For. The Preparatory Study. The Master Plan Study on Hydropower Development in. Cambodia

Size: px
Start display at page:

Download "For. The Preparatory Study. The Master Plan Study on Hydropower Development in. Cambodia"

Transcription

1 Draft Environmental and Social Consideration Report For The Preparatory Study of The Master Plan Study on Hydropower Development in Cambodia April 2007 Economic Development Department, JICA

2 Table of Contents 1. Official Name of the Report on the Project Type of the Study Environmental Category Counterpart Organization Overview of the Study Objective of the Study Background and contents of request Study area Tentative Schedule of the study Outline of the Target Area Physical surroundings Natural environment Social Environment Conservation Areas EIA System in Cambodia Laws and regulations on Environmental Impact Assessment Outline of related organizations Preliminary Scoping Environmental impact of existing dams Other possible environmental impacts Preliminary scoping Alternatives Alternatives to the hydropower master plan Alternative sites for potential sites Result of the Consultation with the Recipient Government on Environmental and Social Consideration Including Roles and Responsibilities Draft terms of reference for social and environmental study Study for real Environmental Impact Data survey Site survey...33 List of Figures Figure 1: Potential Target Sites for Stage Figure 2: Location of Cambodia in the Mekong Basin...9 Figure 3: Geographical Relief...9

3 Figure 4: Geology...10 Figure 5: Land Use Figure 6: Decreasing Forests...12 Figure 7: Wetlands...13 Figure 8: Population Density...14 Figure 9: Fish Production and Fishing Lots...15 Figure 10: Community Fisheries...16 Figure 11: Poverty Level...17 Figure 12: Transportation...18 Figure 13: Landmines...19 Figure 14: Nature Reserves...20 Figure 15: Important Bird Areas...21 List of Tables Table 1: Potential Target Sites for Stage Table 2: Basic Information on Cambodia...8 Table 3: Preliminary Scoping...27 Table 4: First Comparison Table (sample)...32 Table 5: Second Comparison Table (sample)...34

4 1. Official Name of the Report on the Project Report for the Preparatory Study of the Master Plan Study of Hydropower Development in Cambodia 2. Type of the Study Master plan study 3. Environmental Category The master plan was categorized as B based on the preliminary evaluation study because the master plan study includes neither a pre-feasibility study nor a feasibility study. 4. Counterpart Organization Ministry of Industry, Mines and Energy (MIME) 5. Overview of the Study 5.1. Objective of the Study The Study aims at thorough investigation and prioritization of potential hydropower sites in Cambodia, and preparation of the Hydropower Development Master Plan that shall articulate development plans of selected hydropower projects within the framework of the Energy Sector Development Strategy for the period of 20 years Background and contents of request The Cambodian Government promotes hydropower development in the National Electricity Strategy for energy security and effective use of domestic resources. However, the operating hydropower plants are two medium and small power plants with the total capacity of 13 MW, and 8 micro power plants. The past potential hydropower study was not very precise and there is no hydropower master plan. Thus the Cambodian Government needs detailed review of the potential hydropower study and must prioritize the potential hydropower sites from the economic, technical and environmental points of view, and requested the Japanese Government for support to the undertaking above Study area The Study covers Cambodia as a whole. Table 1 lists 29 potential target sites. 28 out of the 29 sites are selected as those with generating capacity of more than 10 MW from 60 sites which are listed in Review and Assessment of Water Resources for Hydropower and Identification of Priority Projects (1995, Mekong River Commission). One of the 29 sites is to be located in the Stung Treng Province but its exact location has not been decided yet. The first stage of the survey on priority sites will be done for these 29 sites. The second stage will be done for 10 sites among them. 4

5 Table 1: Potential Target Sites for Stage 1 No Name of Project Province Installed Capacity (MW) 1 Sambor Kratie 465/ Prek Chhlong II Kratie 24 3 Prek Ter III Kratie 13 4 Prek Ter II Kratie 10 5 Sre Pok IV Mondul Kiri Prek Por I Mondul Kiri 17 7 Lower Sre Pok II Stung Treng Lower Se San II Stung Treng Stung Treng Stung Treng (unknown) Stung Treng (unknown) 11 Lower Se San III Rattanak Kiri Prek Liang I Rattanak Kiri Prek Laing IA Rattanak Kiri Prek Liang II Rattanak Kiri Lower Sre Pok III Rattanak Kiri Middle St. Russey Chrum Koh Kong St. Chhay Areng Koh Kong St. Tatay Koh Kong St. Metoek I Koh Kong St. Metoek II Koh Kong St. Meteok III Koh Kong Stung Kep II Koh Kong Upper St. Russey Chrum Pursat Stung Pursat I Pursat Stung Pursat II Pursat Stung Sen Preah Vihear Stung Battambang II Battambang Stung Battambang I Battambang Bokor Plateao Kampot 24 source: MIME 5

6 Figure 1: Potential Target Sites for Stage 1 Source: MIME (Note: one site has not been decided yet) 6

7 5.4. Tentative Schedule of the study 18 months from May 2007 Stage-1 Preliminary on hydropower resourceand development (1)collection and examination of the existing data and information on hydropower plan (2)Examination of power sector development plans (3)Study on natural and social environment (4)First-round examination of potential hydropower sites (5)Workshop to discuss initial screening of hydropower development Stage-2 Idenfication of prospective hydropower projects (1)Site reconnaissnce (2)Upgrading relevant data and information (3)Field study on natural and social environment (4)Second-round review of potential hydropower projects (5)Selection of prospective hydropower projects (6)Workshops to present priority hydropower projects Stage-3 Master Plan formulation (1)Development of the hydropower Development Master Plan (2)GIS database construction (3)Idenfication of requirements necessary for the development of selected hydropower development projects (4)Recommendations for hydropower development in Cambodia (5)Seminar to present the Master Plan Reports Ic/R It/R Df/R F/R Workshop Workshop Workshop Seminar Seminar Legend : Work in Japan Reports: Ic/R Inception Report It/R Interim Report Work in Cambodia Df/R Draft Final Report F/R : Final Report 7

