1 Environmental and Social Data Sheet Overview Project Name: Renewable Energy HPP Vranduk Project Number: Country: Bosnia and Herzegovina Project Description: The project consists of construction and operation of a runof-river, diversion type hydroelectric power plant (HPP) in Bosnia and Herzegovina (BIH) with a capacity of around 20 MW. EIA required: yes Project included in Carbon Footprint Exercise 1 : yes (details for projects included are provided in section: EIB Carbon Footprint Exercise ) Summary of Environmental and Social Assessment The project, if located inside the EU, would fall under Annex II of the EU Environmental Impact Assessment (EIA) Directive. Based on national legislation the project was screened in by the competent national authority and an EIA was therefore performed. The ESIA documentation was submitted to the Ministry of Environment, the national competent authority, in June 2010 and received approval in March According to the available ESIA documentation, the key adverse environmental impacts of the proposed project relate to biodiversity (flora & fauna), temporary increase of dust emissions, increased noise pollution, hydrology and hydrogeology; while the main social impacts are related to cultural heritage, land acquisition and limited resettlement, and general workplace and community safety. The assessment work carried out by the promoter to date has resulted in an overall understanding of the environmental and social risks and mitigation measures required for a project of this nature however a number of gaps with respect to the Bank s environmental and social requirements have been identified. These mainly relate to the lack of a sufficiently detailed assessment of the following aspects: cumulative impacts, sedimentation, biodiversity baseline, impacts on the biological and hydrological regime, ecological flow and river basin management (in line with the EU Water Framework Directive). In order to fill such gaps an Environmental and Social Action Plan (ESAP) has been agreed with the Promoter, specifying the remaining actions required to meet the Lenders (EBRD and EIB) environmental and social (E&S) standards. The promoter will also need to develop and put in place an Environmental and Social Management system (ESMS) and regularly update an Environmental and Social Management Plan (ESMP) to manage and monitor the E&S impacts associated with Project construction, operation and maintenance. The ESMS and ESMP will be aligned to best practice principles. The Lenders will monitor that the ESAP is implemented properly and in a timely manner. Overall and in the long-term, the project is expected to have several positive environmental and social effects. The project will increase the production of electricity from renewable 1 Only projects that meet the scope of the Pilot Exercise, as defined in the EIB draft Carbon Footprint Methodologies, are included, provided estimated emissions exceed the methodology thresholds: above 100,000 tons CO2e/year absolute (gross) or 20,000 tons CO2e/year relative (net) both increases and savings.
2 sources, partly alleviating BIH heavy reliance on coal for electricity production and thereby contributing to greenhouse gas emissions reduction. The project supports the country s objective of increasing the share of local, renewable energy sources in electricity production. In addition, the project will be the first large-scale HPP developed in BIH after more than 30 years and therefore will contribute to the creation of local employment and know-how in this field. Finally, the promoter will provide expert assistance to local community organisations in conjunction with project activities, such as the development of Management Plan for the national historic monument, Old Fortress of Vranduk. An agreement for the implementation of Program on Friendly Environment has also been signed between the promoter and Zenica Municipality to provide funding for 34 projects including construction of sports fields, water supply and roads for the local communities. With the appropriate mitigation measures in place and the environmental and social contractual conditions placed on the project, the project is considered acceptable for Bank financing. Environmental and Social Assessment The Bosna River catchment is the largest individual catchment within BiH, covering 20% of the total area of BiH. It flows 271 km northward through central BiH and is a tributary of the river Sava which runs along the border between FBiH and Croatia, which is in turn a tributary of the River Danube. The Bosna river is a highly polluted river. Major upstream pollution sources in the project vicinity include a steel factory in the city of Zenica. Inadequate urban and industrial wastewater treatment plants and intensive agriculture are also key contributors to river pollution. The project area of influence covers the project site and its facilities; ancillary infrastructure (mainly access roads), laydown areas for spoil and borrow pits. The spatial extent of potential project impacts is expected to be limited to the villages of Vranduk, Novi Vranduk, Beharinovac, Ponirac, Lučice, Koprivina, Varošište, Nemila and Hanovi, existing infrastructure (roads and bridges), existing businesses and proposed projects potentially affected by the project, and flora and fauna that rely on the Bosna River upstream and downstream of the project. The project has also been granted a Preliminary Water Consent (PWC) and Location permit, and the promoter is in the process of applying for the Water Consent and the Water Permit. No construction permits for the project are in place yet which is normal at this stage as these permits are obtained on the basis of the detailed design that will be contracted as a part of the Supply and Installation contract. Environmental and Social Issues Although BIH has no clear national energy strategy assessing the energy needs of the country with the total number of HPPs planned for construction and their optimal location, the Bosna river catchment area has been studied with respect to its hydroenergy development since 1967 and the project has been identified as one of the priorities taking into account technical, economic and environmental considerations. The selected location and technical solution, elaborated in the project documentation was based on previous studies, knowledge of the area, realised investigations, boundary conditions and altitude limitations of the existing infrastructure. Apart from above mentioned strategic studies no formal Strategic Environmental Assessment (SEA) for planning of new hydro projects in BIH and no Integrated Water Resources Management Plan for the Bosna river basin have been developed so far. However the promoter has been requested by the Government of the Federation of BIH to initiate activities on the preparation of this plan. As a similar plan would be required in the EU under the Water Framework Directive so for this reason a corresponding requirement for the preparation of Bosna river Basin Management study has been introduced as an undertaking by the Bank. The Bank will closely follow preparation of this study as a part of its project monitoring.
