Magino Project Environmental Impact Statement. Technical Support Document Construction Environmental Protection Plan

Similar documents
Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV

Safety Manual. SEMS Program

Section 4: Managing the Construction Site

Environmental Instruction

5.43 NOSA CMB

Safe Operating Procedures 1 SECTION 1 INTRODUCTION 2 PURPOSE 2 SCOPE 2 DEFINITIONS 2 LEGISLATIVE CONTEXT 4

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan

BC Timber Sales Environmental Management System (EMS) and Sustainable Forest Management (SFM) Training for LPC Workers

9.0 Environmental Protection Program

CHAPTER 6 - How to Prepare a SWPPP

HELGET GAS PRODUCTS HAZARD COMMUNICATION PROGRAM

Construction Safety Audit Scoring System (ConSASS) Audit Checklist

Job Description. Motorhand

Health and Safety Management Standards

Humantech Environmental Management System Manual

BC Timber Sales Environmental Management System (EMS) and Sustainable Forest Management (SFM) Training for LPC Management and Field Supervisors

MAPPING & SOLUTIONS GUIDE. RIIENV201D Identify and assess environmental and heritage concerns

CON APPENDIX C USAG HI Storm Water Pollution Prevention Plan Content Review Checklist

HAZARDOUS WASTE STORAGE, LESS THAN 90 DAY SITE LEACHATE SUMP AT RUSSELL ROAD LANDFILL

Alberta Transportation The City of Edmonton The City of Calgary

City of Guelph Transfer of Review Procedures 7 March, 2017

Technical Guidance Document for Environmental Audit Reports

FCX Department of Occupational Health and Safety. Contents. Open-Hole Policy

Hazard Communication Program. Anderson Union High School District

Golden Rule #10: Management of Change

RMM # 1202 Title: Spills to the Environment - Emergency Response & Reporting Program

Ground Disturbance Permit Procedure Environment

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP)

SOP 01 EHSS Risk Management

Safety Regulations and Procedures OCCUPATIONAL HEALTH Hazard Communication - Responsibility, Scope, and Application - S80.

10.0 Environmental protection, follow-up and monitoring

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

Sample Form: Review Checklist

CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11

CHAPTER 9 POLLUTION PREVENTION/GOOD HOUSEKEEPING MAINTENANCE ACTIVITIES BMPS PROGRAM

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

Perry Johnson Registrars, Inc. Licensed Copy #2 RECYCLING INDUSTRY OPERATING STANDARD. Prepared for ISRI Services Corporation

Indoor Air Quality Program

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

Hecla s Safety and Health Policy:

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

Best Management Practice for Management of Used Aircraft Parts and Assemblies and for Recycling of Aircraft Materials

SPILL PREVENTION & RESPONSE

Process Safety Management (PSM) Program. General Company Policy

Contractor Selection & Management Guideline Rev01. Revision 00. April 2011

THE COMPLETE GUIDE TO ISO14001

Crushing and Screening Management Procedure Environment

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Appendix M Framework Stormwater Pollution Prevention Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

Document B Specification

Flagship. A Safety Management System for Members of the Passenger Vessel Association. Revised May 2017

IMS (Quality, Environment, Occupational Health & Safety) Awareness Training Course As per ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007

ENVIRONMENTAL AUDIT CHECKLIST TD 17/16/E

Corporate Policy and Procedure

Managing Universal Waste 40 CFR 273 & 22 CCR 66273

Hazard Communication Program. University of San Diego

LARGE QUANTITY GENERATOR CHECKLIST

CONDUCTING CRITICAL CONTROL AUDITS CS-OHS-60

*************************************************************************** SECTION H40 NAVIGATION DREDGING AND RECLAMATION 02/18

APS Cleaning. Environmental Management System. Scope of Certification

Checklist for ISO14001:2004 (compared with 14001:1996) Standard Clause/Section

GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES

CITY OF NEW LONDON HAZARD COMMUNICATION PROGRAM

ENVIRONMENTAL ASSESSMENT REGISTRATION

S33 Opening Statement Workplace Rules

Borrow Pit and Quarry Management Procedure Environmental

Inspection Requirements of the CGP 2013

This procedure applies to all personnel and departments that operate lift trucks at the University of Windsor.

2 EARTHWORKS AND GEOTECHNICAL REQUIREMENTS

QSS 0 Products and Services without Bespoke Contracts.