Contents Basic Facts of Cambodia Cambodia Power Sector Overview Major Issues Cambodia Power Industry (Structure) Energy Policy Cambodia Power Developm

Contents Basic Facts of Cambodia Cambodia Power Sector Overview Major Issues Cambodia Power Industry (Structure) Energy Policy Cambodia Power Developm TRAINING AND DIALOGUE PROGRAMS IEEJ: August 2012 All Right Reserv IEEJ : June 2012 Energy Policy (B) June 3, 2012 to June23, 2012 IEEJ, Japan Mr. Phan Bunthoeun (Cambodia) Ministry of Industry, Mines and

More information

IEEJ: April 21 Outline Electricity STATUS in Cambodia Energy Supply and Demand Problem Statement Conclusion 2

IEEJ: April 21 Outline Electricity STATUS in Cambodia Energy Supply and Demand Problem Statement Conclusion 2 IEEJ: April 21 Training Course on Energy Policy on April 4 24, 21 Tokyo, JAPAN Country Report On energy SECTOR IN CAMBODIA By: MR. CHOUMNIT Gnhoung Officer of Planning Office Energy Development Department

More information

Ministry of Mines and Energy. Energy Power Plant in Cambodia

Ministry of Mines and Energy. Energy Power Plant in Cambodia Ministry of Mines and Energy MME Energy Power Plant in Cambodia Prepare by : KIN Sothea Energy Development Department General Department of Energy The 5 th ASEAN Connectivity Forum 28-30 November 2017,

More information

Cambodia Power Sector

Cambodia Power Sector Cambodia Power Sector Cambodia Power Sector 31 August 2015, Phnom Penh, Cambodia 1 Content 1. Structure of Electricity Organization 2. Energy Policy 3. Cambodia Power Strategy 4. Overviews of Power Sector

More information

6. TECHNICAL STUDY OF 10 PRIORITY PROJECTS

6. TECHNICAL STUDY OF 10 PRIORITY PROJECTS Final Report Chapter 6 Technical Study of 10 Priority Projects 6. TECHNICAL STUDY OF 10 PRIORITY PROJECTS 6.1 REVIEW OF EXISTING REPORTS Of the selected 10 priority projects, the study team reviewed the

More information

Sustainable Development of Energy and Electricity Policy In Cambodia

Sustainable Development of Energy and Electricity Policy In Cambodia Sustainable Development of Energy and Electricity Policy In Cambodia IEEJ:August 2015 Tokyo, Japan 21-June-2015 Content I. Cambodia Background II. Current energy policy and measures of Cambodia III. Cambodian

More information

Mekong River. Tonle Sap Lake. Basin Group. Basin Group. Code River basin Area (km²)

Mekong River. Tonle Sap Lake. Basin Group. Basin Group. Code River basin Area (km²) 1 Cambodia is a country that has abundant of Water Resources (Average annual rainfall is more than 1,500 mm. There are the regional largest lake, Tonle Sap Lake and the regional longest international river,

More information

Cambodia Power Development

Cambodia Power Development The 4 th ASEAN Connectivity Forum Cambodia Power Development HENG KUNLEANG Deputy Director General General Department of Energy MINISTRY OF MINES AND ENERGY 07-08 November 2016, Seoul, Korea Content 1.

More information

CAMBODIA BASELINE ASSESSMENT PERSPECTIVE

CAMBODIA BASELINE ASSESSMENT PERSPECTIVE CAMBODIA BASELINE ASSESSMENT PERSPECTIVE REGIONAL WORKSHOP ON SEA BASELINE ASSESSMENT PHNOM PENH HOTEL, 27-28 JANUARY 2010 Mekong River Commission SEA of hydropower on the mainstream Mekong River Outlines

More information

Expanding irrigated agriculture in the floodplains of Cambodia. Prepared by Ponh Sachak for the 4 th Regional Stakeholder Forum

Expanding irrigated agriculture in the floodplains of Cambodia. Prepared by Ponh Sachak for the 4 th Regional Stakeholder Forum Expanding irrigated agriculture in the floodplains of Cambodia Prepared by Ponh Sachak for the 4 th Regional Stakeholder Forum 20-22 November 2014 Content 1. Introduction 2. Water Resources in Cambodia

More information

2 nd Meeting of JWG on Water Resources of Mekong-Lancang Cooperation 1 st 2 nd March, 2018 in Chiang Rai, Thailand.

2 nd Meeting of JWG on Water Resources of Mekong-Lancang Cooperation 1 st 2 nd March, 2018 in Chiang Rai, Thailand. 2 nd Meeting of JWG on Water Resources of Mekong-Lancang Cooperation 1 st 2 nd March, 2018 in Chiang Rai, Thailand. Current situation and investment/development challenge regarding the Mekong River Basin

More information

Cambodian Agrarian Structure Study. Table 1 Basic Indicators of the Agricultural Sector in Cambodia

Cambodian Agrarian Structure Study. Table 1 Basic Indicators of the Agricultural Sector in Cambodia 11 Tables Table 1 Basic Indicators of the Agricultural Sector in Cambodia Indicators Value Agricultural Land ('000 ha) 2700 Population in 2003 ('000) 12943 Population growth 2.50% Rural Population 1998

More information

Number of inhabitants in million population [1]

Number of inhabitants in million population [1] Biogas Slide 1 Overview of Cambodian population Millions 16 14 12 10 8 6 4 2 Number of inhabitants in million population [1] 0 1921 1931 1939 1948 1950 1958 1962 1970 1981 1985 1990 1995 1998 2004 2008

More information

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013 World Small Hydropower Development Report 2013 www.smallhydroworld.org C AMBODIA Disclaimer Published in 2013 by United Nations Industrial Development Organization (UNIDO) and International Center on Small

