Produce screens, and make stencils using the capillary system, for screen printing

Similar documents
Assist press operator on a reel-fed printing press

Make ready a sheet-fed offset printing press for spot colour work

PRINTING - SCREEN Make ready and print single colour for flat sheet screen printing

Maximise timber recovery

Confirm log grades and scale logs

NZQA Expiring unit standard version 6 Page 1 of 5. Operate a clamshell die cutter in the corrugated packaging industry

LEATHER - BOTTOM STOCK, MAKING AND LASTING Clean, dress, and spray footwear in a shoe room

Check, coat and reinforce fibre cement substrate to form a Proprietary Plaster Cladding System on site

NZQA Expiring unit standard 2272 version 8 Page 1 of 5

Demonstrate an advanced knowledge of railway signals

Demonstrate knowledge of servicing automotive air conditioning systems

LEATHER - CUTTING AND CLOSING Perform specialist footwear closing operations

Check, coat and reinforce polystyrene substrate to form a Proprietary Plaster Cladding System on site

Demonstrate the requirements for holding permits on high voltage electrical equipment

NZQA Expiring unit standard 3713 version 7 Page 1 of 6. Print single colour work on a sheet-fed registering offset press

PUBLIC SECTOR SERVICE DELIVERY Establish client needs and gain agreement on requirements for public sector service delivery

Store, maintain, and distribute liquid food or related products using automated systems

Remove and repair perforated non-structural body panel corrosion damage

Install and commission high voltage (HV) electricity current transformer metering

Measure and prune trees around electricity lines for vegetation control to minimum approach distance

PUBLIC SECTOR SERVICE DELIVERY Develop public sector service delivery objectives, and implement systems to meet client needs

Control pests by fumigation in the urban pest management industry

Operate a diesel-mechanical/hydraulic railcar/multiple unit on a main line managed by a network operator

Carry out acceptance and maintenance tests on distance protection relays

Demonstrate knowledge of vegetation fire behaviour

Carry out routine maintenance on automotive automatic transmissions

Meet Approved Handler requirements for the transport of bulk hazardous substances by road

Apply earths to and remove earths from electrical conductors, plant and equipment

Set up, repair and maintain a Baader BA 190 fish filleting machine

Plan and manage helicopter overhead lines operation

Demonstrate knowledge of wool and the wool scouring process

Explain hatchery techniques used in the New Zealand aquaculture industry

Manage the transportation of hazardous substances by road

Explain foot and mouth disease controls in the processing of milk in the dairy industry

Set up, repair and maintain a Baader BA 212CK fish filleting machine

Carry out routine inspection and servicing on high voltage bulk oil circuit breakers

Carry out routine inspection and servicing on substation emergency services

Operate a root crop harvester

Outline New Zealand Greenshell mussel (kutai, kuku) farming

Demonstrate and apply knowledge of leading a security team

NZQA Expiring unit standard version 4 Page 1 of 7. Make ready a flat bed die cutter in the corrugated packaging industry

VEHICLE BODYWORK Mask a repair for priming; and prime, fill, and sand a repair in the motor body industry

Use advanced felling techniques in arboriculture

Trim and limb shelter belts

Operate hydro-electric station auxiliary plant

Instruct a programme using low ropes course activities

Test and service hydraulic systems on equipment, vehicles, and/or machines

Establish quality requirements, manage, and monitor the installation of subdivision infrastructure

Carry out off-road motorcycle training

Transport horses by road

Transport perishable products by road

NZQA registered unit standard version 1 Page 1 of 5. Determine and describe construction of medium and large buildings

This qualification is expiring. The last date to meet the requirements is 31 December 2009.

Carry out routine inspection and service on high voltage indoor metal clad circuit breakers and bus

Provide career consultation to career consultation clients

NZQA registered unit standard version 2 Page 1 of 5. Describe the roles and functions of a CIMS Incident Management Team (IMT) at an incident

National Certificate in Concrete Product Manufacture (Masonry Product) (Level 3)

Maintain amenity trees and shrubs

NZQA registered unit standard version 1 Page 1 of 5

Maintain court security

Manage electricity generation dispatch

Carry out general service checks on non-electric forklifts and forklift attachments

Prepare a schedule of quantities, cost estimate and tender documentation for landscape work

NATIONAL CERTIFICATE in 1 of 5

Demonstrate knowledge of the fundamentals of power system earthing

Describe practices to maintain the quality of perishable products during transport by road

