EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

Stanford University Facilities Design Guidelines SECTION STONE FINES PAVING. American Society for Testing and Materials.

ROAD PAVEMENTS GENERAL

Suggested laying methods for STONE pavers

STONE PRODUCT SPECIFICATION SANDSTONE. Some typical installation methods are: Pedestrian traffic only: reinforced concrete* 75mm thick

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

CW 3615 RIPRAP TABLE OF CONTENTS

1.20. Technical Data. Rigidly Laid with Raised Kerb Edge SLABS.

SECTION UNIT PAVERS

Installation Guidelines

Safety Method Statement External Works

Asset Protection Bond Information Sheet

DEMOLITION TRADE SPECIFICATION

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

Overview COSVR367. Lay modular pavement

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.

Construction Specification for Concrete Unit Pavers

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

SECTION INTERLOCKING PRECAST CONCRETE UNIT PAVERS

Tasman Retaining Wall System

ECO OUTDOOR INSTALLATION TIPS FLOORING COBBLESTONES

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

Contract18. Vitrified paving FLAT ROOF BALCONY ROOF TERRACE DISPLAY AREA

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

Bill of Quantity (BOQ)

ECO OUTDOOR INSTALLATION TIPS FLOORING COBBLESTONES MELBOURNE SYDNEY BRISBANE ADELAIDE PERTH T ECOOUTDOOR.COM.AU

freestone eco Prestige & quality DIY vertical wall Large blocks - 10/m 2 Smooth surface finish No concrete footings

SECTION BITUMINOUS CONCRETE PAVING AND ATHLETIC SURFACING. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

ECO OUTDOOR INSTALLATION TIPS FLOORING PORPHYRY

F10. BRICK/BLOCK WALLING To be read with Preliminaries/General conditions. TYPES(S) OF WALLING 110 CLAY FACING BRICKWORK SHALL BE:

Fence Stone. Self locating Wall System

CERAMIC FLOORING TRADE SPECIFICATION

Self Locating Wall System

FREESTONE ECOTM. Retaining Wall SystemTM. No one knows Blocks and Pavers better

ECO OUTDOOR INSTALLATION TIPS FLOORING CRAZY PAVING MELBOURNE SYDNEY BRISBANE ADELAIDE PERTH T ECOOUTDOOR.COM.AU

STH QLD PAVING LANDSCAPE SOLUTIONS

Maintaining a Walkable Sacramento: SIDEWALK MAINTENANCE PROGRAM HANDBOOK

Scanned by CamScanner

General Brick Installation Instructions

ECO OUTDOOR INSTALLATION TIPS FLOORING SPLIT STONE

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

F10. BRICK/BLOCK WALLING To be read with Preliminaries/General conditions. TYPES(S) OF WALLING 110 CLAY FACING BRICKWORK SHALL BE:

NSW PAVING LANDSCAPE SOLUTIONS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

Tasman Retaining Wall System

CONCRETE TILE PAVERS

NOVEMBER 2016 GRANDWALL. retaining walls installation guide

Bill of Quantity (BOQ)

ADPED FIXING GUIDE. Visit to view the PorcelQuick demonstration video

SECTION LIMESTONE PAVING

Tasman Retaining Wall

SECTION 10.0 PIPE TRENCHES Excavation and Preparation of Trench

Installation Information 2018

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1

Conditions of the Contract and Division 1 General Requirements are a part of this section.

Construction Specification for General Excavation

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

Redi Rock Specification and Installation Manual

Porcelain Paver Installation Guide

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

STH QLD PAVING LANDSCAPE SOLUTIONS

Procedure and Specification for the Construction of Vehicle Access Crossings over Footways and Verges April 2016

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

CHESHIRE EAST COUNCIL. Highways Service. Abridged Conditions, Requirements and Specification of Workmanship and Materials for the Construction of

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES

How to build 4 DIY projects with. AB Courtyard

ECO OUTDOOR INSTALLATION TIPS FLOORING SPLIT STONE MELBOURNE SYDNEY BRISBANE ADELAIDE PERTH T ECOOUTDOOR.COM.AU

Landscaping and Fencing

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5

INSTALLATION DETAILS FOR DRIVESETT ARGENT PRIORA PAVING

Installation Information 2016

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS

Masonry. Block Product Guide. what can you build with Selkirk?

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

ECO OUTDOOR INSTALLATION TIPS FLOORING TORINO MELBOURNE SYDNEY BRISBANE ADELAIDE PERTH T ECOOUTDOOR.COM.AU

55.3 AGGREGATE PRODUCTION AND STOCKPILING

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

Building in a Saline Environment

NTH QLD RETAINING WALL LANDSCAPE SOLUTIONS

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

1. Concrete pavers, with ungrouted joints, over sand base. a. Large precast sections in random mix with smaller concrete pavers

Gardenstone Retaining Walls

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

SECTION STORM DRAIN

Technical Manual Section 8 Rapid Drying Lightweight Screeds

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania.

