Similar documents
SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings

SECTION WATER SYSTEMS

SECTION SANITARY SEWER SYSTEM

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

SECTION WATER DISTRIBUTION SYSTEM

***************************************************************************************************************

SECTION WATER DISTRIBUTION

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS

SECTION WASTEWATER FORCE MAINS

TECHNICAL SPECIAL PROVISION FOR FINANCIAL PROJECT ID:

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

San Antonio Water System Standard Specifications for Construction ITEM NO. 813 WATER SERVICE FOR FIRELINES

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.

1.1 SECTION INCLUDES.1 Materials and installation for water mains, hydrants, valves, valve boxes, and valve chambers, including service connections.

SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

SECTION WASTEWATER FORCE MAINS

Wastewater Capital Projects Management Standard Construction Specification. 9.0 Pipe Testing, Inspection and Acceptance

Exhibit A FOX CHAPEL AUTHORITY STANDARD SPECIFICATIONS FOR MATERIALS AND INSTALLATION OF WATER MAINS

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION

SECTION PIPE INSTALLATION

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION POLYETHYLENE PRESSURE PIPE

SECTION GRAVITY WASTEWATER LINES

SECTION 2100 WATER MAIN

SECTION FACILITY SANITARY SEWERS

SECTION WATER UTILITIES

A. Gravity-Flow, Nonpressure, Drainage-Piping Pressure Rating: 10-foot head of water (30 kpa).

CHINO VALLEY FIRE DISTRICT FIRE PROTECTION STANDARD

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL

CONSTRUCTION OF WATER SYSTEMS 1.0 PIPING

ARTICLE 26 UTILITY LINE INSTALLATION REQUIREMENTS

Wastewater Capital Projects Management Standard Construction Specification

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SECTION STORM SEWER COLLECTION SYSTEM

DETAILED WATER MAIN SPECIFICATONS INDEX. Sec. No. Items Page Nos.

CITY OF FARGO SPECIFICATIONS SEWER AND WATER SERVICE CONNECTIONS

TABLE OF CONTENTS

SECTION SANITARY SEWER SYSTEM

WATER TRANSMISSION AND DISTRIBUTION LINES

DIVISION 2 SITE WORK SECTION SYSTEM WATER LINES

1.02 RELATED WORK: Refer to the following sections for related work:

City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860)

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

SECTION C10 CLEANING AND CEMENT LINING GENERAL

DIVISION II TECHNICAL SPECIFICATIONS SECTION S-003 SANITARY SEWER FORCE MAIN SYSTEM

SECTION WASTE WATER DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-Place Concrete.

***************************************************************************************************************

CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER

SECTION FIRE HYDRANTS

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS

SECTION SANITARY UTILITY SEWERAGE PIPING

SECTION VII WATER. Concrete anchor and thrust blocks shall be provided at all discontinuities in accordance with Standard Details G-7.1 and G-7.2.

SUPPLEMENTAL SPECIFICATIONS TO STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION NO. 2611

1 Revised: 2019 Edition

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

CONSTRUCTION OF WATER SYSTEMS 1.0 PIPING

SECTION FACILITY SANITARY SEWERS

SECTION TAPPING SLEEVES AND VALVES

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated.

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

SECTION 39 - MANHOLES TABLE OF CONTENTS

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

All definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10.

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SECTION PIPING AND ACCESSORIES - GENERAL PROVISIONS

SECTION SEWER PIPE

SECTION SANITARY SEWERS

PIPE AND FITTINGS. Submit product information sheet for joint restraint system to be used.

All definitions are defined according to ANSI/AWWA C

DUCTILE IRON PIPE AND FITTINGS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section DUCTILE IRON PIPE AND FITTINGS

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

UBC OKANAGAN UBC Technical Guidelines Section Edition Water Utilities Page 1 of 11

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.