More information

Current working list of Cambodian environmental legislation that may be incorporated into the Code, subject to any required modifications

Current working list of Cambodian environmental legislation that may be incorporated into the Code, subject to any required modifications Current working list of Cambodian environmental legislation that may be incorporated into the Code, subject to any required modifications The majority of the following legislation is available from the

More information

Discharge and Sediment Monitoring Project Regional meeting 14 January 2009 Presented by Ms. Iwona Conlan

Discharge and Sediment Monitoring Project Regional meeting 14 January 2009 Presented by Ms. Iwona Conlan Discharge and Sediment Monitoring Project 2009-2010 Draft Project Proposal Regional meeting 14 January 2009 Presented by Ms. Iwona Conlan 1 Aims for today 1. To discuss and agree on the overall monitoring

More information

Working list of Cambodian environmental legislation that may be incorporated into the Code, subject to any required modifications

Working list of Cambodian environmental legislation that may be incorporated into the Code, subject to any required modifications Working list of Cambodian environmental legislation that may be incorporated into the Code, subject to any required modifications Chbab/Law Law on Allowing the Kingdom of Cambodia a Membership to an Agreement

More information

Transboundary Cooperation Workshop # January 2010, Vientiane. Sharing of Benefits in Transboundary Water Resources Management

Transboundary Cooperation Workshop # January 2010, Vientiane. Sharing of Benefits in Transboundary Water Resources Management Transboundary Cooperation Workshop # 3 20-22 January 2010, Vientiane. Sharing of Benefits in Transboundary Water Resources Management Responses form civil society on stakeholder views on benefit and cost

More information

INVENTORY AND MANAGEMENT OF CAMBODIA WETLANDS PROJECT

INVENTORY AND MANAGEMENT OF CAMBODIA WETLANDS PROJECT Page 1 of 5 BACK HOME INVENTORY AND MANAGEMENT OF CAMBODIA WETLANDS PROJECT Objective 1: Enhanced capacity of relevant line institution in wetland inventory and management Output 1: Staff in relevant line

More information

ANALYSIS OF POLICIES TO ADDRESS CLIMATE CHANGE IMPACTS IN CAMBODIA

ANALYSIS OF POLICIES TO ADDRESS CLIMATE CHANGE IMPACTS IN CAMBODIA ANALYSIS OF POLICIES TO ADDRESS CLIMATE CHANGE IMPACTS IN CAMBODIA Final Draft Ministry of Environment March 2005 1 TABLE OF CONTENTS I. GENERAL INTRODUCTION -------------------------------------------------------------------------------

More information

Prof. Yunus: We must not leave the problem of poverty for the next generation to solve

Prof. Yunus: We must not leave the problem of poverty for the next generation to solve Prof. Yunus: We must not leave the problem of poverty for the next generation to solve Regional and local levels One of the major dichotomies in development is the engagement at local and regional level.

More information

The LMB Sustainable Hydropower Development Strategy. Regional Power Trade Coordination Committee 24 Nay Pyi Taw, 20 June 2018

The LMB Sustainable Hydropower Development Strategy. Regional Power Trade Coordination Committee 24 Nay Pyi Taw, 20 June 2018 The LMB Sustainable Hydropower Development Strategy Regional Power Trade Coordination Committee 24 Nay Pyi Taw, 20 June 2018 The Lower Mekong Basin Most of Cambodia Most of Lao PDR North-East Thailand

More information

FOOD FORTIFICATION PROJECT

FOOD FORTIFICATION PROJECT FOOD FORTIFICATION PROJECT Chan Theary Executive Director, RACHA Phnom Penh, Cambodia Regional Conference on Micronutrient Fortification of Foods, October 11, 2013 Bangkok, Thailand Outline Trend of Anemia

More information

SURVEY ON THE WATER SUPPLY SECTOR IN THE KINGDOM OF CAMBODIA FINAL REPORT

SURVEY ON THE WATER SUPPLY SECTOR IN THE KINGDOM OF CAMBODIA FINAL REPORT SURVEY ON THE WATER SUPPLY SECTOR IN THE KINGDOM OF CAMBODIA FINAL REPORT JUNE 2010 JAPAN INTERNATIONAL COOPERATION AGENCY NJS CONSULTANTS CO., LTD. KOKUSAI KOGYO CO., LTD. Banteay Meanchey Stung Treng

More information

Ranking significance of impacts 7/13/2010. SEA OVERVIEW OF CONCLUSIONS REGIONAL MITIGATION ASSESSMENT WORKSHOP Ho Chi Minh City June 2010

Ranking significance of impacts 7/13/2010. SEA OVERVIEW OF CONCLUSIONS REGIONAL MITIGATION ASSESSMENT WORKSHOP Ho Chi Minh City June 2010 //00 Strategic options for LMB mainstream development SEA OVERVIEW OF CONCLUSIONS REGIONAL MITIGATION ASSESSMENT WORKSHOP Ho Chi Minh City 8-9 June 00 SEA OF HYDROPOWER ON THE MAINSTREAM MEKONG Not to

More information

Lesson Learns from Japanese Practices for Urban Waste Utilization

Lesson Learns from Japanese Practices for Urban Waste Utilization Institute for Global Environmental Strategies Lesson Learns from Japanese Practices for Urban Waste Utilization Yoshiaki Totoki Sustainable Consumption and Production Institute for Global Environmental

More information

LAND MANAGEMENT AND ADMINISTRATION PROJECT (LMAP)

LAND MANAGEMENT AND ADMINISTRATION PROJECT (LMAP) LAND MANAGEMENT AND ADMINISTRATION PROJECT (LMAP) Project Goal: To reduce poverty, stimulate economic development, promote social stability and improve environmental management by improving land tenure

More information

PRoACC2. (First Draft) Research Proposal. Risk Perception and Livelihoods under Climate Change. in the Mekong Cambodia. Royal University of Phnom Penh

