Annual CSAH Needs Update for 2018

Similar documents
Annual CSAH Needs Update for 2017

STATE AID GUIDE FOR: Updated: December 16, 2005

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

ATP-6 STIP APPLICATION FORM FOR FISCAL YEAR 2017 Page AGENCY (Requestor or Agency who'll open bids): Contact: Phone:

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

Concrete Pavement Estimating 101 and. March 10, 2017 CPAM Concrete Paving Workshop Mankato MN Presenters:

State-Aid Bridge News July 20, 2004

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 07/10/17 Comp. Dt:

QUANTITIES MOBILIZATION PAVT, REM EROSION CONTROL, INLET PROTECTION, FABRIC DROP 12 EA AGGREGATE BASE AGGREGATE BASE, CONDITIONING SHOULDER, CL II

September 2007 Thomas Bohuslav Texas Department of Transportation

ODOT ADA Program 10/31/2017. Recent ADA outcomes. What you need to know. Settlement Agreement approved. Updated Transition Plan

BRIDGE INSPECTION REPORT

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17

Plan Unit Description

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR

2399 Pavement Surface Smoothness

MNDOT PAVEMENT DESIGN MANUAL

54 th Annual Concrete Paving Workshop March 13, 2015

February Page 1

COUNTY ROAD ASSOCIATION OF MICHIGAN

Exhibit A Scope of Work. 0.0 Separation of work Types and Cost Estimate

Constructability Guidelines

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

Review of Plans and Specs from a Constructability Perspective

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

South Carolina Department of Transportation. Engineering Directive

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

PREVENTATIVE MAINTENANCE

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

PD-19: Reduce, Reuse and Repurpose Materials

NOTICE. Registration Form and Notice of Needed Revisions

INDEX Warrant for Reclaiming Asphalt Pavement - Partial Depth Warrant for Reclaiming Asphalt Pavement - Full Depth

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

Commercial Tax Abatement

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]

Research Initiatives at TxDOT Related to Utilities and Right of Way

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810

CHAPTER 5: UTILITIES

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

CUY-480-Valley View Bridge. Matchmaker April 20, 2017 Bureau of Workers Compensation 4800 E. 131 st Street

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

TABLE OF CONTENTS. Manual Section. Introduction 1. Using This Manual 2-3. Administrative Actions 4-6. Road and Bridge Project Types 7

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

St. Tammany Parish Government Department of Procurement P. O. Box 628 Covington, LA Phone: (985) Fax: (985)

TH 13 Port of Savage Truck Access Study

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007

PUBLIC NOTICE MEDINA COUNTY HIGHWAY ENGINEER SHAW ROAD BRIDGE REPLACEMENT - DESIGN REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ)

Information for File # RJH

Bridge Construction. Nick Haltvick North Region Bridge Construction Engineer May 17, Bridge Office mndot.gov/bridge/construction.

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY

Plan Unit Description

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

EXCELLENCE IN CONCRETE PAVEMENT AWARDS NOMINATION FORM

Cuyahoga County Constructs a Perpetual Pavement

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS.

Cold In-Place Recycling with Expanded Asphalt B-335 COLD IN-PLACE RECYCLING WITH EXPANDED ASPHALT OPSS 335

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 20 over POMME DE TERRE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency

LRFD Bridge Design Manual Changes

Preventive Maintenance Project & Treatment Selection

Wall Asset Management Implementation at Colorado Department of Transportation. Bryant Walters, Collins Engineers Mark Vessely, Shannon & Wilson

Maintains the status quo even though deteriorated. To keep at original condition or use.

Red Wing Bridge Alternates

COST ESTIMATE STREET IMPROVEMENTS (Off Site)

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST

Construction Cost Estimation Preparation Manual (Metric Units)

POLICY AND PROCEDURES MANUAL FOR THE INSPECTION OF LOCALLY FUNDED CONSTRUCTION PROJECTS

Community Improvement Districts CIDs. CID concepts

SS David L. Seago, P.E. Assistant Director of Construction Dallas District CST Conference