ARTICLE VI. STANDARD SPECIFICATIONS for SANITARY SEWER MAIN CONSTRUCTION. VI.6 Removal, Restoration, and Maintenance of Surface

CITY OF FARGO SPECIFICATION SANITARY SEWER

REGIONAL CONSTRUCTION STANDARDS

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

ITEM NO. 824 SERVICE SUPPLY LINES (WATER)

A. Gravity-Flow, Nonpressure, Drainage-Piping Pressure Rating: 10-foot head of water.

LATHAM WATER DISTRICT

CHAPTER 6 - SANITARY SEWER

CHAPTER 3 - PRESSURE IRRIGATION

Multi-Institutional Academic Health Science & Research Center Evansville, IN

San Antonio Water System Standard Specifications for Construction ITEM NO. 824 SERVICE SUPPLY LINES (WATER)

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

SECTION VITRIFIED CLAY PIPE SEWERS

CHAPTER 4 - CULINARY WATER

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

SECTION STORM DRAINAGE

Transcription:

02732 SANITARY FORCE MAIN *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 34 00. *************************************************************************************************************** PART 1 GENERAL 1.1 SUMMARY A. Section Includes: A sanitary force main system including necessary accessories as shown on drawings and specified in this section from the new lift station to the point of connection shown. B. Related Sections: 1. 02221 - Excavating, Backfilling and Compaction for Utilities. 2. 02731 - Sanitary Sewer System. 3. 02733 - Lift Station. 4. 03300 - Cast-In-Place Concrete. 1.2 REFERENCES A. American National Standards Institute, Inc. (ANSI) Standards, latest edition: 1. A21.10 Ductile-Iron Fittings, 3 inches through 38 inches for Water and Other Liquids. 2. A21.11 Neoprene-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings. 3. A21.51 Ductile-Iron Pipe, Centrifugally Cast in Metal Molds or Sand-Lined Molds, for Water or Other Liquids. B. American Society for Testing and Materials (ASTM), latest edition: 1. D1248-84 Specifications for Polyethylene Plastics Molding and Extrusion Materials. C. American Water Work Association (AWWA) Standards: C600-85 Installation of Ductile Iron Pipe. D. Miami-Dade Water and Sewer Authority Department (WASA) Standards and Specifications. 1.3 SUBMITTALS A. Submit the following before starting work: 1. Pipe and Fittings. 2. Valves. 3. Test Reports. 4. Certificate of compliance for each shipment of materials by manufacturer of products. Project No. SPECIFICATION GUIDELINES 02732-1

1.4 QUALITY ASSURANCE A. Manufacturer's certificate of compliance or certified analysis shall be required for each shipment of materials used. Perform tests according to ANSI A21.6 or A21.8. 1.5 STORAGE A. Store materials on site, and keep clean and free of foreign materials. Any damaged items shall be replaced at no additional cost to M-DCPS. 1.6 PROJECT CONDITIONS A. Miami-Dade Water and Sewer Authority will perform the tapping into the existing force main. Include the cost of construction permit fees, cost of the tapping, including the tapping sleeve, valve and related materials, and any service line installation fees. PART 2 PRODUCTS 2.1 MATERIALS A. Ductile Iron Pipe: 1. ANSI Standard A21.51 and AWWA C151, working pressure not less than 150 pounds per square inch, Class 50. 2. Pipe shall be polyethylene lined. 3. Polyethylene Lining: American Polybond or U.S. Polylined complying with D1248. Lining shall be nominal thickness. B. Joints for Ductile Iron Pipe: 1. Mechanical joints shall comply with AWWA C111. 2. Push-on joints shall comply with ANSI Standard 21.11. 3. Neoprene gaskets and lubricant shall comply with the applicable requirements of ANSI Standard A21.11. C. Fittings and Special Items for Ductile Iron Pipe: 1. Fittings and specials shall be suitable for 250 psi pressure rating. 2. Fittings shall be with mechanical or push-on joints. 3. Fittings and specials for use with push-on joint pipe shall comply with ANSI/AWWA C110 and A21.10. 4. Fittings and specials shall be polyethylene lined. 5. Linings shall be nominal thickness, American Polybond or U.S. Polylined. D. Valves: 1. Gate and plug valves, designed for a working pressure of not less than 150 pounds per square inch. 2. Valve connections shall be as required for the piping in which they are installed. 3. Valves shall have a clear waterway equal to the full nominal diameter of the valve, and shall be opened by turning counter clockwise. Project No. SPECIFICATION GUIDELINES 02732-2

