City Development Plan for Udaipur

Similar documents
City Development Plan ( ) BIHARSHARIF

Draft - Smart City Proposal. Kalyan Dombivli Municipal Corporation

City Development Plan ( ) SAHARSA

City Development Plan ( ) BEGUSARAI

City Development Plan ( ) HAJIPUR

City Development Plan ( ) CHAPRA

Ashwani Saxena. Rajasthan Urban Infrastructure & Finance Development Corporation (RUIFDCO)

City Development Plan ( ) PHULWARISHARIF

NAME OF ULB- LUCKNOW

CSP Baseline Assessment

Presentation from the Workshop on Innovations for Scaling up to Citywide Sanitation

NAME OF ULB BASTI. Location of source of drinking water

City Development Plan ( ) AURANGABAD

BHOPAL SMART CITY SHIVAJI NAGAR REDEVELOPMENT

Executive Summary. Water Sewerage Authority: Feasibility Study

Sustainable Water Management - Goa Initiatives

City Development Plan ( ) SASARAM

Urban Nexus and Linkages to GOI s New Schemes

City: Bhopal State: Madhya Pradesh. Category: Capital, Tier Demographic Profile. 2. Economic Profile

SERVICE LEVEL IMPROVEMENT PLAN FINAL

Performance Improvement Planning for Urban Water Supply and Sanitation Services

Annual Report

NAME OF ULB- PILIBHIT

BRIHANMUMBAI MAHANAGARPALIKA

NATIONAL SMART CITY MISSION. PRS Legislative Research

Guntur is the fourth largest city in the

SWOT ANALYSIS FOR IMPROVEMENT OF MUNICIPAL SOLID WASTE MANAGEMENT PLANNING: A CASE OF AMOD TOWN,BHARUCH

Water Supply. Yes we have collected Census 2011 data table is mentions below:- S.No Source Particulars Numbers Tap Water Connection

WATER SUPPLY AND SANITATION IN SLUMS PAS PROJECT, INDIA. Monitoring in Urban Settings, Stockholm CEPT University, August

GCI Thematic Round Table: A Dialogue on Smart Cities, June 29 th, 2015 National Guidelines for Smart Cities in India

Dahod Smart City Project

Ex-ante Evaluation - 1 -

ECONOMIC ANALYSIS: PROJECT LOAN

City Development Plan ( ) Dehri-Dalmianagar

BHILAI MUNICIPAL CORPORATION WATER SUPPLY SECTOR

Service Level Benchmarking of

Stockholm World Water Week, August Dr. Arne Panesar, Dr. Regina Dube, Dirk Walther, Sanjay Kumar Srivastava IFS (GIZ) Dayanand Panse (ESF)

City Development Plan ( ) SITAMARHI

DESIGN OF 24X7 WATER SUPPLY SYSTEMS

Infrastructure Planning and Management. Class 7 - Urban Infrastructure in India

City Development Plans: An Agenda for Urban Renewal

Institutional Change : Scaling Up Rural Water Supply Program

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities

Composition of Municipal Solid Waste (MSW)

GUIDELINES FOR SCHEME OF URBAN INFRASTRUCTURE DEVELOPMENT IN SATELLITE TOWNS / COUNTER MAGNETS OF MILLION PLUS CITIES

GIZ Support to Ministry of Urban Development Training on Preparation of City Sanitation Plan Part I State of Andhra Pradesh

OFFICE OF MUNICIPAL CORPORATION, KORBA (C.G.) SECTOR WISE SLIP TEMPLATE: WATER SUPPLY

NAME OF ULB - BALLIA

Smart Cities Challenge Amravati Municipal Corporation

Now Available. Report on WATER IN INDIA India Infrastructure Research.

