ADVANTAGES THE LIGHTEST FILLING SOLUTION HIGH LOAD-BEARING CAPACITY

Similar documents
English FOUNDATION SOLUTIONS PERMANENT CRAWL SPACE FORMWORK MODULO NEW ELEVETOR BIOMODULO FAST LIGHT MODULAR DEFENDER

RECYCLED PP SYSTEM FOR VENTILATED FOUNDATION PLATES IN R.C.

SYSTEM FOR THE LIGHTENING OF BIDIRECTIONAL SLABS WITH FLAT INTRADOS

geotub reusable system in ABS REUSABLE LIGHT MODULAR

Modular and reusable formwork for reinforced concrete walls.

THE CUPOLEX SOLUTION EXPANSIVE SOILS. www. cupolex.ca

NEW. Reusable modular formwork for columns.

CRAWL SPACE HIGH LOAD-BEARING CAPACITY LOGISTICS ADVANTAGES

modulo the evolution of the crawl space VENTILATED CRAWL SPACE HIGH LOAD-BEARING CAPACITY LOGISTICAL ADVANTAGES

POOL. Pool made easy INSULATING FORMWORK PANELS

REUSABLE AND MODULAR FORMWORK IN ABS FOR WALLS

Modular formwork. handier light weight enviroment friendly average low cost reusable short time

PENTABLOCK Technical Information 190mm Series

Hollow Core Slabs Applications

easy formwork system

SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES

Access Chambers Systems

Inverted Double T BEAMS and SLABS Applications

Reinforced concrete double walls

Miller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System

GRIDFLEX The flexible slab formwork with safe accessible grid elements

Althon slot channels Althon

Reinforced concrete double walls

2018

Precast Concrete Trench Drain Systems INSTALLATION INSTRUCTIONS

PERI UP Easy * The lightweight and fast frame scaffold for safe working on facades

_spav prefabbricati s.p.a. historical notes

guttadrytek 2.0: the evolution of air gaps

w w w. m d u e. i t - i n f m d u e. i t

HC-Omega (Sinus Slide ) armour joints

Assembly and Installation Instructions Grease Separator KLsepa.pop

Labko FRW Basic flow regulation well

INTENDED USE: Driveways Pool sides Terraces Car parking. Expansion joints are necessary and joints must be filled with cementitious grout.

Site Preparation... 2

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

Disposable formworks for self-bearing perforated floors.

Drawings shown within this brochure is the Preston CarPark Innovation Concept and patents filed in August 2018.

built build to FORMWORKS CLIMBING, RETAINING WALLS, SPECIAL

Appendix 4. Bills of Quantities

CATCHMENT STRUCTURE 13M X 15M

Sealing products. The new Generation of sealing-products

EUROACCESSORIES COLUMN FORMERS

1 Geoplast S.p.A. via Martiri della Libertà 6/ Grantorto PD Tel Fax

TYPICAL INSTALLATION INSTRUCTIONS

Reinforced Earth wall Construction Manual

INSTRUCTIONS ADVANTAGES AND APPLICATIONS HOW TO MAKE A TURF CAR PARK WITH GEOFLOR HOW TO MAKE GRASSY CAR PARK OVER A LAWN

Issue Date: April 2003 Release: I. Product Specifications

APPENDIX 5: CONSTRUCTION CHECKLISTS

INFORMATION KIT 2018 COPYRIGHT 2018 PENTABLOCK WORLWIDE PTY LTD

Disposable formworks for cold rooms

NEVI Light modular formwork

Extruder NANO Machines Products

FRANK Stremaform formwork elements

Installation and maintenance instructions for PLATIN and PLATIN XL Rainwater Underground Tank

Heavy Rib. Page 1 of 6. Expanded Mesh & Metal Products. Key Product Features:

Sept 30, 2004 Page 1 PRODUCT DESCRIPTION PRODUCT FEATURES

Technical Data Sheet NEC/GRAN/95:01

Multidirectional_scaffolding MP

Cantilever Racking STORAGE TECHNOLOGIES & MATERIAL HANDLING

SPECIFICATION FOR REINFORCED SOIL WALL

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

How To Construct a Ferro Cement Tank

TABLE OF CONTENTS

Concrete Framing Systems - Walls and Columns

Heavy-Duty Braces Triplex Assembly and Operating Instructions

INSTALLATION GUIDE PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

Cardok Carlift Data Sheet

The system: it supports 3 load classes (A15, B125, C250) in compliance with Standard EN 1433

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

INSULATING CONCRETE FORMWORK SYSTEM

LATRINE CONSTRUCTION SHELTER. Pour flush latrine 2. Pour flush micro septic tank 3. Initial investment, location, human resources 4.