4. Plug and check valves shall be cast iron body non-lubricated, eccentric type with resilient neoprene rubber faced plugs, similar and equal to those manufactured by DeZurik Corp. E. Valve boxes: 1. Cast iron construction. 2. Cast iron boxes shall be extension type with slide-type adjustment and with flared base. 3. The minimum thickness of metal shall be 3/16". 4. The boxes shall be such length as will be adapted, without full extension, to the depth of cover required over the pipe at the valve location. 5. Covers shall be marked "S". PART 3 EXECUTION 3.1 INSTALLATION A. The force main shall be installed according to requirements of authorities having jurisdiction and AWWA C600. B. Handling: 1. Pipe and accessories shall be handled to insure delivery to the trench in sound, undamaged condition. 2. Do not injure the pipe coating. 3. If the coating or lining of any pipe or fitting is damaged, the repair shall be made by the Contractor at his expense in a satisfactory manner. 4. No other pipe or material of any kind shall be place inside a pipe or fitting after the coating has been applied. 5. Pipe shall be carried into position. 6. Turning pipe will be allowed only on the ends of the pipe. 7. The interior of pipe and accessories shall be thoroughly cleaned of foreign matter before being lowered into the trench and shall be kept clean during laying operations by plugging or other acceptable method. 8. Before installation, the pipe shall be inspected for defects. Material found to be defective before or after laying shall be replaced with sound material without additional expense to M-DCPS. 9. Neoprene gaskets that are not to be installed immediately shall be stored in a cool and dark place. C. Cutting of pipe shall be done in a neat and accurate manner without damage to the pipe. Unless otherwise recommended by the manufacturer and authorized by the A/E, cutting shall be done with an accepted type mechanical cutter. Wheel cutters shall be used when practicable. D. Locating: 1. Where the location of the sewer pipe is not clearly defined in dimensions on the drawings, the sewer pipe shall not be laid closer horizontally than 10 feet from a water supply line except where the bottom of the water pipe will be at least 18 inches above the top of the sewer pipe. Project No. SPECIFICATION GUIDELINES 02732-3

2. Water lines shall in all cases cross above sewage force mains and shall be not less than 6 inches above the sewer main. 3. Sewer lines shall not be laid in the same trench with water lines, gas lines, fuel lines, or electric wiring. 4. Excavation and backfilling for trenches and manholes shall be as specified in Section 02222 - Excavating, Backfilling, and Compacting for Utilities. E. Placing and Laying: 1. Pipe and accessories shall be carefully lowered into the trench by means of derrick, ropes, belt slings, or other authorized equipment. 2. Under no circumstances shall any of the water line materials be dropped or dumped into the trench. 3. Care shall be taken to avoid abrasions of the pipe coating. 4. Except where necessary in making connections with other lines, pipe shall be laid with the bells facing in the direction of laying. 5. The full length of each section of pipe shall rest solidly upon the pipe bed, with recesses excavated to accommodate bells, couplings and joints. 6. Pipe that has the grade or joint disturbed after laying shall be taken up and relaid. 7. Pipe shall not be laid in water or when trench conditions are unsuitable for the work. Water shall be kept out of the trench until jointing is completed. 8. When work is not in progress, open end of pipe, fittings, and valves shall be securely closed so that no trench water, earth, or other substance will enter the pipes or fittings. 9. Where any part of the coating or lining is damaged, the repair shall be made by the Contractor, at his expense, in a satisfactory manner. 10. Pipe ends left for future connections shall be valved, plugged, or capped and anchored. F. Jointing Ductile Iron Pipe: Push-on type joints or mechanical joints shall be installed according to AWWA C600, modified as necessary by the recommendations of the manufacturer to provide for special requirements of ductile iron pipe. G. Setting of Valves and Boxes: 1. Install where shown or specified, and set plumb. 2. Valve boxes shall be centered on the valves. 3. Boxes shall be installed over each outside valve unless otherwise shown. 4. Where feasible, valves shall be located outside the area of roads and parking. 5. Earth fill shall be carefully tamped around each valve box to a distance of 4 feet on all sides of the box, or to the undisturbed trench face if less than 4 feet. 6. A concrete ring shall be poured around the box top flush with the ground. H. Thrust Blocks: 1. Plugs, caps, tees, and bends deflecting 22-1/2 degrees or more, either vertically or horizontally, on sewer lines 6 inches in diameter or larger, shall be provided with thrust blocking, or metal tie rods and clamps or lugs. 2. Thrust blocking shall be concrete of a mix not leaner than 1 cement: 2-1/2 sand: 5 gravel and have a compressive strength of not less than 2000 psi after 28 days. 3. Blocking shall be placed between solid ground and the fitting to be anchored. 4. Unless otherwise indicated the base and thrust bearing sides of thrust blocks shall be poured directly against undisturbed earth. Project No. SPECIFICATION GUIDELINES 02732-4