VEHICLE BODYWORK Detail and groom a vehicle

National Certificate in Concrete Construction (Sawing and Drilling) (Level 3)

Demonstrate knowledge of the principles of organic horticultural production

AUTOMOTIVE WORKSHOP ENGINEERING Demonstrate good work habits and perform safe work practices in the motor and related industries

ELECTRICITY SUPPLY - POWER SYSTEM MAINTENANCE Carry out routine inspection and servicing on high voltage minimum oil circuit breakers

SECURITY STAFF SERVICES Demonstrate knowledge of and operate electronic equipment as a security officer

NZQA Expiring unit standard version 2 Page 1 of 5. Install and maintain roofing, rainwater handling, and cladding systems, and flashings

NZQA registered unit standard version 4 Page 1 of 5

NZQA registered unit standard version 5 Page 1 of 6. Operate hydro-electric generating plant from enterprise control room

NZQA registered unit standard version 2 Page 1 of 5

AUTOMOTIVE WORKSHOP ENGINEERING Use an oxy-acetylene welding plant in the motor industry

NZQA registered unit standard version 3 Page 1 of 5. Install high voltage (HV) electricity network overhead conductors

POULTRY MANAGEMENT Manage hatchery operations

NZQA registered unit standard 738 version 5 Page 1 of 7

PUBLIC SECTOR COMPLIANCE MANAGEMENT Audit quality management systems for compliance with weights and measures legislation

GOODS SERVICE Operate a truck mounted sidelifter

Transport bulk gases by road

POULTRY HATCHERY Process day-old poultry chicks

NZQA registered unit standard version 2 Page 1 of 5. Generate chlorine dioxide for wood pulp bleaching

NZQA Expiring unit standard version 2 Page 1 of 5. Describe roof membrane preparation and installation procedures

NZQA registered unit standard version 5 Page 1 of 5. Manage hazard identification and control on plant and machinery

NZQA Expiring unit standard version 2 Page 1 of 5. Describe metal roof and wall cladding preparation and installation procedures

Facilitate change for Iwi/Māori social service purposes

People who are awarded this qualification have broad knowledge and skills in all aspects of concrete construction.

NZQA registered unit standard version 4 Page 1 of 5. Carry out switching operations on metal clad switchgear

NZQA registered unit standard version 6 Page 1 of 5. Operate biological treatment systems for effluent water in an energy and chemical plant

NZQA registered unit standard version 1 Page 1 of 5. Construction Trades > Painting and Decorating

NZQA registered unit standard version 4 Page 1 of 5. Operate power-operated elevating work platforms (EWP) in an electricity supply environment

NZQA registered unit standard version 3 Page 1 of 5. Carry out automated assembly of wood packaging products

NZQA registered unit standard version 2 Page 1 of 5. Operate x-ray and electronic scanning equipment in a prison environment

NZQA registered unit standard 5555 version 6 Page 1 of 5

This unit standard is expiring

NZQA registered unit standard version 2 Page 1 of 5. Complete pre-competition preparations as an official at a competitive sports event

GOODS SERVICE Transport bulk dry goods by heavy motor vehicle

Transcription:

Page 1 of 5 Produce screens, and make stencils using the capillary system, for screen printing Level 3 Credits 12 Purpose People credited with this unit standard are able to: check documentation and confirm requirements for the job are available; check film positives for faults; select screens to suit the job; select stencils to suit the job; prepare screens for the stencils; make stencils using the capillary system; and make final preparation to screens ready for screen printing. Subfield Domain Status Printing Printing - Screen Registered Status date 21 February 2005 Date version published 12 December 2008 Planned review date 31 December 2010 Entry information Prerequisite: Unit 340, Demonstrate knowledge of safe working practices in the printing and graphic pre-press industries, or demonstrate equivalent knowledge and skills. Recommended: Unit 21328, Demonstrate industry knowledge for screen printing, or demonstrate equivalent knowledge and skills. Accreditation Standard setting body (SSB) Evaluation of documentation and visit by NZQA and industry. Competenz Accreditation and Moderation Action Plan (AMAP) reference 0005 This AMAP can be accessed at http://www.nzqa.govt.nz/framework/search/index.do.

