EPA s 1990 Phase I and 1999 Phase II Stormwater Regulations

Similar documents
City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

(Total Maximum Daily Load) What Does the Federal Government Require for Storm Water Management Under Phase II?

Raindrops Keep Falling on My Head Managing KY s MS4 Program Presentation by: Kentucky Division Of Water Surface Water Permits Branch Abigail Rains

Benefits of Regional Coalitions in Stormwater Program Management. Richard Smith, INCOG Contractor OCLWA Annual Conference April 4-5, 2018

TRAVIS COUNTY WATER CONTROL AND IMPROVEMENT DISTRICT 17 STORMWATER MANAGEMENT PROGRAM TPDES PHASE II MS4 GENERAL PERMIT (TXR040000)

OKR04 Permit Overview. Michele Loudenback, RPES Industrial Wastewater Enforcement Section Water Quality Division Department of Environmental Quality

Phase II MS4 Evaluations: Requirements and Results

OKR04 Permit Overview. Michele Loudenback, RPES Industrial Wastewater Enforcement Section Water Quality Division Department of Environmental Quality

MARCH 2009 TO MARCH 2010 (YEAR 7) REPORTING PERIOD VILLAGE OF PLAINFIELD, ILLINOIS

City of Watertown, South Dakota Storm Water Management Program. Minimum Control Measure 1: Public Education and Outreach on Storm Water Impacts.

CHAPTER 5. NPDES PHASE II EVALUATION

VILLAGE OF SKOKIE, ILLINOIS

Regional Stormwater Program 2013 Stormwater Management Plan

Whitewater River Region SWMP Appendix L

CITY OF CHICO STORM WATER MANAGEMENT PROGRAM

Improved MS4 Permit Data Management, Field Inspections, and Annual Reporting

Phase II MS4 General Permit

BMP Description: The GSWMD will work with NIRPC and local groups to mark existing storm sewer structures.

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

STORMWATER MANAGEMENT PROGRAM

City of Tahlequah Storm Water Management Plan

STORM WATER MANAGEMENT PROGRAM. City of Jacksonville, Alabama Phase II Small MS4 NPDES General Permit ALR040004

Recent Changes in Phase II MS4 Permitting

Stormwater Management - Basic Overview for Municipal Employees

ADMINISTRATIVE REVISIONS TO THE NOTICE OF INTENT

Notice of Intent for New or Renewal of General Permit for Discharges from Small MS4s Preamble

MARCH 2015 TO FEBRUARY 2016 (YEAR 13) REPORTING PERIOD VILLAGE OF SKOKIE, ILLINOIS A. CHANGES TO BEST MANAGEMENT PRACTICES

STORMWATER MANAGEMENT PROGRAM. Table of Contents

CITY OF MANASSAS NPDES PHASE II STORMWATER PERMIT VSMP SMALL MS4 PROGRAM PLAN MINIMUM MEASURES AND BEST MANAGEMENT PRACTICES

Entities required to comply with the regulations must develop a plan which addresses six Minimum Control Measures (MCMs).

MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING PERIOD VILLAGE OF SKOKIE, ILLINOIS

CITY OF BLACK DIAMOND STORMWATER MANAGEMENT PROGRAM PLAN (SWMP PLAN) 2019 UPDATE

WATER QUALITY BASED REQUIREMENTS...1 REQUIREMENTS TO MEET WATER QUALITY STANDARDS...1 DISCHARGES TO IMPAIRED WATERS...2

CITY OF DICKINSON STORM WATER MANAGEMENT PLAN. CITY OF DICKINSON STORM WATER MANAGEMENT PLAN Page 1

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

APPENDIX G Fire BMPs

SCDOT & the NPDES Program

IDDE From the Regulatory Perspective. Chris Kallis IEPA

S5.C.1 Public Education and Outreach

STORMWATER PUBLIC EDUCATION/ OUTREACH AND PUBLIC INVOLVEMENT/PARTICIPATION

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

Implementation of. Storm Water Phase II

The Stormwater Management Plan

Unified Government of Wyandotte County / Stormwater Management Plan. Unified Government of Wyandotte County / Kansas City, Kansas

Annual Update And Public Meeting

Municipal Separate Storm Sewer System (MS4) Permit and Program Ordinance Update. City of Fairmont March, 2018

Checklist for 2013 Draft NH Small MS4 General Permit Requirements

2014 Whatcom County Stormwater Management Program

STORMWATER POLLUTION PREVENTION PLAN

STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems

ILLICIT DISCHARGE, STORM WATER INFLOW TO THE POTW, AND ILLEGAL CONNECTION CONTROL.

