Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River

Similar documents
Executive Summary. Introduction

OWEA Annual Conference Options for Solids and Floatables Control

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017

Municipal Sanitary Authority of the City of New Kensington

ENVIRONMENTAL ASSESSMENT

SESWA. Source Control Measures to Improve Water Quality

Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016

NJ Future CSO Permittee Meeting

Wilmette - Background

IIoT Transformation of Cincinnati MSD Collection System

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

The Case for Operational Optimization

Community Open House

Assessing SWMM 5 Hydrologic Parameter Benefits for Model Calibration

Wastewater Collection. (Sewer Alternatives)

2. DEFINITIONS. American Association of State Highway and Transportation Officials.

Reducing Overflows using a Baffling Solution. OWEA AWWA 2014 Technical Conference & Expo August 28, 2014 Columbus, Ohio

Wastewater Flow Monitoring Services

Consent Decree Appendix 1. Control Measures and Performance Criteria

Capacity Assurance in Charlotte s Central Business District

Pre-Program Work. Omaha CSO Control Program. Agenda. City has worked on addressing CSOs for many years

Maximizing Your Investment

The Indianapolis Deep Tunnel Surge Analysis: Debugging Future Operational Issues in the Present

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel

Technical Memorandum - Final

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

DC Clean Rivers Project

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

DOWNTOWN SHALL NOT FLOOD AGAIN

Section 8 System Evaluation and Capacity Assurance Plan (SECAP)

Chapter 3 Previous Studies

This page is blank to facilitate double-sided printing.

CHAPTER 4 DESIGN CRITERIA

Legal Context for Green Infrastructure Under the Clean Water Act

Section 5 - Inflow and Infiltration Analysis

Using SWMM EXTRAN to Simulate WWTP Hydraulics

Background Where did CSO systems begin? Combined Sewer Overflow (CSO) Control. Background. Background. Background

Progressive Solutions for a Historic Watershed

Defiance CSO Program. Cost Effective Sewer Separation Part 1. Mark Lehnert, Defiance WPC Superintendent Michael Frommer, P.E.

3.9 times the average 3.8 times the average 3.6 times the average

Technical Memorandum No. 1

Infiltration and Inflow. Michael Sassaman Phone

Chapter 8 Addressing I/I Issues and High Flows

Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility

Deep Dive: Water Treatment. Greg Heitzman, Louisville Metro Sewer District

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017

WEF Collection Systems Conference 2017

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington

Hydraulic Modeling of Deep Tunnel Provides Cost Savings

Meeting CSO Capture Requirements & Local Expectations in an Urban Environment Greening the Gray

CONSTRUCTION PROCEDURE

Using SWMM 5 to Develop Wet Weather Operating Strategies in a Large Sewer System

The Wastewater Tsunami is Coming

Finding Solutions to Sanitary Sewer System Capacity Deficiencies

SFPUC Flooding Workshop Tuesday, February 9, 2016

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

LEHIGH COUNTY REGIONAL SEWER SYSTEM

Bloomingdale Neighborhood Flooding Mitigation Washington, DC

2010 System Evaluation and Capacity Assurance (SECAP) Update

Synergy: Addressing Combined Sewer Overflows and Nitrogen

Regional Hydraulic Model Plan

City of Gardiner, Maine Wastewater Committee Meeting. CSO Storage Tank & Screening Evaluation

SECTION 1 SUMMARY, CONCLUSIONS AND RECOMMENDATIONS

Wastewater Master Facility Report. (Project Name) (Project Basin Location)

Blueprint Columbus. Clean Streams. Strong Neighborhoods.

PRELIMINARY WASTEWATER CAPACITY STUDY

MSDGC MODELING GUIDELINES AND STANDARDS VOLUME I SYSTEM WIDE MODEL

The Metropolitan District Status of LTCP Update. January 9, 2017

Reliability & Redundancy for CSO Facilities Using GWWTS as a Case Study. By Jeffrey A. Lundt, P.E.