3 Cumulative impacts: Industrial activities and infrastructure construction in the Project vicinity which may have cumulative impacts with the project include the following: A landfill site on the left bank upstream between the dam and the existing local road will be reconstructed in order to provide access to the dam on the left bank of the river and which may have temporary cumulative impacts with laydown areas for spoil from excavations during the construction phase; The planned motorway corridor Vc to be constructed across the project site, and whose construction coincides with the construction schedule of the project; The planned Kovanici HPP on the Bosna River, approximately 10 km downstream from the project; and The planned Janjici HPP on the Bosna River, approximately 20 km upstream from the project. The ESIA did not assess any likely significant cumulative impacts with the existing landfill site during construction in terms of waste. The ESAP requires the promoter to advise the EPC contractor to consider the potential for cumulative impacts when determining the locations for temporary laydown areas for excavated and other material. With regards the motorway project, the ESIA states that the Vranduk HPP will not directly affect the construction of the motorway. However, according to the FBIH Road Directorate, the Zenica-Nemila stretch of the motorway is anticipated to be constructed between 2015 and 2020 and therefore concurrent with the scheduled construction period and planned dredging of the downstream riverbed. There may be significant impacts in terms of traffic, noise and air quality as it is likely that the motorway will use the same access roads and similar heavy construction, vehicles and machinery. The carrying out of a cumulative impact assessment study of the motorway construction has been included in ESAP, as well as the traffic and noise impact assessments. There are no existing HPPs in the upstream or downstream vicinity of the project although the promoter apparently has plans to develop both the Janjici and Kovanici HPPs on the same river. These are in the pre-planning stages and project details were not known at the time the ESIA for the project was undertaken. According to limited information available these HPPs are unlikely to affect water availability and hence, the functioning of the project. Environmental Impact and Mitigation Sedimentation: Sedimentation of the Bosna River resulting from the dam construction, dredging (construction and later maintenance dredging during operation), other earthworks and erosion of disposed excavated material is a potential significant impact that has not been clearly assessed in the ESIA. Avoidance and management measures will be included in the Construction Environmental Management Plan (CEMP) in accordance with the Water Consent (still to be obtained) so as to reduce sedimentation and water turbidity which would impact on water quality. Control of these sedimentation sources is defined in the project ESAP. Impact on the biological and hydrological regime of the Bosna river: Implementation of the project will alter the current biological and hydrological regime of the Bosna river at the project site, in particular within the section downstream of the dam. These changes are due to the introduction of a barrier to the natural flow of the Bosna river and the diversion of the majority of its waters in the winding stretch in the Vranduk-Nemila canyon with a length of approximately 6.7 km. The significance of likely impacts on flora and fauna are based on an assessment of the expected nature, extent, duration, and intensity of potential impacts as well as of the probability of the impacts occurring. The closest protected sites to the scheme are forested mountainous areas in the vicinity of the town Žepče, approximately 30 km downstream of Vranduk, and the natural landscape area Bristicak near Zenica, approximately 10 km upstream of the Project site. The scheme will not have an impact on either of these sites owing to the small footprint of the scheme and the distance of the project to these sites. Upstream of the dam, the project will submerge an area of approximately 5.3 ha of land, of which only ha consist of natural shrubs and trees. Even though this area might be Annex I Habitat (of the EU Habitats Directive 92/43/EEC) it is highly unlikely that the loss of
4 this small amount would have an impact on the structure and function and integrity of the ecosystem. Downstream of the dam, the reduction in flows may result in some loss or changes to the composition of riparian vegetation, which may also include Annex I Habitat. The assessment whether and how much Annex I Habitat may be lost downstream of the dam due to the reduced water flow is included in the studies required under the ESAP. However, it is anticipated that the riparian vegetation is unlikely to be highly water dependant, owing to the steep valley form. If Annex I Habitat is to be affected, appropriate mitigation and compensation will be required so as to ensure no net loss of biodiversity. In order to protect terrestrial fauna during the construction phase of the Project, the Environmental Permit requires that vehicles deployed for the scheme are to avoid movements beyond existing roads and this requirement will be included in the CEMP and for the operating phase of the project. Biodiversity assessment: A desk study for fish has been carried out for the project in the ESIA using data on fish populations in the Sava river catchment, obtained by field research in 2006 and Despite the fact that the Bosna river is highly polluted, several Cyprinidae species (Minnow Family) were identified as being present downstream from the project, but these are not protected species. However, the sampling locations were not specified and as the river stretch between Zenica and the Sava River is very long there is no certainty of what type of fish species are present up and downstream of the project location. In the past, the river has also been known to be a migrating ground for salmonids, such as trout and grayling, which require cleaner water. As the life-span of a HPP can be up to 100 years, it is likely that future improvements of the water quality of the Bosna river may result in other species returning to the Bosna River. The Bank considers the information provided in the ESIA on likely impacts on fish species to be insufficient to allow for an assessment of impacts or significance to be concluded and it has therefore required that a full aquatic study be carried out and that its conclusions be taken into account in the final design and recommendations form part of an adaptive management plan. The Bank also received excerpts from a Fishermen Baseline Study for Zenica-Doboj Canton prepared