NDT AUDIT Z LLC. An EnergySoluitons Company. Audit Status. Interviewed 3 Finalist. Close to Awarding the Audit

Similar documents
Zion Project Overview S. Chris Baker VP EH&S

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C SAFETY EVALUATION REPORT

Community Engagement Panel ISFSI Location and Technology Option Update July 17, For internal use only

CHARACTERISTICS AND COMMON VULNERABILITIES INFRASTRUCTURE CATEGORY: NUCLEAR SPENT FUEL STORAGE FACILITIES

Re: Holtec HI-STORM UMAX Canister Storage System Amendment 1 (CoC No. 1040)

Division of Spent Fuel Management Interim Staff Guidance 2, Revision 2. Fuel Retrievability in Spent Fuel Storage Applications

Interim Storage of Used Nuclear Fuel. The Nuclear Energy Institute

7/15/2015 Federal Register, Volume 80 Issue 44 (Friday, March 6, 2015)

CURRENT STATUS ON THE SPENT FUEL DRY STORAGE MANAGEMENT IN TAIWAN

Tip-Over Analysis of the HI-STORM Dry Storage Cask System

The paper includes design and licensing status of the MAGNASTOR system, and prototyping development that NAC has performed to date.

Jayant Bondre AREVA TN

Considerations for Disposition of Dry Cask Storage System Materials at End of Storage System Life

Environmental Reviews. William Reckley Advanced Reactor Program Office of New Reactors

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ] Entergy Nuclear Indian Point Unit 2, LLC

Licensing a Centralized Spent Fuel Storage Facility

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS WASHINGTON, DC

Nuclear Energy. Consolidated Interim Storage Facility Design Concepts In the United States. Nuclear Fuels Storage and Transportation Planning Project

Activities of the NRC s Division of Spent Fuel Management: An Overview

HI-STORM UMAX: Holtec s Underground Dry Storage System

The following considerations are taken into account for designing the NUHOMS MP197 packaging.

Spent Nuclear Fuel and Low Level Radioactive Waste: Current and Future Storage Options

Regulation of Waste Streams from Small Modular Reactors and Advanced Reactors

FIG. 1. Fort St. Vrain Nuclear Generation Station.

SONGS Dry Cask Storage System. Defense in Depth

RECOMMENDATION 2.3: SEISMIC. The U.S. Nuclear Regulatory Commission (NRC) is issuing this information request for the following purposes:

Division of Spent Fuel Management Overview

Westinghouse AP1000 Nuclear Power Plant


Fee Schedule FY2019. Table 1 Schedule of Source, Special Nuclear, and Byproduct Material Annual Fees

DISPOSITION OF ORNL S SPENT NUCLEAR FUEL*

FY 2015 Fee Schedule. Table 1 Schedule of Source, Special Nuclear, and Byproduct Material Annual Fees

Centralized Interim Storage and a National Interim Storage Strategy. Robert Petroski ANS WISE August 1, 2005

Demonstrative Drop Tests of Transport and Storage Full-Scale Canisters with High Corrosion-resistant

NRC Participation and Perspectives on Codes and Standards for Nuclear Construction

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] Proposed License Renewal of License No. SNM-2506 for the Prairie Island

Collection and safekeeping of TRIGA Spent Nuclear Fuel

Fukushima and Beyond THREAT-DIMENSIONED SECURE FACILITIES & GC SERVICES

Spent Nuclear Fuel, Low Level Radioactive Waste and Decommissioning

Development of Chloride- Induced Stress Corrosion Cracking (CISCC) Aging Management Guidelines

ПРЕДПРИЯТИЕ ГОСКОРПОРАЦИИ «РОСАТОМ» STATE CORPORATION "ROSATOM GROUP OF COMPANIES

Safety Aspects of SMRs: A PRA Perspective

High Burnup Dry Storage Cask Research and Development Project. Final Test Plan. Prepared by: the Electric Power Research Institute REVISION LOG

Spent Fuel Transportation

Regulatory Perspective on Potential Fuel Reconfiguration and Its Implication to High Burnup Spent Fuel Storage and Transportation

Commercial in Confidence COPYRIGHT 2010

NUREG-1536: Standard Review Plan for Dry Cask Storage Systems

Light years ahead! AREVA TN Americas 1/22/2015. Prakash Narayanan AREVA TN INMM Spent Fuel Management January 2015

