Pre-Qualification Questionnaire Checklist

Similar documents
H&S007 Level 2 and 3 Risk Health and Safety Contractor Approval Request

Health, Safety and Environment Pre-Qualification Questionnaire Health, Safety & Environmental Long Form Questionnaire Version 1, August FINAL

WORK HEALTH AND SAFETY AUDIT STANDARD

SHORT COURSES. Industry Training New Zealand

Campbell Arnott s Contractor Management

Contractor Safety Pre-qualification Questionnaire - Instructions

Registration of Interest in Employment

SUBCONTRACTOR MANAGEMENT PLAN

Social Sector Accreditation Standards Level 4

CONTRACTOR SAFETY PRE-QUALIFICATION CHECKLIST. Name of Contractor: Date: Business Address: Telephone No.:( ) Fax No.:( )

SUBCONTRACTOR SAFETY PRE-QUALIFICATION FORM

Industry Training New Zealand SHORT COURSES

SUBCONTRACTOR MANAGEMENT PLAN

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

Brian Moore. All Contractors. Regarding: Contractor Safety Introduction Letter and Packet. To Whom It May Concern:

SUBCONTRACTOR MANAGEMENT

Working for business. Workplace Safety Discount Application For those with employees

WORK HEALTH AND SAFETY AUDIT STANDARD

Contractor and Supplier Expectations

Mini Tender PART B External Wall Insulation, Mechanical and Electrical Installation

Work Health & Safety Procedure

SUPPLIER/SUBCONTRACTOR PURCHASING & RECEIPT PROCEDURE- PRO006.04

CONTRACTOR WHS HAZARD STANDARD MOBILE POWERED PLANT EXTERNAL USE ONLY

ECCS Information Form

Contractor Pre-qualification profile and Questionnaire

HEALTH AND SAFETY GUIDANCE NOTE PERMIT TO WORK

ACC Workplace Safety Management Practices Audit Report

Sub-Contractors Questionnaire

PROCEDURE. Revision: Operative Date: 01/06/2017 Department: Company. Author: D Steel CONTENTS

NZ Health & Safety at Work

POL EWP + Vessels Permit To Work (Elevated Work Platform)

SHE Training Procedure

CDM COMPETENT QUESTIONNAIRE FOR DESIGNERS AND DESIGN RELATED PRACTICES Companies with 5 or more employees

Health and Safety Management System Manual

REGISTRATION OF INTEREST FOR EMPLOYMENT

BUILDING ACTIVITY APPLICATION PACKAGE

BASF Contractor Pre-Access Checklist

REFURBISHMENT DEMOLITION

Employment Application-Clerical Frost Oil Co.

Skills Passport. Work Starts with Safety. Passport #TAS1-16

ACT Scaffolding Services LTD METHOD STATEMENT Scaffold erection

Burnett Dairy Cooperative State Rd. 70 Grantsburg, WI

Joint Operations CHESM Interim Performance Review Form. Interim Performance Review Related Information

Applicant s Name: Visit to get a check done electronically.

HFM Asset Management Contractor Induction Queens Riverside Apartments

OWA Vendor Pre-Qualification System

HEALTH AND SAFETY CONTRACT BETWEEN EMPLOYER AND MANDATORY (CONTRACTOR) SECTION 37(2) OF THE OHS ACT, ACT 85 OF 1993

LOADING UNLOADING OPERATIONS

JOB SAFETY ANALYSIS PROGRAM. Owner: Risk Management Revision No: 01. Document number: Q-001 Date last revised:

PROCEDURE. Revision: 6. Category: Contract Management CONTENTS

(3) Major Service: Service(s) provided by a contractor that cost more than $250K per year and are considered high risk.

