Cambodia Power Development

Similar documents
Cambodia Power Sector

Contents Basic Facts of Cambodia Cambodia Power Sector Overview Major Issues Cambodia Power Industry (Structure) Energy Policy Cambodia Power Developm

Ministry of Mines and Energy. Energy Power Plant in Cambodia

IEEJ: April 21 Outline Electricity STATUS in Cambodia Energy Supply and Demand Problem Statement Conclusion 2

Sustainable Development of Energy and Electricity Policy In Cambodia

For. The Preparatory Study. The Master Plan Study on Hydropower Development in. Cambodia

Rural Electrification by Renewable Energy in Cambodia

Cambodia s First Solar Park

RURAL ELECTRIFICATION WITH PV - MARKET POTENTIAL IN CAMBODIA

Electricity Data Collection

CLEAN POWER ASIA on Policy and incentives to encourage renewable energy development in Cambodia

CAMBODIA ENERGY SECTOR

CAMBODIA BASELINE ASSESSMENT PERSPECTIVE

Renewable Energy Development in Cambodia. Institute of Technology of Cambodia

Energy Policy in Lao PDR

In The Name of Allah. Islamic Republic State of Afghanistan Ministry of Energy and Water

Uruguayan Energy matrix change Wind & PV development. Stuttgart - Germany June, 2013

HOW GOVERNMENT AND PRIVATE SECTOR INTIATIVES HAVE SUPPORTED SUSTAINABLE ENERGY IN ZAMBIA

Ministry of Infrastructure The Republic of Rwanda AFRICA ENERGY FORUM JW MARRIOTT HOTEL, DUBAI 9 th JUNE, 2015

INTEGRATION OF RENEWABLE BASED GENERATION INTO SRI LANKAN GRID

Energy Situation in ASEAN countries

SCALING UP RENEWABLE ENERGY IN LOW INCOME COUNTRIES (SREP) Investment Plan for Vanuatu

THE ELECTRIC POWER INDUSTRY: Power Capacity Mix

Member State Perspectives

vre Grid Integration in ASEAN

THE MASTER PLAN STUDY ON RURAL ELECTRIFICATION BY RENEWABLE ENERGY IN THE KINGDOM OF CAMBODIA FINAL REPORT VOLUME 4: PRE-FEASIBILITY STUDY

Sustainable Power Sector Development in the GMS

OVERVIEW OF RENEWABLE ENERGY IN VIETNAM

Sri Lanka s Power Generation Past, Present and Future

World Small Hydropower Development Report 2013

By Dr. Daovong PHONEKEO, Director General Department of Energy Policy and Planning, MEM

the Future De carbonized Power Systems in Thailand

Renewable Energy Policies Case Study For Morocco

Existing Studies on Rural Electrification & Energy Demand Forecasting in Cambodia

Solar PV in ASEAN Challenges and Opportunities. Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia

Feasibility Study of Renewable Energy Options for Rural Electrification in Cambodia (REOREC) Publication Reference: EuropeAid/119920/C/SV

Financing Sustainable Energy

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

Ministerial Perspectives on Energy Transition and Regional Cooperation Country/ Organization Statement and Discussion

Energy sector in Mongolia. Contents Brief of energy sector Energy sector policy Future trend

RENEWABLE ENERGY IN GHANA: POLICY AND POTENTIAL

Sustainable Energy for All (SE4ALL) Action Agenda for Ghana. Presented By: Gifty Delali Tettey (Mrs.) Deputy Director Ministry of Power

Grid Integration in Sri Lanka

Chapter 10. Lao PDR Country Report. September 2016

Renewable Energy Development in Sri Lanka Opportunities and Challenges. Ministry of Power and Energy Sri Lanka 01/12/2014 1

Developing a Regional Roadmap on Energy Connectivity. China Electric Power Planning & Engineering Institute Bangkok

LONG-TERM SOLUTIONS FOR NEW YORK S CLEAN ENERGY FUTURE

Rural Electrification Situation in Lao PDR

Current Status of Energy in Viet Nam: Tran Thuc

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

Funded by: European Union

Energy in Kenya. Energy Scenarios Workshop July 24, 2013 Stanley Hotel

Democratic Socialist Republic of Sri Lanka Commercial Capital: Colombo Administrative Capital: Sri Jayawardenapura Kotte

SUSTAINABLE ENERGY FOR ALL. Suman Basnet Sustainable Energy Coordinator (NPC/UNDP)

Modernization of the Power System

Ministry of Industry and Trade General Directorate of Energy. Viet Nam s Power Development Plan

KENYA S NUCLEAR INDUSTRY

Current Status Of Myanmar s Energy Statistics

Electricity Grid Evolution in EU pre-access Countries: the Turkish case. Gaia Moretti

DEVELOPMENT OF ENERGY INDUSTRY IN VIETNAM

List of training courses on electrical power system for Cambodia, Laos, Vietnam and Thailand (CLVT) countries

14 TH to 18 th SEPTEMBER, 2015 ABIDJAN, CITE D IVOIRE

Moldova Business Week Gas Natural Fenosa in Moldova

2 nd Meeting of JWG on Water Resources of Mekong-Lancang Cooperation 1 st 2 nd March, 2018 in Chiang Rai, Thailand.