4 EXISTING FACILITIES EVALUATION

City of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage

ALMEDA TUNNEL PAST, PRESENT AND FUTURE

Rainfall Comparison Summary

Long-Term Control Plan Orientation. July 1, 2009

Springfield, MO SSO Control Program: Using Big Data to Chart Progress

Interim Interconnector Sewer Operational Plan

LICK RUN WATERSHED MASTER PLAN. Community Design Workshop #1 August 11, 2011

Chapter 5: Conveyance Assessment 2020 Baseline Conditions

Water and Sewer Infrastructure

The City of Baltimore Back River Wastewater. No more backups Reducing SSOs with headworks improvements in Baltimore

Deep Tunnel, Shallow Pipe - How the City of Hamilton, OH plans to save millions on SSO control. Glenn Weist, P.E.

Measure Twice, Cut Once Using Flow Monitoring Data to Re-evaluate Wet Weather Improvement Alternatives

Modelling a Combined Sewage and Stormwater Flood Detention Basin

City of Logan Sanitary Sewer Design Standards

City of Elmhurst Comprehensive Flooding Plan Task Force Meeting

Design and Construction of Local Public and Private Sewers and Ancillary Facilities

SILVER SPRINGS/RIVER POLLUTION REDUCTION PROJECT IMPROVING THE WATER QUALITY OF THE SILVER SPRINGS ECOSYSTEM

LIMITED ENVIRONMENTAL REVIEW For. Northeast Ohio Regional Sewer District. Kingsbury Run Preliminary Engineering Early Action CSO CS

Drainage Servicing Report - Terms of Reference

Miami-Dade Water & Sewer Department. Miami-Dade Water and Sewer Department 1

City of Hudson. Wastewater Treatment Plant Improvements. Columbia County, New York. Facility Plan. Delaware Engineering, P.C.

Metropolitan St. Louis Sewer District. CSO LTCP Update EXECUTIVE SUMMARY

APPENDIX A Summary of Potential Factors of Basement Water Infiltration

Rowlett Cottonwood Transfer Sewer: 60" RCP Sanitary Sewer Rehabilitation Project. TACWA Meeting

Combined Sewer Overflow - Long Term Control Plan Update

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

PRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS

City of Elmhurst Comprehensive Flooding Plan December 5, 2011

DRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J

Transcription:

Sanitation District No. 1 of Northern Kentucky Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River Ohio WEA Collection Systems Workshop May 5, 2011

Sanitation District No. 1 of Northern Kentucky Created in 1946 Serves Boone, Kenton, and Campbell Counties in Northern Kentucky Serves approximately 350,000 people Greater Cincinnati / Northern Kentucky Airport

Sanitation District No. 1 of Northern Kentucky Total service area ~ 200 sq miles >1,600 miles of sewers >42,000 manholes 2 regional WWTP

Sanitation District No. 1 of Northern Kentucky Combined Service Area Combined service area ~ 12 sq miles Additional 21 sq miles of separate area tributary to combined interceptors 96 CSOs 15 flood pumping stations 3,302 catch basins Estimated annual overflow volume 1.5 BG

Watershed Consent Decree In October 2005 Sanitation District No. 1 negotiated a Watershed Consent Decree CSOs into compliance with CSO Policy by 2025 Public Outreach Regulatory Assistance Strategic Advisory Team Watershed Partners Eliminate sanitary sewer overflows by 2025 Improve water quality WATERSHED PLANNING PRIORITIZE CONTROLS INFRASTRUCTURE PLANNING and COMPLIANCE Develop Watershed Plans every five years that can address all sources of pollution Public Input Plans Regulatory Approval Outcome: affordable combination of gray, green, and watershed controls to improve water quality IMPLEMENT CONTROLS

River s Edge Project Background Proposed development along Ohio River in Dayton Kentucky, Northern Campbell County Would comprise 2,000 units of condominiums and single family residences along 1.5 miles of the Ohio River River s Edge Development McKinney St. CSO Main St. CSO

River s Edge Project Background Interceptor replacement was needed due to significant amount of fill (> 20 ) needed for development Developer proposed in-kind replacement The District decided that this was an opportunity to address two large CSOs (6 th and 7 th largest in terms of annual overflow volume) within the development boundaries Main St. Outfall McKinney Outfall Fill boundary