CDM COMPETENT QUESTIONNAIRE FOR DESIGNERS AND DESIGN RELATED PRACTICES Companies with less than 5 employees

EXPRESSION OF INTEREST CRITERA CONTRACTORS. How to complete the Expression of Interest Application Form

Contractor Selection & Management Guideline Rev01. Revision 00. April 2011

Safe Work Method Statement. 14/4/16 Approved by (Snr Management Rep):

APPLICATION FOR EMPLOYMENT

Renewable Energy Bonus Scheme - Solar Hot Water Rebate. Guidelines and application form

WORK IN THE VICINITY OF POWER POLES AND OVERHEAD LINES

AIRPORT ACCESS PROCEDURE

Apply for Access Permit

Verify Category A Audit Content

CDM COMPETENT QUESTIONNAIRE FOR PRINCIPAL DESIGNERS Companies with less than 5 employees

LOOKING FOR WORK AS A LONG HAUL DRIVER or AS A LONG HAUL OWNER OPERATOR?

SUBCONTRACTOR PREQUALIFICATION REV G. If insufficient space, attach details of request and reference them in the space provided.

792 Based at West Sale. Built and Natural Environment. General Manager Built and Natural Environment. Enquiries: Human Resources Officer Ph:

Work Integrated Learning Work-based Placement Agreement Form (WIL-WPAF)

Brown Trucking Company INDEPENDENT CONTRACTOR DRIVER APPLICATION 6908 Chapman Road Lithonia, GA Fax: (770)

PS 02 PLANT AND EQUIPMENT

APPLICATION FOR EMPLOYMENT / EMPLOYEE RECORD

YOUR WHS READY RECKONER

ENVIROGEN INDUSTRIAL SERVICES APPLICATION FOR EMPLOYMENT

JOB DESCRIPTON. Health & Safety / Security Officer. Purpose of the position:

~ Safety Our Priority ~

WILLIAMS CRANES & RIGGING PTY LTD

Health, Safety & Wellbeing Absolute Rules

Student Handbook 2017

BIDDER INFORMATION QUESTIONNAIRE:

SOUTH DUBLIN COUNTY COUNCIL CONTRACTOR S HEALTH AND SAFETY ASSESSMENT FORM

Supplier Approval Page no: 1 of 5

CONTRACTOR WHS SYSTEM STANDARD RISK MANAGEMENT EXTERNAL USE ONLY

Health, Safety & Environmental Pre-Qualification Program Pre-Qualification Application Form

E N E R G Y E F F I C I E N T H O M E S PA C K A G E Solar Hot Water Rebate. Guidelines and application form

Contractor EHS Program Attachments

Workplace Safety and Health Guidelines Contractor Management

Quality Assurance Manual

OPERATION AND MAINTENANCE MANUAL

WESTERN AUSTRALIAN HEAVY VEHICLE ACCREDITATION PROCESS GUIDELINES FOR AUDIT PROVIDERS

MESSAGE. (A.K. Dwivedi) Director (Expl) I/c HSE

WORK METHOD STATEMENT CABINETRY/JOINERY

WHS Manual Insert Business Name & Logo

HOPKINS TRANSPORT AUSTRALIA EMPLOYMENT APPLICATION

The Health & Safety Policy

BESCA CPS APPLICATION FOR REGISTRATION

SUB-CONTRACTOR ASSESSMENT PROCEDURES

HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE

WA HEAVY VEHICLE ACCREDITATION. Single Operator Guide. How to Become and Stay Accredited

2014 SAFETY EXCELLENCE AWARD SAFETY SURVEY FORM FINAL EVALUATION FOR CRANE & RIGGING SUPPORT

2014 SAFETY EXCELLENCE AWARD SAFETY SURVEY FORM FINAL EVALUATION FOR GENERAL & HARD/SOFT CRAFT CONTRACTORS

Work Placement Agreement

Adelaide Airport Limited

Transcription:

