STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

Similar documents
STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

2. The expected cost of the project is Rs.50 crores.

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)

State Expert Appraisal Committee, Punjab Ministry of Environment and Forests, Government of India

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous


.in Dated 9th August, Sharma ;

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

PROPOSED TERMS OF REFERENCE

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

meeting held on meeting held on The SEAC observed that:

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

No. SEIAA/2015/5519 Dated:

No. SEIAA/M.S./2014/692 Dated M/s Jolly Bricks & Tiles., Vill. Chajalwadi, Tehsil Baba Bakala, Distt. Amritsar.

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB. Ministry of Environment and Forests, Government of India

2 PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE (TOR)

No.J-11011/177/2016- IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

Environmental Clearance for mining of minor minerals (brick clay) in the revenue estate of Vill. Juglan, Tehsil Budhlada, Distt. Mansa.

No. SEIAA/M.S./1805 Dated To M/s Sita Ram & Co., Vill. Ghungrana, Tehsil & Distt. Ludhiana.

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

PROPOSED TERMS OF REFERENCES. Standard Terms of Reference for Pesticides Industry and pesticide specific intermediates (excluding formulations) 5(b):

No //6/2/2(1-1), 27//14(7-11), 15(7-7), 16(8-0), 33//4/3(2-4),5(8-0),6/1

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India

No. SEIAA/M.S./ 1835 Dated

No. SEIAA/M.S./905 Dated To M/s Ganesh Brick Kiln Co. # 702, Model Town, Phase-I, Distt. Bathinda.

No. SEIAA/2016/859 Dated: To M/s Uggarsain BKO, Sh. Varinder Kumar, Village Kakrala, Tehsil & Distt. Patiala.

To M/s Jai Ganesh BKO, Sh. Mohinder Kumar, # 1057, Sec-21-B, Chandigarh.

No. SEIAA/M.S./1855 Dated

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB

Site Hadbast No (5-16), 97 (7-16), 102/1 (2-9)

No.J-11011/132/2010-IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No. SEIAA/M.S./ 8458 Dated

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India

Proposed TOR Calix Industries

Proposed Terms of Reference for EIA studies

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB

PROPOSED TERM OF REFERENCE

No. SEIAA/M.S./ 1885 Dated

No. SEIAA/M.S./ 8378 Dated

Telefax : 011: Dated 1 st March, 2013

The following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S.

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB

EIA Study for Development of Industrial Model Township (IMT) at Faridabad

No.J-11011/436/2005-IA II (I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India

Telefax: 011: Dated:10 th May, 2013

No. SEIAA/M.S./ 8278 Dated

No. SEIAA/M.S./2014/7659 Dated To The General Manager-cum-Mining Officer, District Industries Centre, Ferozepur.

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests Telefax:

No. SEIAA/3757 Dated: To Sh. Bhushan Kumar, M/s Mangla BKO, Bhagat Ram Joshi Street, Near PNB, Barnala.

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India. Registered

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

Proposed Terms of Reference for EIA studies

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

No.J-11011/60/2014-IA.II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

STANDARD TERMS OF REFERENCE

V: PROJECT SCOPING & METHODOLOGY

BRIGADE MIXED USE DEVELOPMENT

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB

Hind Energy & Coal Beneficiation (India) Ltd.

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

Sh. Amit Kumar, Deputy Manager of M/s Ascenso Enviro Pvt. Ltd., Noida is the Environmental Consultant, presented the case before the SEAC as under:

Registered. Sh. Shiv Kumar, Managing Partner M/s Shiva Exim Enterprises, Plot No. 3 (A+B+C+D), SIEL Industrial Estate, Rajpura, District Patiala

No. SEIAA/2016/2161 Dated Sh. Rakesh Gupta, M/s GGP Buildtech (P) Ltd., Kharar Landran Road, Sector-115, Kharar.

No.J-11015/307/2006-IA.II(M) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

TERMS OF REFERENCE. Submitted to Ministry of Environment & Forests New Delhi. August 2014

Hind Energy & Coal Beneficiation (India) Ltd.

MINISTRY OF ENVIRONMENT & FORESTS NOTIFICATION. New Delhi, the 7 th May 1992

M/s. Phillips Carbon Black Ltd. Survey No. 47, SH 46, Village: Mokha, Tal: Mundra, Dist: Kutchh , Gujarat

Registered. M/s Baba Jiwan Singh Baba Dalip Singh Educational Trust, Goindwal Sahib Road, Tarn Taran.

Health and safety norms of CPWD should be followed during construction.

No. SEIAA/3225 Dated: To M/s The Greater Mohali Municipal Officers & Other Welfare Co-Operative House Building Society Ltd.