2. NPDES BACKGROUND 2.1 Regulatory Background TCEQ Small MS4 Permit Storm Water Management Plan Development and Implementation...

Notice of Intent for New or Renewal of General Permit for Discharges from Small MS4s Preamble

MS4 PROGRAM PLAN 2018 TO 2023

City of Evanston STORMWATER MANAGEMENT PLAN February 2018

INDIAN HILLS GENERAL IMPROVEMENT DISTRICT MUNICIPAL SEPARATE STORM SEWER SYSTEM STORM WATER MANAGEMENT PLAN ANNUAL UPDATE 2006

Storm Water Pollution Prevention Program (SWPPP)

ANNUAL FACILITY INSPECTION REPORT NPDES PERMIT FOR STORM WATER DISCHARGES FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4)

Stormwater Management Program

VICTORIA COUNTY DRAINAGE DISTRICT NO. 3

General NPDES Permit No. ILR40 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

ENVIRONMENTAL SERVICES

STORM WATER MANAGEMENT PLAN

NEW JERSEY POLLUTANT DISCHARGE ELIMINATION SYSTEM

TOWN OF PANTEGO PHASE II STORM WATER MANAGEMENT PLAN

Storm Water Quality Management Plan. Brooke Shireman, SD1 Co-permittee and SWAC Meeting 08/28/18

STORMWATER UTILITY ANNUAL REPORT

Phase II (Small) MS4 Annual Report Form TPDES General Permit No. TXR040000

Notice of Intent for New or Renewal of General Permit for Discharges from Small MS4s Preamble

NPDES PHASE II MS4 GENERAL PERMIT STORM WATER QUALITY MANAGEMENT PLAN PART C: PROGRAM IMPLEMENTATION UPDATE

CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN

City of Richmond Municipal Separate Storm Sewer System Program Plan for the July 9, 2008 July 8, 2013 Permit Term

EPA s MS4 Compliance and Enforcement Program. SESWA - April 8, Kenneth Kwan, P.E. U.S. EPA, Region 4 404/

Monthly Report July 2017

Monthly Report September 2017

Susan Myerov, AICP Watersheds Program Director Pennsylvania Environmental Council Michael Helbing Staff Attorney Citizens for Pennsylvania s Future

Municipal Separate Storm Sewer System (MS4) Stormwater Permit Program Minimum Control Measure 1 Public Education and Outreach

VILLAGE OF HODGKINS STORM WATER MANAGEMENT PLAN (MS4) NPDES PERMIT No. ILR400356

City of Milton NPDES Phase II Stormwater Management Program 2008

MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) STORMWATER MANAGEMENT PROGRAM

Water Quality Regulatory Programs and Our Citywide EPA / DEQ Stormwater Permit. Public Works Engineering City Council Briefing June 7, 2016

STORMWATER MANAGEMENT PROGRAM. Pottawatomie County, Kansas Stormwater Management Program

Recommended Best Management Practices Bacteria

Washington State University Pullman Stormwater Management Program Plan 2017

Storm Water Management Program

ES Inspection and Maintenance of MS4 Structural Controls* Document Identification Number Date: March 14, 2018

Welcome The purpose of this information is to give you an opportunity to:

(5) "EPA" means environmental protection agency.