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

SECTION INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING

GROUNDtrax GROUNDGRIDZ

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT

CHAPTER 11 - RESTORATION OF SURFACE IMPROVEMENTS

Retaining Walls. Made Easy

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990

Section (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM

Transcription:

SECTION 16: GROUND ASSETS CONTENTS 16.1 INTRODUCTION 2 16.2 LANDSCAPING 2 16.2.1 Paving 2 16.2.2 Site Conditions 4 16.2.3 Protection of Trees, Shrubs and Grounds During Construction 4 16.2.4 Protection of Soil During Construction 5 16.2.5 Landscape Furniture 5 16.2.6 Protection of Cultural Materials 5 DESIGN STANDARDS CHANGE LOG FEBRUARY 2013 No Changes Design Standards page 1 of 5

16.1 INTRODUCTION This section provides details of minimum requirements for Landscaping services. The consultant is expected to produce their own specification incorporating the elements of the following information and submit all designs to the University for review prior to any works commencing on site. 16.2 LANDSCAPING 16.2.1 Paving Landscaping elements proposed shall be in accordance with the Landscape Elements Report 1974, copies of which may be obtained through the University s Manager (Engineering and Infrastructure). Adequate provision shall be made in the project budget for a total landscaping proposal. All new landscaping proposals and alterations to existing grounds require approval by the Landscape and Open Space Sub-Committee of the Building and Estates Committee. All paving shall be carried out by suitably-qualified paving contractors in consultation with the University s Manager (Engineering and Infrastructure) and the Grounds Manager. Brick Paving and Bluestone Specifications. All Works shall be carried out using first quality materials entirely free from any defect. All Works shall be constructed under the observation of, and to the approval of, the University s Manager (Engineering and Infrastructure). No part of the Works shall be covered by the contractor until the approval of the University s Manager (Engineering and Infrastructure) has been obtained. Setting Out and Levels The Contractor shall set out the Works and levels as shown on the drawings or in the specifications. Obvious Works Where the construction or item of work is to be obviously inferred, or is usual, or proper, in the class or work described in this specification, it is to be included notwithstanding that such construction, or such necessary item, or work is not specifically mentioned in this specification or shown on the drawings. The Site The contractor is deemed to have visited the site to inspect, ascertain, and be satisfied with all these conditions, including the full extent and character of the work involved, the accessibility of the site, the location of existing services, security, and all other conditions liable to effect the cost, execution and general performance of the Contract, because no claim whatsoever will be entertained on the ground of insufficient knowledge of the site conditions. Program of Work Before commencing on site, the Contractor shall discuss with the University s Manager (Engineering and Infrastructure) the intended sequence of carrying out the works. Design Standards page 2 of 5

Barricades The Contractor shall be responsible for the provision and maintenance of barricades around all excavations and work areas to ensure the safety of all persons on the University grounds. Subgrade Compaction The Contractor shall trim and proof roll the exposed subgrade over the site to locate any further soft areas. Soft areas to be excavated and removed from site with other excavated material. These areas to be filled with sub-base material consisting of Class 3 wet mixed crushed rock compacted in layers not exceeding 100mm to achieve 98% compaction of the dry density given test E1.1 of AS 1289. Basecourse Material for Heavy and Light Duty Areas The thickness of the basecourse for heavy duty areas shall be 150mm and for light duty or foot traffic areas 75mm. Material shall be 20mm Class 2 wet mixed crushed rock complying with the current VicRoads grading specification for Class 2 crushed rock. The material shall be laid and compacted in layers not exceeding 50mm thick and achieve 98% of the maximum dry density given by test 2.1 of AS 1289. The levels of the compacted basecourse shall not be higher than 5mm, nor lower than 20mm, below the corresponding finished surface level of the brick paving. Bedding Course (Wet Mortar) The bedding material is washed coarse sand from Aggregate Sand Seymour 921055 mixed six parts with one part Portland cement. The wet consistency should be firm and hold together when squeezed in the hand. Bedding should not exceed 50mm depth and not less than 25mm depth. The mortar must not dry out whilst laying is in progress. Brick Paving Supply and lay Nubrick University grey pavers to match existing, unless otherwise specified. Bricks are laid normally in stretcher bond on flat. Bricks must be laid to levels and lines as per drawings supplied but should always have a minimum fall of 1:80 to allow for adequate drainage. Large colour or size variation between deliveries from the brick supplier should be immediately notified to the supplier and rectified so that any delay in laying of pavers is minimised. Colour blending, to avoid patches of light and dark colours, is the responsibility of the layer. Using a rubber mallet, the bricks should be hand-tapped down into the mortar, with a gap of approximately 3mm between courses and verticals. No mechanical vibrators are to be used. The final surface profile shall be within +/- 5mm of the design levels, with a level variation not greater that 5 mm over a 3m straight edge laid in any direction, and without hollows that would allow water to pond. After each section of the area is completed fine white dry washed sand must be brushed into the spaces between the bricks and some sand allowed to remain on the surface. The latter must be swept off when the works are completed and joints completely filled. Bluestone Paving Pavers shall be 40mm thick (nominal) diamond sawn bluestone with an approved sandblasted finish. Up to 20% cats paws (blotches) and/or vented streaks on the face of the pavers is desirable. Bluestone banding to bicycle hoop areas shall be 250mm x 350mm and sizes as nominated for random pattern paving. When laying apply a 5mm layer of raw cement Design Standards page 3 of 5