NATIONAL ENERGY BOARD ONSHORE PIPELINE REGULATIONS

WORK HEALTH AND SAFETY AUDIT STANDARD

Environmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review

SS David L. Seago, P.E. Assistant Director of Construction Dallas District CST Conference

KEEYASK TRANSMISSION PROJECT EA REPORT APPENDIX F DRAFT ENVIRONMENTAL PROTECTION PLAN

WHSE POL 1 WORK HEALTH, SAFETY & ENVIRONMENT MANAGEMENT POLICY

Construction Environment Management Plan

COLORADO OIL & GAS CONSERVATION COMMISSION POLICY ON THE USE OF MODULAR LARGE VOLUME TANKS IN COLORADO. January 3, 2014

GUIDANCE ON THE MANAGEMENT OF THIRD PARTY COMPETENCE FOR SAFETY CRITICAL POSITIONS OFFSHORE

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS

COPY. EMS Compliance Requirements for Port Users Environmental Performance

Procedure. Work Health and Safety Pre-approved work. Document number: PRO Rev no.

Work Health and Safety Management Systems and Auditing Guidelines

Revision Date: April 2, 2019

HAZARD COMMUNICATION PROGRAM

Form C General Information

Company Profile Fumigation Procedures ile for the Port of Tauranga

Performance Standards for Self-insurers

SAMPLE SECURITY PLAN

Apache / Contractor X. Contractor/Vendor Bridging Document

bizsafe Level 3 Risk Management Audit Checklist (26-Sep-2017)

2017 Archaeology Audit Program Procedure Manual. April 2017

YOUR TRANSPORTATION CO.

CRAVEN COMMUNITY COLLEGE. Control of Hazardous Energy. (Lockout/Tagout) Completed by: Eddie Foster. Completed Date: January 2, 2018

Implement Traffic Control Plans - RIISS Practical Assessment Tools. Name: Trainer / Assessor Name: Date:

4.0 Material and Waste Controls

Health, Safety and Wellbeing Policy

ALBANY PORT AUTHORITY ENVIRONMENTAL MANAGEMENT SYSTEM

Apache / Contractor X. Contractor/Vendor Bridging Document

Transcription:

Magino Project Environmental Impact Statement Technical Support Document 20-6 Rev. No. Revision Date Approved 0 Document issued for EIS

Table of Contents SECTION 1.0 CONTENT AND REVISON CONTROL... 1 SECTION 2.0 INTRODUCTION... 1 2.1 PURPOSE OF THE CEPP... 1 2.2 SPECIFIC OJECTIVES OF THE CEPP... 2 2.3 RELATIONSHIP TO PRODIGY EMS... 2 SECTION 3.0 IMPLEMENTATION OF THE CEPP... 2 3.1 ROLES AND RESPONSIBILITIES... 2 3.2 CONTRACTOR ENVIRONMENTAL METHODS STATEMENT... 3 SECTION 4.0 STRUCTURE OF THE CEPP... 5 4.1 CONTENT OF OPERATIONAL STANDARDS... 5 4.2 LIST OF STANDARD OPERATING PROCEDURES... 5 SECTION 5.0 INSPECTION AND RECORD KEEPING... 6 SECTION 6.0 REQUESTS FOR REVISION TO CEPP... 6 APPENDIX 1 SITE MAPS... 7 APPENDIX 2 SITE CONTACT LIST... 7 APPENDIX 3 AUTHORIZATION AND PERMITS SPECIFIC TO THE WORK... 7 APPENDIX 4 SEDIMENT AND EROSION CONTROL DIAGRAMS... 7 Page ii

TABLES Table 1: Content of Operating Standards... 5 Page iii

SECTION 1.0 CONTENT AND REVISON CONTROL The (CEPP) will be developed prior to the start of site preparation and construction of the Magino Project. An outline of the content of this plan is provided for the Environmental Impact Assessment. The CEPP is a living document and is subject to on-going updates. This Contents and Revision Control Operational Standard presents the contents of the CEPP and the most up-to-date revision that has been issued for each Operational Standard. This Contents List will be updated and re-issued when any Operational Standard is added or revised. Section Operational Standard Revision Revision Date 1.0 Content and Revision Control 2.0 Introduction 2.1 Purpose of the CEPP 2.2 Objectives of the CEPP 2.3 Relationship to Prodigy s EMS 3.0 Implementation 3.1 Roles and Responsibilities 3.2 Contractor s Environmental Methods Statement 4.0 CEPP Structure 4.1 Content of Operating Procedures 4.2 Refer to this section for list of Operational Standards to be developed 5.0 Inspection and Record Keeping Pre-Construction Inspection Report Grubbing and Clearing Permit Form Fuel Storage Inspection Form Spill Reporting Form Waste Disposal Log Compliance Monitoring Form Compliance Reporting Form 6.0 Request for Revision to CEPP Appendix 1 Site Maps Appendix 2 Site Contact List Appendix 3 Task Specific Authorizations and Permits Appendix 4 Useful Diagrams / Illustration SECTION 2.0 INTRODUCTION 2.1 PURPOSE OF THE CEPP The (CEPP) Plan provides guidance to Prodigy personnel and Contractors performing site preparation and construction activities for the Magino Project. The intent of the CEPP is to provide a practical way to facilitate field implementation of environmental regulations, practices, and measures required to eliminate or reduce potential adverse environmental effects. The CEPP is a working document for use in the workplace by project personnel and contractors for ensuring commitments made in policy statements are implemented and monitored. Page 1

