RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014. A. Background

Similar documents
RFP No: WB/MOF/MINIS/CS/CQS/1.1.14/2014

Tajikistan STRATEGIC ENVIRONMENTAL AND SOCIAL ASSESSMENT (SESA) OF THE MINERAL SECTOR

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

Mining Environmental Impact Assessment Guidelines. May 2018

MINISTRY OF LANDS AND NATURAL RESOURCES NATURAL RESOURCES AND ENVIRONMENTAL GOVERNANCE PROGRAMME (TECHNICAL ASSISTANCE- TA) DRAFT

SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD

SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

FOR DISCUSSION ONLY. (A) ADB Safeguard Policy Statement. (C) Extent of Equivalence 2

UNRAVELING THE MYRAID OF STANDARDS AND TOOLS

NEW BUGESERA INTERNATIONAL AIRPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT- CUMULATIVE IMPACT ASSESSMENT

TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE

Summary of Preparatory Study

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR

ToR. Consultancy Firm to undertake Strategic Environmental Assessment (SEA) for the new Mining and Minerals Policy

Performance Requirements

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT

DRAFT FOR CONSULTATION OCTOBER 7, 2014

SUSTAINABLE HYDROPOWER DEVELOPMENT A NORWEGIAN-GEORGIAN COOPERATION PROGRAM. A Citizen s Guide. Communication and Hydropower EIA

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process

Summary of Preparatory Study for Development Study

Environmental Governance in Myanmar. U Than Aye Director Environmental Conservation Department

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country?

NATIONAL ENVIRONMENTAL MANAGEMENT AUTHORITY (NEMA)

Rainforest Alliance GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

SOUTH SUDAN EASTERN AFRICA REGIONAL TRANSPORT, TRADE AND DEVELOPMENT FACILITATION PROGRAM (SS-EARTTDFP) PROJECT ID (P131426)

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

EAGLE S NEST PROJECT

Category Environmental Item Main Check Items Confirmation of Environmental and Social Considerations

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

IUCN Policy on Biodiversity Offsets

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia

SEMINAR ON CUMULATIVE IMPACT ASSESSMENT & MANAGEMENT

EBRD Performance Requirement 1

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Environmental and Social Impact Assessment (ESIA) for Oil & Gas Projects, a Myanmar Context

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

[P ] ENVIRONMENTAL and SOCIAL COMMITMENT PLAN (ESCP) 10 February 2019

Czech Republic National Reporting for CSD-18/19 Thematic profile: Mining

Responsible Mining in the Lake Superior Basin Dec. 2013

3.0 APPROACH AND METHODOLOGY

Multi-Year Area-Based Permitting Policy for Mineral and Coal Exploration Activities

SANDCRETE ENGINEERING NIG. LTD. Background Information Document (BID)

TERMS OF REFERENCE STRATEGIC ENVIRONMENTAL, POVERTY AND SOCIAL ASSESSMENT (SEPSA) FOR CORRIDOR IMPROVEMENT PROGRAM (CIP)

Oyu Tolgoi Copper & Gold Mine Associated Power Plant:

PROCUREMENT NOTICE. National Individual Consultant (IC): Capacity Building Needs Assessment. Date of issue: 03 August (Re-advertisement)

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

MINING EIA REVIEW CHECKLIST

Terms of Reference. Application type: External vacancy Job Title: Category: Duty station:

Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects

Outline of the presentation

6 IMPACT ASSESSMENT METHOD

8 Geology, Hydrology & Hydrogeology

National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR

Trishuli River Case Study

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES

BACKGROUND / INTRODUCTION

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

IGF Geneva 2016 MPF-SDG Comparative Analysis. Perrine Toledano CCSI, Head: Extractive Industries

TERMS OF REFERENCE Socio-economic/ Livelihood Assessment and Site-based Sustainable Finance Plans Consultancy

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:

TERMS OF REFERENCE FOR TA CONSULTANTS

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1

TECHNICAL REVIEW COMMENTS on the Environmental Impact Statement. Rio Tinto Uranium Corp. Roughrider Advanced Exploration Project

EAO s Assessment of an Application for Certificate Amendment Prince Rupert Gas Transmission Project

Terms of Reference. National or International consultants: International Consultant

1. Background Provisioning Regulating: Cultural:

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

Environmental and Social Data Sheet

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Comparative Analysis of Cambodia Legal Framework and ADB Safeguard Policy Statement: ENVIRONMENT

GREEN DEVELOPMENT POLICY

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

IEMA ES Review Criteria

Europe and Central Asia Region Capacity Development Trust Fund

Licensing Nuclear Power Plants in Canada. Ensuring Safe and Environmentally Acceptable Operations

OPERATIONAL GUIDELINES ON ECOSYSTEM-BASED APPROACHES TO ADAPTATION

In all our projects, we seek to provide fresh inspiration and practical solutions that have a positive impact.