onto the bedding sand/cement mortar mix. Lay to falls, levels and maximum deviations as previously specified for concrete pavers. Grouts/Joints between pavers shall be a maximum 2.5mm wide. Grout joints with an approved non shrink cementitious grout (Durabed or equivalent which is equal and approved). Mix and apply in accordance with manufacturer s recommendations. Ensure that no residue grout remains on paver surface. Provide sample paver with sandblasted finish for approval prior to ordering all pavers. 16.2.2 Site Conditions The University s campus at Parkville has a number of areas in which the soil fungus, Phytophthora cinnamoni, is present. The Principal Consultant shall ensure that the site is cleared of all rubble and surplus building material on completion of construction. The site shall be handed over in a clean and tidy condition. It may be necessary to allow for excavation of the areas to be landscaped to a level suitable for the introduction of fresh soil. The Principal Consultant shall consult with the Grounds Manager or his/her nominee on the extent of responsibility for provision of new soil, rocks for landscaping, grounds furniture, irrigation systems and plant materials. Soft landscaping (lawns and planting) shall be approved by the Grounds Manager or his/her nominee. All trees on site shall be retained unless otherwise agreed with the Grounds Manager or his/her nominee. 16.2.3 Protection of Trees, Shrubs and Grounds During Construction During the design planning stage the Principal Consultant shall consult with the Grounds Manager or his/her nominee with regard to the impact of the proposed construction works on trees, shrubs and grounds within the construction site. The Contractor is required to consult with the Grounds Section at least 48 hours prior to the commencement of any excavation and / or construction in garden areas and tree root zones. Damage to grounds, gardens, plant material, tree roots, paving, irrigation systems and outdoor furniture must be avoided. If damage does occur this must be reported to the Grounds Section of PCS immediately. An assessment of each tree within the construction zone shall be carried out by the Grounds Section during the design process and any trees requiring protection will be nominated at this time. The techniques associated with providing and managing tree protection shall be considered by the Grounds Manager or his/her nominee and implications considered in the project budget. Any tree, group of trees or shrubs nominated in the tender documents as requiring protection must have suitable protection. This shall be in the form of a two-metre-high fixed hoarding or chain-link fencing, complete with access gate to be erected, maintained and removed by the Contractor. The fence shall be placed at the outer drip line of the tree(s) or shrubs. No building or construction material or liquid waste is to be stored or disposed of within the designated zone of protection, or other areas of garden. Pruning of branches and / or roots and any removal of plants must only be carried out by the University s Ground Section or approved contractor. In the likelihood that activities associated with intended site works or construction would damage or remove significant portions of plant root zones, the Grounds Design Standards page 4 of 5

Manager or his/her nominee shall advise the Principal Consultant who will make arrangements to install and manage a suitable temporary irrigation system. In the likelihood that activities associated with intended site works or construction would interrupt the supply of water to either the landscape or, specifically, to irrigation systems, arrangements will be made by the Principal Consultant to install and manage a suitable temporary system until such time as the infrastructure is repaired or replaced. The Grounds Manager or his/her nominee may determine it necessary to set aside a bank guarantee to the value of the nominated tree(s) on construction sites. Such a guarantee shall be held by the University in trust against damage and injury to the nominated tree(s) for at least the period of the construction defects period, or any longer period as judged to be necessary by the Grounds Manager or his/her nominee. 16.2.4 Protection of Soil During Construction Construction activities have a high potential to adversely affect plant growing conditions below the soil. During the design planning stage, the Principal Consultant shall consult the Grounds Section with regard to the impact of the proposed construction activities on soil conditions in the vicinity of the construction site. An assessment of soil conditions within the construction zone will be carried out by the Grounds Section during the early design process and areas requiring protection will be nominated at this time. The elimination or strict control of pollution (chemical and debris), trenching and compaction shall be considered at this time. The techniques associated with providing soil protection shall be nominated by the Grounds Manager or his/her nominee and implication will be considered in the project budget. 16.2.5 Landscape Furniture Standard landscape furniture drawings are available from the Drawing Office at Division. 16.2.6 Protection of Cultural Materials The University of Melbourne s buildings and grounds contain a large number of objects of cultural importance such as sculptures, facades, mosaics, etc. These belong to the various cultural collections of the University and are to be protected during works. Protection and care of objects of cultural significance during works will be based on advice sought by from the University s Potter Museum of Art, the custodian of the University s cultural objects. Individual objects of cultural significance will be identified in tender documents and the specific nature of their protection and care during works will be documented prior to site occupation. Site inspections may be made to ascertain compliance with protection of cultural materials. Design Standards page 5 of 5