2.2 SPECIFIC OJECTIVES OF THE CEPP The specific objectives of the CEPP are as follows: MAGINO PROJECT Provide a reference document to ensure that commitments to minimize adverse environmental effects will be met; Document environmental concerns and ensure appropriate protection measures are implemented; Provide concise (short and clear) guidance to project personnel regarding standards for protecting the environment and minimizing environmental effects; Provide a reference document for personnel when planning and/or conducting specific activities and working in specific areas; Provide a training aid during implementation efforts; Communicate changes in the program through the revision process; and Provide a reference to applicable legislative requirements and guidelines. 2.3 RELATIONSHIP TO PRODIGY EMS The CEPP is an integral part of Prodigy s Environmental Management System (EMS). It builds on management approaches outlined in Prodigy s: Health and Safety Management Plan; Emergency Response and Spill Prevention Contingency Plan; Hazardous Substances Management Plan; and Waste Management Plan. The CEPP provides a quick reference for project personnel to monitor compliance and to make suggestions for improvements. The CEPP provides documentation of environmental protection measures against which Prodigy personnel and contractor s environmental performance can be readily measured and corrective measures determined where required. SECTION 3.0 IMPLEMENTATION OF THE CEPP 3.1 ROLES AND RESPONSIBILITIES Refer to Appendix 2 of the EMS (TSD 20-1). An overview of roles and responsibilities is provided below. Vice-President Sustainability Provide corporate resources and overall direction to the implementation of the CEPP. Prodigy Construction Manager Ensure overall compliance with Prodigy s Environmental Management System (EMS) for all parties involved in construction activities. Environmental Superintendent and Coordinators Conduct a review of the CEPP on an as needed basis to determine if updates are required; Review revisions to the CEPP and approve as required; Page 2

Ensure revisions are distributed to managers and supervisors; Perform document controls; Ensure that managers, supervisors and their staff are familiar with the CEPP and its protection measures; and Obtain approvals from management. Environmental Leads, Operations and Site Managers (including Contractors) Implement the CEPP in daily operations; Maintain a current copy of each Operational Standard and the Content List (Section 0); Provide training and support to ensure successful implementation of the CEPP; and Initiate changes to improve and update the plan. Site Personnel Familiarize them with the CEPP; and Have knowledge of reporting procedures. Contractor Superintendent Provide resources for implementation of the CEPP; Develop and submit his Environmental Methods Statement; and Ensure compliance with Prodigy s EMS. Contractor s Environmental Coordinator Prepares contractor Environmental Methods Statement; and Monitors and report on environmental performance during execution of the work. 3.2 CONTRACTOR ENVIRONMENTAL METHODS STATEMENT Prodigy personnel and Contractor(s) are expected to understand and implement the environmental protection measures provided within the CEPP. If the Contractor does not understand or is unclear on how or when to implement a protection measure the EPCM Environmental Coordinator should be contacted to obtain clarification. All Contractor(s) must have reviewed and committed to Prodigy s Environmental Management approach prior to the commencement of construction activities. The Contractor s signature on the Awarded Contract indicates that they have read and can carry out all Work activities in accordance with the EMS requirements and the CEPP. For every defined scope of work, the Contractor(s) will designate an Environmental Coordinator. The contractor s Environmental Coordinator is to ensure adherence to the CEPP throughout the execution of the work. The Contractor is required to complete the Environmental Method Statement form (Appendix C) and obtain the approval of the Project s Construction Manager(s) and the Project s Environmental Superintendent prior to the initiation of any construction activity. The Contractor must submit the completed Environmental Method Statements to the Environmental Superintendent prior to the scheduled start date for that specific Work activity. The completed Environmental Method Statements must incorporate the CEPP environmental standards. Page 3

