastructure code

Pre-Feasibility Report

Chapter 5: Predicted Environmental Impact & Mitigating Measures

APPENDIX II (See paragraph 6)

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

TOOELE COUNTY LAND USE ORDINANCE CHAPTER 26 Page 1

Environment Compliance Report (Apr 2017 to Sep 2017)

ENVIRONMENT MANAGEMENT PLAN

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN

Application of Low and Non Waste Technology in the production process;

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP)

Paraprofessional Training Session 1

Approval of Terms of Reference (TOR) For Development of Smart City Project, Ranchi, Jharkhand. M/s Ranchi Smart City Corporation Limited.

Environmental Management Plan

ENVIRONMENTAL ASSESSMENT for. Village of Williamsburg. SR 133 Sewer Expansion Project Loan Number CS

CHAPTER 4.2 ENVIRONMENTAL ELEMENT

FORM I A GROUP HOUSING PROJECT GH-03C, SECTOR-144 NOIDA, UP. For. M/s GULSHAN HOMES and INFRASTRUCTURE PVT.LTD. En-vision Enviro Technologies Pvt.

LEED Credits. How FieldTurf Can Contribute To Obtaining

Chapter 9 SUMMARY AND CONCLUSION

Promoter: Navkar Prime Developers Private Limited ENVIRONMENTAL MANAGEMENT PLAN & CER

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector

Presented for Environmental Clearance under EIA Notification 2006 from SEIAA of Maharashtra

Alberta Transportation The City of Edmonton The City of Calgary

LIST OF CONDITIONS FOR PROPOSED EXTENSION OF THE EXISTING C PALMAR MAURITIUS HOTEL (EX LE GRAND SABLE HOTEL) BY LAGON DE REVE LTEE [ENV/DOE/EIA/1776]

Date of Inspection 13/09/2017 Location of Inspection Manildra Solar Farm. ER Demelza Scott Proponent Representative Bjorn Schultz Aaron Hawkins

Mitigation Monitoring Program Campus Master Plan 2015

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

Environmental Check List Georgia Environmental Policy Act

sqm. 123 kld (Landscaping - 31 kld, Dual Flushing 73 kld Car Washing - 19 kld) Quantity Of Wastewater Discharge

10. ENVIRONMENT MANAGEMENT PLAN

IV. ADVERSE IMPACTS THAT CANNOT BE AVOIDED

APPLICATION FOR CHANGE OR CANCELLATION OF RESOURCE CONSENT CONDTION

Details of the proposed project as presented before the committee are tabulated below:

San Antonio Low Impact. Development

Pre- feasibility Report. For. At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra.

Details of Project. Underground source

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

EM P. Project Name. Project Address Lok Nayak Hospital, Jawahar Lal Nehru Marg, New Delhi Environment Consultant

Executable EMP. Mahanagar Realty. CTS no. 373(pt), 375, (pt),378 (pt), S. No. 19A/3A, Dhanakawadi, Pune

BC Timber Sales ENVIRONMENTAL MANAGEMENT SYSTEM

Annex F Scoping Checklist

Environmental Guidelines for Construction Sites

5.0 LONG-TERM CEQA CONSIDERATIONS

Atlantic Division Naval Facilities Engineering Command Norfolk, Virginia

This project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report.

Factor Potential Effects Mitigation Measures

ENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP)

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

Environmental Clearance for Proposed development at Kandivali (E), Mumbai ANNEXURES

WHS RISK REGISTER FOR THE DESIGN OF BUILDINGS AND STRUCTURES

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

IMPACT ON LAND. 1. Will there be an effect as a result of a physical change to project site? Yes No

Hope Foundation s International Institute of Information Technology. CRITERION 7 Institution Values and Best Practices

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

ENVIRONMENTAL ASSESSMENT For Choctaw Utilities, Inc. Water Plant Replacement Loan Number FS

Infrastructure Element

No construction activity started

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

Transcription:

Management Plan during Phase Sr 1 Ambient Air Quity Negative inside site premises outside site 2 ise Negative near noise generation sources inside premises on ambient noise levels in the Surrounding area Probable source of CONSTRUCTION PHASE Dust emissions excavation, air emissions machinery and other activities at site ise generated activities and operation of equipment and DG sets Dust reduction measures such as road watering Periodic maintenance of equipment Use of good quity fuels Use of Person Protective Equipments Use of well maintained equipment Heavy activity limited to day- time hours only Use of noise mufflers in and vehicle Use of earplugs/muffs by staff are temporary during phase will be confined to short distances, as coarse particles will settle within the short distance activities Temporary s during phase blasting or other high noise activities envisaged 3 Water 4 Land Surface runoff project site Oil/fuel and waste spills Improper debris dispos sewage labour camp Excavation, Silt fences to reduce run-off Secondary containment and dykes in materi storage areas Sewage treatment in septic tanks Reutilization and recycling of Labour will be employed to reduce size of labour camps perenni surface water resource adjacent to site excavation work will be

5 Aesthetics s Probable source of debris, waste labour camp activities and Excavation debris Waste labour camps will be collected and composted on site n compostable waste will be transported to landfill site Topsoil will be conserved and used for landscaping in function phase The s will be compensated by extensive tree plantation and gardening in the use phase - Short term restricted only in the initi stages of

Management Plan during Function Phase FUNCTIONAL PHASE Use of low sulphur good fuel 1 Ambient Air Quity Negative Particulate and gaseous emissions DG sets and vehicle movement Periodic maintenance of DG sets Use of CNG/LPG as a fuel should be encouraged Housing of DG sets in buildings with appropriate acoustics 2 ise inside premises ise vehicle movement and operation of diesel generator sets during power failure management measures to reduce noise Appropriate trees which will act as noises barriers will be planted in the premises and ong roadside -- 3 Water adverse Oil/ fuel and waste spills in vehicle parking area sewage contaminated Sewage water will be treated and recycled Rainwater harvesting and recharge of groundwater aquifer is Recycled water will be used for gardening and flushing purpose

storm water proposed Good housekeeping and storm water management will be followed 4 Land Storage and dispos of solid wastes sewage Fuel and materi spills Treatment and reuse of sewage water Integrated waste management and spill control plan Dry garbage will be sent for recycling and wet garbage will be composted Segregation of dry and wet garbage before will be done before dispos 5 Biologic Overl Positive Habitat disturbance Green spaces inside the premises will help to compensate the earlier effect vegetation Landscaping and extensive plantation in the premises Landscaping will help in reducing any adverse s on air and noise quity 6 Socioeconomic Overl positive Increased job opportunity in household maintenance and ancillary services -- Positive and long term - FUNCTIONAL PHASE

7 Pattern The complex is likely to add moderately to the traffic flow considered during peak hour Management practises will be employed Adequate parking space will be provided in the premises