Pre-Qualification Questionnaire Checklist Thank you for your interest in becoming an Approved Contractor with Christchurch Airport. To ensure efficient processing of your application please utilise the check list below to ensure all required documentation has been submitted. 1. Contractor Pre-Qualification Questionnaire completed 2. Completed Creditor Form 3. Completed Access Card Application Form (if required) 4. Insurance Certificates Public Liability Airside ($10 million) Public Liability Landside ($5 million) Third Party Motor Vehicle Liability ($5 million) 5. Signed Contractor Acknowledgement of Terms (required commencing work) 6. If applicable, copies of: Signed, dated copy of Health & Safety Policy Examples of safe work procedures Example of Site Specific Safety Plan (SSSP) Example of Hazard Identification process and a completed Job Safety Analysis (JSA), Task Analysis (TA) or Work Method Statement (WMS) Copy of equipment isolation and lock-out procedure Example of H&S inspection/audit Copy of induction procedures Relevant licences and certification Emergency response procedures Rescue plans (confined spaces, working at height) Environment policy Waste Management Plan Carbon Emissions Management Plan/Policy Spill procedure ACC Workplace Safety Programmes Certificate Drug and Alcohol Policy Please direct any questions to: Katrina Berry, Manager Health & Safety P: 03 364 5730 M: 021 410 562 E: Katrina.Berry@cial.co.nz Page 1 of 12 January 2016

Pre-Qualified Contractor Questionnaire Company Name: Address: Key Contact Person: Phone: Mobile: Email: Brief description of services provided to CIAL: H&S Contact Person (if different than above) Name: Phone: Mobile Email: Instructions for completion Please complete each question by circling your response (/NA) Where evidence is requested, e.g. copies or examples, please ensure that these are attached (refer to the enclosed checklist) Return the completed questionnaire to the Manager Health & Safety (details below), any queries/questions should also be directed to the Manager Health & Safety. Katrina Berry Manager Health & Safety Christchurch International Airport Ltd PO Box 14001 Christchurch P: 03 364 5730 M: 021 410 562 E: Katrina.Berry@cial.co.nz Page 2 of 12 January 2016

1. MANAGEMENT COMMITMENT Does your organisation have a current signed and dated Health and Safety Policy? If yes, please attach a copy 2. HAZARD IDENTIFICATION AND MANAGEMENT Do you have written work instructions/safe work procedures or specific safety instructions for work you do (e.g. working at heights, in confined spaces, isolation and lockout of equipment, hot work, or crane activities)? /NA If yes, please attach examples Examples attached Do you develop Site Specific Safety Plans (SSSP) when undertaking contracted work? If yes, please attach an example of a recent SSSP Example attached Does your organisation have a process to identify report and control hazards in the workplace? /NA Does this process include Task Analysis (TA) OR Work Method Statements (WMS) or Job Safety Analysis (JSA)? If yes, please attach an example of your Hazard Identification process and a completed JSA, TA or WMS Examples attached 3. PLANT, EQUIPMENT, VEHICLE MAINTENANCE Does your organisation check and test equipment to ensure that it is fit for the purpose? For example: Plant and Equipment Inspection Registers (e.g. lifting equipment) Electrical Testing and Tagging Register Maintenance Schedules (e.g. vehicles, trucks) /NA /NA /NA If N/A please describe why this does not apply: Page 3 of 12 January 2016

4. EQUIPMENT ISOLATION AND LOCK-OUT Does your organisation have a procedure/process to lock and tag out energy sources? /NA If yes, please attach a copy of your procedure OR describe the process below: 5. SAFETY MONITORING/INSPECTIONS Do you carry out regular Health & Safety inspections and/or audits? Audit Frequency If yes, please attach an example Example attached 6. INDUCTION AND TRAINING Do you have a staff Health & Safety Induction and/or Training Programme that includes the following? Hazard Identification Emergency Procedures Plant and Equipment Procedures PPE Requirements Special Work Procedures If you answered yes to any of the above please attach a copy of your Induction, e.g. staff induction or training checklist 7. LICENCES AND CERTIFICATION Do any of your employees perform any tasks that require special competencies or licences? a) Licences (e.g. forklift crane, scaffolding, powder actuated hand tools) b) Confined Space Entry c) Working at Height d) Trade certification (e.g. electrical, boilers, rigging, plumbing) e) EWP (Elevated Work Platform) f) Other, applicable to your specific work /NA If yes, please attach evidence of competency Competency records attached Page 4 of 12 January 2016