River s Edge Project Background Current Topography Flood Levee Ohio River 32 ft to levee top MH Depth 15 ft

River s Edge Project Background Post-Development Topography 10 ft to levee top Future Depth 37 ft

River s Edge Partnering Opportunity Addressing overflows now makes sense: Developer would have been responsible for in-kind replacement costs and construction which provides cost-sharing for any upsizing Design and Construction could go much quicker through partnership with the developer and their engineers and contractors using a modified designbuild There would be significant opportunity cost to come back later to do significant construction

River s Edge Existing Conditions Preliminary system-wide calibrated model was available as tool to assess current situation and to evaluate alternatives Model was developed in Infoworks Combined sewers 18-inches and larger Separate sewers 10-inches and larger

River s Edge Existing Conditions River's Edge Existing Conditions Location Length (ft) Size ORI Peak Flow Capacity (MGD) Peak Flow Needed For Conveyance (MGD) Beginning of Development to Main CSO 2100 21" 2.8 15 Main CSO to McKinney CSO 3110 27" 6.5 48 McKinney CSO to End of Development 1900 27" 6.0 93

River s Edge Existing Conditions Existing System Model Results: Typical year overflow volume for Main St. is about 42 MG Typical year overflow volume for McKinney St. CSO is about 65 MG These two outfalls comprise almost 10% of the total CSO volume system-wide 72-inch McKinney St. Outfall 96-inch McKinney St. Outfall

River s Edge Alternatives Analysis Goal: Develop plan to address overflows in the near term while maintaining flexibility for long term planning Challenges: Watershed Planning not started yet Construction scheduled to begin within 6 months of notice Development is on upper end of combined sewer system Proximity to the Ohio River

River s Edge Alternatives Analysis Approach: Use typical year (1970) rainfall to develop preliminary sizes for a range of alternatives for comparison purposes to preview feasibility of various options. McKinney St. Outfall Initial Alternatives Evaluated: Local storage at each outfall with 0 overflows in typical year Conveyance to potential regional storage downstream at 0 overflows in typical year Potential Storage Locations Main St. Outfall Potential Storage Locations

Storage Sizing and Preliminary Construction Costs Local Storage (Typical Year Level of Control) Location Tank Volume (MG) Tank Pricing ($/gal) Tank Cost (M$) Main Street 3.1 5.4 16.7 McKinney Street 3.8 4.9 18.6 Interceptor Conveyance For Local Storage Option Location Peak Flow (MGD) Length (ft) Diameter (in) Pipe Pricing ($/in/ft) Pipe Cost (M$) Cumulative Cost (M$) Beginning of Development to Main CSO 15 2080 36 15 1.1 1.1 Main CSO to McKinney CSO 17 3010 42 15 1.9 3.0 McKinney CSO to Ward 19 2640 48 15 1.9 4.9 Total Estimated Construction Cost with 30% Cont: $44.3 million

Conveyance Sizing and Preliminary Construction Costs Typical Year Analysis - Wet Weather Options for Conveyance of All Peak Flows Does NOT account for additional downstream conveyance and/or storage River's Edge Conveyance Sizing (Typical Year Level of Control) Location Peak Flow (MGD) Length (ft) Diameter (in) Pipe Pricing ($/in/ft) Pipe Cost (M$) Cum Cost (M$) Beginning of Development to Main CSO 15 2080 36 15 1.1 1.1 Main CSO to McKinney CSO 48 3010 60 15 2.7 3.8 McKinney CSO to Ward 93 2640 84 15 3.3 7.1 Total Estimated Construction Cost with 30% Cont: $9.2 million

84-inch In-line Storage Alternative Additional option was added: Construct 84-inch replacement along entire length of development Provides conveyance sizing if Watershed Plan calls for conveyance but also provides 2.3 MG of in-line storage under current conditions for near-term benefit Provides flexibility in long-term Watershed Plan

Preliminary Alternatives Evaluation Advantage for local storage is that overflows are addressed on site and would achieve CSO compliance Disadvantage is that cost to store locally was prohibitively high and might not fit into Watershed Plan Potential sites for local storage were needed for development and was therefore not considered further Conveyance alternative only addressed moving peak flows downstream with no significant CSO reduction

