CRUCEA NORTH WIND POWER PLANT

Source of requirement EBRD. - Each six months during construction - Annually during operation. Best practice EBRD PR 1

Darial Energy LLC. Dariali Hydro Power Plant Construction and Operation Project. Environmental and Social Action Plan, Dariali HPP

Environmental and Social Action Plan Adjaristskali Hydropower Plants

DRAFT FOR CONSULTATION OCTOBER 7, 2014

Syvash Wind Farm Environmental and Social Action Plan (ESAP)

Uzbekenergo: Talimarjan Thermal Power Plant 2, Uzbekistan Environmental and Social Action Plan (ESAP)

Project: Category A Road Project, Kazakhstan Kurty Buribaytal 62 km Road Project

EBRD Environmental and Social Action Plan

ENVIRONMENTAL AND SOCIAL ACTION PLAN ÖKSÜT GOLD MINE, TURKEY (THE 'PROJECT')

ENVIRONMENTAL AND SOCIAL ACTION PLAN

Requirement (legislative, lender requirement (e.g. EBRD PR), Best Practice)

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT

DRAFT ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP)

Environmental and Social Action Plan 400kV Transmission Line, SS Bitola 2 Macedonian/Albanian border and SS Ohrid

1 Environmental and Social Action Plan

Environmental and Social Action Plan

Čibuk 1 Wind Project Environmental and Social Action Plan

Doc. No H1 Rev. 0 - July 2011 APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN

Aquanova Nyzhniy Bystryi small hydropower plant project non-technical summary

GATSUURT GOLD MINE : ENVIRONMENTAL AND SOCIAL ACTION PLAN

220 KV TRANSMISSION LINE AKHALTSIKHE-BATUMI

Performance Requirements

Mezitli Wastewater Treatment Plant

Svarychiv small hydropower plant project non-technical summary

ESAP Final 12 September 2017

Environmental and Social Action Plan

Required Actions. Perform monitoring as described in the EMP.

COMPLIANCE APPRAISAL: SUMMARY OF RESULTS

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country?

EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT

SUSTAINABLE HYDROPOWER DEVELOPMENT A NORWEGIAN-GEORGIAN COOPERATION PROGRAM. A Citizen s Guide. Communication and Hydropower EIA

SNTGN TRANSGAZ SA MEDIAS. ESAP BRUA Version 3 1

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES

LNG Terminal Świnoujście, Poland. Environmental and Social Action Plan (ESAP)

Ankara-Nigde Motorway Project

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

City of Bishkek & European Bank for Reconstruction & Development (EBRD) Bishkek Solid Waste Management Project Environmental and Social Action Plan

Chapter 13 Management and Monitoring

Dariali Hydropower Project Stakeholder Engagement Plan

Amaila Hydropower ESIA Update Section 7

PUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME. 2 Objective of the Phase II Environmental and Social Programme

ENVIRONMENTAL & SOCIAL ACTION PLAN

EBRD and Wind Energy

Chapter 13 Management and Implementation

A CITIZEN S GUIDE. Awareness Raising on Hydropower Project Development and EIA for Citizens (part I)

DOORNVALLEI EXT 5 & 6

Public Disclosure Authorized EXECUTIVE SUMMARY

CONTENTS of Section 6 6 ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP) GENERAL Construction Operation 6-3 LIST OF TABLES

Mining Environmental Impact Assessment Guidelines. May 2018

Environmental and Social Review Summary

Environmental and Social Data Sheet

Rykove Solar Project Non-Technical Summary

Environmental and Social Review Summary. For. Uganda. Renewable Energy Development Program Lubilia Hydropower Project

1 Project description

EBRD and Wind Energy in Turkey and Beyond

Potential Impacts and Mitigations from a Saline Discharge into Marine Environment

Category Environmental Item Main Check Items Confirmation of Environmental and Social Considerations

Environmental and Social Review for GDF Projects

Environmental and Social Impact Assessment (ESIA) for Oil & Gas Projects, a Myanmar Context

Environmental and Social Action Plan. Draft Report. The business of sustainability

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

These potential changes and their implications are outlined in Annex 1.