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

MS4 Annual Facility Inspection Report

TABLE OF CONTENTS APPENDIX. Unified Government of Wyandotte County / Kansas City, Kansas Stormwater Management Plan

Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation

City of Elgin, Illinois

VILLAGE OF LAKE ZURICH Engineering Division NPDES PHASE II YEAR 2 ANNUAL REPORT FOR

AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM AND THE ARKANSAS WATER AND AIR POLLUTION CONTROL ACT

Kathleen Bertuch, Central New York Regional Planning and Development Board

8. BMP SUMMARY TABLE

Transcription:

EPA s 1990 Phase I and 1999 Phase II Stormwater Regulations Green Country Stormwater Alliance Employee Training Workshop September 10, 2013 Tulsa Technology Center, Broken Arrow 1

NPDES Program Overview National Pollutant Discharge Elimination System. 40 CFR Part 122 of EPA Federal Regulations. Oklahoma has Primacy = OPDES ODEQ is the Permitting Authority Addresses Point Source discharges from: Wastewater treatment plants Stormwater MS4 runoff (Phase I and II regs) Stormwater Construction activities 1 acre (Phase I regs) Stormwater Industrial activities (Phase I regs) 2

NPDES Penalties for Non-Compliance PENALTY TYPE PROVISION AMOUNT PERIOD PROVISION MA. PRISON Civil Not to exceed $25,000 Per day For each violation -- -- Admin Class I Admin Class II Not to exceed $10,000 -- Per violation $25,000 -- Not to exceed $10,000 Per day Of violation $125,000 -- Criminal Negligence Criminal Knowing Not less than $2,500 - $25,000 Not less than $5,000 - $50,000 Per day Of violation $25,000 1 year Per day Of violation $50,000 3 years Knowing Endanger. Knowing Endanger. Not more than $250,000 -- For first conviction Not more than $500,000 -- After first conviction $250,000 15 years $500,000 30 years Criminal Endanger. By an Organization $1,000,000 -- After first conviction $2,000,000 -- 3

Phase 1 and 2 Basics 4

A City s Storm Drain System Has No Pollution Treatment From pollution source directly to a waterbody. 5

Urban Non-Point Sources: Are Now Regulated as Point Sources 6

NPDES Stormwater Phase I and II A true NPDES permitting program with full penalty provisions as other discharge permits. Addresses urban nonpoint source pollution using point source regulations. Phase I addresses: Cities 100,000 Specific industrial activities Construction 5 acres Phase II addresses cities and counties under 100,000 in Urbanized Areas, ODEQ-designated, Construction 1-5 acres. 7

Overview of Phase II Program All Phase II permittees must comply with ODEQ s general permit for small MS4s (OKR04). Every Phase II permittee must implement a Stormwater Management Program (SWMP). Phase II must eliminate violations of Water Quality Standards due to urban stormwater runoff. Permittees must implement numerous Best Management Practices (BMPs) to control runoff pollution. Each permittee must document all actions in order to demonstrate success. 8

Summary of Phase 2 Permit Requirements 9

OKR04 Penalties for Non-Compliance PENALTY TYPE PROVISION AMOUNT PERIOD PROVISION MA. PRISON Civil Not to exceed $10,000 Per day For each violation -- -- Admin Not to exceed $10,000 Per Day Per violation $125,000 -- Criminal Action Not less than $2,500 Per day Of violation $2 million 30 year Permit Fraud Not more than $20,000 Per day Of violation $20,000 4 years 10

Illicit Discharge Definition FROM EPA REGULATIONS: Part 122.26(b)(2) Illicit discharge means any discharge to a municipal separate storm sewer that is not composed entirely of storm water except discharges pursuant to a NPDES permit (other than the NPDES permit for discharges from the municipal separate storm sewer) and discharges resulting from fire fighting activities. 11

Municipal Separate Storm Sewer System (MS4) According to 40 CFR 122.26(b)(8), municipal separate storm sewer means a conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-made channels, or storm drains): (i) Owned or operated by a State, city, town, borough, county, parish, district, association, or other public body (created by or pursuant to State law)...including special districts under State law such as a sewer district, flood control district or drainage district, or similar entity, or an Indian tribe or an authorized Indian tribal organization, or a designated and approved management agency under section 208 of the Clean Water Act that discharges into waters of the United States. (ii) Designed or used for collecting or conveying storm water; (iii) Which is not a combined sewer; and (iv) Which is not part of a Publicly Owned Treatment Works (POTW) as defined at 40 CFR 122.2. 12

Six Minimum Control Measures 1. Public Education and Outreach 2. Public Participation and Involvement 3. Illicit Discharge Detection and Elimination 4. Construction Site Runoff Control 5. Post-Construction Runoff Control 6. Pollution Prevention and Good Housekeeping 13