8. ACCIDENT REPORTING AND INVESTIGATION Does your organisation have an accident/incident reporting and recording system? Please describe how accidents are investigated: Has your organisation had any of the following accidents/incidents within the last five years? Fatalities Serious Harm Incidents Worksafe NZ Investigation Spills If yes, please describe what actions have been taken to prevent this happening again: If yes, did any of the above result in prosecution from the Worksafe NZ? 9. EMERGENCY PROCEDURES Does your organisation have emergency response procedures to deal with worksite emergencies? If yes, please provide a copy of your emergency response procedure. Does your organisation have certified first-aiders on site who can respond in the event of an emergency? Do you have rescue plans for staff who work in confined spaces or who work at height using safety harnesses? /NA If yes, please attach a copy of your rescue plans Page 5 of 12 January 2016

10. SELECTION OF SUB-CONTRACTORS Does your organisation have a process to select and monitor sub-contractors engaged by you? /NA Please describe an overview of the process you use to engage sub-contractors and monitor their performance: 11. ENVIRONMENTAL MANAGEMENT Does your organisation have a current signed and dated Environment Policy? If yes, please attach a copy Does your organisation have a Waste Management Plan? If yes, please attach a copy Does your organisation have a Carbon Emissions Management Plan or Policy? If yes, please attach a copy Does your organisation have a procedure in place to ensure that any environment regulations specific to working at CIAL are adhered to? Does your organisation have a spill response procedure that is relevant to working at CIAL? If yes, please attach a copy If refueling of equipment takes place on site what procedures are in place to ensure no spills occur? Page 6 of 12 January 2016

12. ACC WORKPLACE SAFETY PROGRAMMES Does your organisation belong to any of the following ACC workplace incentive programmes? ACC Partnership Programme ACC Workplace Safety Management Practices Programme (WSMP) ACC Workplace Safety Discount (WSD Programme) If yes, please attach a copy of your most recent certificate 13. INSURANCES Please attach a copy of your current certificate for the insurances listed below: General Public Liability (airside works) $10,000,000 N/A General Public Liability (landside works) $5,000,000 N/A Third Party Motor Vehicle Liability $5,000,000 N/A Please note: The insurance certificates provided must be stamped by your insurer Confirmation of specific insurances required will be agreed between CIAL and the Contractor prior to commencement of work and may vary depending on the location and nature of the work being undertaken by the Contractor. 14. DRUG AND ALCOHOL POLICY Does your organisation have a Drug and Alcohol Policy? If yes, please attach a copy Please indicate below whether you will comply with your Drug and Alcohol Policy or with CIAL s Drug and Alcohol Policy (a copy is available from Gail.Dorsey@cial.co.nz. Please confirm whether while working at the Airport you will either (delete one): (a) (b) Comply, and ensure your employees and contractors comply, with the CIAL Policy as though they were employees of CIAL; Comply, and ensure your employees and contractors comply, with your own Drug and Alcohol policy, subject to CIAL approval of that policy. Page 7 of 12 January 2016

15. CIAL REQUIREMENTS FOR CONTRACTORS DOCUMENT Does your organisation have a copy of the CIAL Requirements for Contractors document? This document is available on the CIAL website: http://www.christchurchairport.co.nz/doingbusiness/buildingcontractorssuppliers/ If yes, have all employees who provide services for CIAL, read and understand its contents? Signed Contractor Acknowledgement of Terms returned 16. REFEREES Please provide details of three referees for clients you have provided services to within the previous 12 months, that you are happy for CIAL to contact: Company Name Contact Person Contact Phone Number 17. ADDITIONAL FORMS Please find to follow additional forms for completion: 1. Contractor Acknowledgement of Terms all contractors must complete 2. Creditor Set Up Form all contractors must complete 3. Application for Access Cards if applicable Page 8 of 12 January 2016