Decommissioning of Dairyland Power s Lacrosse Boiling Water Reactor

INDEPENDENT SPENT FUEL STORAGE INSTALLATION WATTS BAR NUCLEAR PLANT. FINAL ENVIRONMENTAL ASSESSMENT Rhea County, Tennessee

WM2015 Conference, March 15 19, 2015, Phoenix, Arizona, USA

Dominion North Anna Power Station Restart Readiness

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level

Risks of long term irradiated. on site at nuclear power plants

Safety Considerations in the Transition from Operation to Decommissioning of Research Reactors

H.R relies on the NRC for all safety issues. However, the NRC provides limited safety evaluations.

INPRO Criterion Robustness of Design Position of the EPR TM reactor Part 3. Franck Lignini Reactor & Services / Safety & Licensing

Spent Fuel Storage Operational Experience With Increased Crud Activities. I. Barnabás Public Agency for Radioactive Waste Management (PURAM), Hungary

Joint Meeting of the Radioactive Materials. Waste Transportation Working Group November 27, 2012

Arab Journal of Nuclear Science and Applications, 48(3), ( ) 2015

Refueling Outage & Dry Cask Shielding Improvements at US Nuclear Plants

San Onofre Unit 1 Decommissioning

WM2016 Conference, March 6 10, 2016, Phoenix, Arizona, USA. Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites An Update 16057

TROJAN DECOMMISSIONING STATUS. OPUC Meeting March 8, 2005 (draft)

1. Korean Regulatory Framework and Technical Standards applied to Site Selection and Safety Review for NPPs

LONGENECKER and ASSOCIATES. Ronald E. Matthews

STRUCTURAL DESIGN CRITERIA

LABGENE CONTAINMENT FAILURE MODES AND EFFECTS ANALYSIS

Reactor Technology: Materials, Fuel and Safety. Dr. Tony Williams

Proud To Power Iowa. Chief Nuclear Officer, FPL Group. January 9, Today, and Into the Future

NUCLEAR DRY CASK FUEL STORAGE OPERATIONS

June 18, Dear Mr. Scarola:

THE FUKUSHIMA ACCIDENT: IMPLICATIONS FOR NUCLEAR SAFETY. Edwin Lyman Union of Concerned Scientists May 26, 2011

NuScale: Expanding the Possibilities for Nuclear Energy

Ensuring Spent Fuel Pool Safety

EPRI Utility Requirement Document

Nuclear Regulatory Commission (NRC) Review of Reducing the Hazards from Stored Spent Power-Reactor Fuel in the United States 1

NFSC Standards Title Format for Consistency November 2010

STRUCTURAL DESIGN CRITERIA

SUMMARY: The U.S. Department of Energy (DOE) is providing notice of request for public

TERM TASK FORCE. Presented to: Waste Management Symposia By: Dr. Charles L. Miller. Phoenix, AZ. Fukushima Daiichi NRC Near Term Task Force 1

Regulatory framework on DPC licensing in the Czech Republic. Peter Lietava

Power Reactor Decommissioning: U.S. Perspective on Regulatory Insights and Challenges

Draft Report for Comment

Spanish Spent Fuel Transport

Byron Generating Station

Spent Fuel Management and Research Activities in Korea

HI-MAX Air Cooled Condensers

6.0 ENGINEERED SAFETY FEATURES

IMPACT ANALYSES AND TESTS OF CONCRETE OVERPACKS OF SPENT NUCLEAR FUEL STORAGE CASKS

Demonstration Test Program for Long term Dry Storage of PWR Spent Fuel

Improvements Needed in Nuclear Power Plant Probabilistic Risk Assessments: Lessons Learned from Fukushima

Journal of American Science 2014;10(2) Burn-up credit in criticality safety of PWR spent fuel.