by Faculty of Agriculture and Food Sciences University of Sarajevo in April This study is an updated catalogue of fish in Bosna river and its tributaries in the project zone and may serve as an additional source of information for the acquatic study required. The ESIA proposes the addition of a fish ladder for fish movement and migration over the dam structure. This is also a requirement of the environmental permit. The Bank met representatives of the Association of Fishermen USR Bistro from Zenica and discussed the effectiveness of the suggested fish ladders. The Bank has required, as a part of ESAP, that further studies be undertaken by an independent expert prior to the tendering of the Supply and Installation Contract to confirm any requirements, in particular for protected species and for the long-term sustainability of the river system and to provide sufficient background information for main design The ecological minimal acceptable flow (EMF): The EMF of 14 m3/s has been calculated based on the provisions included in the national Law on Water which was applicable when the ESIA was undertaken and the preliminary design developed and considers minimum mean monthly flows based on available flow data from 1955 to The Bank has some concerns about the accuracy of the data used as it is >20 years old. Water use and water management practices in the area may have changed significantly over the last 20 years. It is also unclear whether any changes in the hydrological regime may have occurred over the last 20 years have been taken into account. Both the EMF calculations and the Vranduk HPP design have used the same baseline data. In order to fulfil Bank s requirements, the project must retain an EMF that is sufficient to meet the needs of downstream water users and biodiversity. Neither tourism nor related activity, such as kayaking, take place on the Bosna River in the Project vicinity and the water is not used as drinking water. However, there is no data contained within the ESIA that considers the water use requirements on the river stretch with the EMF downstream of the dam, such as for irrigation purposes. The promoter has not provided the data on water resource users downstream of the dam or been able to advise whether the EMF would be sufficient to meet their needs and general biodiversity requirements. The Bank has required that the promoter
5 undertake, as a part of ESAP, a more detailed analysis of the EMF that also takes into account the specific requirements of downstream water resource users. The conclusions of this analysis shall be taken into account in the final design. In addition, the promoter should develop a rating curve to define the correlation between the water flow and water elevation/depth of the Bosna River at the project site following dam gate closure, install sensors for continuous measurement of water elevation/depth in the river stretch immediately downstream of the dam and use the resulting data to ensure that the EMF is continuously maintained. Environmental and Social Management Systems The Construction Environmental Management Plan (CEMP) will need to be developed by the EPC contractor, approved by the promoter, the PIU consultant and the Bank and be in accordance with the conditions included in the Environmental Permit, and Water Consent. This requirement must be included in the project tender documentation and incorporated into the appointed EPC contractor s contractual obligations. The promoter will establish a team supervising the development and implementation of the CEMP and other environmental management plans. The supervisory team will include an environmental expert and will also monitor the implementation of health and safety requirements. PIU consultant with sufficient international experience will assist the promoter in this respect. For the operational phase the promoter has committed to develop all management plans for the prior to obtaining the Operation Permit and in accordance with the relevant legislation in BIH. The ESAP includes clear requirements for an adaptive management approach that allows operations to be adjusted as needed to reduce any observed impacts on biodiversity or downstream impacts. The actions include a series of plans to control potential impacts during construction (traffic, occupational health and safety, erosion control, waste management, etc.) as well as an assessment of the aquatic ecosystem to verify the conclusion of the ESIA that the project would have no significant adverse impacts operational plans and actions. The ESAP also requires detailed hydrologic and sediment modelling and management to protect river integrity, construction of a fish ladder if feasible, independent verification that ecological minimum flows are adequate to preserve biodiversity in the downstream river. The promoter will develop and implement a plan to manage any unexpected impacts on the nearby Vranduk Fortress and any other cultural heritage resources. In addition, filling of the reservoir would require one household to be relocated and other private land to be acquired from private landowners. The promoter will implement a Resettlement Policy Framework to guide resettlement and land acquisition and ensure that all losses by landowners and land users are properly compensated or replaced. The Promoter has obtained ISO accreditation for its generating facilities, but not for its corporate management structure. An environmental and social management system (ESMS) will need to be developed prior to construction and regularly updated to manage environmental and social aspects and impacts associated with project construction, operation and maintenance. The ESMS will be based on the key principles of the ISO14001:2004 and Occupational Health and Safety Advisory Services (OHSAS) The promoter will submit annual reports that provide details on the implementation of each ESAP requirement and on compliance with the Bank s Requirements. The Bank will also audit performance at least once during construction and again within a year of commissioning. Any mitigation and monitoring measures identified as a result of further surveys will be included in the project CEMP and ESMS. The ESAP includes sufficient requirements to avoid or mitigate potentially significant adverse impacts. EIB Carbon Footprint Exercise The project will not result in significant GHG emissions from methane as a result of anaerobic digestion of submerged vegetation. The reservoir will not be very deep and the resident time of the water in the reservoir is limited. It appears that only a small area of vegetation will be covered by the increased water level in the reservoir and vegetation shall be cleared prior to filling the reservoir. Hence, GHG emissions can be expected to be minimal, if any.