Ministry of Urban Development New Delhi April 16 th, 2010

Workshop on Mainstreaming Citywide Sanitation 4-5 April 2016 About Centre for Science & Environment (CSE) & About the Workshop Objectives

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR

Challenges in the delivery of Water and Sanitation

GIZ Support to Ministry of Urban Development Training on Preparation of City Sanitation Plan Part 2 State of Andhra Pradesh

ECONOMIC ANALYSIS. Table 1: Background Information of States in the National Capital Region GSDP Population below poverty line FY2000 a (%)

Excreta Matters: 7 th Citizens Report on the state of India s Environment. An agenda for water-prudent and waste-wise India

Bruhat Bangalore Mahanagar Palika (BBMP) is one of the first municipal bodies to show how this could be done.

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES

Sanitation Sector. Ministry of Urban Development Govt. of India

CHAPTER 6 PROFILE OF URBAN PUNJAB WITH SPECIAL REFERENCE TO LUDHIANA CITY

5.0 URBAN ENVIRONMENT

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1

Municipal Solid Waste in India 2017 Market Analysis, Outlook and Opportunities (till )

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES (WATER AND WASTEWATER)

DETAILED TERMS OF REFERENCE. 1.0 Terms Of Reference: I.1 The scope of services of a consultant shall include the following categories:

KARNATAKA URBAN WATER SECTOR IMPROVEMENT PROJECT (KUWASIP)

Report of the committee set up to frame National Sustainable Habitat Standards for the Municipal Solid Waste Management

Energy and resource efficiency in Urban Water Management : Challenges & potential ti for enabling paradigm shift

Water Demand and Waste Water Management, Rajkot, India

Urban Growth and Planning : Experiences from India

Measurement of Environmental Performance Index: A Case Study of Thane City

Draft Smart City Proposal - Lucknow

Arghyam s Inputs to the Pre-Budget Consultation of the Finance Minister with Social Sector related groups

Action Plan for Open Defecation Free Dahegam

Information required for Preparation of Master Plan for Sewerage

12 TH WORLD LAKE CONFERENCE

Performance Evaluation of the Ahmednagar Municipal Corporation

National Water Demand Management Policy

Role of JNNURM in Upgrading Quality of Life of the Citizens of Bhopal

Performance assessment systems for improved service delivery. IUC, Mysore 18 November, 2011 Meera Mehta, CEPT University, India

AMRUT. Flagship Program. October 2015

WATER AND SANITATION AS AN INTEGRAL COMPONENT OF URBAN PLANNING

ANNUAL REPORT 2008: KMDA

URBAN INFRASTRUCTURE RAJASTHAN. Cost Benefit Analysis of Urban Infrastructure Interventions in Udaipur. Gagan Nigam. Priyesh Shukla.

Republic of India Support to Government of India for Implementation of National Urban Sanitation Policy

Village Development Strategies: An approach towards Rurbanisation..

COMMUNITY PARTICIPATION IN DEVELOPMENT, OPERATION AND MAINTENANCE OF WATER SUPPLY AND SEWERAGE SERVICES

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES

Innovative Lake Management Frameworks: Lessons from Rajasthan

SECTOR ASSESSMENT: WATER AND SANITATION. 1. Sector Performance, Problems, and Opportunities

11. CITY DEVELOPMENT PLAN FRAMEWORK & PROCESS

Diversion of domestic sewage for improving urban lake water quality, India

Smart Cities Conference and Expo By: Dr. Jyoti Parikh Executive Director

Improved Sanitation in South Asia

ECONOMIC AND FINANCIAL ANALYSIS

TOTAL SANITATION IN SHIMLA, VARANASI & RAIPUR

ABSTRACT. G.O.( Ms) No.161 Dated:

Municipal Corporation of Tirupati. Draft City Sanitation Plan

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES

Transcription:

City Development Plan for Udaipur - 2041 Draft Revised CDP 19 th February 2015 Dr. Ravikant Joshi CBUD Project, Ministry of Urban Development