INDUSTRIAL GUARDRAIL SYSTEMS

CUPOLEX Frequently Asked Questions

Formwork being erected

Cardok Carlift with Rigid Chains Data Sheet

Underground Dry Utilities Civil Engineering 2014 Edition

INSTALLATION GUIDE. Please read all the instructions before you begin the installation. Improper installation will void warranty.

Important: Before You Start

ACO Utility Enclosure Products

Twin Floor. Technical description. Advantages

Stylite. T-Beam Suspended Floor Insulation Technical Datasheet. Stylite T-Beam Floor Insulation

PHILIPP Power Box Installation Instruction

COLLARWINGS. The new passive fire protection system

MONOLITHIC R.C. WALLS

AN INNOVATIVE DESIGN FOR PAVING USING VERTICALLY- INTERLOCKING ARTICULATED CONCRETE MATS

The Terrace Book. Edition 2. Support Structures

ALUMINIUM LOADING SYSTEMS

Utility Cabinet System (UCS)

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

SigmaJoint. The Ultimate Joint J. Armouring & Load Transfer Systems. Metallic Leave-In-Place Contraction & Day Joints for INDUSTRIAL CONCRETE FLOORS

Valmont Newmark is your single source for steel, concrete or hybrid structures for power delivery

FrameFast Shoring System

7.1 Wood/Lumber/Board Storage 7.2 Flat Glass 7.3 Steel Formwork/ Plates/Coils 7.4 Paper Storage 7.5 General Requirements

Confined masonry. Definition

PRODUCT DESIGN AND SELECTION GUIDE REVOLUTIONISING CONCRETE LIFTING

Storage space in steel. Storage Space in Steel. From the market leader!

Water for the World. 7 y

Rapid Ply versatile, modular formwork

RADON ABATEMENT FROM THE GROUND UP

Transcription:

SINGLE-USE FORMWORK SYSTEM UP TO 300 CM elevetor new the evolution of crawl space LOGISTICAL ADVANTAGES THE LIGHTEST FILLING SOLUTION HIGH LOAD-BEARING CAPACITY w w w. g e o p l a s t. i t

BUILDING 02 NEW ELEVETOR VISION Gas Radon does not make distinctions between private and working life: it threatens us even while we are working. Therefore, we extended our interventions to industrial and commercial buildings. To work in safe and comfortable, human-sized environments is everyone s dream. We are working to make it real. RECYCLING, OUR CHOICE Not only we turn our ideas into innovative and successful products but we also commit into the study and selection of more suitable materials to guarantee both high quality and the respect of the environment. Geoplast S.p.A. in Green Building Council Italia, The Network of Green Building. Polypropylene (PP) is a recyclable material that can be obtained from the regeneration of plastic waste. It is solid and strong, with high load-bearing capacity and resistant to abrasion. Regenerated polypropylene is a chemically inert material, which does not suffer from natural weathering and does not pollute the environment when in contact with the ground or with water.

NEW ELEVETOR CONCEPT 03 NEW ELEVETOR IS SUITABLE FOR: the construction of a ventilated crawl space with a significant reduction of the concrete consumption and installation time; moreover, it allows the installation of plumbing or electric wires. The system versatility allows the building of foundation slabs of different depths depending on the design requirements. Furthermore, the innovative base GRID guarantees a simple and fast installation of the PVC tubes which sustain the entire system, while mantaining them perfectly vertical during the pour. BUILDING TYPES APPLICATIONS COMMERCIAL BUILDINGS INDUSTRIAL BUILDINGS RESIDENTIAL BUILDINGS LARGE SCALE STRUCTURES FOUNDATIONS ALL SORTS OF FILLING APPLICATIONS CONCRETE RAISED FLOORS STEPPED SURFACES SLOPING RAMPS ROOT APPLICATION NEW ELEVETOR ROOTS STORAGE TANKS NEW ELEVETOR TANK

BUILDING 04 NEW ELEVETOR ADVANTAGES Modular and single-use formwork system for crawl spaces up to 300 cm for the creation of a physical barrier between the ground and the building stackable Unmatched logistical advantages when transporting and storing. At a height of 50 cm, conventional filling requires 50 trucks of filling in comparison to only 1 truck of NEW ELEVETOR light By far it is the lightest filling solution; the total weight of the cross section is approximately equal to the thickness of the upper slab high load bearing Countless pillars, arches and domes create the highest load bearing structure void space fast savings The void space created under NEW ELEVETOR allows an easy installation of electrical as well as mechanical systems. The void space is also perfect for ventilating damp and RADON GAS away from the building When compared with traditional systems, it guarantees a faster installation up to the 80% (in respect to the use of the traditional inert materials) NEW ELEVETOR system allows savings compared to the use of traditional inert materials, especially in terms of transport and installation