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

Development of an Environmental Manual for Environmental and Social Assessment, Management and Monitoring for the Road Sector in Suriname

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles

General issues and SESA purpose

TERMS OF REFERENCE FOR CONSULTANTS

ENVIRONMENTAL AND SOCIAL ACTION PLAN ÖKSÜT GOLD MINE, TURKEY (THE 'PROJECT')

Abeokuta, Nigeria Greenfield Power Generation Plant Environmental Impact Assessment (EIA) Background Information Document (BID) January 2015

September 2016 ID Competency Statement Type

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

TERMS OF REFERENCE EIA ASSESSMENT CONSULTANCY

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Implementing the Mitigation Hierarchy

Environmental and Social Review for GDF Projects

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1

Public Information Note. Ongoing World Bank Study of Biodiversity Offsets

Note: This is a draft document and does not represent a position or decision by government. Part 2: Policy for Cumulative Effects Management

Terms of Reference for National Consultant for Project Formulation Policy Framework Capacity and Conservation Needs Assessment (National)

Environmental Impact Assessment (EIA)

SUMMARY 2013 EDITION

Transcription:

Terms of Reference for a Cumulative Impacts Assessment in Baganuur Coal Mine in Mongolia to be financed by Mining Infrastructure Investment Support Project (MINIS) RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014 A. Background 1. Coal is most important primary energy source in Mongolia, due to insufficient oil reserves, absence of natural gas and presence of large coal reserves. Coal supplies about 93 percent of Mongolia s total energy requirements. Mongolia has vast coal resources, contained within 15 large-scale coal bearing basins. There are around 320 coal deposits and occurrences according to Geological Information Center of Mongolia. Total geological coal resources are estimated at approximately 150 billion tons, including about 20 billion tons explored. All the coal deposits and occurrences are located relatively in all areas of the country, but most of them in east, central and south areas. During last decade, coal exploration by foreign companies has been increased. 2. The Mining Infrastructure Investment Support Project (MINIS) financed by the World Bank aims to facilitate investments in infrastructure to support mining related activities and downstream value-added processes (regardless of funding source) and to build local capacity to prepare and transact infrastructure Projects.The environmental assessment work should be conducted so that the results are able to support a due diligence process required for access to international financing sources. The process and detailed requirements described in this TOR are based on World Bank Guidelines but all work and the end products of the ESIA must conform to applicable Mongolian Laws and Regulations. 3. Environmental and Social Safeguards. The total area of the land impacted by the mining activities of the mine, established in 1978 is 1770.6 hectare. Of this total area, 167.5 hectare area was undergone through technical rehabilitation and 140.5 hectare biological rehabilitation. These amounts equal to 9 % of the total area impacted. Technical and biological rehabilitations were undertaken in 10 hectare area of the land rehabilitated in 2013. One of the main factors that contribute to environmental pollution is the dust. The concentration of air dust at the mine site is 0.015-0.098 mg/m3. Dust concentration increases during the activities of mining, constructing road, blasting, and coal crushing and loading. 1