Agenda 1 Progress update 2 City Level Assessment - Key Issues 3 Stakeholder Suggestions 4 45 City Vision and Sector Goals Demand Sector Strategies, and Gap analysis; Demand and Projects Gap Identified analysis and Projects Identified 6 Capital Investment Plan and Financial Operating Plan 7 Way Forward 2

Progress Update 3

Project Background - CBUD MoUD, GoI with the assistance of The World Bank have launched the Capacity Building for Urban Development Project The project has two components strengthened urban management effective urban poverty monitoring and alleviation. The project support selected cities in following areas: Addressing issues in land use and planning, service delivery, governance and poverty reduction. Provide assistance on urban management and poverty reduction A differentiated approach to capacity building Bring innovative practices to the forefront To identify broader issues for intervention and areas of assistance pertaining to development of city, MoUD decided to prepare the CDPs for 30 cities as per the revised CDP guidelines issued in 2013. CRISIL Risk & Infrastructure Solutions is appointed as consultant 4

CDP shall be an Input Document to.. City Development Plan Swachh Bharat Mission NUDM (Additionality TO JNNURM) Smart Cities Community and Public Toilets, Solid Waste Management, Information, Education & Communication (IEC) and Public Awareness, Capacity Building Civic Infrastructure Capacity Building Capacity Building in Urban Transport Municipal Cadre, Reform management and support E-Governance, ICT application, Use of Technology (GIS in planning) Retrofitting minimum 500 acres (3 years) Redevelopment minimum 50 acres (5 years) Greenfield development- Minimum 250 acres 5

Udaipur City Development Plan - Progress Udaipur CDP Milestones CBUD/GoI UMC Deliverables 1 Inception Meeting 8 th Aug 13 September 13 Inception Report Sep 13 2 Stakeholder Interactions - Sept 13 to May 14-3 Interim Stage - 9 th June 14 - Wokrshop Interim Report June 14 4 Draft CDP Stage Apr and May 14 June, July14 - Discussions Draft Report - July 14 5 Revised Draft CDP stage - 20th Feb 15 Final Workshop Revised Draft Report Nov 14 6 Final CDP Stage - - - 6

A brief fact file and physical growth pattern 7

Udaipur: A Brief Fact File Background Foundation laid in 1559 by Maharaja Udai Singh. Became Municipality in 1922 and Municipal Corporation in April 2013 Administrative headquarter of the district Rich in mineral resources including copper, lead, zinc and silver. Tourist centre rich heritage Industrial node Wholesale market for food grains to building materials. Area Current planning area 64 sq. Km Population 4.88 lakhs (census 2011) including outgrowth Households 0.94 lakhs Density 70 persons/ha Sex Ratio - 925 Literacy Rate 80% Total Workers - 33% 8

Growth Trends Growth Pattern Towards East, North East and South East. Aravallis in West and North West act a natural barrier to growth Municipal area increased from 17sq km in 1946 to 64 sq. km. in 2011 NH8 and NH 76 triggered growth Physical growth pattern of Udaipur 9

Draft Master Plan 2031 10

Salient Features of Draft Master Plan 2031 Maintain city s strengths from Historical, Religious and Tourism perspective Decongest city core by relocating wholesale markets and by developing traffic management measures Water resources to be preserved and pollution abatement measures to be implemented (Mansi plan) Enhance tourism potential by creating tourist infrastructure Regional hub of education, health and commerce Instead of industrial estates Industrial growth centers to be developed at apt distance from urban area. Develop activity nodes based on human scale Traffic generation points including logistics nodes to be planned at peripheries Development of Social Infrastructure as per population density Udaipur basin and hillocks around Udaipur to be afforested World class Entertainment City, Sports City Fringe area to be planned A separate authority for lake management 11