NEW ELEVETOR TECHNICAL CHART 05 TECHNICAL CHART NEW ELEVETOR 47 cm 58 cm 58 cm 15 Actual size (cm) Material Weight (kg) Package size (cm) No. pieces per pallet FORMWORK 58 x 58 x 15 Polypropylene 1.50 120 x 120 x 265 225 GRID 58 x 58 x 2.5 Polypropylene 0.70 110 x 110 x 240 310 TUBE LINTEL 2.5 Actual size (cm) Material 75 > 200 x ø12.5 PVC 8 x 10 x 100 Polystyrene CONCRETE CONSUMPTION UP TO THE TOP (m [ 0,037 X (height New Elevetor in m - 0,15)] 3 /m 2 ) + 0,030 m 3 /m 2 The tube The supporting structure consists in a classical construction tube of PVC with an external diameter of 125 mm and a thickness of 1.8 mm. When the tubes are inserted into the patented base grid and filled with concrete, they support structurally the upper formwork.

BUILDING 06 THE SYSTEM NEW ELEVETOR The concept This system is ideal for the ventilation of reinforced concrete foundation slabs for residential, industrial and commercial buildings. The product consists of a formwork, PVC tubes and a patented grid that guarantees the system perfect verticality in order to ensure great load-bearing capacity. The system is modular and the formwork can be installed on-site in order to build a walkable and selfsupporting system which is ready for the concrete pour. When the concrete solidifies, it takes the form of NEW ELEVETOR, thus creating a supporting and completely ventilated crawl space. The formwork The formwork is a dome made of regenerated PP (polypropylene) with plan size of 58X58 and an height of 15cm, with a bottom click rail to hook it perfectly to the tubes. The dome geometry allows a uniform load-bearing capacity over the four pillars. Moreover, it permits the reduction of the upper slab thickness. Reinforcement option To deal with difficult construction sites where the combination between loads and heights is particularly complex, it is recommended to insert iron elements (such as steel bars or forks) in the tubes in order to guarantee the stability of the concrete pillars even when exposed to dinamic loads.

DETAILS AND ADVANTAGES OF THE GRID NEW ELEVETOR DETAILS 07 The base grid, essential for NEW ELEVETOR system, is made of regenerated PP and allows the perfect verticality of the tubes of PVC. The single grids are locked with one another creating a solid base grid that guarantees the stability and the walkability of the final structure. PATENTED VERTICAL TUBES The verticality of the pillars is guaranteed by the base grip serving two main purposes: SAFETY: the perfectly aligned system guarantees a safe walkability after installation LOAD-BEARING CAPACITY: The verticality of the pillars guarantees the reinforced-concrete structure s reliability 7 classic system without grid PRECISION The locking system of the base grids allows the mantainment of the vertical alignment of the system (PVC tubes + formwork) and it also guarantees the extreme precision during installation. The grid is very lightweight and easy to cut: thus it can be placed even in correspondence of walls. NEW ELEVETOR system with grid QUICK INSTALLATION The use of the base grid is a major advantage for NEW ELEVETOR system. It is an extremely lightweight and space-saving element that can be installed quickly thanks to the male/female locking system.

BUILDING 08 ON-SITE POSITIONING The correct installation of New Elevetor system 1 GRID Installation of the base grid,essential for the tubes verticality and the structural resistance. 2 TUBES Place the tubes of PVC in the base grids. 3 FORMWORK Place NEW ELEVETOR from right to left and interlock in the tubes to guarantee safe walkability. 4 COMPENSATION In the starting sides, where the formwork leans against the wall, the listels of polystyrene avoid the concrete dispersion. 5 UPPER MESH The upper mesh has to be placed right over the formwork or when required by the project over the spacers with an appropriate overlapping. 6 CONCRETE POUR The pour comes after the end of the mesh installation. Pour concrete gradually from a side to the other and vibrate it properly. LAYING SEQUENCE 1 st row 1 st row 2 nd row 2 nd row

NEW ELEVETOR CALCULATION NEW ELEVETOR THE FINISHED SYSTEM The construction of a ventilated crawl space with NEW ELEVETOR requires different stratigraphies depending on the final destination of the building and the working loads. The main sections of a finished stratigraphy with NEW ELEVETOR system are depicted in the following picture: 09 8 6 7 5 4 3 2 1 1 Lean concrete 5 Listel 2 3 Grid New Elevetor Tube New Elevetor 6 7 Wire mesh Foundation slab 4 Formwork New Elevetor 8 Pavement Load increments perm.+acc. (kg/m 2 ) Minimum slab thickness (cm) Minimum wire mesh Concrete thickness (cm) LOAD TABLE Gravel thickness (cm) Pressure on the soil (kg/cm 2 ) up to 500 4 Ø5/25x25 5 0 0.593 up to 1,000 5 Ø6/20x20 8 0 0.633 up to 2,500 6 Ø8/20x20 10 0 1.095 up to 5,000 8 Ø8/20x20 5 12 1.031 up to 10,000 10 Ø8/20x20 5 20 1.119 over 10,000 Detail of the stratigraphy (For further information please contact Geoplast Technical Department (ufficiotecnico@geoplast.it)