The mine road watering system did not meet the requirement and the dust is in high concentration. Measures for dust reducing at by its sources should be improved in the future. The mine discharges an average of 4.5 5 million cubic meters of water. In order to restore Baga gun Lake, 950 m long channel was created using the relief of the area surrounding the lake and the channel is fed by the underground water. Channel surface was covered with water-proof material and with gravel for the purpose of reducing water loss from the channel and cleaning and warming the water. Hygiene and sanitary condition Hygiene and sanitary conditions and the housekeeping in outside and inside of the industry have been improved better than previous years. The result of hygiene measurement performed on the workplace condition demonstrates that there are some definite progresses in the outcome of the dust reduction work. For instance, there is a progress in coal handling and loading plant-2, in that, 160 mg/m3 dust concentration was decreased to 80 mg/m3 by the last measurement after taking measures to reduce coal dust by dry suppression method. Environmental protection and rehabilitation works It is necessary to use advanced dust suppression method, suitable for each dust source. New technologies and options need to be introduced in mine road watering, as initial measures. Availability of water trucks should be ensured. In the further, dry dust adsorption method will be used for dust reducing at coal handling and loading plants. This method is offering several advantages, but best options for use not yet finalized, so further improvement is required. Further rehabilitation without irrigation method will not provide complete growing condition for plants, thus regular watering is necessary in the rehabilitation. Irrigation norms should be followed. Rehabilitation only covered 9% of all the damaged land, therefore it is necessary to develop and intensify rehabilitation projects. Employees health condition Providing double profession to employees, working in heavy condition is important in order to reduce the occupational disease. In other words, it will allow them to change work condition after 7-8 years of 2

working. Evaluation of authorized/ professional organization should be done, before constructing new building and facilities, use of new equipment. Blasting rules and instructions should be followed precisely to avoid accidents. International Safety Standard OHSAS-18000 should be implemented. Machinery and equipment used for many years can create certain condition for accident, thus equipment maintenance should be improved and technical innovation needs to be implemented duly. Preventive measures and actions against rock sliding and failures, coal combustion/fire and other technological violations should be implemented in time and proper manner. 4. As a Technical Assistance project, following the example of more recent Bank-financed projects supporting mining sector governance reforms, the sensitivity of the mineral sector in general and the work supported for the Baganuur Additional Exploration project, a detailed assessment of the environmental and social impacts from the ETT development, including an assessment of compliance with international best practice and World Bank norms, and recommendations for any remedial actions resulting from implementation need to be conducted. 5. In its final phase of implementation have a number of activities planned that are related to safeguards issues. (i) ASector Strategic Environment and Social Assessment are expected to be initiated in 2014 (see the ToRsattached); (ii) the Ministry of Environment and Green Development (MEGD) is leading on the work to develop sector specific regulations including those for mine closure. 6. SESA. In parallel to this cumulative assessment, a Strategic Environmental and Social Assessment to assess the regional environmental and social impacts caused by the development of coal mine projects and their associated facilities in the region is prepared. The SESA will be a planning tool that will involve a participatory consultative process aimed to help the Government to: (a) diagnose the key environmental and social problems and opportunities associated with the anticipated growth of Mongoliamining and gas sectors; (b) identify the policy, legal, regulatory, and institutional adjustments and capacity-building actions needed to minimize the adverse cumulative environmental and social impacts of mining and gas operations and associated infrastructure development, while enhancing the positive impacts; and (c) propose specific measures that Government can implement in the near future to improve the environmental and social sustainability of mining and gas sector in Mongolia.SESA was launched in November 2013 and is expected to be completed by the fall of 2014. 3

B. Objectives 7. The objectives of the proposed cumulative impact assessment are to: (a) Evaluate if the Baganuur Additional Exploration project (including its associated facilities) will have an effect on Valuable Ecological Components (VEC); (b) Evaluate if the effect of the Baganuur Additional Exploration project will act cumulatively with that of other projects (either from the past, current time, or in the future); (c) Evaluate if the effect of the Baganuur Additional Exploration project, in combination with the other effects, may cause a significant change now or in the future in the characteristics of the VEC, after the application of mitigation measures. (d) Identify appropriate actions for the Baganuur Additional Exploration project to address its contribution to significant impacts. C. Scope of Work 8. The firm is required by the Government of Mongolia, represented by MINISand Ministry of Environment and Green Development, to assist it to: Step 1: Describe the Baganuur coal field development, its setting and other projects and activities that may give rise to cumulative effects. This cumulative impacts assessment will need to sequence planned developments of the mines in the coal fields and ancillary and regional infrastructure development (approximate time horizon of 20 years to start operation). Step 2: Identify key Baganuur-related contributions to cumulative effects on selected resources of concern, such as ground water, biodiversity, and livelihood of local communities; Step 3: Assess the level of cumulative effects (according to the manual on Cumulative impact assessment, MEGD). Step 4: Determine the impacts of cumulative effects; and Step 5: Recommendations: Analyze reasonable, feasible options for mitigating or avoiding contribution to any significant cumulative effects, following the national legal system related to the cumulative impact assessment. 9. The final conclusions of the CIA should define the following: (i) to what extent the Baganuur Additional Exploration project will contribute to cumulative impacts; (ii) the mitigation measures which should be implemented by the Baganuur Additional Exploration project; and (iii)the 4