SWMP Best Management Practices CONTROL MEASURE ADDRESSED BMP DESCRIPTION PUBLIC EDUCATION PUBLIC PARTICIPATION ILLICIT DISCHARGE CONSTRUCTION POST- CONSTRUCTION GOOD HOUSEKEEPING BROCHURES Water quality impacts from urban stormwater Household chemical disposal options Proper on-site sewage disposal system maint. Chemical storage and disposal at businesses Construction / erosion control BMPs Post-construction / erosion control BMPs City good house-keeping options How to become involved in stormwater program Recycling and re-use benefits Chemical storage and disposal at city facilities TRAINING MODULES Storage and disposal of chemicals Water quality impacts and regulations Data quality and data management How to conduct inspections effectively Stormwater and city activities MS4 MAPPING Regional MS4 system maps Regional GIS databases / set priority areas 14

CONTROL MEASURE ADDRESSED BMP DESCRIPTION PUBLIC EDUCATION PUBLIC PARTICIPATION ILLICIT DISCHARGE CONSTRUCTION POST- CONSTRUCTION GOOD HOUSEKEEPING ADMINISTRATIVE Adopt illicit discharge ordinance Adopt construction ordinance Adopt post-construction ordinance Comply with state and local public notification Program to receive information from the public Site Plan review to include water quality Support regional agency-sponsored seminars Discuss Phase II in city council meetings Collect local and regional pollution data Develop regional stormwater web site COMMUNITY INVOLVEMENT Sponsor local clean-up events Create display board for public meetings Create signs for community education Create signs for city work areas Blue Thumb school presentations Blue Thumb volunteer stream monitoring Blue Thumb stormdrain marking Promote household pollutant collection events Promote use of recycling centers Distribute items with water quality logos INSPECTIONS Complaint investigations for MS4 system Source tracking of pollutants in MS4 system Inspection of construction sites and activities Good housekeeping inspections of city property 15

Public Education and Participation Booths at local festivals and events Stormdrain marking Volunteer stream monitoring Brochures, newsletters Give-away items with logos Adopt a watershed Future TV, Radio, Print? Adopt a stream Household Pollutant Collections Scouts, Camp Fire, etc. Local school clubs & classes 16

Regional Events: Education and Clean-up Semi-Annual Household Pollutant Collection Event Held Twice a Year at Tulsa Fair Grounds 17

Blue Thumb Program (Public Education and Volunteer Monitoring) Dump No Waste Drains to River 18

Illicit Discharge Control Measures You must develop, implement and enforce a program to detect and eliminate illicit discharges Develop a storm sewer system map showing outfalls and streams. Prohibit through ordinance non-stormwater discharges. Implement enforcement procedures. Develop a plan to detect and address non-stormwater discharges. Inform employees and public about improper disposal hazards. EPA recommends developing procedures to: 1. Locate priority areas 2. Trace the source of the illicit discharge 3. Remove the source of the discharge 4. Evaluate and assess the program. 19

Map the City s Storm Drain System Receiving Streams Outfalls Open Channels, Pipes Detention Ponds Watersheds 20

Source-Tracking Inspections Technical resources and skills will be needed for performing inspections. Crew Experience Field Safety Enforcement 21

Construction Related Control Measures Phase 1 addressed 5 acres and greater. Phase 2 addresses 1 to 5 acres (<1 acre can also be designated). What cities must do: Develop ordinances or other regulations for erosion and sedimentation. Require operators to use sediment control BMPs. Require water quality considerations in site plans. Develop procedures for site inspection and enforcement. Develop program to address stormwater runoff from postconstruction activities. 22

City Codes must address construction site runoff and prohibit discharges that impair water quality. City Inspectors must have the authority to control construction site runoff through enforcement of local codes. 23

Dry Weather Field Screen and Construction Site Inspections Visual observations Chemical test kits Interviews Private property entry Lab samples 24

Annual Report to Permitting Authority Status of compliance with permit conditions. Assessment of BMP effectiveness. Progress of achieving the Measurable Goals. Information analyzed and monitoring data. Summary of future planned activities. Proposed changes in SWMP and BMPs. Description / schedule of additional BMPs. Notify PA that another entity is being used to implement part of the SWMP, if any. 25