Developing a Low Power/Shutdown PRA for a Small Modular Reactor. Nathan Wahlgren

DRAFT REGULATORY GUIDE

Prairie Island Nuclear Generating Plant. EAL Reference Manual. Revision 9

Impact Analyses and Tests of Metal Cask Considering Aircraft Engine Crash

Intermodal Transportation of Spent Nuclear Fuel from Office of Civilian Radioactive Waste Management Sites 9328

STATE OF NEVADA. February 17, 2012

Transcription:

NDT AUDIT OLUT Audit Status Mailed RFP to 8 Chicago Area CPA Firms Interviewed 3 Finalist Close to Awarding the Audit Commence ASAP to Ensure Report by Year End 33

Design Standards for ISFSI OLUT 34

Now Wet Storage in Fuel Building OLUT 35

Next Dry Cask Storage Facility OLUT ion Used Fuel Westinghouse 2,226 fuel assemblies combined total for both reactors Weight 1472# Size 85" 8.5 x85" 8.5 x 165" long (13' -9") 36

Dry Fuel Storage Location OLUT ion Used Fuel Westinghouse 2,226 fuel assemblies combined total for both reactors Weight 1472# Size 85" 8.5 x85" 8.5 x 165" long (13' -9") 37

ion Dry Cask Storage System OLUT MAGNASTOR System 61 Fuel + 4 GTCC 2 Transfer Casks for SNF and GTCC Concrete Cask Canister Transfer Cask 38

Dry Cask Storage Components OLUT Transportable Vertical Concrete Storage Canister Cask 6 diameter X 15-5 high 11-4 diameter X 18-9 high Empty weight: ~20 tons Loaded weight: 157 tons Loaded weight: ~51 tons Steel liner: 1¾ thick Capacity: 37 used fuel assemblies Concrete: 26 thick 39

ion Vertical Concrete Casks OLUT 40

Regulatory Standards OLUT Code of Federal Regulations U.S. Nuclear Regulatory Commission Part 72 Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High Level RadioactiveWaste, and Reactor Related Greater Than Class C Waste 41

NRC Licensing Process OLUT NAC International, Inc. submits Modular Advanced Generation Nuclear All-purpose Storage (MAGNASTOR ) Dry Cask Storage System Final Safety Analysis Report NRC reviews and prepares Safety Evaluation Report CERTIFICATE OF COMPLIANCE NO. 1031 Amendment 2 Docket No. 72-1031 Amendment 3 Expected December 2012 42

NRC Safety Evaluation Report - Contents OLUT Spent fuel to be stored Technical Specifications Structural evaluations Thermal evaluations Confinement (leakage) evaluations Shielding evaluations Radiation protection evaluations Accident and natural phenomena and operating controls Criticality evaluations Materials evaluations Operating procedures evaluations Acceptance tests and Maintenance Program evaluations Quality Assurance 43

Site-Specific Requirements OLUT 72.212 Conditions of the General License The general license is limited to spent fuel which the licensee (ionsolutions) is authorized to possess at the site. This general license is limited to storage of spent fuel in casks approved under 10 CFR 72. The license for the storage of spent fuel in each cask is granted for 20 years and can be renewed through Certificate of Compliance process. 44

Site-Specific Requirements OLUT 72.212 Conditions of the General License Review the Safety Analysis Report referenced in the Certificate of Compliance and the related NRC Safety Evaluation Report to make sure the (ion NPS) site parameters, including analyses of earthquake intensity and tornado missiles, are enveloped by the cask design bases considered in these reports Protect the spent fuel against the threat of radiological sabotage. 45

Design Criteria MAGNASTOR Criteria NPS Site Criteria OLUT Temperature: -40 F to +133 F Snow & Ice: 100 psf Seismic: 037 0.37 g horizontal 0.25 g vertical Temperature: -26 F max / +105 F Snow & Ice: 39 psf Seismic: 017 0.17g horizontal 0.11g vertical Flood: 50 feet above fuel casks Seiche: 15 fps, fully submerged Fire/Explosion: 22 psig Tip-over (accidental): canister maintains structural integrity Tornado: 360 mph Flood: ~6 feet below fuel casks Seiche: below fuel casks Fire: No equivalent criteria Tip-over: No equivalent criteria i Tornado: 360 mph 46

Design Criteria Dry Storage Canister Design & NPS Licensed Criteria 2.5 diameter pipe at 190 mph OLUT NRC Regulatory Guide 1.76 Design Basis Tornado Missiles 1 diameter steel sphere at 18 mph 8 diameter wood pole at 225 mph 6, 8, 10, 12 diameter pipes at 225 mph 6.5 diameter pipe pp at 92 mph 4 x 12 wood at 255 mph 4000# automobile at 255 mph 4000# automobile at 92 mph 75# concrete block at 255 mph 47