management/mitigation measures which are needed but beyond the scope of the Baganuur Additional Exploration project, including the need for consequent additional assessments that the Government will need to require to ensure sustainable development of the area and to develop core principles for environmental and social management in the area that respective investors and project developers will need to be guided by. D. Main Tasks. Step 1: Describe the Baganuur development and its setting. 10. Project Description. The first step in the CIA is to describe the Baganuur Additional Exploration project and its phases, including key components that may give rise to cumulative effects. This will include the following: Phases and timing of the project; Description of the scheme and project area of influence; Description of offsite facilities including coal transportation, power transmission lines, access roads; Identify environmentally sensitive areas, including protected areas, key stakeholders and affected people. 11. Past, present, and probable future projects.once Baganuur Additional Explorationproject issues have been identified, analyze past, present and probable future projects and activities within a defined temporal and spatial framework. The evaluation of other projects and activities should consider the following: Include those projects of known footprint that can be assessed; Consider a time frame that extends backwards to a pre-development scenario and forwards as realistically as possible; Include projects that are approved, awaiting approval, announced or under design; Include those projects whose environmental and social impacts and contribution to cumulative effects can be reasonably predicted, particularly projects with direct impacts on water resources, land and biodiversity; and, Discuss pending projects with regulators and incorporate the concerns of affected stakeholders. 5

Prepare a map or schematic of all existing and planned projects with the basic information on location, water intake, wastewater discharge points, mining waste, and coal transportation roads. 12. Define VECs. The domestic EIA has already identified some key issues of concern associated with the construction, operation, and decommissioning of the Baganuur Additional Exploration project. Typical impacts include the following: Impacts on water resources (water use, quality, quantity) Impacts on biodiversity and wildlife Impacts on land use and soil? Loss of archaeological and cultural resources Impacts of mining wastes on environment Impacts on air quality Impacts on the livelihood of local communities and herders. Visual Impacts The VECs should be defined based on the assessment of impacts on the above aspects and consultations with stakeholders. VECs could be (but are not limited to): water resources, land erosion, wildlife, cultural resources, air quality etc. Step 2: Identify key Baganuur-related contributions to cumulative effects on selected resources of concern. 13. The CIA should identify key impacts of Baganuur Additional Exploration project activities throughout all phases (construction, operation and decommissioning) in conjunction with other projects and activities. The following questions should be answered: Are other projects and activities in the defined project area affecting the VECs? Do the effects of the project overlap or increase the effects on the resource? Do the effects of the project have a potential to affect the long-term sustainability of the resource? Step 3: Assess the level of cumulative impacts. 14. The next step in the CIA process is to assess the level of cumulative impacts. This uses a similar methodology to that employed in the EIA, but the difference is that it assesses the impacts of other projects and activities, in addition to the project in a defined spatial and temporal framework. For each 6

resource/issue in question, the cumulative effects should consider typical components of an EIA assessment extent, frequency, duration, magnitude, uncertainty and probability. Step 4: Determine the impacts of cumulative impacts. 15. Once the cumulative impacts are determined, their significance must be considered relative to an established threshold limit, an established legal guideline or policy, or a qualitative assessment based on professional opinion and consultation. In any case, the significance of the cumulative impacts must be defensible. The significance of the cumulative impacts and the contribution of the project must be subsequently evaluated by project decision makers. The significance of the Baganuur Additional Exploration project interventions contribution to the cumulative impacts should be defined in one of the following ways: The project has a measurable effect on the resource; The project acts in conjunction with the effects of past present or future projects and activities; and The project in conjunction with other projects and activities shifts the resource to an unacceptable level or exceeds a threshold such that the impact is considered significant, in that: - The project s contribution to cumulative effects is responsible for exceeding the threshold and therefore is significant or, - The project is contributing with the effects of other projects and activities and the project contribution may or may not be significant, depending on the level of the contribution. Step 5: Formulate recommendations. 16. The CIA should reach a conclusion on whether the contribution, if any, to the cumulative impacts by the Baganuur Additional Exploration project is significant or not. An action plan (with time, institutional responsibilities, budget) should be developed based on this conclusion, and clearly define what mitigation measures need to be incorporated into the project Environmental Management Plan, and what mitigation/environmental management measures should be carried out above the project level. For example: Project level mitigation to reduce the impacts of the contribution of the project to cumulative effects; 7