5. The sides of thrust blocks not subject to thrust may be poured against forms. 6. The area of bearing shall be as shown. 7. Blocking shall be placed to allow the fitting joints to be accessible for repair. I. Hydrostatic Tests: 1. Where any section of the force main is provided with concrete thrust blocking for fittings, the hydrostatic tests shall not be made until at least 5 days after installation of the concrete thrust blocking unless otherwise accepted. 2. Upon completion of the pipe installation for any section, the force main shall be thoroughly flushed. 3. The method proposed for disposal of waste water from hydrostatic tests, cleaning and flushing shall be submitted to the A/E before performing hydrostatic tests, to avoid causing a nuisance or property damage. 4. Pressure Test: a. After the pipe is laid, the joints completed, and the trench partially backfilled leaving the joints exposed for examination, the newly laid piping shall, unless otherwise specified, be subjected for 1 hour to a hydrostatic pressure test of 100 pounds per square inch. b. Exposed pipe, joints, fittings, and valves shall be carefully examined during the partially open trench test. c. Joints showing visible leakage shall be replaced or remade as necessary. d. Cracked or defective pipe, joints, fittings, or valves discovered by this pressure test shall be removed and replaced with sound material, and the test shall be repeated until the test results are satisfactory. e. All replacement and repair shall be without additional expense to M-DCPS. f. Tests shall be inspected and accepted by Miami-Dade Water and Sewer Authority Dept. 5. Time for Making Test: Except for joint material setting or where concrete reaction backing requires a 5 day delay, pipe lines or couplings may be subjected to hydrostatic pressure, inspected and tested for leakage any time after partial completion of backfill. Polyethylene lined pipe may be filled with water as recommended by the manufacturer before being subjected to the pressure test. 6. Leakage shall be defined as the quantity of water that must be supplied into the newly laid pipe, or any valved section thereof, to maintain the specified leakage test pressure after the air in the pipe line has been expelled and the pipe has been filled with water. 7. The maximum allowable leakage shall be determined by the following formula from the "AWWA Standard for Installation of Ductile Iron Water Mains", AWWA C600-85, L = ND times square root of P 3700 L = allowable leakage in gallons per hour. N = number of joints in the length of pipe line tested. D = nominal diameter of the pipe in inches. P = average test pressure during the leakage test in pounds per square inch gage. a. No pipe installation will be accepted if the leakage is greater than that determined by the above formula. Project No. SPECIFICATION GUIDELINES 02732-5

b. Locate and repair all leaks until the leakage is reduced to the limits specified, but shall repair all known leaks regardless of the amount of leakage. J. Connection to Existing System: 1. All connections to existing mains of the Miami-Dade Water and Sewer Authority Department shall be made under the direction of the Authority. Valves separating the mains being installed from existing mains shall be operated by or under the direction of the Authority's representative. The cost of the work by the Authority in making the connection shall be paid by the Contractor. 2. A plug valve and a check valve shall be installed at the beginning of the force main after crossing the property line as indicated on the drawings. 3. In the event the proposed main is to be connected to a main which has one or more active services between the point of connection and the first existing line valve, a temporary plug or cap shall installed on the new main until the pressure tests are completed. Upon satisfactory completion, the cap or plug shall be removed from both mains and the connection made. The connection shall be made as swiftly as possible. The pipe line shall then be placed in service by the Authority personnel. 3.2 FIELD QUALITY CONTROL A. Cost of Test: Cost of tests will be at the Contractor's expense. 3.3 CLEANUP: A. Upon completion of the installation of the force main and appurtenances, all debris and surplus materials resulting from the work shall be removed. END OF SECTION Project No. SPECIFICATION GUIDELINES 02732-6