6 Based on an estimated electricity production of 96 GWh/year, emissions savings are expected to be 121 kt/year of CO2 equivalent. For the annual accounting purposes of the EIB Carbon Footprint, the project emissions will be prorated according to the EIB lending amount signed in that year, as a proportion of project cost. Social Assessment Although an ESIA has been prepared for the project, a self-standing social impact assessment was not required under FBIH law. Further due diligence has therefore been done by the Bank to complement the social elements that are already included in the ESIA. Primary adverse social impacts associated with construction and operation of the project relate to (i) noise, blasting, vibration and community disturbance impacts, (ii) cultural heritage (primarily through visual impacts and potential temporary reduction in tourist visits); (iii) land acquisition and associated (minor) economic and physical displacement that will occur due to flooding of the reservoir and construction of new roads; and (iv) general workplace and community safety. The total area that will be affected by land acquisition consists of approximately 80,000m 2 made up of 126 land plots that belong to the cadastral municipalities of Vranduk, Nemila, Banlozi and Donja Gračanica. Most of these are government owned (either water land or forest land) with some being privately owned. This will be verified through the survey activities which will determine the precise number of affected persons and nature of impacts. A Land Acquisition and Compensation Framework has been prepared by the promoter, based on which a specific Resettlement Action Plan will be developed following completion of a census. The ESAP also includes provisions to reduce impacts on tourism at the nearby Vranduk Fortress. The ESIA has identified the Vranduk fortress as a nearby cultural heritage sites that needs special attention. While the fortress is not expected to be physically affected by the project, the project will have a significant visual impact on the surrounding cultural landscape. In addition, the noise and congestion during the construction phase may reduce the number of tourists that visit the locations. Given this, a Management Plan is being prepared for the protection and maintenance of Old Town Vranduk. The Plan will include measures for continuous monitoring by an authorised organization for protection of cultural-historic heritage as well as maintenance and promotion of this important national monument. In terms of the positive social impacts of the project, approximately 1500 temporary jobs are expected to be created during the construction phase of the Project and 15 jobs in the operational phase. The intention is to hire as many local workers as possible. A one-off Program on Friendly Environment has been signed between EPBiH and Zenica Municipality to provide funding for 34 projects (including the construction of sports fields, water supply and roads for local communities) in the municipality with a budget of approximately KM 1.5 million In addition, during the operational phase, the project will pay concessions to the Municipality of Zenica as well as the canton and the national government. The breakdown of payments within the municipality, and therefore the amount of money that is given to Vranduk will be decided by the Municipality of Zenica. These will be in the form of one-off lump sum payments and also annual payments for a concession period of 30 years. Public Consultation and Stakeholder Engagement Public consultation, in the form of public hearings, is required by FBiH law for the Preliminary Water Consent and for the ESIA prior to the issuance of the Environmental Permit. Public hearings were carried out in September 2009 and November The last public hearing was carried out as part of the ESIA approval process and was arranged by the Federal Ministry of Environment and Tourism (MoET). Further public consultation was required by EBRD and it is considered to be sufficient to comply with the Bank s own E&S standards.
7 The stakeholder engagement and public consultation carried out to date has been documented in a Stakeholder Engagement Plan. This document lists all known stakeholder groupings and outlines a set of future stakeholder engagement activities. To date, no stakeholders have expressed concerns about potential impacts. The ESIA and Preliminary Design were presented to the attendees at the public hearing held in November A Non-Technical Summary (NTS) was published by the Federal MoET along with the EIA on its website for 30 days from 18 October to 16 November 2010, in accordance with the Law on Environment. The ESIA package inclusive of the EIA, revised NTS, Stakeholder Engagement Plan, and Environmental and Social Action Plan (ESAP) was disclosed on the Promoter s website ( on 14 May The link to the ESIA has also been published on the EIB website.
Darial Energy LLC. Dariali Hydro Power Plant Construction and Operation Project. Environmental and Social Action Plan, Dariali HPP
Darial Energy LLC Dariali Hydro Power Plant Construction and Operation Project Environmental and Social Plan, Dariali HPP Tbilisi 2014 Dariali Energy JSC, the Sponsor, is planning construction and operation
More informationEnvironmental and Social Action Plan Adjaristskali Hydropower Plants
Environmental and Social Plan Adjaristskali Hydropower Plants The International Finance Corporation (IFC), the Asian Development Bank (ADB), and the European Bank for Reconstruction and Development (EBRD)
More informationGuiding Principles on Sustainable Hydropower Development in the Danube River Basin
Guiding Principles on Sustainable Hydropower Development in the Danube River Basin Lead Countries : Austria, Romania, Slovenia in the frame of the International Commission for the Danube River Protection
More informationENVIRONMENTAL IMPACT ASSESSMENT
UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE TRANS-EUROPEAN NORTH-SOUTH MOTORWAY (TEM) 65th Steering Committee and EIA Workshop ENVIRONMENTAL IMPACT ASSESSMENT Best practices and challenges in Bosnia
More informationEnvironmental and Social Data Sheet
Environmental and Social Data Sheet Overview Project Name: Project Number: 2013-0342 OUARZAZATE II (PARABOLIC) Country: MOROCCO Project Description: Construction and operation of a 200 MW CSP Parabolic
More informationEnvironmental and Social Data Sheet
Environmental and Social Data Sheet Overview Project Name: S3 EXPRESSWAY Project Number: 2012-0666 Country: POLAND Project Description: The project consists of two components, as follows: (i) construction,
More informationANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:
ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not
More informationPROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)
PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:
More informationBosnia and Herzegovina Energy Efficiency in Public Buildings Project Environmental Management Framework. Republika Srpska
Bosnia and Herzegovina Energy Efficiency in Public Buildings Project Environmental Management Framework Republika Srpska November 2013 GENERAL INFORMATION The development objective of the Project is to
More informationEnvironmental and Social Impact Assessment for Rogun Hydro Power Plant
Environmental and Social Impact Assessment for Rogun Hydro Power Plant Environmental and Social Impacts July 14-19, 2014 Content Project History Purpose and Scope The Project Area The Project The Project
More informationAnnex F Scoping Checklist
Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve
More informationFactor Potential Effects Mitigation Measures
Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table
More informationNatura 2000 and Hydropower. Hydropower and Fish Workshop Brussels 29 May, 2017
Natura 2000 and Hydropower Hydropower and Fish Workshop Brussels 29 May, 2017 Christina Pantazi European Commission DG Environment, Nature Protection Unit (D3) Hydropower and Natura 2000 Hydropower one
More informationPUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME. 2 Objective of the Phase II Environmental and Social Programme
PUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME 1 Introduction and Background To meet its environmental and social obligations and commitments, the Lesotho Highlands Development
More informationYes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)
Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been
More informationCottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref:
Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell Volume 2 NON TECHNICAL SUMMARY December 2012 SLR Ref: 419.00034.00473 INTRODUCTION 1. This Non Technical Summary (NTS) has been produced by
More informationUkraine Sustainable Energy Lending Facility (USELF) Strategic Environmental Review (SER) Ecoline EA Centre
Ukraine Sustainable Energy Lending Facility (USELF) Strategic Environmental Review (SER) Ecoline EA Centre Objectives of Strategic Environmental Review (SER) The European Bank for Reconstruction and Development
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET
More informationPerformance Requirements
Environmental and Social Policy 15 Performance Requirements PR 1: Environmental and Social Appraisal and Management Introduction 1. The EBRD considers it important that all companies receiving EBRD financing
More informationL 337/36 Official Journal of the European Union
L 337/36 Official Journal of the European Union 22.12.2005 PROTOCOL on the implementation of the Alpine Convention of 1991 in the field of energy Energy Protocol Preamble THE FEDERAL REPUBLIC OF GERMANY,
More information5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:
5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the
More informationCountry reports Summary of Environmental Issues
WORLD BANK - SUPPORT TO WATER RESOURCES MANAGEMENT IN THE DRINA RIVER BASIN Mouth of Lim River into the Drina River, Republika Srpska, Bosnia and Herzegovia Country reports Summary of Environmental Issues
More informationChapter 13 Management and Implementation
Chapter 13 Management and Implementation TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Overview of AGT Region Operating Management System... 13-1 13.3 Construction
More information6 Risk assessment methodology
Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management
More informationENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR Overview of Presentation 1. Objectives of the Consultancy 2. Hydropower in Myanmar 3. Draft Table of Contents 4.
More information4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:
4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:
More informationChapter 17 Cumulative Impacts
Chapter 17 Cumulative Impacts CONTENTS 17. Cumulative Effects... 2 17.1 Introduction... 2 17.2 Summary of Relevant Legislation, Planning Policy and Guidance... 2 17.3 Methods... 5 17.4 Consultation...
More informationEuropean sediment regulations: Gaps and bridges
Sednet Conference, Venice 2004 European sediment regulations: Gaps and bridges Helge Bergmann Federal Institute of Hydrology Koblenz (Germany) Sednet 2004 Folie 1 Professional background contaminants in
More informationWelcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016
Welcome to the Boulevard Lake Dam Class Environmental Assessment Public Information Session #1 June 14, 2016 Boulevard Dam - Overview Built approximately 100 years ago Owned and operated by the City of
More informationEBRD and Wind Energy
EBRD and Wind Energy Climate Investment Funds Managing the Impact of Wind Energy Development on Birds and Bats September 2012 Jack Mozingo and Robert Adamczyk Environmental and Sustainability Department
More informationSTRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR ENERGY SECTOR: CASE STUDY OF OLKARIA GEOTHERMAL EXPANSION PROGRAMME IN NAKURU COUNTY, KENYA.
STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR ENERGY SECTOR: CASE STUDY OF OLKARIA GEOTHERMAL EXPANSION PROGRAMME IN NAKURU COUNTY, KENYA. Philip.J. Barasa Environmental Scientist Kenya Electricity Generating
More informationEnvironmental Impact Assessment of Hydroelectric Power Plant LEEZA MALIK (2013CEP2080) TUSHAR SINGLA (2011MT50623)
Environmental Impact Assessment of Hydroelectric Power Plant LEEZA MALIK (2013CEP2080) TUSHAR SINGLA (2011MT50623) 1 Contents Background Objective EIA of Hydroelectric plants Tools and Techniques used
More informationSUMMARY 2013 EDITION
SUMMARY 2013 EDITION RSAT Joint Initiative on Rapid Basin-wide Hydropower Sustainability Assessment Tool PART 1: OVERVIEW OF THE RSAT The RSAT is designed as an integrative tool to assess hydropower development
More informationEnvironmental and Social Policy
Environmental and Social Policy Contents Foreword 2 Purpose 2 Commitments 2 Environmental and Social Assessment 3 Operations financed directly 4 Operations financed through Financial Intermediaries 4 Environmental
More information18 Cumulative Impacts and Interaction of Effects
18 Cumulative Impacts and Interaction of Effects 18.1 Introduction This chapter addresses the cumulative impacts and main interactions between different aspects of the environment likely to be significantly
More informationAustrian inland navigation policy & the Integrated River Engineering Project on the Danube East of Vienna
Austrian inland navigation policy & the Integrated River Engineering Project on the Danube East of Vienna Robert TÖGEL & Markus SIMONER Zagreb, June 9th, 2009 Austrian inland navigation policy Austrian
More informationThese potential changes and their implications are outlined in Annex 1.