It is the Contractor s responsibility to review the approved Environmental Method Statement form with the field crew responsible for carrying out the work activities to ensure they understand and can to carry out their assigned tasks as specified in the Environmental Method Statement form. The types of information provided by the Contractor in the Environmental Method Statement form include: Description of materials, labour and methodology required to carry out the proposed activity; Identification of potential environmental impacts and risks associated with the proposed activity; Measures proposed to mitigate potential impacts and schedule for implementation; Identification of relevant environmental standards to be met; Identification of construction procedures; Procedures for transporting equipment/materials to and from site; Storage of equipment/materials; Identification of measures/procedures and containment utilized for possible leaks or spills of any liquid or material; Identification of timing and location of Work activities; and Other information deemed necessary by the Project Site Manager. The Contractor s Environmental Monitor will use the approved Environmental Method Statements to monitor the Contractors field activities for compliance. The Contractors Environment Method Statements shall also be used to determine compliance during an environmental audit. All changes or revisions to the approved Environmental Method Statement must be documented in a revised Environmental Method Statement and provided to Prodigy s Construction Manager and Environmental Superintendent for approval prior to conduct of the Work activities identified. The revised form should note that the change is required to successfully complete the work in an environmentally compliant manner. The contractor is required to keep copies of the following documentation on file to exhibit compliance of the Project s policies and procedures during project and/or third party audits: Environmental Method Statements; Approved environmental inspection forms; Training records (Project orientation, health and safety training, Chance Find, etc.); Professional Certifications (i.e. welding certificates, electrical certifications, etc.); Vehicle/Equipment Inspection Checklists; Grubbing and Clearing Permits; Spill Reports; Pre-Construction Inspection Checklists; Waste Tracking Manifests; and Water Discharge Monitoring Records. The environmental protection procedures (CEPP s) provide a measure on which to base the assessment of the Contractor s environmental performance. Page 4

SECTION 4.0 STRUCTURE OF THE CEPP The CEPP provides instructions to ensure project personnel understand and implement environmental protection standards for both routine activities and unplanned events associated with the construction activities. The CEPP is comprised of the following sections: Section 1 outlines the purpose and organization of the CEPP; Section 2 outlines the implementation approach for the CEPP; Section 3 provides Operational Standards for a variety of specific activities anticipated to occur in relation to the Project. Each Operational Standard provides an overview, description of environmental concerns and general environmental protection measures associated with that activity in order to meet regulatory requirements, corporate commitments and/or best management practices; Section 4 provides examples of the inspection and record keeping forms that will be used by project personnel to verify adherence or audit compliance to the Operational Standards; Section 5 includes a Request for Revision, which allows for users to recommend changes or additional Operational Standards, to facilitate continuous improvement; and Appendices which offer additional information and resources reference within the CEPP. It is expected that additional operational standards will be added throughout the project lifecycle, prior to new activities occurring. 4.1 CONTENT OF OPERATIONAL STANDARDS The format and content of the Operational Standards is presented in Table 1. Table 1: Content of Operating Standards Section Content Section 0 Revision number Revision date Section 1.0 Purpose States the purpose of the SOP and intended outcome Identifies special permit/authorization requirements; Provides an overview of environmental concerns; Section 2.0 Activity Based Identifies risks and safety concerns specific to the activity; Operational Standard Identifies general environmental protection procedures and mitigation associated with specific activity; and Provides specific work instruction where required Section 3.0 Documentation For inspections, record keeping is to be used by Project personnel to verify adherence and audit compliance Attachments Maps, drawings and useful reference material for the specific task 4.2 LIST OF STANDARD OPERATING PROCEDURES The following Operational Standards will be developed prior to site preparation and construction. Geotechnical investigation; Drilling; Page 5

Equipment and Machinery Fueling Procedure; Use of Day Tank / Temporary Fuel Storage Tanks; Site Clearing and Grubbing; Waste handling and disposal; Blasting in or near water bodies; Earthworks near water bodies; and Sediment and erosion control practices. SECTION 5.0 INSPECTION AND RECORD KEEPING SECTION 6.0 REQUESTS FOR REVISION TO CEPP Page 6

APPENDIX 1 SITE MAPS APPENDIX 2 SITE CONTACT LIST APPENDIX 3 AUTHORIZATION AND PERMITS SPECIFIC TO THE WORK APPENDIX 4 SEDIMENT AND EROSION CONTROL DIAGRAMS Page 7