Cooperative mitigation measures between project proponents to reduce cumulative effects, or Regional intervention on behalf of government or regulators to reduce the overall cumulative effect through the establishment of thresholds or policy intervention. 17. Mitigation/environmental management measures that are needed but beyond the scope of the Baganuur Additional Exploration project, will be presented to relevant (government) agencies/entities in the form of a workshop and finalized based on the views by the agencies. Their endorsement/acknowledgement on the recommendations from the CIA should be sought. Presentation and Consultation 18. The consultant will organize and carry out workshops in the Baganuurmine site to present the findings of the Cumulative Impact Assessment.To ensure meaningful consultations throughout the course of the CIA, key stakeholders, particularly for defining the Valuable Ecosystem Components and final results should be clearly documented. The records of public consultations undertaken will form part of the final deliveries by the consultant. 19. The expected result of the workshops will be the following: (i) stakeholders will validate environmental, social (including labor and resettlement), health, safety and security priority concerns at the local level; (ii) workshops should also be a way of informing and engaging stakeholders in the immediate vicinity of the Baganuur Additional Explorationproject and impacted area subject to this cumulative assessment; (iii) vulnerable stakeholders (women, children, youth and others) should fully participate in the process, not only leaders, groups and NGOs that claim to represent their interests. E. Outputs 20. Report and Consultation. Based upon the results of thecumulative Impact Assessment Report, the firm will organize and carry out workshops in the Baganuur mine site. F. Duration and Timing 21. The Cumulative Impacts Assessment Reportshould be completed within 4months of commencement. All reports should be prepared in Mongolian and English both in CD and hard copy. The final presentation workshop should be held within 5months of commencement of the contract. G. Institutional Arrangements 8

22. The consultant shall report to MEGD and liaise with other agencies of the government including Ministry of Energy and Mining, and local authorities. Data will be provided by MEGD, MEM and aimag/soum authorities. Existing EIAs, EMPs, and plans for development will be provided by relevant ministries with facilitation from MEGD. 23. Coordination and contract management will be carried out by MINIS Project ImplementationUnit. 24. The final output will be subject to acceptance by MEGD and World Bank for compliance with the World Bank guidelines for safeguards. H. Requirements for the Consultant Team 25. To qualify and carry out the work the consultant should be a consulting firm experienced in performing work on projects similar in size and subject ( the consultant ). 26. The consultant must have the following qualifications: (i) Consultants must have sound knowledge and at least five years work experience plus experience on at least two similar assignments, and must have good knowledge of mining regulations. (ii) The team should comprise the following specialists: (1) A Team Leader who is skilled at leading and managing inter-disciplinary teams, can produce well-written reports on time, and is knowledgeable about strategic environmental assessments and extractive industries. (2) An Infrastructure Specialist with at least ten years of relevant experience in infrastructure policy and public administration of the mining sector. (3) A Mining Specialist who is knowledgeable in Mongolian geology and in modern mining technologies and practices. Proven experience in environmental regulatory frameworks and environmental standards for mining activities is required. (4) An Environmental Engineer or Scientist who is knowledgeable about the impacts of miningrelated activities on natural habitats, water, land and biodiversity. Experience in Mongolian terrestrial and aquatic ecosystems is desirable. (5) A Social Development Specialist who is knowledgeable about the direct and indirect social impacts (positive and negative) of mining-related activities including public health. S/he should have proven experience in anthropological studies of indigenous populations. 9

(6) A Stakeholder Engagement Specialist who can effectively manage stakeholder engagement throughout the preparation process, including the facilitation of public consultation events and other large meetings. Specific technical inputs on legal, infrastructure development projects and gender should be provided by the team as needed. I. Payment Schedule Ten percent (10%) upon acceptance of the Inception Report / Work Program and the Consultation and Communications Program (Advance payment is optional) Twenty percent (20%) upon acceptance of the Annotated Outline of Cumulative Impact Assessment Report. Twenty percent (20%) upon acceptance of detailed report on workshops and findings. Twenty Five percent (25%) upon acceptance of Preliminary Draft Cumulative Impact Assessment Reports. Twenty percent (25%) after receiving an approval letter from the Client and upon acceptance of the Final Cumulative Impact Assessment Report. 10