Guidance Note Hydropower Guidance Note: This Guidance Note has been prepared by Natural Resources Wales (NRW) to provide applicants for abstraction and impoundment licences for hydropower schemes with
More information4 PROJECT ALTERNATIVES
4 PROJECT ALTERNATIVES 4.1 Introduction In terms of the EIA Regulations published in Government Notice R543 of 2 August 2010 in terms of Section 24 of the National Environmental Management Act (Act No.
More informationGUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08
CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Manager Environment Approved: Executive General Manager Asset Strategy DOCUMENT HISTORY Date
More informationNatural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA).
Guidance Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA). March 2008 Table of Contents Page INTRODUCTION... 2 DEFINITIONS...
More informationTen Steps to Implementing ROW LID
connecting drops the Ten Steps to Implementing ROW LID UTRCA Symposium Low Impact Development: Opportunities for Municipalities Implementing LID on a Watershed Basis and Making a Difference: A 10 Step
More informationESIA for the proposed Baynes Hydropower Project:
ESIA for the proposed Baynes Hydropower Project: Public Scoping Meeting: Windhoek Special Arrangements Visitors from Kunene Region Liaison Officer will translate for them. Meeting filmed. Microphones to
More informationRepublic of Bulgaria Ministry of Regional Development DG Territorial Cooperation Management EX-ANTE EVALUATION AND SEA OF THE BULGARIA THE FORMER
Republic of Bulgaria Ministry of Regional Development DG Territorial Cooperation Management EX-ANTE EVALUATION AND SEA OF THE BULGARIA THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA IPA CBC PROGRAMME 2014-2020
More informationEuropean State Questionnaire on Hydropower and the WFD
Water management, Water Framework Directive & Hydropower Common Implementation Strategy Workshop Brussels, 13-14 September 2011 European State Questionnaire on Hydropower and the WFD 1. Context The 2 nd
More informationThe World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc
The World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc Dubrovnik, 07 October 2009 Structure of Presentation 1. A Bit
More informationFinal Environmental Impact Assessment Report
NON-TECHNICAL SUMMARY... I 1 INTRODUCTION... 1 1.1 BACKGROUND... 1 1.2 PROJECT IMPLEMENTATION SCHEDULE... 2 1.3 COST ESTIMATE... 2 1.4 KEY LEGISLATIVE, REGULATORY AND INSTITUTIONAL FRAMEWORK... 2 1.4.1
More informationPromoting PES in the Danube Basin
Promoting PES in the Danube Basin Fostering PES projects in CEE and NIS Training Seminar, December 7-9 2006, Isle of Vilm Yanka Kazakova WWF Danube Carpathian Programme The Danube The most international
More informationNotes for NEPA for Generic Terms of Reference
TERMS OF REFERENCE IIRRIIGATIION AND WATER MANAGEMENT Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to the construction and/or the development of Irrigation
More informationFRAMEWORK FOR AQUACULTURE DEVELOPMENT ON THE VOLTA LAKE. Implementation Guidelines Document
FRAMEWORK FOR AQUACULTURE DEVELOPMENT ON THE VOLTA LAKE Implementation Guidelines Document APRIL 2017 INTERPRETATIONS: In these Guidelines, unless the context otherwise requires: Applicant: Company or
More informationWorks, services and infrastructure code
9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the
More informationNational Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR
National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR By Xaypaseuth PHOMSOUPHA Deputy Director General Department of Energy Promotion and Development Ministry of
More informationSEA and Green Growth The African Development Bank Experience
SEA and Green Growth The African Development Bank Experience Presented By Justin Ecaat, Principal Environmental Safeguards Officer Lusaka, Zambia. January 2013 Content Background: SEA: Beyond project level
More informationJI AND CDM: HYDROELECTRIC POWER PROJECTS OVER 20 MW
Last Update: 31.10.2007 JI AND CDM: HYDROELECTRIC POWER PROJECTS OVER 20 MW Guideline for Determination of Compliance with the Recommendations of the World Commission on Dams Regarding Hydroelectric Power
More informationClifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary
Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until 2035 Non Technical Summary SLR Consulting Limited Project Ref: 403.00079.00474
More informationReport for Agenda Item: 2
QLDC Council 28 September 2017 Department: Planning & Development Report for Agenda Item: 2 Stage 2 Proposed District Plan Notification Purpose The purpose of this paper is to present those parts of Stage
More informationSHAMS MA AN SOLAR PV POWER PLANT PROJECT (50MW) NON-TECHNICAL SUMMARY IN ENGLISH
SHAMS MA AN SOLAR PV POWER PLANT PROJECT (50MW) NON-TECHNICAL SUMMARY IN ENGLISH 21 October 2014 TABLE OF CONTENT Table of Content... i 1. Introduction... 1 1.1 Project Alternatives... 2 2. Project Description...
More informationENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass
ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT
More informationCONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES
CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES EMIOLA ABASS June 13, 2017 COURSE OBJECTIVE This course has been designed to provide guidance to
More informationEnvironmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)
Checklist:. 10.Ports and Harbors (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders (3) Examination of Alternatives (1) Air Quality (2) Water
More informationSCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS
SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS Version 2 June 2006 1. Purpose These Guidelines are supplementary
More informationPRIORITY AXIS 1: A well connected region
PRIORITY AXIS 1: A well connected region Corresponds to Thematic objective 7- promoting sustainable transport and removing bottlenecks in key network infrastructures All data presented is published for
More informationEBRD Performance Requirement 1
EBRD Performance Requirement 1 Assessment and Management of Environmental and Social Impacts and Issues Introduction 1. This Performance Requirement (PR) establishes the importance of integrated assessment
More informationEnvironmental and Social Review Summary. Hoi Xuan Hydropower Project
Environmental and Social Review Summary Hoi Xuan Hydropower Project This Environmental and Social Review Summary (ESRS) is prepared by MIGA staff and disclosed prior to the date on which MIGA s Board of
More informationConstruction of a Motorway in Slovakia under the Juncker Plan: A public-private partnership with high costs and limited benefits
Briefing paper June 2016 Construction of a Motorway in Slovakia under the Juncker Plan: A public-private partnership with high costs and limited benefits After being elected President of the European Commission,
More informationSummary of Preparatory Study
Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic
More informationThe following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:
TRCA Technical Guidelines for the Development of Environmental Management Plans for Dewatering September 2013 Rationale: The Technical Guidelines for the Development of Environmental Management Plans for
More informationSouth West Water Strategic Environmental Assessment of Water Resources Plan Summary Document
South West Water Strategic Environmental Assessment of Water Resources Plan 2009 Summary Document Hyder Consulting (UK) Limited 2212959 5th Floor The Pithay All Saints Street Bristol BS1 2NL United Kingdom
More informationAnnex 1: Project Tropicalia Sustainable Tourism, Dominican Republic
Annex 1: Project Tropicalia Sustainable Tourism, Dominican Republic and Social Action Plan (ESAP) Item PS 1: Assessment and Management of and Social Risks and Impacts 1.1 and Social Management System (ESMS)
More informationThe Project. Federal Regulatory Approvals and Involvement
Government of Canada Response to the Report of the Joint Federal-Provincial Review Panel for Nalcor s Lower Churchill Generation Project in Newfoundland and Labrador The Project Nalcor Energy proposes
More informationThis summary and the Report subsequently inform the recommended mitigation contained in Section 28 and will inform the Project conditions.
18. Air The Project Air quality team prepared an Air Quality Assessment Report for the Project, which is included in Volume 3 (Part 1). The Report provides an assessment of air quality effects associated
More informationChapter 14 Overall Project Assessment
Chapter 14 Overall Project Assessment TABLE OF CONTENTS 14 OVERALL PROJECT ASSESSMENT... 14-1 14.1 Introduction... 14-1 14.2 Development of the ESIA... 14-1 14.2.1 Adopted Process... 14-1 14.2.2 Challenges
More informationThree Gorges Project. A Project with Tremendous Benefits and in Favour of Environmental Improvement. By Cao Guangjing May 22, 2004
Three Gorges Project A Project with Tremendous Benefits and in Favour of Environmental Improvement By Cao Guangjing May 22, 2004 Contents 1. Brief Introduction 2. Why Should TGP Be Built? 3. Investment
More informationCMPDI. 4.6 Mine Closure Plan
4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.
More informationCoire Glas Pumped Storage Scheme
About SSE SSE is one of the UK s largest energy companies and is headquartered in Perth. Our purpose is to provide the energy people need in a reliable and sustainable way. We're involved in producing,
More informationSession: For more information:
Session: For more information: www.hydropower.org/congress VALUE CREATION AT HYDROPOWER PROJECTS IHA World Congress 2015 Session : Macroeconomic Benefits Emmanuel Branche, EDF Senior Economist EDF Project
More informationAMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1
AMDAL Procedure (This is only indicative and for reference purposes. This is not exhaustive and therefore, the Consultants are requested to familiarize themselves with all the laws, rules, regulations,
More informationPlava Voda Regional Water Supply Project
PlavaVoda Regional Water Supply Project Client: Project: Assignment: Contract No: European Bank for Reconstruction and Development Plava Voda Regional Water Supply Project Review and update of Environmental
More informationBalkan Rivers - The Blue Heart of Europe
Balkan Rivers - The Blue Heart of Europe Hydromorphological Status and Dam Projects Executive Summary Supported by: Vienna, March 2012 Executive Summary Among the biggest current threats to the natural
More informationCase of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT Weda Bay Nickel Project. Summary
APPRAISAL REPORT CAO Appraisal for Audit of MIGA CAO Compliance October 3, 2011 PT Weda Bay Nickel Indonesia Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT
More informationPortbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009