PRoACC2. (First Draft) Research Proposal. Risk Perception and Livelihoods under Climate Change. in the Mekong Cambodia. Royal University of Phnom Penh Royal University of Phnom Penh PRoACC2 (First Draft) Research Proposal Risk Perception and Livelihoods under Climate Change in the Mekong Cambodia By Kesa Ly March 2013 21 1. Introduction Project Title:

More information

THE MASTER PLAN STUDY ON RURAL ELECTRIFICATION BY RENEWABLE ENERGY IN THE KINGDOM OF CAMBODIA FINAL REPORT VOLUME 4: PRE-FEASIBILITY STUDY

THE MASTER PLAN STUDY ON RURAL ELECTRIFICATION BY RENEWABLE ENERGY IN THE KINGDOM OF CAMBODIA FINAL REPORT VOLUME 4: PRE-FEASIBILITY STUDY Ministry of Industry, Mines and Energy in the Kingdom of Cambodia No. THE MASTER PLAN STUDY ON RURAL ELECTRIFICATION BY RENEWABLE ENERGY IN THE KINGDOM OF CAMBODIA FINAL REPORT VOLUME 4: PRE-FEASIBILITY

More information

Hydrological Model Soil Water & Assessment Tool (SWAT)

Hydrological Model Soil Water & Assessment Tool (SWAT) Hydrological Model Soil Water & Assessment Tool (SWAT) SWAT is a simulation catchment runoff based on estimates of daily rainfall and the topography, soils and land cover of each sub-basin. The SWAT software

More information

Feasibility Study of Renewable Energy Options for Rural Electrification in Cambodia (REOREC) Publication Reference: EuropeAid/119920/C/SV

Feasibility Study of Renewable Energy Options for Rural Electrification in Cambodia (REOREC) Publication Reference: EuropeAid/119920/C/SV Feasibility Study of Renewable Energy Options for Rural Electrification in Cambodia (REOREC) Publication Reference: EuropeAid/119920/C/SV Budget line BGUE-B2004-19.100200-C8-AIDCO Project Number: 103-2004

More information

Title: Roadmap towards Effective Flood Hazard Mapping in Cambodia. October 31~December 03, Name: PHENG SEANGMENG

Title: Roadmap towards Effective Flood Hazard Mapping in Cambodia. October 31~December 03, Name: PHENG SEANGMENG Title: Roadmap towards Effective Flood Hazard Mapping in Cambodia October 31~December 03, 2005. Name: PHENG SEANGMENG Ministry of Water resources and Meteorology Department of Hydrology and River works,

More information

KINGDOM OF CAMBODIA NATION, RELIGION, KING. SUB-DECREE on ESTABLISHMENT OF PREY LANG FORESTRY PROTECTED AND BIODIVERSITY CONSERVATION AREA

KINGDOM OF CAMBODIA NATION, RELIGION, KING. SUB-DECREE on ESTABLISHMENT OF PREY LANG FORESTRY PROTECTED AND BIODIVERSITY CONSERVATION AREA DRAFT UNOFFICIAL TRANSLATION Royal Government of Cambodia No.... KINGDOM OF CAMBODIA NATION, RELIGION, KING SUB-DECREE on ESTABLISHMENT OF PREY LANG FORESTRY PROTECTED AND BIODIVERSITY CONSERVATION AREA

More information

Resettlement Due Diligence Report. CAM: Urban Water Supply Project Kampot Subproject

Resettlement Due Diligence Report. CAM: Urban Water Supply Project Kampot Subproject Resettlement Due Diligence Report September 2014 CAM: Urban Water Supply Project Kampot Subproject Prepared by the Ministry of Industry and Handicraft for the Asian Development Bank. This Due Diligence

More information

CAMBODIA FOREST COVER 2016

CAMBODIA FOREST COVER 2016 KINGDOM OF CAMBODIA NATION RELIGION KING CAMBODIA FOREST COVER 2016 March 2018 THE MINISTRY OF ENVIRONMENT General Directorate of Administration for Nature Conservation and Protection Morodok Techo building

More information

WELCOME TO. The First General Meeting Network of Asian River Basin Organisation

WELCOME TO. The First General Meeting Network of Asian River Basin Organisation WELCOME TO The First General Meeting Network of Asian River Basin Organisation Prepared by : Dr. THENG TARA Director Department of Water Resource Management Batu, East Java,Indonesia, 24-26 February 2004

More information

Two-Week Training Workshop in Siem Reap Town

Two-Week Training Workshop in Siem Reap Town Making Waste Work for the Economy through the Development of Integrated Waste Management Capacity in Cambodia, Lao PDR and Vietnam Volume 02 February/2004 Two-Week Training Workshop in Siem Reap Town The

More information

MRC's role in relation to planning and implementation of mainstream dams and its strategic assessment framework

MRC's role in relation to planning and implementation of mainstream dams and its strategic assessment framework MRC's role in relation to planning and implementation of mainstream dams and its strategic assessment framework Jeremy Bird, Chief Executive Officer MRC Secretariat 1 Average flow in Kratie 1960-2004 Flow

More information

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study) Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 1. Full title of the Project The Study on Integrated Development Strategy for Danang City and Its Neighboring

More information

Presentation Transboundary water cooperation in Mekong Countries, key issues, challenges and intervention to address

Presentation Transboundary water cooperation in Mekong Countries, key issues, challenges and intervention to address Regional Workshop on Transboundary Water Cooperation in the context of the SDGs in South Asia and beyond Pokhara, Nepal 23-24 May 2017 Presentation Transboundary water cooperation in Mekong Countries,

More information

TABLE OF CONTENTS. General information about the human population living along the Se San, Sre Pok and Lower Sekong Rivers

TABLE OF CONTENTS. General information about the human population living along the Se San, Sre Pok and Lower Sekong Rivers A Community-Based Study of the Downstream Impacts of the Yali Falls Dam Along the Se San, Sre Pok and Sekong Rivers in Stung Treng Province, Northeast Cambodia March 2002 By Ian Baird, Monsiri Baird, Chum