EBRD Performance Requirement 1

Ukraine Sustainable Energy Lending Facility (USELF) Strategic Environmental Review Environmental Report Non-Technical Summary

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

JCM Power. The Environmental and Social Governance (ESG) Policy

1 Project description

Downstream Flow Regimes

Environmental and Social Review Summary. Congo Equipment - Expansion

Environmental and Social Review Summary. Hoi Xuan Hydropower Project

We re here to share information about the project so you can see how it might affect you, your community, and the environment.

I hope that this explanation suffices, Thx, Robert

Principles for environmental and social responsibility

Kitchener Drain Depollution Project: Drain Rehabilitation Solid Waste. Non-Technical Summary

Armenia: ENA-Modernisation of Distribution Network Stakeholder Engagement Plan: Draft Final Report

River Diversion Hydropower in BC: Impacts, Assessment, and Planning

Environmental and Social Impact Assessment for Guinea Bauxite Mining, West Africa

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

Environment and Sustainability Coordinator

10.0 Environmental protection, follow-up and monitoring

7 MONITORING PLAN 7.1 INTRODUCTION

Environmental and Social Action Plan

ROUND 2 OPEN HOUSE. Keeyask Transmission Project EA Report Appendix D: Public Involvement Materials D-81

EAGLE S NEST PROJECT

Environmental and Social Review Summary. Gigawatt Mozambique SA

To: The Board of Executive Directors of the World Bank. CC: Mr. Bruce Moats, Director, Corporate Relations, IFC;

Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY PROJECT Rehabilitation works on the big arch of Krk Bridge

Natura 2000 and Hydropower. Hydropower and Fish Workshop Brussels 29 May, 2017

ENVIRONMENTAL AND SOCIAL REVIEW SUMMARY (ESRS) PROJECT: HIB Petrol. Disclaimer

Altain Khuder. Management Action Plan REQUEST NUMBER:

8 ENVIRONMENTAL MANAGEMENT PROGRAMME (PROJECT ENVIRONMENTAL SPECIFICATION)

Environmental and Social Review Summary. Small Hydropower Project

Environmental and Social Review Summary, La Castellana

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project

Environmental and Social Review Summary

PROJECT BRIEF for the John Hart Generating Station Replacement Project

Transcription:

GEORGIA URBAN ENERGY LTD PARAVANI HYDROPOWER PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT REPORT ENVIRONMENTAL AND SOCIAL ACTION PLAN Prepared by SRF Gamma Tbilisi, 2011

Paravani Hydropower Project Environmental & Social Action Plan Page 1 of 7 1. INTRODUCTION Georgia Urban Energy (GUE) Ltd. has been assigned as the privileged investor for construction of the Paravani HPP and related transmission infrastructure in the framework of the agreement signed between the Georgian Government and the company. The project is being implemented in two stages: Construction of a hydropower plant (HPP) involving a weir on the Paravani River about 13 kilometres upstream of the confluence with the Mktvari River and a powerhouse on the right (south) bank of the Mtkvari River about 1.5 km upstream of the confluence. This part of the project is being implemented in two municipalities - Akhalkalaki (intake facilities) and Aspindza (hydropower station and substation) in Georgia s Samtskhe- Javakheti region; Construction of a 32-kilometer transmission line connecting the HPP to the power distribution system at a new substation near Agara that will be constructed as part of another project. This part of the project is also is being implemented in two municipalities in the Samtskhe-Javakheti region: Aspindza (HPP site/substation and start of the transmission line) and Akhaltiskhe (end of transmission line). As required by Georgian law, GUE evaluated the project s potential impacts on environmental and social aspects in Environmental and Social Impact Assessments, one for the hydropower plant and one for the transmission line. These ESIAs, together with a consideration of cumulative impacts, this report, and a Stakeholder Engagement Plan were also designed to meet the requirements of the European Bank for Reconstruction and Development (EBRD) and the International Finance Corporation (IFC), each of which will provide financing for the project. Before and during construction, and then throughout of the project, GUE will need to implement a series of actions to avoid, reduce, or otherwise control potential impacts identified in the ESIAs. These actions are summarized in this Environmental and Social Action Plan (ESAP). The ESAP will be part of the financing agreements between the lenders and GUE. The performance of the required actions will be reported annually by GUE and may be audited or otherwise evaluated by the lenders throughout construction and of the project. The table below constitutes the ESAP. It identifies the required actions, the basis of the requirement, the timing of the action, and the criteria to be used for determining whether the required action has been successfully achieved. Implementation all of the actions is the responsibility of GUE. When other companies perform work under contract to GUE, GUE will be responsible for those contractors compliance with the requirements of the ESAP. This is expected to be accomplished by inclusion of requirements in contracts and subcontracts, and by direct oversight and supervision by GUE as needed. As agreed by the parties, this ESAP may be revised from time to time during project development. No changes will allow violations of Georgia law or of EBRD and IFC requirements for environmental and social performance.