City Level Assessment- Key Issues 12

SWM Sewerage 2013 CRISIL Ltd. All rights reserved. Water Supply City Level Assessment - Key Issues Insufficient water resources resulting into ground water extraction and depletion. (70 MLD against demand of 80 MLD) Old water supply infrastructure, resulting in water leakages and sudden breakdowns. Duration of water supply, low pressure and uneven distribution of resources. (at 2-3 day interval) Replacement of meters required. Low cost recovery. (29% cost recovery) Absence of planned underground sewerage network system. (13% population connected to underground sewerage) Existing sewerage system in the old city area needs refurbishment. Fragmentation of responsibilities between UMC, UIT and PHED. Technical and coordination issues in operation and maintenance of the existing system. (29% cost recovery) Inadequate coverage of door to door waste collection facilities. (43% coverage) Absence of waste segregation, processing and scientific waste disposal facilities. UMC doesn t have a separate department for SWM services. Lack of financial and institutional resources. (Samekit Kar is inadequate to cover O&M cost of INR 790 per tonne) 13

Urbam Poverty T & T 2013 CRISIL Ltd. All rights reserved. Storm Water City Level Assessment - Key Issues Inadequate or no drainage facilities in many areas. (80% total coverage) Inadequate and irregular maintenance of existing storm water drains. Most of the drains is in dilapidated condition and/or chocked due to silting. Lack of motivation and public awareness. Lack of parking space at adversely affecting through traffic. Lack of good and efficient public transportation system in the city. Absence of efficient public transportation system and rapid increase in private vehicles leading to congestion UMC, UIT doesn t have completer data base related to urban slums and status of services in slums More than 45 percent households are not connected with proper sanitation facilities lack of administrative and monitoring staff leading to slow progress of housing for urban poor UMC has limited role; centrally sponsored scheme being implemented by UIT 14

Heritage 2013 CRISIL Ltd. All rights reserved. City Level Assessment Key Issues Lack of maintenance of heritage structures. Lack of demarcated heritage zones lead to insensitive development near heritage structures. Lack of efficient public transport system makes tourist center difficult to reach by tourists. Similarly, absence of sidewalks make the experience less enjoyable. Some selected important tourist destinations are as under- City Palace Lake Palalce Jag Mandir Monsoon Palace Jagdish Temple Sagasji Mandir Durbar Hall Fateh Sagar Lake Pichola Lake Saheliyo ki Bari City Palace 15

Local Economic Dev. City Level Assessment Key Issues Tourism is mainstay of economy. Due to rise of competing tourist destinations in the region an impact on city s economic base is possible. Females constitute meagre 19% of work force; Incentivizing house hold level industrial development may improve situation. Due to lack of irrigation share of agriculture has declined. Commercial activity concentrated in city core leading to congestion. Lack of resource management has lead to depleting natural resources like marble etc. Newly merged areas lack infrastructure facilities. It would require additional resources. Udaipur s Economic Base Tourist Destination Lake Palace 16

Stakeholder Consultations in Udaipur 17

Inception Stage Presentation by CRISIL One to One interactions CRIS team has organised the inception meeting on 2 nd September 2013 at UMC. Discussed the revised CDP preparation process and the role of UMC. UMC has still not formulated both policy and technical committees. However it is in the process of formation of these committees. 18

Workshop Proceedings Interim Stage Presentation by CRISIL CRIS presented city level assessment and SWOT. Post presentation, Q&A session has been conducted. City Vision Stakeholders gave the issues and suggestions. City vision framing exercise carried out. 19

Stakeholder Suggestions Water Supply Sewerage SWM Storm Water Need overhead tanks in new colonies laying pipes in new areas. Proper distribution in low-lying areas. Augmentation of water resources. Water connection to all households. Daily water supply and metering for all connections. Removal fluoride. of Water recharging structures. Need for sewerage and sanitation system in new areas. Stopping disposal sewage natural sources. of in water Household level sewerage network connections. Sewerage network coverage across city. Comprehensive plan for SWM is required. Need solid waste management in outer areas. Creating awareness among people for waste management. IEC activities to segregate waste at source. Establishment of waste treatment plant and scientific landfill site. Need for separate storm water drains Drainange plan is required for the city. Curbing sewerage flowing into storm water drains 20