More information

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning) Page: 1 Date: May 27, 2014 Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full Title of the Project 2. Type of the study (e.g. Master

More information

PROJECTING INDUSTRIAL POLLUTION

PROJECTING INDUSTRIAL POLLUTION PROJECTING INDUSTRIAL POLLUTION IN THE GREATER MEKONG SUBREGION The smoke stacks of an oil refinery emit pollutants into the atmosphere. Rapid economic growth in the Greater Mekong Subregion (GMS) has

More information

The Living Mekong Programme Goal :

The Living Mekong Programme Goal : The Living Mekong Programme Goal : The biological integrity of the Mekong basin is maintained and natural resources are managed sustainably for the benefit of local communities, national states, and the

More information

Terms of Reference to International Project

Terms of Reference to International Project Terms of Reference to International Project Assistance on capacity development of the Designated National Authority (DNA) and other concerned organizations for promoting Clean Development Mechanism (CDM)

More information

5. EIA Program for Developmental Assistance

5. EIA Program for Developmental Assistance 5. EIA Program for Developmental Assistance 5.1 EIA Process in World Bank In May 1987, a series of structural changes were introduced to strengthen the Bank's environmental policies, procedures and resources.

More information

The Credibility Gap. and the Need to Bridge it. Increasing the pace of forestry reform. A Briefing Document by Global Witness, May 2001

The Credibility Gap. and the Need to Bridge it. Increasing the pace of forestry reform. A Briefing Document by Global Witness, May 2001 Page 1 of 6 The Credibility Gap and the Need to Bridge it Increasing the pace of forestry reform A Briefing Document by Global Witness, May 2001 1. RECOMMENDATIONS The Royal Government of Cambodia should

More information

I C E M - I n ternat i o n a l C e n tre fo r E n v i ro n m e n t a l Manage m e n t

I C E M - I n ternat i o n a l C e n tre fo r E n v i ro n m e n t a l Manage m e n t 1 MRC SEA OF HYDROPOWER ON THE MAINSTREAM MEKONG OVERVIEW OF FINDINGS & RECOMMENDATIONS. 1 S T M E E T I N G O F C S C A P S T U DY G R O U P O N WA T E R R E S O U R C E S S E C U R I T Y HANOI, VIET

More information

Summary Note on Awareness Raising on Basin Management Approach Baray Commune, Srey Santhor District, Kampong Cham Province

Summary Note on Awareness Raising on Basin Management Approach Baray Commune, Srey Santhor District, Kampong Cham Province Summary Note on Awareness Raising on Basin Management Approach Baray Commune, Srey Santhor District, Kampong Cham Province 1. Introduction On 28 September 2016, the CamboWP conducted Awareness Raising

More information

AQUACULTURE IN CAMBODIA: TRENDS AND PATTERNS IN RECENT YEARS. Olivier JOFFRE SO Nam CHHENG Phen

AQUACULTURE IN CAMBODIA: TRENDS AND PATTERNS IN RECENT YEARS. Olivier JOFFRE SO Nam CHHENG Phen AQUACULTURE IN CAMBODIA: TRENDS AND PATTERNS IN RECENT YEARS Olivier JOFFRE SO Nam CHHENG Phen Citation: Joffre, O, So N., Chheng P. 2016. Aquaculture production in Cambodia: trends and patterns in recent

More information

Interactions Among Key Stakeholders in Hydropower Development in Vietnam

Interactions Among Key Stakeholders in Hydropower Development in Vietnam REGIONAL WORKSHOP FOR COORDINATION OF RESEARCH ON HYDROPOWER DEVELOPMENT IN THE LOWER MEKONG BASIN VIENTIANE, LAO PDR- 14-15 SEPTEMBER 2010 Interactions Among Key Stakeholders in Hydropower Development

More information

Drivers of Forest Change in the Greater Mekong Subregion

Drivers of Forest Change in the Greater Mekong Subregion Drivers of Forest Change in the Greater Mekong Subregion Cambodia Country Report USAID Lowering Emissions in Asia s Forests (USAID LEAF) Drivers of Deforestation in the Greater Mekong Subregion Cambodia

More information

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1 1 1. PURPOSE OF THE SEA 2. WHAT IS AN SEA? 3. SEA SYSTEMS IN THE REGION 4. THE PLAN THE SEA IS ASSESSING 5. THE SEA APPROACH 6. INITIAL REVIEW OF KEY ISSUES Jeremy Carew-Reid, Team Leader MRC SEA of hydropower

More information

Geopolitical benefits of transboundary water cooperation. The Mekong River Basin Case

Geopolitical benefits of transboundary water cooperation. The Mekong River Basin Case Geopolitical benefits of transboundary water cooperation The Mekong River Basin Case Dr Anoulak Kittikhoun Coordinator, Basin Development Plan (BDP) Mekong River Commission Secretariat Mekong - Top 10

More information

Potential Impacts of Climate Change on Food Security in the Lower Mekong Basin. Mekong ARCC

Potential Impacts of Climate Change on Food Security in the Lower Mekong Basin. Mekong ARCC Potential Impacts of Climate Change on Food Security in the Lower Mekong Basin Keith Forbes, DAI AIARD Annual Conference June 3-4, 2013 Feeding the Future in a Changing Climate Mekong ARCC CONTEXT Stems

More information

CAM: Urban Water Supply Project Stung Treng Subproject

CAM: Urban Water Supply Project Stung Treng Subproject Resettlement Due Diligence Report September 2014 CAM: Urban Water Supply Project Stung Treng Subproject Prepared by the Ministry of Industry and Handicraft for the Asian Development Bank. This Due Diligence

More information

IWRM best practices in the 4-Ps Pilot Basin - towards Integrated River Basin Management