RENEWABLE ENERGY MARKET DEVELOPMENT IN LAO PDR- OPPORTUNITUES FOR INVESTMENT

SCALING UP RENEWABLE ENERGY PROGRAME IN TANZANIA

SREP/SC.15/5 May 20, Meeting of the SREP Sub-Committee Oaxaca. Mexico Friday, June 17, Agenda Item 5 SREP INVESTMENT PLAN FOR CAMBODIA

SOUTH AFRICA POWER MARKET OUTLOOK TO MARKET TRENDS, REGULATIONS AND COMPETITIVE LANDSCAPE

World Bank Group Renewable Energy & Energy Efficiency Performance July June2005 Q&A

Outline 1 Introduction : Key Data of Malaysia 2 Energy Policies Electricity Sector in Malaysia Challenges in Meeting Future Energy Demand Mo

Analysis of Distributed Generation and Power Losses Viesgo Distribución

Programme of Activities (PoA) for Sustainable Renewable Energy Power Generation in Papua New Guinea (PNG) Journey So Far

Clean Energy Development in Sri Lanka

Current status and Development plan for Grid Small Hydro Power in Thailand

Energy Status - Tanzania.

Scaling-up Renewable Energy for Low Income Countries Program Investment Plan for the Kingdom of Cambodia

Planning for Universal Access in Eastern Indonesia Asia Clean Energy Forum 6 June 2017

Energy Historical Trends in ASEAN+3

ZAMBIA REFIT POLICY 2015 GENERAL OVERVIEW

The Ultimate Goal of the Ministry of Energy

Current Status on Environment Statistics in NIS by So Tonnere Ho Dalina

Renewable Energy Policies and the Solar Home System in Cambodia

GUYANA POWER UTILITY UPGRADE PROGRAM (GY-L1041 AND GY-X1002) TERMS OF REFERENCE PROGRAM COORDINATOR I. BACKGROUND AND JUSTIFICATION

SAARC Knowledge Sharing Workshop on Modern Techniques Including Renewable Energy Auctions for Economizing Renewable Energy Tariff

Content Sri Lanka At a Glance Energy reserves Current Energy Policy and Measures Past Energy Demand and Supply Outlook of energy Demand and Supply Ene

AZERBAIJAN ECONOMY AND POWER SECTOR: CHALLENGES AND OPPORTUNITIES

SECTOR ASSESSMENT (SUMMARY): POWER

4th EU - Philippines Meeting on Energy Electricity for a Better Life

Reliable, affordable, and sustainable energy services for agriculture,

Gender Mainstreaming in ADB s Energy Projects in Nepal. Pushkar Manandhar 2 October 2017

UGANDA COUNTRY REPORT; ENERGY POLICY

Security of supply status quo. Challenges and future developments. 14 June 2018, Budapest, Hungary

National Energy Policy 1995

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region

Figure Gross Domestic Product Growth of Viet Nam,

HYDROPOWER EXPLOITATION AND INDUSTRIAL DEVELOPMENT OF AFRICA

Chapter 1 Primary Energy Data

SECTOR ASSESSMENT (SUMMARY): ENERGY

Energy Outlook for ASEAN+3

Transcription:

The 4 th ASEAN Connectivity Forum Cambodia Power Development HENG KUNLEANG Deputy Director General General Department of Energy MINISTRY OF MINES AND ENERGY 07-08 November 2016, Seoul, Korea

Content 1. Structure of Electricity Organization 2. Energy Policy 3. Cambodia Power Strategy 4. Overviews of Power Sector 5. Power Demand Forecast of National Grid 6. Generation Development Plan 7. Transmission Development Plan 8. Development of Rural Electrification 2

1. Structure of Electricity Organization

2. ENERGY POLICY To provide an adequate supply of energy throughout Cambodia at reasonable and affordable price, To ensure a reliable and secured electricity supply at reasonable price, which facilitates investment in Cambodia and development of national economy, To encourage exploration and environmentally and socially acceptable development of energy resources needed for supply to all sectors of Cambodia economy, To encourage the efficient use of energy and to minimize the detrimental environmental affects resulted from energy supply and consumption.

3. CAMBODIA POWER STRATEGY A-Development of Generation B-Development of Transmission System C-Development of Rural Electrification Increasing diversify of power supply such as Hydro, Coal power, Importing electricity, biomass and others renewable energies to meet the electricity demand and reduce fuel oil for power generation. Development the national transmission system, GMS & ASEAN power grid, extent the grid to rural areas, upgrading the HV, MV & LV. Supply from the National Grid, Mini-grid, Grid extension and stand-alone system (BCS, SHS, Micro Hydropower, biomass, etc.