Portbury Dock Renewable Energy Plant Cumulative Impact Assessment Non-Technical Summary September 2009 INTRODUCTION On 28 th August 2009 E.ON Climate & Renewables UK Developments Limited (EC&R) submitted
More informationTechnical Guidance Document for Operational Environmental Management Plan (OEMP)
Technical Guidance Document for Operational Environmental Management Plan (OEMP) EAD-EQ-PCE-TG-06 Signature on Original Environment Quality Sector * Corporate Management Representative Secretary General
More informationSEARs project justification and conclusion
31 Project justification and conclusion This chapter presents a justification for the project and a conclusion to the environmental impact statement (EIS). The justification is based on the strategic need
More informationEnvironmental Licensing of Wind Farms in Greece
Environmental Licensing of Wind Farms in Greece Alexandros Koulidis Environmental Licensing is EIA The term environmental licensing in Greek legislation is equivalent to the environmental impact assessment
More informationBerth 9 Quay Extension Environmental Statement Non-Technical Summary
Berth 9 Quay Extension Hutchison Ports UK Ltd July 2013 Final Report 9Y0150 CONTENTS Page 1 PROJECT BACKGROUND 1 2 NEED FOR THE PROPOSED SCHEME 4 3 DESCRIPTION OF THE CONSTRUCTION PHASE 4 4 DESCRIPTION
More informationHigh Speed Rail (London- West Midlands)
High Speed Rail (London- West Midlands) Draft Environmental Minimum Requirements Annex 4: Draft Environmental Memorandum November 2013 ESA 4.2 High Speed Rail (London- West Midlands) Draft Environmental
More informationBuilding from the ground up in West Africa. The Hatch approach to projects in a developing country
Building from the ground up in West Africa The Hatch approach to projects in a developing country 2 Agenda 1. Hatch Contribution to West Africa Development 2. Three Recent Projects on Which We Worked 3.
More informationEnvironmental and Social Review Summary. For. Uganda. Renewable Energy Development Program Lubilia Hydropower Project
Public Disclosure Authorized Environmental and Social Review Summary Public Disclosure Authorized For Public Disclosure Authorized Uganda Public Disclosure Authorized Renewable Energy Development Program
More informationFourth Meeting of the Conference of the Parties to the Framework Convention on the Protection and Sustainable Development of the Carpathians
Fourth Meeting of the Conference of the Parties to the Framework Convention on the Protection and Sustainable Development of the Carpathians UNEP/CC/COP4/DOC11/REV1 Original: English STRATEGIC ACTION PLAN
More informationIntroduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and
Introduction There are many tools that a reviewer of environmental impact assessment documents can use to help determine whether such documents are complete and adequate. Among the powerful tools that
More informationAppendix General Environmental Risk Analysis
Proposed Solar Power Station Near Moree, NSW (MOREE SOLAR FARM) Appendix Prepared by BP Solar & Walsh Consulting January 011 Background The body of the identifies all significant environmental risks identified
More informationGold Coast. Rapid Transit. Chapter content. Chapter ten Environmental impacts
Chapter ten Environmental impacts Gold Coast Rapid Transit Chapter ten Environmental impacts Chapter content Environment overview...219 EPBC referral...220 Impacts and mitigation strategies for: Flora
More informationCity of Bishkek & European Bank for Reconstruction & Development (EBRD) Bishkek Solid Waste Management Project Environmental and Social Action Plan
City of Bishkek & European Bank for Re & Development (EBRD) Bishkek Solid Waste Management Project Environmental and Social Plan ESAP/Final Final 9 November 2016 This report takes into account the particular
More informationIt will be of particular interest to those potentially affected by the Government s proposals for high speed rail.
HIGH SPEED TWO INFORMATION PAPER E8: ARCHAEOLOGY This paper outlines HS2 Ltd's approach to assess and reduce as far as reasonably practicable the impact on archaeological remains that could result from
More informationGUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK
PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the
More information8 ENVIRONMENTAL MANAGEMENT PROGRAMME (PROJECT ENVIRONMENTAL SPECIFICATION)
8 ENVIRONMENTAL MANAGEMENT PROGRAMME (PROJECT ENVIRONMENTAL SPECIFICATION) In order to manage the construction phase impacts associated with the establishment of the Compilation Yard and the Common User
More informationEnvironmental and Social Review Summary
Environmental and Social Review Summary Rajamandala Hydropower Project This Environmental and Social Review Summary (ESRS) is prepared by MIGA staff and disclosed prior to the date on which MIGA s Board
More information(50MW) Non Technical Summary (NTS)
RISHEH SOLAR PV POWER PLANT PROJECT (50MW) Non Technical Summary (NTS) 13 August 2017 REV 0 TABLE OF CONTENT Table of Content... i 1. Introduction... 1 2. Project Description... 1 2.1 Project Location...
More informationAdvice to decision maker on coal mining project
. Advice to decision maker on coal mining project IESC 2015-063: West Muswellbrook Project New Development Requesting agency The New South Wales Mining and Petroleum Gateway Panel Date of request 27 January
More informationEnvironmental and Social Review Summary. Ejuva One and Ejuva Two Solar Projects
Environmental and Social Review Summary Ejuva One and Ejuva Two Solar Projects This Environmental and Social Review Summary (ESRS) is prepared by MIGA staff and disclosed prior to the date on which MIGA
More informationPPIAF Assistance in Montenegro
PPIAF Assistance in Montenegro October 2012 Since 2007 PPIAF has supported four activities in Montenegro, two in the energy sector, one in the transport sector, and one in the water sector under PPIAF
More information