Paravani Hydropower Project Environmental & Social Action Plan Page 2 of 8 0 Submit report on environmental, social, health and safety performance, including status of each ESAP element 1. Environmental and Social Planning 1.1 1.2 1.3 1.4 1.5 Develop and implement an Environmental and Social Management System (ESMS) Ensure that there is a qualified on-site Occupational Health and Safety representative at all times, with independent reporting lines to corporate management Appoint a qualified Environmental manager to report directly to site manager, with independent reporting lines to corporate management Require all on-site contractors to retain qualified environmental and OHS managers for all activities for which they are responsible Develop a waste management plan to guide management of all wastes to be generated during construction and EBRD, IFC EBRD PR 1 IFC PS 1 EBRD PR 1 IFC PS 1 EBRD ESP EBRD ESP Each six months during construction, annually thereafter Develop key construction procedures (e.g. OHS, blasting, traffic management, waste management, monitoring, community liaison) prior to construction. Develop s phase procedures prior to the start of s. s Prior to construction Prior to contractor activities 2011 (prior to initial EHS report) Submission of performance report - Development of construction management procedures - Development of an al ESMS Construction OHS representative already appointed GUE to identify s phase OHS representative prior to s starting Designated person throughout construction and Appropriate clauses in contracts Appointment of qualified personnel Waste management in accordance with Georgia law and plan Annual data on waste generation and management

Paravani Hydropower Project Environmental & Social Action Plan Page 3 of 8 1.6 Appoint: prior to first disbursement Appoint an independent EHS Consultancy to undertake periodic external monitoring of key EHS issues as outlined in this ESAP and the ESIA documentation. 2. Labour and working conditions 2.1 2.2 2.3 Develop/update HR Policy and Procedures/ Manual in English and Georgian to fully comply with national law and EBRD and IFC requirements (Georgian Law to take precedence if there are any conflicts with lender requirements). Make the policy and procedures/manual (2.1 above) or a detailed summary available to employees in their languages Develop and implement an occupational health and safety (OHS) plan to guide all activities on the project site(s) during all phases of activities. s to include (but not be limited to): - Job- and task-specific hazard analysis and controls for GUE activities - PPE provided, use of PPE required, and enforced - Safety training for all personnel in their language - Review of contractors OHS plans, to meet same standards as GUE plan - Oversight of contractor OHS implementation, including mandatory reporting EBRD PR 1 IFC PS 1 Georgia labour law BAT Monitor: every 6 months during construction and annually for the first 2 years of s; any additional monitoring requirements to be based on monitoring outcomes Within 3 months after commitment of funds. GUE plan: prior to first disbursement Contractor plan: prior to contractor activities on-site External EHS monitoring reports - Submission of HR Policy and Procedures to the representative of the lenders for review - Include in annual EHS report data on workers, including dismissals and new hires, collective bargaining developments, status of medical checks, etc. Availability of materials for workers in their languages - Submission of GUE plan by independent OHS professional to lenders for review and approval.. Submission of contractor OHS plan(s) and approval by GUE OHS manager - Annual report on OHS issues, including accident statistics and training (by GUE and contractor workforces)