84-inch In-line Storage Alternative Model Predicted Benefits: Scenario AREA CSO S TYPICAL YEAR VOLUME (MG) MODEL RESULTS MH 0360018 Main St. CSO McKinney St. CSO Total Pre-Development 7.9 41.7 64.8 114.4 With 84-inch Pipe 3.1 5.5 27.8 36.4 Volume Reduction 4.8 36.2 37.0 78 Percent Reduction 61% 87% 57% 68% Estimate downstream CSO volume increase is 3 MG Estimated Construction Cost with 40% Cont: $14.1 M

84-inch In-line Storage Alternative Analysis 84-inch sewer provides significant local reduction (68%) in overflow volume with minimal downstream increases Provides flexibility for conveyance option in future This option was selected for construction Developer agreed to pay for 31% of the total cost for a total savings of over $4.5 million! Final construction cost higher than earlier estimate due to local construction factors ($14.6 M) District cost was about $0.14 per gallon of CSO reduction

84-inch Sewer Design Design Challenges Joints leak resistant to 100-year flood elevation or up to 45-feet of water Corrosion resistant Withstand 35 of soil and groundwater loads Limit surge Prevent Ohio River intrusion 2 fps velocity during DWF Work within fixed upstream and downstream elevations Do not cause upstream flooding

84-inch Sewer Design Solutions Hobas CCFRPM pipe Watertight gasketed joint Corrosion resistant Fiberglass monolithic manhole risers Tideflex valves on outfalls Vents to discharge air when filling Surge Maintain inflow below conveyance capacity Surge model Upstream flooding Use model to evaluate backwater effects LF Manufacturing Hobas USA

84-inch Sewer Design Diversion Chambers New construction provided opportunity to construct new diversion structures to help meet Nine Minimum Control goals as part of the Consent Decree Design includes grit and floatables control in a single structure Hydraulic model used to assess hydraulics and performance of chambers an d to verify no flooding risk Inflow to interceptor had to be controlled to reduce chance for pocket surge Orifice into interceptor

84-inch Sewer Design Diversion Chambers

84-inch Sewer Construction Challenges Proximity to the Ohio River Groundwater rises and falls with the Ohio River Construction scheduled around river level probabilities using 36 years of level data 60 58 Days per Year at or Above River Level Month Average Days above 30' Level (above 429.6) 56 54 52 50 48 46 44 42 40 38 36 34 Groundwater problems at 30 January 15.0 February 17.0 March 23.0 April 19.0 May 13.0 June 6.0 July 2.0 32 30 28 26 24 22 20 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 Days at or Above Level August 1.0 September 2.0 October 2.0 November 5.0 December 14.0

84-inch Sewer Construction Challenges Geotechnical Issues Pipe settlement due to additional load expected to be several inches which would significantly affect slope Much of the construction is in fill material which required over excavation in some places Slope stability problems concerns Long term Rapid drawdown Seismic Flexible pipe requires careful bedding and backfill to prevent excessive deflection

84-inch Sewer Construction Challenges Geotechnical Solutions Surcharge piles loaded 30 days before excavation to pre-load and force rapid settlement.

84-inch Sewer Construction Challenges Geotechnical Solutions Strict and careful installation procedures were put in place to ensure proper bedding and backfill Special bedding practices where over-excavated (burrito solution!)

84-inch Sewer Construction Challenges Ohio River Alignment within flood plain

Then Watershed Plans There are opportunities to utilize green infrastructure to reduce runoff to combined system. If implemented and effective, CSO volume would drop down to about 14.5 MG per year for an 87% reduction without additional gray controls based on model results With additional downstream controls, the overflow volume would drop to less than 1 MG per year or over 99% reduction

Overall Project Benefits Reduces overflow volume by 68% Saved over 30% in construction and more in design $0.14 per gallon of CSO removed Meets NMC for solids and floatables Grit removal protects downstream interceptor Prevents river intrusion and significant CSO overflow reduction Would meet presumptive level of control with implementation of green infrastructure Provides flexibility for future controls