4. OVERVIEWS OF THE POWER SECTOR 6

Available Generation Capacity in 2015 Year Unit 2009 2010 2011 2012 2013 2014 2015 Import Via Distribution MW 29 39 49 78 81 81 81 Import Via High Voltage MW 180 200 215 250 270 320 320 Coal MW 7 7 7 7 108 228 363 Hydro MW 11 11 11 223 512 927 927 Fuel MW 246 229 230 227 227 218 218 Note: the hydro power can generate only 50% of their capacity during dry season

MW 1000 900 800 700 600 500 400 300 200 100 0 Peak Demand in National Grid 40 133 165 232 from 2005-2015 278 274 334 407 50 70 83 94 99 116 508 143 625 784 168 177 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 May 2015 Peak Demand Off Peak Demand 897 448 Year 8

Energy Generation and Consumption in 2015 Energy Generation : 5,709 GWh 4.25% 5.65% 40.32% 17.21% Energy Consumption: 5,015 GWh 32.57% 3.57% 19.07% 26.15% 20.68% 30.54% Import from distribution line Coal Fuel Oil Import from high voltage line Hydro Residential Commercial Industrial Government Others 9

5. Power Demand Forecast of National Grid 4,000 [MW] 3,832 3,500 3,504 3,000 High case(gdp:8%) Base case(gdp:7%) Low case(gdp:6%) 3,204 3,256 2,929 3,002 2,678 2,768 2,732 2,449 2,552 2,500 2,315 2,542 2,229 2,353 WB 2006 Base (GDP:5%) 2,141 2,365 2,029 2,170 1,980 2,200 2,000 1,847 1,991 1,833 2,047 1,681 1,827 1,905 1,615 1,676 1,494 1,764 1,492 1,500 1,538 1,374 1,633 1,340 1,267 1,378 1,513 626MW(record) 1,203 1,247 1,401 1,117 1,079 1,128 1,266 958 954 1,000 1,020 1,155 879 816 824 910 1,054 761 732 961 653 792 582 710 864 638 758 574 685 500 621 563 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

6. Generation Development Plan Year Name Type Installed Capacity (MW) 2017 Coal-fired Power Plant-I.2 C 135 2018 Lower Sesan 2 H 400 2019 Coal-fired Power Plant-II.2.1 C 200-250 2020 Coal-fired Power Plant-II.2.2 C 200-250 2021 Salamunthon C 70 Veal thmorkombut H 100 2022 Midle Russey chhrum H 70 Prek Laang 1 H 72 Prek Laang 2 H 56 Coal-fired Power Plant-III C 200-250 Pursat 1 H 40 2023 Chay Areng H 108 Battambang 2 H 36 2024 Coal-fired Power Plant-IV C 400-500 2025 Sambor Phase 1 H 600 2026 Thermal Power Plant-V C/G 300 Sambor Phase 2 H 600 2027 Thermal Power Plant-VI C/G 300 Sambor Phase 3 H 600 2028 Thermal Power Plant-VII C/G 300 2029 Thermal Power Plant-VIII C/G 300 Lower Seasan1 H 96 2030 Thermal Power Plant-IX C/G 300 Total 4,483.00

7. Transmission Development Plan in 2030 Thailand BMC Odor Meanchay SRP E-SRP Preah Vihear L. Sekong: 190 MW STR L. Sesan 3: 260 MW L. Sesan 1: 96 MW Prek Liang 1: 72 MW Prek Liang 2: 50 MW RTK L. Sesan 2: 400 MW Pailin BTB Pursat 1: 40MW Battambang 2: 36MW Thermal KKG Botum Sakor Osom SHV (574) Chay Areng PST Chamkar Loung KPT KCN Soung NPP CC EPP(500kV) GS5 Svay Antor 500kV GS NCC Thermal WPP SPP PRV TKO Kampong Thom KCM Vietnam Bavet KTE P. Chhlong 2: 16 MW MDK Legend: 500kV Lines(tentative) 230kV Lines 115kV Lines (Number) MVA/cct S. Pok 3A: 300 MW S. Pok 3B: 68 MW S. Pok 4: 48 MW Prek Por: 17 MW

8. Development of Rural Electrification Goal of the Rural Electrification Development Program 13

Level of Rural Electrification Three Levels of Electrification Level 3: National Grid (grid electrification) 2: Mini-grids 1: Battery lighting Use of Renewable Energy off-grid areas Mini-grids: Solar, biomass and micro hydro BCS: solar BCS 14 14

Estimated Rural Electrification Investment Infrastructures Development Unit Total Investment Year 2011-2020 Total Investment Year 2021-2030 Quantity Cost, MUS$ Quantity Cost, MUS$ 1. MV network km 11,432 167.05 14,425 197.16 2. Transformer set 7,635 70.85 9,616 93.92 3. LV network km 38,174 285.46 48,082 415.48 4. Meter and Accessory h.h 945,263 68.45 1,346,298 74.32 Total included Contingency hh 591.81 780.87 15

End of Presentation Thank you for your attention. BCS 16