Stakeholder Suggestions T&T Urban Poverty Local Economy Urban Governance Provision of over and under bridge and flyovers. Provision for public transport. Awareness of traffic rules. Penalty for violation A center for Stray animals. Road widening needed. Parking facilities (areawise). Redesigning of junctions New CTS system and creation of employment avenues for taxi drivers. Disposal of cars/vehicles older than three years. EWS housing. Adequate area and basic infrastructure facilities to be provided. Land is given to slum dweller under patta scheme. Slum dwellers are not ready for relocation schemes of IHSDP. De-notification of slums is required. In-situ slum development for require support through micro finance or state govt -- ensuring beneficiary contribution. Tax structure should be proposed. House and building tax. City charges. entrance More budget allocation required. Increase in tourism related activities needed. Air connectivity to major Indian cities needed. Business should be developed to improve employment scenario. Establishment of hotel and catering management institutes. Different agencies involved in different projects implementation. Computerization of all govt. departments Coordination between different institutions is required. Social Infra. Convention hall needed / Construction of community centre. Amusement park. Conserve city heritage. Ensuring heritage and culture of the city. 21

City Vision and Sector Goals 22

City Vision and Sectoral Goals Tourist Hub Industrial node Development of Udaipur Natural resource base Education hub 23

SWOT Strength Rich heritage and culture Picturesque and congenital natural setting Attract large number of tourists foreign as well as domestic Regional trade centre Presence of good educational institutes Administrative centre of district and division Opportunity Protection, restoration and conservation of heritage structures and lakes Improved connectivity with Gujarat and within Rajasthan Developing tourist circuits Developing sewerage and sanitation system Weakness Infrastructure coverage is low Lack of awareness on heritage and conservation City centre congested due to concentration of commercial activities Absence of public transportation facility Threat Pollution of water bodies due to discharge of sewage and solid waste Congestion in core city areas Depleting resources like marble and other minerals Increasing air and water pollution Competing investment in other tourist hubs within Rajasthan 24

Priority Sectors as identified by stakeholders Sector Requirement Priority Sewerage and sanitation Underground drainage system with safe disposal and treatment of sewage i.e. Complete sewerage network and STP 1 Strom water An integrated storm water drainage system 2 drainage Solid waste Solid waste management and treatment facility 3 management Traffic management Road widening, footpaths, parking lots and integration of transport nodes 4 Urban poverty Slum housing and provision of infrastructure 5 Heritage and Tourism Conservation of historical monuments, providing tourist infrastructure and improving facilities near existing religious places 6 Governance Capacity building of UMC staff, e-governance 7 Drinking water 24 hour water supply, cost recovery 8 25

City Vision and Sectoral Goals City Vision: Develop as a green city of lakes, educational hub and hospitality centre by 2041, with a focus to improve the quality of physical and social infrastructure Water Supply Sewerage SWM T&T Water supply to all and 24 x 7 water supply system with adequate pressure and quality To provide safe and reliable collection network, treatment and reuse/disposal of waste water towards an eco-friendly city Efficient integrated solid waste management system and complying the MSW 2000 rules To make city a transportation node for the region with efficient road network and safe, reliable public transport system Urban Poor To become a slum-free city by 2041 Urban Environment To provide a pollution-free and sustainable living environment to the citizens Heritage Protect heritage and cultural value of the city 26

Sector Strategies and Projects Identified 27

Population Projections Population projection method / year 2011 2021 2031 2041 Census Population 488,100 2nd Order Polynomial - 588,794 699,543 890,949 Incremental Increase method - 594,350 725,325 880,946 Geometrical Progression method - 680,653 949,325 1,324,049 Exponential Method - 667,079 876,475 1,151,600 Power Method - 517,590 574,578 628,991 Arithmetic Increase 569704 651390 733075 Log Method - 477,504 507,350 533,204 Studies/Documents referred for projections- Master plan, DPRs Population trends of past four decades from Census of India First generation CDP 28