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI

No.IA-J-11011/116/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB

State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests)

No. SEIAA/2018/329 REGISTERED Dated:

No. SEIAA/M.S./2015/3809 Registered Dated

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

During the discussions, the Committee finalized the following additional TOR for further study:

Transcription:

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802 No. SEAC/165/26235 Dated 7/8/2009 To Speed Post M/s P & R Agri Energy Pvt. Ltd., Quiet Office No. 7, 2 nd Floor, Sector-35-A, Chandigarh. Sub: Application for grant of environmental clearance of M/s P & R Agri Energy Pvt. Ltd. to establish a 5 MW Biomass based power plant at Anandpur Sahib, Near Gopalpur Sub-Station, Tehsil Anandpur Sahib, Distt. Rupnagar. This has reference to your application for grant of environmental clearance for installation of biomass based power plant of 5 MW capacity at Anandpur Sahib, Near Gopalpur Sub-Station, Tehsil Anandpur Sahib, Distt. Rupnagar. The case was considered in the 25 th meeting of State Expert Appraisal Committee held on 18/7/2009. After detailed deliberations on the presentation by the Members, it was decided to categorise the project into B1. After further deliberations on the proposed Terms of Reference (TOR) suggested by the project proponent, the Committee approved the following Terms of Reference for Environmental Impact Assessment Study of the proposed project:- 1. The map indicating details within 10 Km radius from the proposed site be submitted. 2. The project proponent shall submit documentary proof to the effect that distance from the proposed site is more than 10 Km from the Inter-state Boundary. 3. The project proponent shall submit certificate from the Deptt. and Forests to the effect that the project site is not lying in eco-sensitive and protected area including wild life sanctuaries. 4. The industry should submit copy of CLU from the Competent Authority.

5. The project proponent shall submit the details of arrangements proposed for the management, storage and disposal of ash / fly ash. 6. The design and drawings of ESP should be submitted. 7. All the coordinates of the plant site should be provided with toposheet. 8. The study area should cover an area of 10 km. radius around the proposed site. 9. Land use of the study area as well as the project area shall be given. 10. The process flow sheet diagram of the process alongwith material and energy balance date on one day basis be given. 11. Location of any National Park, Sanctuary, Elephant / Tiger Reserve (existing as well as proposed), eco-sensitive area, interstate boundary, migratory routes, if any, within 10 km. of the project site shall be specified and marked on the map. 12. Layout map of 500 metre radius around the project site indicating important building, existing residential areas, if any. 13. Land requirement for the project to be optimized. Item wise break-up of land requirement and its availability to be furnished alongwith complete layout plan of the site indicating proposed locations of different machineries / utilities etc. 14. Topography of the area should be given clearly indicating whether the site requires any filling. If so, details of filling, quantity of fill material required, its source, transportation etc. should be given. 15. Impact of the project on drainage of the area and the surrounding area should be given. 16. Information regarding surface hydrology and water regime and impact on the same, if any, due to the project should be provided. 17. Source of water and its availability. Commitment regarding availability of requisite quantity of water from the competent authority. 18. Ground water potential including water harvesting, recharge and water balance of the area: Ground water recharge and balance available for present and future use. 19. Details of rainwater harvesting and how it will be used in the plant. 20. Sustainability study for groundwater in the existing tubewells and quality of groundwater as per BIS: 10500 (drinking water standards) should be provided.

21. Quantum of wastewater generation from various sources, treatment scheme and mode of disposal. Also, impacts of wastewater on the environment should be given. 22. Water conservation measures proposed in the project should be given. 23. Re-circulation and reuse of treated effluents within the plant. In case of any proposed discharge, its quantity, quality and point of discharge, users downstream etc. should be provided. 24. Details of water balance taking into account the reuse and re-circulation of effluents. 25. Model study for prediction of ground water contamination and suggested mitigating measures to minimize the pollution level. 26. One season site-specific climatological and meteorological data (except monsoon) shall be provided. The climatological data should be in respect of temperature, humidity, wind speed and directions, wind rose and rain fall. 27. One complete season Ambient Air Quality (AAQ) data (except monsoon) to be given alongwith the dates of monitoring. The parameters to be covered shall include SPM, RPM, SO 2 and NOx from NABL accredited laboratory. Monitoring shall be carried out for at least 6 different locations all around the project within 10 km. radius. The location of the monitoring stations should be so decided so as to take into consideration the pre-dominant downwind direction, population zone and sensitive receptors including reserved forests. There should be at least one monitoring station in the upwind direction. 28. Impact of the project on the AAQ of the area, details of the model used and the input data used for modelling should also be provided. The air quality contours may be plotted on a location map showing the location of project site, habitation nearby, sensitive receptors, if any. The wind roses should also be shown on this map. It may be kept in view that SPM in the stack emissions are to be restricted within 150 mg/nm 3. 29. Complete analysis of each fuel including the ash fusion temperature to be used alongwith assessment of quantity of such fuels required, collection, storage, its source and mode of transportation. 30. Details of storage of fuel inside the industrial premises and its impact on the environment such as air, water, land and biological.