IWRM best practices in the 4-Ps Pilot Basin - towards Integrated River Basin Management i KINGDOM OF CAMBODIA Nation Religion King IWRM best practices in the 4-Ps Pilot Basin - towards Integrated River Basin Management contributed to International Conference on WATERSHED MANAGEMENT: "From

More information

Drivers of Forest Change in the Greater Mekong Subregion

Drivers of Forest Change in the Greater Mekong Subregion Drivers of Forest Change in the Greater Mekong Subregion Cambodia Country Report USAID Lowering Emissions in Asia s Forests (USAID LEAF) Drivers of Deforestation in the Greater Mekong Subregion Cambodia

More information

Comments on CNR s report for the Government of Laos on the Xayaburi Dam June 2012

Comments on CNR s report for the Government of Laos on the Xayaburi Dam June 2012 Comments on CNR s report for the Government of Laos on the Xayaburi Dam June 2012 In April 2011, the four governments of the Mekong River Commission (MRC) Cambodia, Laos, Thailand, and Vietnam met to discuss

More information

Regenera'on process analysis of the resin Haix used from Arsenic affected community in Cambodia

Regenera'on process analysis of the resin Haix used from Arsenic affected community in Cambodia Institute of Technology of Cambodia Regenera'on process analysis of the resin Haix used from Arsenic affected community in Cambodia 2 nd Interna'onal workshop Energy, Environment and Ecosystem (3E) Nexus

More information

Gender Mainstreaming Action Plan of the Ministry of Justice

Gender Mainstreaming Action Plan of the Ministry of Justice Gender Mainstreaming Action Plan of the Ministry of Justice 2009 2013 Prepared by the Gender Mainstreaming Action Group of the Ministry of Justice in cooperation with the Cambodia Criminal Justice Assistance

More information

INFLUENCE OF BUILT STRUCTURES ON TONLE SAP FISHERIES

INFLUENCE OF BUILT STRUCTURES ON TONLE SAP FISHERIES INFLUENCE OF BUILT STRUCTURES ON TONLE SAP FISHERIES SYNTHESIS REPORT Partner institutions:. Ministry of Environment. Ministry of Water Resources And Meteorology INFLUENCE OF BUILT STRUCTURES ON TONLE

More information

Water Environment and Wastewater Management in Cambodia

Water Environment and Wastewater Management in Cambodia Water Environment and Wastewater Management in Cambodia Participants: 1. H.E HENG Rathpiseth Director General of Public Works_MPWT 2. Mr. CHAO Sopheak Phibal Director, Sewerage Management and Construction

More information

The 11th Japan- Peru Business Council. New Clean Energy. August 20, at Country Club Lima Hotel. NIPPON KOEI Co., Ltd.

The 11th Japan- Peru Business Council. New Clean Energy. August 20, at Country Club Lima Hotel. NIPPON KOEI Co., Ltd. The 11th Japan- Peru Business Council New Clean Energy August 20, 2013 at Country Club Lima Hotel NIPPON KOEI Co., Ltd. Global Status of Renewable Energy -Renewable Power Capacities, not including hydropower,

More information

Existing Studies on Rural Electrification & Energy Demand Forecasting in Cambodia

Existing Studies on Rural Electrification & Energy Demand Forecasting in Cambodia Existing Studies on Rural Electrification & Energy Demand Forecasting in Cambodia Romny OM Institute of Technology of Cambodia (ITC) Department pf Energy & Electrical Engineering Russian Federation Blvd.

More information

Contents Overview of Laos Current energy policy and Measure Energy demand and Supply in Laos Energy outlook in Laos Difficulties and bottlenecks in fo

Contents Overview of Laos Current energy policy and Measure Energy demand and Supply in Laos Energy outlook in Laos Difficulties and bottlenecks in fo IEEJ : June 2012 Country report Lao PDR Litthanoulok LASPHO Engineer Ministry of Energy and Mines, Department of Energy Policy and Planning. Contents Overview of Laos Current energy policy and Measure

More information

South-East Asia Flood Risk Reduction Forum

South-East Asia Flood Risk Reduction Forum UNITED NATIONS ECONOMIC AND SOCIAL COMMISSION FOR ASIA AND THE PACIFIC South-East Asia Flood Risk Reduction Forum 20 February 2012, Bangkok, Thailand By: TES Sopharith Senior Hydrologist Department of

More information

Broad aims of the SEA. SEA SUMMARY OVERVIEW REGIONAL MITIGATION ASSESSMENT WORKSHOP Ho Chi Minh City June The context for the SEA

Broad aims of the SEA. SEA SUMMARY OVERVIEW REGIONAL MITIGATION ASSESSMENT WORKSHOP Ho Chi Minh City June The context for the SEA Broad aims of the SEA SEA SUMMARY OVERVIEW REGIONAL MITIGATION ASSESSMENT WORKSHOP Ho Chi Minh City 8-9 June 00 To improve the sustainability of development decisions including to help avoid or minimise

More information

Investment Information. Stung Treng Province

Investment Information. Stung Treng Province Stung Treng Road Network 129 I. Introduction to the Province is located in the northeastern Cambodia, 481 km from the nation s capital, Phnom Penh, and borders Lao to the north, Ratanakiri to the east,

More information

TERMS OF REFERENCE FOR TA CONSULTANTS

TERMS OF REFERENCE FOR TA CONSULTANTS Skills for Competitiveness Project (TRTA CAM 50394) TERMS OF REFERENCE FOR TA CONSULTANTS A. Individual consultants for preliminary analytical work 1. Industrial Human Resource Development Specialist (2.5

More information

Aquatic agricultural systems in Cambodia: National situation analysis

Aquatic agricultural systems in Cambodia: National situation analysis Aquatic agricultural systems in Cambodia: National situation analysis AQUATIC AGRICULTURAL SYSTEMS IN CAMBODIA: NATIONAL SITUATION ANALYSIS Authors Borin Un, 1 Sokhem Pech 2 and Eric Baran 3 AQUATIC AGRICULTURAL