Methodology for Project Identification City Level Assessment Workshop Suggestions Sector goals Design parameters Snap shot of sector plan Provide 24 X 7 water supply The quality of the water should meet the CPHEEO standards. Undertake tariff revision and expenditure reduction to achieve 100% O&M cost recovery. Minimize the energy consumption during water supply operations. Base year as 2013 and design year as 2041. Demand estimation based on the projected population for UMC and additional tourist population. Daily water supply demand (180 lpcd) calculated on the basis of daily per capita water supply norm (150 lpcd +15% un-accounted for water)1. Quality of water as per CPHEEO standards. 100% treatment capacity. 33% of water supplied as storage capacity. Distribution network coverage 100% of road network. Cost recovery through user charges (100% O&M expenses). Interactions with UMC/Parastatals/ CBUD Team Demand and Gap Analysis and URDPFI guidelines Projects Identified in Master plan Projects Identification/ Sector Strategies Demand assessment gap Desired outcomes Action plans Increase household coverage the Water supply system rehabilitation plan Comprehensive water supply plan Current gap 2021 (Short term) 2041 (long term) Components 2013 Demand Gap Demand Gap Source (Daily supply in MLD) 70 49 136 66 190 120 Distribution network coverage (km) 900 685 2689 1789 3212 2312 Elevated storage (MLD) 66-45 - 63 - Treatment Capacity (% of water supply) 84 35 136 52 190 105 Individual metering system (nos.) 77835 23693 118870 41035 176189 98354 Components 2017 2019 2021 Remarks Network coverage to households (%) 70 90 100 Per capita supply (lpcd) 135 135 135 24x7 water supply (% household coverage) 50 70 100 Quality of water (%) 100 100 100 Non revenue water (%) 30 30 30 Consumer metering (% household) 70 90 100 Cost recovery (%) 100 100 100 Activities Increase water supply coverage through individual service connections. Provide water supply to newly developed/developing and uncovered areas. Rehabilitation and refurbishment of existing water supply network / system in order to cater future demand. The old, defunct and inadequate piping system needs to be replaced by a proper distribution network. This focuses on source augmentation, adequate storage, and distribution network and treatment facilities for future requirement. Develop the asset inventory. Conduct workshops on water supply and other services to educate the citizens. Operation and Training calendar to be prepared and trainings to be imparted to all the staff members maintenance plan throughout the year on O&M of assets. 1 CPHEEO rrecommended minimum water Trainings supply levels for expenditure for metropolitan control and mega and cities reduction where sewerage of O&M system cost on has key been services. contemplated. As per the population projections, Udaipur city is estimated to have 10.23 lakh population by 2021. Hence the standard for Metropolitan city has been considered. 29

Water Supply Sector Sector Strategies Provide 24 X 7 water supply The quality of the water should meet the CPHEEO standards Undertaken tariff revision and expenditure reduction to achieve 100% O&M cost recovery. Minimize the energy consumption during water supply connections. Demand and Gap Assessment Components 2013 Current gap Source (Daily supply in MLD) Distribution network coverage (km) Elevated storage (MLD) Treatment Capacity (% of water supply) Individual metering system (nos.) 2021 (Short term) 2041 (long term) Demand Gap Demand Gap 70 49 136 66 190 120 900 685 2689 1789 3212 2312 66-45 - 63-84 35 136 52 190 105 77835 23693 118870 41035 176189 98354 Project cost Rs. 380 crore (2021) Rs.476 crore (2041) 1. Augmentation of resources, identified new sources include; Wakal III, Dewas III & IV. 2. Project will supply 278 MLD water by 2041, in order to meet the water demand identified for the city. 3. New treatment plants are proposed having capacities of 35 and 140 MLD. 4. Construction of ESRs with a storage capacity of 250 KL by 2026 and 550 KL by 2041. 5. Laying of new distribution network and replacement of old network. 6. 100% metering at consumer end. 7. Installation of SCADA system to monitor the water supply losses in the distribution. 8. Replacement of old pumps and electrical fittings in the water supply system. 30