Paravani Hydropower Project Environmental & Social Action Plan Page 4 of 8 2.4 2.5 2.6 2.7 On annual basis, review and update OHS plan as needed, and require contractor updates BAT Annually Develop a formal grievance mechanism for employees and contractors and disseminate information about its uses to the workforce (in the language of the worker) Develop and implement a contractor management plan and procedures to ensure contractors compliance with lender and Georgian labour requirements Develop and maintain construction camps that are appropriate for their locations and that meet the requirements of Georgian law and EBRD PR2 3. Pollution prevention and abatement 3.1 Develop and implement erosion control plan to cover all site s (may be developed by contractor(s), but must be reviewed and approved by GUE and implemented by all contractors). Review and revise as needed 3.2 Isolate fuel storage tank away from traffic 3.3 3.4 3.5 Provide impermeable containment sufficient to hold at least the total volume of fuel stored in tanks Conduct fueling s and use chemicals/solvents only over prepared impermeable surfaces Prepare for cleanup of small spills (fuel, etc.), including (but not limited to): - Cleanup kits (absorbent materials, etc.) carried in all vehicles and equipment at all times - Training for drivers and equipment operators, and others who use fuel, oil, other hazardous materials - Inspect all vehicles and equipment for leaks before use near or in water Georgia law Prior to first disbursement At all times construction camps are occupied Plan: prior to construction Implement: throughout construction and Prior to first disbursement and throughout construction As long as fuel and other chemicals/solvents are stored and used on-site Prior to construction - Updated OHS plan as needed - Annual report - Submission (with first EHS report under item 0) for review and approval by lenders of grievance procedure - Annual report to include information on worker grievances. Contractor compliance - Compliance - Annual reports of incidence Approval by EHS manager Placement of tank(s) away from traffic in isolated area Containment of all spills at fueling and storage areas No off-site fueling or oil/chemical handling - Provision of cleanup kits - Training records for drivers and operators - Immediate cleanup of all spills with no residual contamination

Paravani Hydropower Project Environmental & Social Action Plan Page 5 of 8 3.10 3.11 3.12 3.6 3.7 3.8 3.9 Store tunneling and other spoil only in prepared designated areas approved by authorities and protected from erosion (to be specified in erosion control plan) Prior to spoil generation To the maximum extent possible, use or allow others to use spoil For spoil that cannot be used at all or for some extended For all spoil piles not being period of time, provide other permanent erosion control used within a 30-day period protection (to be specified in erosion control plan) Maintain vehicles, motors and emergency generators to manufacturers specifications to minimize emissions Control dust emissions in dry periods by using water or other dust suppression devices Implement monitoring program in the tailrace of the turbines after the power house and up to the Mktvari River as required by Georgian authorities Contain all sanitary wastes from all sites, provide appropriate treatment prior to permitted discharge 4. Community Health and Safety 4.1 4.2 Develop and implement procedures to protect public health and safety, to include (but not be limited to): - Traffic management plan for all drivers and equipment operators (speed limits, training, etc.) - Public notice of blasting s near areas open to the public - Security to prevent unauthorized access to project sites, with appropriate training for guards. - Notice to local authorities and nearby residents during construction of transmission line and then during s - Hazard signs/ notices on power pylons/poles Establish and enforce appropriate rules to control behavior of workers who live in construction camps to avoid disruption of communities EBRD PR 4 Georgia law Throughout construction As required by permit Prior to the commencement of major construction works maintenance s Establish: before occupation of camp Enforce: throughout construction - 100% of topsoil salvaged and stored in contained piles/locations - Maximum beneficial use of spoil - Annual report on spoil use and storage Annual monitoring report Annual report - Submission of traffic plan to EBRD with first EHS report, after commitment of funds - Annual report on traffic management, security, other activities, including any incidents - Annual report on rules and enforcement actions