BUILDING 010 LARGE SCALE STRUCTURES Easy creation of crawl spaces Thanks to its easy installation, with NEW ELEVETOR system it is possible to fill excavations filling and overcoming gaps quickly even in the case of large foundations. With low concrete consumption it creates a slab over pillars that guarantees very high load-bearing capacity and permits the transit of vehicles. Compared to a traditional filling with inert material, it simplifies the logistics and installation. Moreover, the socreated void space can be used for the installation of conduit or the creation of water storage tanks. Easy execution Simplified logistics Material savings Material storage in the construction site

NEW ELEVETOR APPLICATIONS 011 INDUSTRIAL BUILDINGS Systems with high load-bearing capacity The systems allows the construction on-site of high crawl spaces, avoiding having to fill them with inert material and making it possible to use the so-created space for the installation of wires or pipes. The structure of reinforced concrete that can be built with NEW ELEVETOR is comparable to a floor slab supported by pillars. This guarantees high load-bearing capacity against both permanent and accidental loads, which are typical of industrial environments. High crawl space Suitable for heavy loads Technical compartment Reinforcement of the pillar with steel forks

BUILDING 012 RESIDENTIAL BUILDINGS Gas Radon: protect your house! NEW ELEVETOR creates a gap of variable height in order to protect the residential buildings from the rising damp and RADON, a radioactive gas from the subsoil which is harmful to human health. In the case of a low load-bearing capacity ground it is necessary to build deeper foundations. NEW ELEV- ETOR system allows to avoid the filling with inert material creating a large crawl space that can be used for various purposes. Natural ventilation Gas Radon dispersion Moisture elimination

NEW ELEVETOR APPLICATIONS 013 ACCESS RAMPS The system for sloping surfaces Thanks to its modularity, NEW ELEVETOR system allows the overcoming of the level differences, even for the transit of heavy vehicles or trucks. The ramp can be built in two ways: Inserting the inclined domes in the tube (inclination up to 5%); Shaping the tubes in order to create a step and placing the domes horizontally (step s maximum height: 8 cm); the maximum slope and applied loads must be first arranged with Geoplast Technical Department. Easy construction Gradual slope Material savings Ramp with finished slope

BUILDING 014 ROOTS APPLICATION Protecting the growth of green in our cities NEW ELEVETOR ROOTS is used to preserve the growth of tree roots along the roadway. Usually, the rooting space is hindered by cables, sewages or road underground layers. All these hindrances steal space to the roots which cause the typical upheaval of the road surface. Our solution considers the use of a slab placed at the top of a column grid in order to let the roots grow between the tubes. Roots protection Avoids roads upheaval Greening of traffic areas Section of New Elevetor Root system

NEW ELEVETOR SPECIAL APPLICATIONS 015 NEW ELEVETOR TANK Rainwater storage tanks NEW ELEVETOR TANK is the ideal solution for the fast construction of storage concrete tanks of variable height which can be used for the storage of high quantities of rainwater in a small space. The tank can be inspected through a pit that allows cleaning, checking the water level, the systems functionality and the microbiological status of the water. Customizable size and shape Inspectionable No lifting devices required Rainwater storage tanks up to 300 cm

BUILDING 016 STEPPED SURFACES The system for stepped surfaces NEW ELEVETOR allows the construction of structures with various levels such as staircases or stepped extensions. The simple and fast installation of the system avoids the filling with inert material whom would be very complicated to deal with, especially in the contact points between areas placed at different heights. Variable height High stability during pour Fast installation Detail of the formwork installation

NEW ELEVETOR SPECIAL APPLICATIONS 017 INSPECTION MAN-HOLES Safety and inspectionability The inspection man-holes facilitate to check and maintain the storage tanks. The gap between the pillars make it easy to move within the structure, thus giving the possibility to inspect the tank even afterwards. Customizable size and shape Easy inspection Easy maintenance

BUILDING 018 INSTALLATION INSTRUCTIONS Cut the base as in the picture and place the first row against the wall, starting from the right. Place the tubes in PVC in the base grids and lock them pushing at the top of the tubes. Install NEW ELEVETOR paying attention in order to wedge it perfectly.

NEW ELEVETOR INSTALLATION 019 Place the last row of NEW ELEVETOR with the cut dome against the curb. Place the lintels against the curb. Place the wire mesh and the steel reinforcement in the pillars.

GEOPLAST S.p.A. 35010 Grantorto PD - Italia - Via Martiri della Libertà, 6/8 tel +39 049 9490289 - fax +39 049 9494028 e-mail: geoplast@geoplast.it - rev.000-01/2015