Sewerage and Sanitation Sector Sector Strategies Demand and Gap Assessment Provision of underground sewerage network. Provision of adequate sewerage treatment facilities. Provision of public toilets to meet the requirement of slum areas and tourists. Project cost - Rs. 1126 crore (2021); Rs.1348 Crore (2041) 1. Provision of underground sewerage network, covering an area of 67 sq.km. 2. 2 STPs are proposed having capacity of 100 and 30 MLD respectively. 3. Total 520 community toilets are proposed by 2041. 31

Solid Waste Management Sector Sector Strategies Demand and Gap Assessment 100% door-to-door collection and segregation of waste at source. Provision of waste treatment and sanitary landfill site. Project cost Rs.77 Crore (2021); Rs 102 crore (2041) 1. The components envisaged under primary collection are push carts, community bins along the main roads. 2. IEC campaigns are recommended for effective primary collection and segregation at the source. 3. Introducing user charges. 4. For secondary transportation, required vehicle carrying capacity is 926 ton. 5. Developing waste treatment facility. 6. Developing a scientific sanitary landfill site having an area of 69 acre. 32

Storm Water Drainage Sector Sector Strategies Demand and Gap Assessment 90% of the storm water drains should be pucca closed. It should be on all roads and linked to major channels. Size of the drains to be designed according to the rainfall and runoff. Storm water drains as percentage of road length is considered as 110%. Project cost Rs 206 crore (2021); Rs.402 crore (2041) 1. Construction of pucca closed drains having length of 464 km 2. Pucca open drain of 556 km are proposed to be constructed by 2041. 33

Traffic and Transportation Sector Sector Strategies All roads must have footpaths. Area under mobility should be increased from 9% to 12-15%. Public transportation system should be strengthened. Proper planned parking facility requires to be provided at various places in the city. Project cost Rs. 251 crore (2021); Rs.254 crore (2041) 1. Up-gradation of existing WBM roads and earthen roads to CC/BT roads and resurfacing of damaged roads. The total length would be around 226 km by 2041. 2. Up-gradation of BT to CC i.e. 94 km by 2041. 3. Road widening as per Master plan 2031. 4. Construction of roads, over-bridges and bus stands. 5. Construction of fly over at Pratapnagar of length of 0.75-0.8 km length. 6. Construction of elevated road having length of 1.75 km from Shastri circle to Udai pol 7. Installation of 57688 high power lamps by 2041. 34

Housing and Basic Services to Urban Poor Sector Strategies Provide housing to slum dwellers with basic infrastructure facilities. Redevelopment and in-situ development of existing slum. Improving service levels in slum areas of the city. Project cost Rs. 550 crore (2021); Rs.371 crore (2041) 1. Construction of 5080 houses by 2021. 2. Under RAY, 37 slum pockets are left for the re-development. 3. Proposal for construction of 1949 EWS, LIG and MIG houses at Bedawas under Mega housing project. Rajasthan Avas Vikas and Infrastructure Limited (RAVIL) is the nodal agency while UIT helps in implementation of the programme. 35

Social Infrastructure and Heritage Sector Sector Strategies Development of new schools, and renovation of old school buildings. Identification of land for development of schools in the fringe areas and newly added areas. Mapping of existing health care facilities and development of infrastructure on hierarchical basis. Rehabilitation and renovation of existing heritage structures, development of gates and overall improvement of heritage sites. Developing a street vendor policy. Project cost Rs. 180 crore (2021); Rs. 500 crore (2041) 1. Development of parks and give on adoption basis. 2. Rehabilitation of existing heritage structures, development of gates and overall improvement of heritage sites. 3. Projects under NLCP. 4. Development of various sports activities / facilities at Khelgaon. 5. Development and beautification of Ayad river. 6. Developing bylaws for heritage conservation and implementation through heritage cell 36