More information

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1 1 1. PURPOSE OF THE SEA 2. WHAT IS AN SEA? 3. SEA SYSTEMS IN THE REGION 4. THE PLAN THE SEA IS ASSESSING 5. THE SEA APPROACH 6. INITIAL REVIEW OF KEY ISSUES Jeremy Carew-Reid, Team Leader MRC SEA of hydropower

More information

Avoidance, Enhancement and Mitigation Avoidance measures Enhancement measures Mitigation measures. Review and collect existing data

Avoidance, Enhancement and Mitigation Avoidance measures Enhancement measures Mitigation measures. Review and collect existing data 1. To develop a complete database on baseline conditions for the LMB, particularly the Mekong Delta (floodplains of Viet Nam and Cambodia). 2. To quantitatively assess impacts of proposed mainstream hydropower

More information

Roleang Chrey Headworks Rehabilitation Sub-project

Roleang Chrey Headworks Rehabilitation Sub-project Roleang Chrey Regulator (downstream view) Andong Sla Intake (downstream view) Vat Krouch Intake (downstream view) North Main Canal South Main Canal Socio-economic Survey in Kampong Speu Sub-project Name:

More information

Review of Existing Knowledge on the Effectiveness and Economics of Fish-Friendly Turbines

Review of Existing Knowledge on the Effectiveness and Economics of Fish-Friendly Turbines Review of Existing Knowledge on the Effectiveness and Economics of Fish-Friendly Turbines Session II, Item 4. Applicability of Fish FriendlyTurbines for Mekong River Hydroplants Hydropower Vientiane, Laos

More information

ENVIRONMENTAL CONDITIONS

ENVIRONMENTAL CONDITIONS CHAPTER 10 ENVIRONMENTAL CONDITIONS CHAPTER 10 ENVIRONMENTAL CONDITIONS 10.1 Outline of Environmental Conditions In the course of Feasibility Study on Improvement of Cambodian National Road No.1, environmental

More information

Presentation on IWRM best practices in Pilot 4 Ps Basin towards Integrated River Basin Management. Cambodia National Mekong Committee

Presentation on IWRM best practices in Pilot 4 Ps Basin towards Integrated River Basin Management. Cambodia National Mekong Committee Presentation on IWRM best practices in Pilot 4 Ps Basin towards Integrated River Basin Management contributed to International Conference on WATERSHED MANAGEMENT: "From Local Watershed Management to Integrated

More information

THE MASTER PLAN STUDY ON RURAL ELECTRIFICATION BY RENEWABLE ENERGY IN THE KINGDOM OF CAMBODIA FINAL REPORT VOLUME 2: MASTER PLAN

THE MASTER PLAN STUDY ON RURAL ELECTRIFICATION BY RENEWABLE ENERGY IN THE KINGDOM OF CAMBODIA FINAL REPORT VOLUME 2: MASTER PLAN Ministry of Industry, Mines and Energy in the Kingdom of Cambodia No. THE MASTER PLAN STUDY ON RURAL ELECTRIFICATION BY RENEWABLE ENERGY IN THE KINGDOM OF CAMBODIA FINAL REPORT VOLUME 2: MASTER PLAN June

More information

Technical Workshop: Xayaburi HPP

Technical Workshop: Xayaburi HPP Technical Workshop: Xayaburi HPP Requisites for Concession Agreement: Requirements of MRC-1995 Agreement By: Xaypaseuth Phomsoupha Director General Department of Energy Business Donchan Palace Hotel Ministry

More information

Three step selection process

Three step selection process 1 Basin-wide Climate Change Impact and Vulnerability Assessment for Wetlands of the LMB for Adaptation Planning 1 st Regional Expert Advisory Workshop, Vientiane 1 March 2011 CASE STUDY SELECTION Prepared

More information

Agriculture Services Programme for Innovation, Resilience and Extension

Agriculture Services Programme for Innovation, Resilience and Extension Ministry of Agriculture, Forestry and Fisheries Agriculture Services Programme for Innovation, Resilience and Extension (ASPIRE) TERMS OF REFERENCE (Individual Consultant, Fixed Term) Title: Programme:

More information

Concept of WSM Country Status on Watershed Management Planning Institution and Legislation relevant to WSM in Laos Application of Watershed Management

Concept of WSM Country Status on Watershed Management Planning Institution and Legislation relevant to WSM in Laos Application of Watershed Management Watershed Management in the Lao PDR Dr. Khamla Phanvilay Assoc. Prof. Dr. Sithong Thongmanivong Faculty of Forestry National University of Laos 1 Outlines of Presentation Concept of WSM Country Status

More information

Assessment of Flow Changes from Hydropower Development and Operations in. Sekong, Sesan and Srepok Rivers of the Mekong Basin

Assessment of Flow Changes from Hydropower Development and Operations in. Sekong, Sesan and Srepok Rivers of the Mekong Basin Assessment of Flow Changes from Hydropower Development and Operations in Sekong, Sesan and Srepok Rivers of the Mekong Basin T. Piman 1, T. A. Cochrane 2, M.E. Arias 3, A. Green 4 and N. D. Dat 5 Abstract

More information

Aquatic ecosystem connectivity, ecosystem processes, and watershed integrity under Mekong dam development

Aquatic ecosystem connectivity, ecosystem processes, and watershed integrity under Mekong dam development Aquatic ecosystem connectivity, ecosystem processes, and watershed integrity under Mekong dam development International Conference on Watershed Management Chiang Mai March 2011 Nikolai Sindorf, WWF Conservation

More information

FROM VISION TO ACTION

FROM VISION TO ACTION RAP PUBLICATION 2004/32 THE FAO-ESCAP PILOT PROJECT ON NATIONAL WATER VISIONS Bangkok, December 2004 FROM VISION TO ACTION A SYNTHESIS OF EXPERIENCES IN LEAST-DEVELOPED COUNTRIES IN SOUTHEAST ASIA Le Huu