1. CONTRACTOR ACKNOWLEDGEMENT OF TERMS Date: ------------------------------ (This Document to be copied as required.) I/We have read and understood the Christchurch International Airport Limited (CIAL) Requirements for Contractors Document and all relevant Policies and Procedures and agree to be bound by its/their terms. Name of Contractor: --------------------------------------------------------------------- Signature of Contractor: --------------------------------------------------------------------- Phone Number: --------------------------------------------------------------------- Postal Address: --------------------------------------------------------------------- Email Address: --------------------------------------------------------------------- Description of Contracted Works: --------------------------------------------------------- --------------------------------------------------------------------------------------------------- Name and Signature of Employees/Subcontractors/Consultants who will be on site: Name Signature Name Signature Details of any criminal convictions of Employees/Subcontractors/Consultants who will be on site: CIAL Action Insurance compliance checked Property Approved (if Applicable) Online Campus Training Programme completed (If Applicable) Please return to: supporting evidence. Katrina Berry, Manager H&S along with your completed questionnaire and any Page 9 of 12 January 2016

2. CREDITOR SET UP FORM The following information is required to set up a creditor account within the CIAL accounting system. Failure to provide this information will cause delays in the ability of CIAL to engage your services and pay any invoices you send in. Required Information Trading name: GST number: Physical/Postal Address: Suburb: City: Post Code: Ph. Number: Fax Number: Accounts Contact Person - Email: Accounts Contact Person - Name: If collection of goods provided to CIAL will be from a different address to that noted above please specify below. Physical/Postal Address: Suburb: City: Post Code: Please provide a printed bank deposit slip to verify your bank account details. If you do not have a bank deposit slip, please provide a copy of a bank statement that shows the account name and address, bank account number, details of the banking provider (I.e. ASB, BNZ etc.) Page 10 of 12 January 2016

3. CONTRACTOR PARKING ACCESS CARD APPLICATION FORM APPLICATION FOR ACCESS CARD(S) FOR CONTRACTORS Company: Address: Contact Person: Telephone: E-Mail: Tenant: Term of Contract: Start Date: End Date: We hereby apply to Christchurch International Airport Limited ( CIAL ) for Access Cards to operate the barriers controlling any area set aside for the operation of Contractor parking at Christchurch Airport. The Operator acknowledges that this agreement is in substitution for, and supersedes, all previous agreements between the Operator and CIAL in respect of access to contractor parking. Failure to comply with the following rules may result in your access being withdrawn. Rules for operation of vehicles at Christchurch International Airport Limited 1. The driver shall comply with any Act, Regulation or provisions, which govern contractor vehicles operating at Christchurch Airport including all parking information included in Section 19 of the Requirements for Contractors working at Christchurch International Airport. 2. This Application for access for Contractors does not replace any permit system in place for parking of Contractor vehicles. 3. The driver shall at all times comply with directions of a Police Officer or Compliance Officer or CIAL Official. Parking is restricted in any authorised area to the posted time limit in place for that area. 4. The driver shall park his/her vehicle in an area designated for that class of vehicle unless otherwise directed by a Police Officer or Compliance Officer or CIAL Official. 5. The driver of a contractor vehicle shall not enter the contractor parking area other than through the designated card access entry barrier for that class of vehicle, and then only after activating the barrier by access card except at the direction of a Police Officer or Compliance Officer or CIAL Official. 6. The Access Card is only issued for the purposes of completing work that has been contracted by the Tenant. 7. CIAL reserves the right to make such additional rules as it may from time to time deem necessary or desirable. The rule shall be deemed to be in effect when the change has been notified to drivers through each organisation known to CIAL to be effected by the rule change. Page 11 of 12 January 2016

8. We understand that should the card be lost or stolen, we are required to advise the Airport Services Administrator immediately. 9. The Access Card must be returned to the Airport Services Administrator at the end of the contract. Access Cards not returned will be charged at $25.00 per card. 10. CIAL reserves the right to change or restrict the Contractors hours of access as it sees fit at any time. Signature: Name: Date: VEHICLE DETAILS Make: Registration: Model: Type: Make: Registration: Model: Type: Make: Registration: Model: Type: Make: Registration: Model: Type: Make: Registration: Model: Type: Make: Registration: Model: Type: Office Use Only: Processed by: Date: Comments: Cards Issued: Allocated Space(s): Page 12 of 12 January 2016