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

NEW MEXICO LAND OF ENCHANTMENT

GRAYSON COUNTY POLICY, PROCEDURES AND SPECIFICATIONS OF GRAYSON COUNTY, TEXAS FOR THE INSTALLATION OF DRIVEWAY

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

Chapter 3: Permit Procedures and Requirements

OHIO PUBLIC WORKS COMMISSION SMALL GOVERNMENT PROGRAM PY 33 METHODOLOGY. May 2018

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 4/27/2015

Zoo Interchange Reconstruction

COUNTY OF SUTTER ENCROACHMENT PERMIT

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center


B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313

CHAPTER 11 PAVEMENT TYPE DETERMINATION

Design of rural and urban roads contributes a lot towards safety of users. Identify some low-cost

VDOT s Strategic Approach to Bridge Management and Maintenance

Rehabilitation of Highway Pavements an Engineering Challenge

INNOVATIVE CONTRACTING GUIDELINES

Baseline Document Change Announcement

Minnesota s Statewide Freight System Plan and Freight Investment Plan

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

Building Concrete Overlays on Two Lane Roads Under Traffic U.S /2 PCC Unbonded Chickasaw / Fayette County, Iowa

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 12, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Transcription:

Annual CSAH Needs Update for 2018 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segment and project data using the SANeeds system. To access the SANeeds system you must obtain a user account from State Aid. Please contact Kim DeLaRosa; Kimberlie.delarosa@state.mn.us or 651-366-3810 or John Pantelis at john.pantelis@state.mn.us or 651-366-3811 for assistance. Update Road Project Data It is important for counties to review their existing project data and add projects completed in previous construction years (2013-2016) because unit costs are determined by project financial data. The pool of projects that will be used to determine unit costs for the 2019 distribution will be those awarded from 2013-2017. While reviewing your project data please keep the following in mind: Enter only projects that are approved to the construction or reconstruction standard: rural 8820.9920, urban 8820.9936 & 8820.9981 NPR. Turn lanes, intersection improvements, mill & overlays and bridge replacements are not included the road project pool. Enter all complete 2017 awarded construction projects. Add all phased contract costs to the final surfacing project and report as one complete project cost. E.g. grading done in 2014, base and non-wear course done in 2015, final wear course in 2016. Total all three projects (state aid eligible items), report under the 2016 project number. Split projects that change design (rural/urban) or traffic groups. The table below specifies the traffic groups and design types: Traffic Group Design Type Traffic Group Design Type 0-149 Rural 0-9999 Urban 150-1499 Rural 1500-6999 Rural 10,000-19,999 20,000-34,999 Urban Urban 7000+ Rural 35,000+ Urban E.g. A 3.0 mi project starts in a city and continues outside the city limits for 2.2 mi. Enter the 0.80 mi urban design as one project and use the same project number again for the 2.2 mi rural design portion. Split out the costs from projects that have both reconditioning and reconstruction. E.g. A 10 mile mill & overlay with 1.5 mile reconstruction segment should be reported as a 1.5 mile reconstruction project with the appropriate costs. The needs unit will enter preservation project costs. Counties can view projects and should report inaccuracies to the needs unit.

To update project data, access the SANeeds system (http://www.dot.state.mn.us/stateaid/csah.html) and follow the links to the application. Once you have successfully logged on, click Needs Data Road Projects. Select project to revise or click Add New Road Project:

Update existing project:

Add New Road Project For new projects: Enter project number (there may be multiple entries for the same project number). Enter award date for project. When construction is done in multiple years enter the award date for the last (surfacing) project. Projects are considered complete on the award date. Update or revise the length (miles) of the new or reconstructed length. Enter projected AADT from the plan. Enter total state aid eligible construction costs regardless of the funding source. Staged construction projects are added together and put in the year of the surfacing project. Subtract out bridge costs, culverts >10, traffic signal costs or any other state aid ineligible items, see list below. You may use final costs up to year five after the award date. You may change projects costs to reflect final costs within the five year window and you must submit documentation to DSAE. Enter only eligible right of way costs associated with the construction project listed. Eligible costs include all payments to those with property interests, including utility companies. Condemnation, commissioner and court awarded payments, payments to property owners for appraisal costs, fees, damages, etc. are eligible costs. Agency incurred abstract fees, appraisal costs, attorney fees, court fees, filing fees, taxes and payroll are not eligible needs costs. Note: Scan and email all supporting documentation to your DSAE and needs unit for review!!