31. Assessment of ash generation and detailed management plan for disposal / utilization of such ash/solid residue. 32. Availability of land for storage / disposal of ash in environmentally appropriate manner, for a period of at least five years and proper ash management plan such as removal of this ash and its disposal etc. so that sufficient land is available for ash disposal for the life of the project. 33. Details of flue gases such as its quantum, particulate matter concentration/ distribution and velocity etc. 34. Feasibility report of the proposed APCD to be installed, its efficiency and efficacy etc. 35. Representation of SPM, RSPM, SO 2 and NOx to be indicated in a tabular form given below: S.N. Locations of Monitoring Station (name, distance & directions) Background Level Predicted conc. Resultant conc. Air quality Standards 36. Details of green belt i.e. land with not less than 1000 trees per hectare giving details of species, width of plantation, planning schedule etc. and the details of the model with which this green belt has been designed, alongwith input parameters. 37. Details of hazardous waste to be generated and its disposal vis-à-vis impacts on the environment. 38. Impact due to present and future surface transportation activities by road. 39. Details regarding infrastructure facilities such as sanitation, restroom etc. to be provided to the labour force during construction as well as to the casual workers including truck drivers during operation phase. 40. Public hearing points to be raised and commitment of the project proponent on the same. An action plan to address the issues raised during public hearing and the necessary allocation of funds for the same should be provided. 41. Measures of socio economic influence to the local community proposed to be provided by project proponent. As far as possible, quantitative dimensions to be given.

42. Details of flora and fauna duly authenticated should be provided. In case of any scheduled fauna, conservation plan should be provided. 43. Impact of the project on local infrastructure of the area such as road network and whether any additional infrastructure would need to be constructed and the agency responsible for the same with time frame. 44. Detailed Environment Management Plan (EMP) to mitigate the adverse impacts due to the project along with item-wise cost of its implementation. 45. Impact of various chemicals to be used in the process of the industry on the environment of the area and the mitigation measures to be adopted thereof. 46. Risk assessment to be undertaken & based on the same, proposed safeguard measures should be provided. 47. Any litigation pending against the project and / or any direction / order passed by any Court of Law against the project, if so, details thereof. 48. A detailed environmental protection budget would also be presented and earmarked. The source of getting secondary data, wherever applicable, should be intimated alongwith its reference. Generic structure of Environment Impact Assessment Document, given in Appendix III of EIA Notification 2006 shall be followed in preparation of Rapid Environmental Impact Assessment report. be followed: Besides the above, the following general points / guidelines will also a) All documents to be properly referenced with index, page numbers and continuous page numbering. A uniform system of units to be used while reporting data. b) Where data is presented in the report especially in table, the period in which the data was collected and the source should invariably be indicated. c) The questionnaire for environmental appraisal of thermal power project as devised earlier by the Ministry of Environment & Forests shall also be filled and submitted. d) The list of abbreviations used in preparing the report should be given in a separate index. e) SI system of unit s should be followed, while reporting any data.

In addition to the above, information on the following may also be incorporated in the EIA report. 1. Is the project intended to have CDM-intent? (i) If not, then why? (ii) If yes, then (a) Has PIN (Project Idea Note) {or PCN (Project Concept Note)} submitted to the? NCA? (National CDM Authority) in the Ministry of Environment & Forests? (b) If not, then by when is that expected? (c) Has PDD (Project Design Document) been prepared? (d) What is the? Carbon Intensity? from your electricity generation projected (i.e. CO 2 Tons/MWH or Kg/KWH) (e) Amount of CO 2 in Tons/year expected to be reduced from the baseline data available on the CEA?s web-site (www.cea.nic.in) 2. Notwithstanding 1 (i) above, data on (d) & (e) above to be worked out and reported. The industry should prepare draft rapid EIA / EMP Report for its project based on above Terms of Reference and apply to the Chairman, Punjab Pollution Control Board for conducting public hearing as per the provisions of EIA Notification, 2006 on submitting EIA / EMP prepared by the industry as per TORs. After completing the process of public hearing / public consultation, the industry should submit final EIA / EMP Report to the State Expert Appraisal Committee after incorporating all the issues raised during public hearing / public consultation for Appraisal of its project. Endst. No. (Malvinder Singh) Secretary (SEAC) Dated A copy of the above is forwarded to the following for information and necessary action :-

1. The Secretary to Govt. of India, Ministry of Environment & Forests, Govt. of India, CGO Complex, Lodhi Road, New Delhi. 2. The Director, Northern Regional Office, Ministry of Environment & Forests, Bays No. 24-25, Sector 31-A, Dakshin Marg, Chandigarh. 3. The Member Secretary, State Environment Impact Assessment Authority, O/o Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala. 4. The Member Secretary, Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala. 5. The Senior Environmental Engineer (Computer), Punjab Pollution Control Board, Head Office, Patiala. He is requested to display the approved Terms of Reference given to the industry on the website of State Environment Impact Assessment Authority. (Malvinder Singh) Secretary (SEAC)