More information

Cambodia, Stung Treng. Community Development and Long-term Plans

Cambodia, Stung Treng. Community Development and Long-term Plans Cambodia, Stung Treng Community Development and Long-term Plans August, 2014 Present Realities Stung Treng is one of the poorest and most isolated provinces with a population just over 112,000; most work

More information

CEPF FINAL PROJECT COMPLETION REPORT

CEPF FINAL PROJECT COMPLETION REPORT 3 OM 4.4.4 CEPF FINAL PROJECT COMPLETION REPORT Organization Legal Name: Project Title: Date of Report: 4 September 2013 Report Author and Contact Information CEPF Region: Indo-Burma WWF Greater Mekong

More information

Assessment of Flow Changes from Hydropower Development and Operations in Sekong, Sesan, and Srepok Rivers of the Mekong Basin

Assessment of Flow Changes from Hydropower Development and Operations in Sekong, Sesan, and Srepok Rivers of the Mekong Basin Case Study Assessment of Flow Changes from Hydropower Development and Operations in Sekong, Sesan, and Srepok Rivers of the Mekong Basin T. Piman 1 ; T. A. Cochrane 2 ; M. E. Arias 3 ; A. Green 4 ; and

More information

TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE

TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE Greater Mekong Subregion Nam Ngum 3 Hydropower Project (RRP LAO 41385) Supplementary Appendix 5 TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE Strengthening Biodiversity

More information

Overview of NAMA and CDM Project Implementation in Cambodia

Overview of NAMA and CDM Project Implementation in Cambodia Overview of NAMA and CDM Project Implementation in Cambodia 22 nd, April 2013 Phnom Penh, Cambodia By: Sum Thy Director, Climate Change Department Ministry of Environment 1. NAMA Capacity Building Actions

More information

VOLUME II PAPER IV DEVELOPMENT OF HYDRO-HYDRAULIC MODEL FOR THE CAMBODIAN FLOODPLAINS FINAL REPORT

VOLUME II PAPER IV DEVELOPMENT OF HYDRO-HYDRAULIC MODEL FOR THE CAMBODIAN FLOODPLAINS FINAL REPORT VOLUME II PAPER IV DEVELOPMENT OF HYDRO-HYDRAULIC MODEL FOR THE CAMBODIAN FLOODPLAINS FINAL REPORT MARCH 24 WUP-JICA TEAM for the Cambodian Floodplains; WUP-JICA, March 24 TABLE OF CONTENTS 1. BACKGROUND...

More information

Summary of Preparatory Study. The Development Study on Water Resources Development and Management for Lake Kyoga Basin in the Republic of Uganda

Summary of Preparatory Study. The Development Study on Water Resources Development and Management for Lake Kyoga Basin in the Republic of Uganda Summary of Preparatory Study 1. Full Title of the Project The Development Study on Water Resources Development and Management for Lake Kyoga asin in the Republic of Uganda 2. Type of Study Master plan

More information

Profiles of 12 proposed Mainstream developments in the LMB

Profiles of 12 proposed Mainstream developments in the LMB Profiles of 12 proposed Mainstream developments in the LMB MRC SEA of Mekong mainstream hydropower REGIONAL IMPACTS ASSESSMENT WORKSHOP Vientiane, April 2010 Presentation by Peter-John Meynell & Lawrence

More information

1. Background Provisioning Regulating: Cultural:

1. Background Provisioning Regulating: Cultural: IN PARTNERSHIP WITH EXECUTIVE SUMMARY The Myanmar hydropower sector, in the early stages of development, has the opportunity to develop sustainably by balancing electricity generation with environmental

More information

RBwtiþbRtRbcaMRtImas sþibisnþisuxes,óg niggaharubtßmöenakm<úca ISSUE #7 April June 2012

RBwtiþbRtRbcaMRtImas sþibisnþisuxes,óg niggaharubtßmöenakm<úca ISSUE #7 April June 2012 Cambodia Food Security and Nutrition Quarterly Bulletin RBwtiþbRtRbcaMRtImas sþibisnþisuxes,óg niggaharubtßmöenakm

More information

The Mekong River Commission s Initiative for Sustainable Hydropower. Oslo, Norway 4-6 September Presented by: Voradeth Phonekeo

The Mekong River Commission s Initiative for Sustainable Hydropower. Oslo, Norway 4-6 September Presented by: Voradeth Phonekeo The Mekong River Commission s Initiative for Sustainable Hydropower Oslo, Norway 4-6 September 2017 Presented by: Voradeth Phonekeo Mekong hydropower development context Rational for Initiative on sustainable

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japan ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: Republic of Tunisia Project: Mejerda River Flood Control Project Loan Agreement: July 17, 2014 Loan Amount: 10,398

More information

Hybrid Islands Initiative Smart Energy Integration for Resilient Islands

Hybrid Islands Initiative Smart Energy Integration for Resilient Islands International Seminar on Energy Security in the Pacific Island Countries JICA s Cooperation for Energy Sector in Pacific Island Counties Hybrid Islands Initiative Smart Energy Integration for Resilient

More information

Information and Knowledge Management Programme - Modelling Component

Information and Knowledge Management Programme - Modelling Component Information and Knowledge Management Programme - Modelling Component 1. The Council Study Hydrologic Assessment Discipline Team led by the Information and Knowledge Management Programme (IKMP) is responsible

More information

Environment and Climate Change Adaptation and Mitigation in Myanmar. SAN WIN Assistant Director Environmental Conservation Department 23 August, 2014

Environment and Climate Change Adaptation and Mitigation in Myanmar. SAN WIN Assistant Director Environmental Conservation Department 23 August, 2014 Environment and Climate Change Adaptation and Mitigation in Myanmar SAN WIN Assistant Director Environmental Conservation Department 23 August, 2014 Presentation Outlines Background and Environmental Governance

More information