Capital Investment Plan 37

2041: Investment of Rs.3511 crores 2021: Rs. 2846 crores 2013 CRISIL Ltd. All rights reserved. Capital Investment Plan for Udaipur Sector Short Term - 2021 Long Term - 2041 Water Supply 380 476 Sewerage and Sanitation Solid Waste Management Storm Water Drains Urban Roads, Traffic and Transport Street lights Other investments (slum housing, social and cultural infrastructure development) River conservation, health and educations zones 1126 1348 77 102 206 402 251 254 76 58 550 371 180 500 Total 2846 3511 All figures are in Rs Crs

Composition of Investment UMC 33% PHED 14% UIT 53% PHED UIT UMC Planning, design, and construction of water supply sector are taken care by PHED. Sewerage and sanitation sector is taken care by UMC, PHED and UIT. Works related to solid waste management, roads and transportation, street lights, storm water drains, development of parks/gardens heritage sectors are being taken care by UMC. Rs. 1021 crore till 2021 Slum housing projects are being implemented by UMC, UIT and state level institution (RAVIL). Other social infrastructure projects such as projects under NLCP, development of sports related activities are being carried out UIT. Educational and health facilities are not within the ambit of UMC.

Financial Sustainability 40

Key Assumptions Head Assumptions Guiding factor for assessing the sustaining capacity Surplus Positive surplus - year-on-year basis DSCR Greater than 1.25 Project Financing For Admissible Components under JNNURM-II Project Costing Unit Cost, with 7% price contingency and 8% physical contingency New/Additional O&M Urban Roads, Traffic and Transport 4% Storm Water Drains 1% Solid Waste Management 8% Street lighting 5% Social Infrastructure 1% For projects to be approved Grant from GoI 50% of sanctioned cost Grant from GoR 20% of sanctioned cost Loan for balance funding Repayment in 15 years @11% interest rate Regular capital expenditure Rs. 504 crore per annum (growth rate 10% over current expenditure) Revenue Expenditure Minimum growth rate: 10% Growth in Expenditure Maximum growth rate: 12% Pay Commission Revision 7th Pay Commission revision from 2016 and 2022 (Currently, in UMC, the salaries are being paid from State treasuries) Assumption for assessment of UMC s sustainability Income Items Growth in revenue income Minimum growth rate: 8% Maximum growth rate: 15% Income items Urban development tax Annual growth in Assessment 1.75% per annum Revision of Tax 15% every 5 year starting from 2015-16 Collection Performance 80% (Maximum collection performance over the last 5 years) current 53%

INR Crore Key Assumptions 1200 1000 800 600 400 200 0 1021 Investment Required 409 Business as Usual UMC continue operating as business as usual The income and expenditure growth would follow the past trends The regular capital expenditure would grow at 5% on year-on-year basis. UMC will maintain the minimum closing balance of Rs 10 Crores on regular basis

INR Crore Sustainability Scenario Reforms Implementation and Debt 2013 CRISIL Ltd. All rights reserved. 1200 1000 800 1021 817 600 400 409 200 0 Investment Required Business as Usual Reforms & Debt Undertake reforms leading to improved financial sustenance capacity. Reforms are especially in areas of urban development tax. [ UMC shall receive grant from state and central governments Capital expenditure would grow at 5% on year-on-year basis. UMC has to take Rs. 214 crores loan from external borrowings. Maintain minimum closing balance of Rs 10 Crores on regular basis.

Way Forward 44

Way Forward The comments and suggestions of technical advisory committee shall be incorporated. Incorporate changes as suggested during Workshop UMC to issue approval Final CDP shall be submitted to MoUD and UMC. 45