Page 2 of 5 Special notes 1 All workplace practices must meet any applicable and recognised codes of practice, and documented workplace health, safety, and environmental procedures for personal, product, workplace health, safety, and environmental matters, and the obligations required under current law including the Health and Safety in Employment Act 1992, Hazardous Substances and New Organisms Act 1996, Resource Management Act 1991, Privacy Act 1993 and their subsequent amendments. 2 Workplace practices refer to the documented procedures for the machine and/or workplace. Elements and performance criteria Element 1 Check documentation and confirm requirements for the job are available. 1.1 Job documentation is checked to ensure that all specifications for the process being undertaken are complete and any discrepancies are reported in accordance with workplace practices. quantity, press, special instructions. 1.2 Components required for the job are checked against the job documentation and their availability confirmed. may include but is not limited to job samples or layouts, frames, mesh, film positives, ink, substrates. 1.3 Availability of equipment, as determined by the job documentation, is confirmed. Element 2 Check film positives for faults. 2.1 Reasons for checking film positives are explained. density, emulsion side, image resolution definition, trap. 2.2 Film positives are checked for any imperfections and errors, and faults found are rectified or reported in accordance with workplace practices.

Page 3 of 5 Element 3 Select screens to suit the job. 3.1 Different kinds of screen frames are listed, and their characteristics and uses described. frames wooden, steel, aluminium, self-stretching; characteristics cost, weight, strength, solvent resistance, corrosion resistance. 3.2 Characteristics and uses of mesh are described. may include but is not limited to nylon, polyester, metal, carbon fibre; combinations of these; characteristics film deposit, substrate, static control, warp, weft, mesh count, tension stability, flexibility, durability, chemical resistance. 3.3 Methods for stretching mesh to achieve the required tension are described. manual, mechanical, pneumatic. 3.4 Factors affecting the way mesh is stretched are explained. mesh material, mesh count, tension control, angle. 3.5 Screens are selected to meet the requirements of job and press specifications. Element 4 Select stencils to suit the job. 4.1 Stencil systems are described, and the work each system is most suited to explained. capillary, indirect, direct. 4.2 Stencils are selected to suit the requirements of the job specifications. consider film deposit, substrate, ink, quality of print required, run length, material of mesh, mesh count.

Page 4 of 5 Element 5 Prepare screens for the stencils. 5.1 Screen size and mesh count meet the requirements of the job specifications. 5.2 Screens are pre-treated to ensure stencil adhesion is achieved. chemical, mechanical. 5.3 Screens are degreased using degreasing agents, and in accordance with the manufacturer s and/or supplier s instructions. 5.4 Faults found when preparing the screens are rectified in accordance with workplace practices. may include but is not limited to poor reclaiming, poor screen preparation, unsuitable screen size, unsuitable mesh count, poor adhesion. Element 6 Make stencils using the capillary system. 6.1 Mesh is wet and capillary film positive is applied to the screens. 6.2 Excess water is removed and stencils are dried using the method available in the workplace. 6.3 Carrier sheet is removed from stencil when dry. 6.4 Film positives are checked to ensure that they read suitably for the job and are laid up in position on the screen. 6.5 Stencils are exposed using the method available in the workplace. any of laser, mercury vapour, xenon, metal halide. 6.6 Stencils are washed out and dried in accordance with workplace practices. may include but is not limited to pressure of water, incomplete wash out, incomplete image, drying temperature.

Page 5 of 5 Element 7 Make final preparation to screens ready for printing. 7.1 The reasons for spotting and blocking out the stencil, and taping the inside edges are explained. water based inks, solvent based inks. 7.2 Stencils are checked for imperfections, spotted, and blocked out. 7.3 Tape is applied to the inside edges of the screen frames to prevent ink seepage. Please note Providers must be accredited by NZQA, or an inter-institutional body with delegated authority for quality assurance, before they can report credits from assessment against unit standards or deliver courses of study leading to that assessment. Industry Training Organisations must be accredited by NZQA before they can register credits from assessment against unit standards. Accredited providers and Industry Training Organisations assessing against unit standards must engage with the moderation system that applies to those standards. Accreditation requirements and an outline of the moderation system that applies to this standard are outlined in the Accreditation and Moderation Action Plan (AMAP). The AMAP also includes useful information about special requirements for organisations wishing to develop education and training programmes, such as minimum qualifications for tutors and assessors, and special resource requirements. Comments on this unit standard Please contact Competenz info@competenz.org.nz if you wish to suggest changes to the content of this unit standard.