Exhibit 2 When entering or revising road project data, the following are considered Ineligible Items: Ineligible Items Spec. Item 2011.xxx 2013.xxx 2015.xxx 2016.xxx 2104.xxx 2104.xxx 2211.xxx 2221.xxx 2231.xxx 2355.xxx 2356.xxx 2401.xxx 2402.xxx 2403.xxx 2404.xxx 2405.xxx 2412.xxx 2433.xxx 2452.xxx 2453.xxx 2461.xxx 2471.xxx 2472.xxx 2476.xxx 2478.xxx 2479.xxx 2480.xxx 2481.xxx 2503.xxx 2504.xxx 2514.xxx 2520.xxx 2521.xxx 2540.xxx 2541.xxx 2545.xxx 2550.xxx 2557.xxx 2560.xxx 2564.xxx 2565.xxx 2571.xxx 2572.xxx 2577.xxx Description Miscellaneous Items Miscellaneous Items Miscellaneous Items Miscellaneous Items All removal, salvage, abandon, and relocate items associated with water, gas, and sanitary sewer storm sewer is OK All removal, salvage, abandon, and relocate items associated with water, gas, and sanitary sewer storm sewer is Allowed by percentage supported by Hydro Memo Aggregate Base (stockpile items only) Aggregate Shouldering (stockpile items only) Bituminous Surface Reconditioning Bituminous Fog Seal (2357 is OK) Bituminous Seal Coat Concrete Bridge Construction Steel Bridge Construction Timber Bridge Construction Concrete Wearing Course for Bridges Pre-stressed Concrete Beams Box culverts over 10 with a structure number Structure Renovation Piling Drilled Shaft Items Structural Concrete Structural Metals Metal Reinforcement Painting Items Organic Zinc-Rich Paint System Inorganic Zinc-Rich Paint System Painting Items Waterproofing When used for sanitary and water mains Water System Items Slope Paving Lean Mix Backfill Special Surfacing Landscaping Items Historic Items Electric Lighting Systems Traffic Management System Fencing Highway-Railroad Grade Crossing Signals Traffic Signs and Devices Traffic Control Signals Plant Installation Protection and Restoration of Vegetation Soil Bioengineered Systems ***Incentives and disincentives are ineligible items.

Update Road Segment Data When revising CSAH Segment data please keep the following in mind: Update segments based on Commissioner Orders approved in 2016. Please split segments if you had corporate limit changes that fall within an existing segment. Please split segments in which the design, number of lanes or traffic group changes fall within an existing segment. You DO NOT HAVE to split segments because of a project. Make sure your signal legs are entered. (one signal per leg of the intersection) Use the comment field for project numbers and any other information that pertains to that segment. When you build or participate in an interchange or MnDOT bridge project you must create a segment for the interchange or bridge. Enter all state aid eligible county costs associated with that interchange or county cost participation on the bridge and the application will compute the appropriate money needs. Please call the CSAH Unit for assistance when entering interchange segments.

To update CSAH Segment data access the SANeeds system (http://www.dot.state.mn.us/stateaid/csah.html) and follow the links to the application. Once you have successfully logged on click Needs Data Segments. Road Segment Screen: Culvert, Bridge and RRxing Info is now shown on Segment Data Screen Click on the Structure or RRxing

Update Structure Data The application will compute needs on every existing structure with a bridge number based on the existing size. Please update all bridge and culvert replacements in 2015. Add any missing structures and delete any structures that have been removed or are not on a CSAH. Pedestrian bridges, railroad bridges and TH bridges do not receive needs. When revising structures please keep the following in mind: For bridges, please verify the structure number, length and width, milepoint on route, year bridge built, and type of structure. For Culverts (10 or larger only) please verify the structure number, length, barrel width and height, number of barrels (e.g. 1=single, 2=double, 3=triple), culvert length, area of waterway opening Indicate whether or not the structure is on the county line and shared with another county or state. Use the comment field to enter project number or any information related to the structure. Structure Screen:

Update Railroad Data Each railroad crossing on a CSAH will receive needs for the length of one track of crossing surface and the existing protection. RR crossings: Choose a rail company Fill in the USDOT number Enter the mile point on the route, not the segment Choose your existing protection type Enter last year of upgrade on crossing protection Enter the crossing material length Last year crossing surfaced Is it a shared crossing on county line Use the comment field to enter project number or any information related to the crossing. Railroad Crossing Screen:

Submit Project and Segment Data Please submit changes to your District State Aid Engineer by March 31, 2017. You must login to the program and submit your county even if you had nothing to update. From the main menu select Needs Cycle Submit County: Your county should appear on the list. Under the Action column, click Submit. Once submitted the DSAE will have the ability to review.