Paravani Hydropower Project Environmental & Social Action Plan Page 6 of 8 4.3 Maximize hiring of local workers and managers, to the extent labour with required expertise and qualifications are available During construction and - Inclusion in EHS report data on numbers of local, Georgian, and foreign workers and management 5. Land acquisition and compensation 5.1 Complete, disclose and implement the land acquisition and compensation plan agreed upon by the lenders, in accordance with Georgian, EBRD and IFC requirements Georgia law EBRD PR 5 IFC PS 5 Disclose at least 60 days prior to construction of the transmission line - Acquisition of rights to all land needed, by buying the land for the towers and right of way for the footprint of conductors. - Full compliance with Georgia law - Inclusion in EHS reports to EBRD the status of land acquisition and compensation 6. Biodiversity and natural resources conservation 6.1 Develop and implement a downstream flow monitoring programme to ensure minimum biological flow is maintained downstream of the Paravani Weir Georgia permits EBRD PR 6 IFC PS 6 Recovery plan (item 6.4) Develop: prior to dam/weir closure Implement: after dam/weir closure - Maintain minimum flow rates - Include in annual reports data on flow rates 6.2 6.3 Prepare a detailed baseline for fish and aquatic habitat and water quality in the Paravani River from the upstream end of the reservoir to the convergence point with Mtkvari River. Prepare and implement a robust multi-taxa aquatic monitoring programme to measure changes attributable to the project in fish and other aquatic life and water quality in the Paravani, from at the upstream end of the reservoir to the convergence point with Mtkvari River EBRD PR 6 IFC PS 6 Also part of potential cumulative impact mitigation Prepare prior to first disbursement Implement prior to any instream work, including construction of weir Plan: prior to plant commissioning Implement: as required by plan throughout construction and 2 years of s - Submission of monitoring plan to lenders - Summary report on baseline fish populations and aquatic ecosystem - Submission of monitoring programme to lenders e - Annual report on fish populations and ecosystem health, including changes from previous monitoring results

Paravani Hydropower Project Environmental & Social Action Plan Page 7 of 8 6.4 6.5 6.6 6.7 If fish populations decline or ecosystem health decreases significantly downstream of the Paravani weir up to the convergence point with Mtkvari River, due to reasons attributable to the project, develop -via an adaptive management approach - potential mitigation and offset measures, including any needed changes in project s Commission a review of fish passage design to ensure it will allow sufficient upstream & downstream fish movement at all times with minimum risk of mortality Avoid weir construction and other in-stream work during fish spawning periods Do not use herbicides to control vegetation on transmission line corridor EBRD PR 6 IFC PS 6 If monitoring results show adverse downstream changes Prior to first disbursement Throughout in-stream construction - Development and implementation of a recovery plan - Recovery of fish populations and ecosystem health - Construction of fish passage adequate to allow upstream and downstream movement by fish - No adverse effect on fish spawning Throughout - Manual control of vegetation 6.8 Salvage and store topsoil prior to disturbing new land Before disturbing new land - No loss of topsoil 6.9 7. Cultural heritage 7.1 Monitor bird mortality along transmission line corridor. In case of excessive mortality, develop and implement bird protection plan) Develop and implement a chance find procedure and ensure foremen and others are trained in its use 8. Disclosure and stakeholder engagement 8.1 Implement the agreed SEP, including regular (at a minimum annual) feedback to local stakeholders on the implementation of agreed environmental and social mitigation measures related to impacts that could affect them. Keep records of any grievances raised and associated responses provided. EBRD PR 6 IFC PS 6 EBRD PR8 IFC PS 8 EBRD PR 10 IFC PS 1 First two years of : once during each year s spring and fall migration season Thereafter: during routine maintenance Prior to disturbance of new land Include monitoring and bird mortality data in annual reports. Submission for review to lenders Submission of annual report on stakeholder engagement and resolution of grievances to lenders.